Loading...
HomeMy WebLinkAboutREDLINED INFRASTRUCTURE PLANS - 22-00630 - Bodifi - AdditionAuthor Name Author Email Author Phone No.: Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167 Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Description : Bodifi - Addition Address : 730 W 7th S Application Type : Document Filename : INFRASTRUCTURE PLAN 8.25.22 - 22-00630 - Bodifi - Addition.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalk must be constructed in Right-of-Way according to City Engineering standards 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalks shall be provided along the full length of the building along any facade featuring a customer entrance, and along any facade abutting public parking areas. See section 6.00.090 893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Sidewalk connectivity must be provided from sidewalks in ROW to customer entrance See section 6.00.090 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sight triangle requirements apply at all ingress/egress locations 893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Please submit Landscape plan to determine lot coverage requirements, sight triangle requirements and screening requirements etc. G1.1 Free text Joel Gray : PW Open 1 Infrastructure approved with parking lot permit # 22-00630 Commercial - Addition Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 09.19.2022 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) I n f r a s t r u c t u r e a p p r o v e d w i t h p a r k i n g l o t p e r m i t Please submit Landscape plan to determine lot coverage requirements, sight triangle requirements and screening requirements etc. Sidewalk must be constructed in Right-of-Way according to City Engineering standards Sidewalks shall be provided along the full length of the building along any facade featuring a customer entrance, and along any facade abutting public parking areas. See section 6.00.090 Sidewalk connectivity must be provided from sidewalks in ROW to customer entrance See section 6.00.090 Sight triangle requirements apply at all ingress/egress locations