HomeMy WebLinkAboutREDLINED INFRASTRUCTURE PLANS - 22-00630 - Bodifi - AdditionAuthor Name Author Email Author Phone No.:
Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Joel Gray Joel.Gray@rexburg.org 208-372-2331
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Description : Bodifi - Addition
Address : 730 W 7th S
Application Type :
Document Filename : INFRASTRUCTURE PLAN 8.25.22 - 22-00630 - Bodifi - Addition.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
893-SD1.2-SPL
SD1.2 (1)
Callout Kyle Baldwin : P&Z Open 4 Sidewalk must be constructed in Right-of-Way according to
City Engineering standards
893-SD1.2-SPL
SD1.2 (1)
Callout Kyle Baldwin : P&Z Open 4 Sidewalks shall be provided along the full length of the
building along any facade featuring a customer entrance, and
along any facade abutting public parking areas.
See section 6.00.090
893-SD1.2-SPL
SD1.2 (1)
Free text Kyle Baldwin : P&Z Open 4 Sidewalk connectivity must be provided from sidewalks in
ROW to customer entrance
See section 6.00.090
893-SD1.2-SPL
SD1.2 (1)
Callout Kyle Baldwin : P&Z Open 4 Sight triangle requirements apply at all ingress/egress
locations
893-SD1.2-SPL
SD1.2 (1)
Free text Kyle Baldwin : P&Z Open 4 Please submit Landscape plan to determine lot coverage
requirements, sight triangle requirements and screening
requirements etc.
G1.1 Free text Joel Gray : PW Open 1 Infrastructure approved with parking lot permit
# 22-00630
Commercial - Addition
Please digitally re-submit all pages of the plan set in response to requested revisions
for our next review cycle, with noted items resolved.
Report Date: 09.19.2022
Approval of plans does not constitute approval of variance from code
Page 1 of 1
Powered by TCPDF (www.tcpdf.org)
I
n
f
r
a
s
t
r
u
c
t
u
r
e
a
p
p
r
o
v
e
d
w
i
t
h
p
a
r
k
i
n
g
l
o
t
p
e
r
m
i
t
Please submit Landscape plan to determine lot
coverage requirements, sight triangle
requirements and screening requirements etc.
Sidewalk must be constructed in
Right-of-Way according to City
Engineering standards
Sidewalks shall be provided along
the full length of the building along
any facade featuring a customer
entrance, and along any facade
abutting public parking areas.
See section 6.00.090
Sidewalk connectivity must be
provided from sidewalks in ROW
to customer entrance
See section 6.00.090
Sight triangle requirements apply at
all ingress/egress locations