Loading...
HomeMy WebLinkAboutCONCRETE FIELD TESTS - 21-00488 - Denny's - New Commercial BldgFile Name 22212C04152022MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8B2B9B16-2D71-4216-A25E-9DBCFE018E1E 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 15.0 Ticket #: 07006 Project Name: Rexburg Denny's Test Location: Rexburg Denny’s foundation walls Client: EcoCon Admixtures: MSAC 534, P 997 Required 28 day Strength (psi): 3,000.0 Contractor: KC Concrete Supplier: Walters ready mix Mix Number: 1710 Date: 04/15/2022 Start Time 01:00 PM End Time 03:30 PM Testing: Set #:Time Tested: Ticket #:Test Location: Ambient Temp. (°F): Unit Weight (PCF): Entrained Air (%): Entrained Air Spec. (%): Concrete Temp. (°F): Slump (in): Slump Spec. (in): 1 02:15 PM 07006 Rexburg Denny’s foundation walls 47 143.13 1.20 2 63 6.25 6 max Observations/Remarks: I arrived at 1:20 pm, and inspected the rebar and forms. I was able to get my work station setup while the pump truck was setting up. The trucks began to arrive around 2:00 pm and I was able to get my sample and begin my testing. The results were received and reported, the air was low but they decided to continue. I cleaned up and observed the remainder of the pour. The crew utilized knocking on the forms for consolidation as they went. I returned to my truck and finished my report. I left the job site at 3:00 pm. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: File Name 22212C04152022MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8B2B9B16-2D71-4216-A25E-9DBCFE018E1E 2 Date: 04/16/2022 Inspection Images File Name: 22212FB04202022CJH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51824609-16B3-40D7-BA36-B8A136AB32AF 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 8.0 Project Name: Rexburg Denny's Test Location: Western continuous footing Client: EcoCon Admixtures: NC, P997, MS AC 534 Ticket Number: 6979 Contractor: J&M Concrete Supplier: Walter's Mix Number: 1700 Pour Date: 4/13/2022 Cylinder Log #: 115 Field Test Results: Set #: 1 Slump (inches): 5.0 Slump Maximum (in): Entrained Air (%): 1.50 Entrained Air Spec. (%): 2.00 Concrete Temperature (°F): 65 Ambient Temperature (°F): 33 Unit Weight (PCF): 143.13 Tested By: C. Carlson Date: 4/13/2022 Time Tested: 2:30 PM Picked Up By: Mark Mansfield Date: 4/14/2022 Time: 1:00 PM Max, Min Temperature 55,70 Initial Break Results: Cylinder #: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Break Type: Required 28 day Strength (psi): A 7 4/20/2022 12.56 40,335.0 3211.39 Type 5 3,000.0 Date: 04/20/2022 Reviewed By: E. Vail Signature: File Name: 22212FB04222022EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 057AE1B1-9D78-489E-BF48-62FB6EE78869 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 15.0 Project Name: Rexburg Denny's Test Location: Rexburg Dennys foundation walls Client: EcoCon Admixtures: MSAC 534, P 997 Ticket Number: 7006 Contractor: KC Concrete Supplier: Walters ready mix Mix Number: 1710 Pour Date: 4/15/2022 Cylinder Log #: 121 Field Test Results: Set #: 1 Slump (inches): 6.2 Slump Maximum (in): Entrained Air (%): 1.20 Entrained Air Spec. (%): 2.00 Concrete Temperature (°F): 63 Ambient Temperature (°F): 47 Unit Weight (PCF): 143.13 Tested By: M. Mansfield Date: 4/15/2022 Time Tested: 2:15 PM Picked Up By: E. Vail Date: 4/18/2022 Time: 10:30 AM Max, Min Temperature 84, 61 Initial Break Results: Cylinder #: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Break Type: Required 28 day Strength (psi): A 7 4/22/2022 12.56 46,495.0 3701.83 Type 2 3,000.0 Date: 04/25/2022 Reviewed By: E. Vail Signature: File name: 22212SB05112022LC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DF5EF5C7-A38E-4E75-B396-90B376F6FB60 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 8.0 Project Name: Rexburg Denny's Test Location: Western continuous footing Client: EcoCon Admixtures: NC, P997, MS AC 534 Ticket Number: 6979 Contractor: J&M Concrete Supplier: Walter's Mix Number: 1700 Date: 4/13/2022 Cylinder Log #: 115 Field Test Results: Set #: 1 Slump (inches): 5.0 Slump Maximum (in): Entrained Air (%): 1.50 Entrained Air Spec. (%): 2.00 Concrete Temperature (°F): 65 Ambient Temperature (°F): 33 Unit Weight (PCF): 143.13 Tested By: C. Carlson Date: 4/13/2022 Picked Up By: Mark Mansfield Date: 4/14/2022 Time: 1:00 PM Max, Min Temperature 55,70 Previous Test Results: Cylinder ID: Break Age:Break Date: Area (in^2:Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 4/20/2022 12.56 40335 3211.39 3,000.00 Type 5 File name: 22212SB05112022LC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DF5EF5C7-A38E-4E75-B396-90B376F6FB60 2 Current Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: B 28 5/11/2022 4.00 12.6 54,600.0 4333.3 3,000.0 Type 5 C 28 5/11/2022 4.00 12.6 55,870.0 4434.1 3,000.0 Type 3 D 28 5/11/2022 4.00 12.6 54,160.0 4298.4 3,000.0 Type 5 Second Break Average: 4355 Date: 05/11/2022 Reviewed By: E. Vail Signature: File name: 22212SB05132022LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. A7F4BE43-26ED-4970-B8D1-F4D2F7C68A8F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 15.0 Project Name: Rexburg Denny's Test Location: Rexburg Dennys foundation walls Client: EcoCon Admixtures: MSAC 534, P 997 Ticket Number: 7006 Contractor: KC Concrete Supplier: Walters ready mix Mix Number: 1710 Date: 4/15/2022 Cylinder Log #: 121 Field Test Results: Set #: 1 Slump (inches): 6.2 Slump Maximum (in): Entrained Air (%): 1.20 Entrained Air Spec. (%): 2.00 Concrete Temperature (°F): 63 Ambient Temperature (°F): 47 Unit Weight (PCF): 143.13 Tested By: M. Mansfield Date: 4/15/2022 Picked Up By: E. Vail Date: 4/18/2022 Time: 10:30 AM Max, Min Temperature 84, 61 Previous Test Results: Cylinder ID: Break Age:Break Date: Area (in^2:Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 4/22/2022 12.56 46495 3701.83 3,000.00 Type 2 File name: 22212SB05132022LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. A7F4BE43-26ED-4970-B8D1-F4D2F7C68A8F 2 Current Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: B 28 5/13/2022 4.00 12.6 59,155.0 4694.8 3,000.0 Type 2 C 28 5/13/2022 4.00 12.6 63,850.0 5067.5 3,000.0 Type 1 D 28 5/13/2022 4.00 12.6 59,925.0 4756.0 3,000.0 Type 6 Second Break Average: 4839 Date: 05/16/2022 Reviewed By: E. Vail Signature: File Name 22212C06152022COP PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AEB7039C-EF2C-48A5-8AAD-FD7AF7212419 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 11.0 Ticket #: 08797 Project Name: Rexburg Denny's Test Location: Interior slab of building Client: EcoCon Admixtures: MS AC 534, MP 322 Required 28 day Strength (psi): 4,000.0 Contractor: K&C Concrete Supplier: Walters Ready Mix, Inc. Mix Number: 142I Date: 06/15/2022 Start Time 04:45 AM End Time 08:15 AM Testing: Set #:Time Tested: Ticket #:Test Location: Ambient Temp. (°F): Unit Weight (PCF): Entrained Air (%): Entrained Air Spec. (%): Concrete Temp. (°F): Slump (in): Slump Spec. (in): 1 05:50 AM 08797 Interior slab of building 39 144.3 1.7 2 64 6 max 2 06:45 AM 08803 Interior slab of building 41 145.3 1.4 2 57 6 max Observations/Remarks: I arrived on site and prepared my gear. I noted a pump truck was to be used to place the concrete. At approximately 5:30 am, the first truck arrived. After approximately two cubic yards had been poured, I sampled from the truck and began my tests. I found these tests to be within the given specifications. I then sampled from the fifth truck, and performed the required tests. I found the tests to be within the given specifications, except for the slump test. The specification for slump was 6 in and I tested 6 3/4 in. I informed the contractor of my results. After performing my tests, I observed the remainder of the pour. I then returned to the lab. Tested By: C. Price Signature: Reviewed By: Luke Hammar Signature: File Name 22212C06152022COP PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AEB7039C-EF2C-48A5-8AAD-FD7AF7212419 2 Date: 06/15/2022 Inspection Images File Name 22212C06152022COP PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AEB7039C-EF2C-48A5-8AAD-FD7AF7212419 3 File Name: 22212FB06132022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AF6B181-24C3-4DC6-9630-D0840F9275E3 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 11 Project Name: Rexburg Denny's Test Location: Interior slab of building Client: EcoCon Admixtures: MS AC 534, MP 322 Ticket Number: 8797 Contractor: KC Concrete Supplier: Walters Ready Mix, Inc. Mix Number: 142I Pour Date: 6/15/2022 Cylinder Log #: 271 Field Test Results: Set #: 1 Slump Maximum (in): Entrained Air (%): 1.7 Entrained Air Spec. (%): 2.0 Concrete Temperature (°F): 64 Ambient Temperature (°F): 39 Unit Weight (PCF): 144.3 Tested By: C. Price Date: 6/15/2022 Time Tested: 271 Picked Up By: K. Drake Date: 6/15/2022 Time: 12:00 PM Max, Min Temperature 55,70 Initial Break Results: Cylinder #: Break Age: Break Date: Area (in^2):Maximum Load (lbs): Compressive Strength (psi): Break Type: Required 28 day Strength (psi): A 7 6/22/2022 12.56 5344 Type 4 Date: 06/22/2022 Reviewed By: Luke Hammar Signature: File Name: 22212FB06132022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6ECB3ED2-04E1-4C3E-842E-A28652EFFBF9 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 55 Project Name: Rexburg Denny's Test Location: Interior slab of building Client: EcoCon Admixtures: MS AC 534, MP 322 Ticket Number: 8803 Contractor: KC Concrete Supplier: Walters Ready Mix, Inc. Mix Number: 142I Pour Date: 6/15/2022 Cylinder Log #: 272 Field Test Results: Set #: 2 Slump Maximum (in): Entrained Air (%): 1.4 Entrained Air Spec. (%): 2.0 Concrete Temperature (°F): 57 Ambient Temperature (°F): 41 Unit Weight (PCF): 145.3 Tested By: C. Price Date: 6/15/2022 Time Tested: 272 Picked Up By: K. Drake Date: 6/15/2022 Time: 12:04 PM Max, Min Temperature 55,70 Initial Break Results: Cylinder #: Break Age: Break Date: Area (in^2):Maximum Load (lbs): Compressive Strength (psi): Break Type: Required 28 day Strength (psi): A 7 6/22/2022 12.56 4781 Type 3 Date: 06/22/2022 Reviewed By: Luke Hammar Signature: File name: 22212SB06152022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AE3EF741-3AB7-4BF1-A030-C1874B8CA3D6 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 55 Project Name: Rexburg Denny's Test Location: Interior slab of building Client: EcoCon Admixtures: MS AC 534, MP 322 Ticket Number: 8803 Contractor: KC Concrete Supplier: Walters Ready Mix, Inc. Mix Number: 142I Date: 6/15/2022 Cylinder Log #: 272 Field Test Results: Set #: 2 Slump Maximum (in): Entrained Air (%): 1.4 Entrained Air Spec. (%): 2.0 Concrete Temperature (°F): 57 Ambient Temperature (°F): 41 Unit Weight (PCF): 145.3 Tested By: C. Price Date: 6/15/2022 Picked Up By: K. Drake Date: 6/15/2022 Time: 12:04 PM Max, Min Temperature 55,70 Previous Test Results: Cylinder ID:Break Age:Break Date:Area (in^2):Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 6/22/2022 12.56 60055 4781 4,000.00 272 File name: 22212SB06152022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AE3EF741-3AB7-4BF1-A030-C1874B8CA3D6 2 Current Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: B 28 7/13/2022 4.000 12.56 72,900.0 5804 4,000.0 Type 2 C 28 7/13/2022 4.000 12.56 72,040.0 5736 4,000.0 Type 1 D 28 7/13/2022 4.000 12.56 74,200.0 5908 4,000.0 Type 1 Second Break Average: 5816 Date: 07/14/2022 Reviewed By: Luke Hammar Signature: File name: 22212SB06152022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3330DB78-E757-4CBE-AFC0-B6AB4D05C2A6 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 11 Project Name: Rexburg Denny's Test Location: Interior slab of building Client: EcoCon Admixtures: MS AC 534, MP 322 Ticket Number: 8797 Contractor: KC Concrete Supplier: Walters Ready Mix, Inc. Mix Number: 142I Date: 6/15/2022 Cylinder Log #: 271 Field Test Results: Set #: 1 Slump Maximum (in): Entrained Air (%): 1.7 Entrained Air Spec. (%): 2.0 Concrete Temperature (°F): 64 Ambient Temperature (°F): 39 Unit Weight (PCF): 144.3 Tested By: C. Price Date: 6/15/2022 Picked Up By: K. Drake Date: 6/15/2022 Time: 12:00 PM Max, Min Temperature 55,70 Previous Test Results: Cylinder ID:Break Age:Break Date:Area (in^2):Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 6/22/2022 12.56 67125 5344 4,000.00 271 File name: 22212SB06152022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3330DB78-E757-4CBE-AFC0-B6AB4D05C2A6 2 Current Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: B 28 7/13/2022 4.000 12.56 82,445.0 6564 4,000.0 Type 2 C 28 7/13/2022 4.000 12.56 80,720.0 6427 4,000.0 Type 3 D 28 7/13/2022 4.000 12.56 81,660.0 6502 4,000.0 Type 2 Second Break Average: 6498 Date: 07/14/2022 Reviewed By: Luke Hammar Signature: File Name 22212C04132022CRC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7ca1bb41ba298523-1649879948832 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 22-212 Cumulative Test Load Amount: 8.0 Ticket #: 06979 Project Name: Rexburg Denny's Test Location: Western continuous footing Client: EcoCon Admixtures: NC, P997, MS AC 534 Required 28 day Strength (psi): 3,000.0 Contractor: J&M Concrete Supplier: Walter's Mix Number: 1700 Date: 04/13/2022 Start Time 01:00 PM End Time 04:15 PM Testing: Set #:Time Tested: Ticket #:Test Location: Ambient Temp. (°F): Unit Weight (PCF): Entrained Air (%): Entrained Air Spec. (%): Concrete Temp. (°F): Slump (in): Slump Spec. (in): 1 02:30 PM 06979 Western continuous footing 33 143.13 1.50 2 65 5.00 6 max Observations/Remarks: The rebar was inspected, and photos placed into this report. A Walter's Concrete truck arrived a half hour later than scheduled. The concrete was placed via pump truck (Brundage Bone). After approximately 10% of the truckload was offloaded, a sample was collected and tested for temperature, unit weight, air, and slump. Compressive strength cylinder specimens were casted and stored in a thermal container for initial set. Results were reported to K&C Concrete, as well as Walter's mixer driver. Two trucks total (16 Yds) were placed. The entire pour consisted of the continuous footing around the perimeter of the building. Tested By: C. Carlson Signature: Reviewed By: E. Vail Signature: File Name 22212C04132022CRC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7ca1bb41ba298523-1649879948832 2 Date: 04/13/2022 Inspection Images