Loading...
HomeMy WebLinkAboutJRW RESPONSE - 22-00630 - Bodifi - AdditionJRW response for Bodify G1.1 Free text Cody Jones : Building Open 1 Need Envelope COMM check or prescriptive insulation formed signed. See attached As per Energy code Table C402.1.3 slab will need to be insulated underneath.(need detail) See sheet A3.1 Landings at doors and cross slope of sidewalks not to exceed 2%. Panic hardware to be installed as per section 1010.1.10. Acknowledged Recreational facilities to comply with IBC section 1110. (1110.4.10 exercise machines) Acknowledged Risk category II? (as per section 1604) Acknowledged Special Inspector needs to be identified. (welding, bolt ups) See Iron man Sub list Glass and Glazing to meet requirements of Chapter 24. Acknowledged Amount of plumbing fixtures in existing build meet requirements of Chapter 29 due to occupant increase? Fixture count Ok see Calc On G1.1 Exit lighting and Exit signs to comply with Sections 1008 and 1013. Acknowledged G1.1 Free text Alex Owens : Electrical Open 1 All electrical work to comply with 2017 NEC Acknowledged E0.0 Callout Alex Owens : Electrical Open 324 All electrical work to comply with 2017 NEC requirements Acknowledged 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalk must be constructed in Right-of- Way according to City Engineering standards Site walk is to be installed under previously approved parking lot permit have been updated on this set. 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalks shall be provided along the full length of the building along any facade featuring a customer entrance, and along any facade abutting public parking areas. See section 6.00.090 See sheet SD1.2 893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Sidewalk connectivity must be provided from sidewalks in ROW to customer entrance See section 6.00.090 Connectivity has been established to the south on original project 893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sight triangle requirements apply at all ingress/egress locations Site triangle approved on parking permit review 893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Please submit Landscape plan to determine lot coverage requirements, sight triangle requirements and screening requirements etc. See Attached G1.1 Free text Joel Gray : PW Open 1 Infrastructure approved with parking lot permit Acknowledged