HomeMy WebLinkAboutJRW RESPONSE - 22-00630 - Bodifi - AdditionJRW response for Bodify
G1.1 Free text Cody Jones : Building Open 1 Need Envelope COMM check or prescriptive insulation
formed signed. See attached
As per Energy code Table C402.1.3 slab will need to be insulated underneath.(need detail) See sheet
A3.1
Landings at doors and cross slope of sidewalks not to exceed 2%. Panic hardware to be installed as per
section 1010.1.10. Acknowledged
Recreational facilities to comply with IBC section 1110. (1110.4.10 exercise machines) Acknowledged
Risk category II? (as per section 1604) Acknowledged
Special Inspector needs to be identified. (welding, bolt ups) See Iron man Sub list
Glass and Glazing to meet requirements of Chapter 24. Acknowledged
Amount of plumbing fixtures in existing build meet requirements of Chapter 29 due to occupant
increase? Fixture count Ok see Calc On G1.1
Exit lighting and Exit signs to comply with Sections 1008 and 1013. Acknowledged
G1.1 Free text Alex Owens : Electrical Open 1 All electrical work to comply with 2017 NEC Acknowledged
E0.0 Callout Alex Owens : Electrical Open 324 All electrical work to comply with 2017 NEC requirements
Acknowledged
893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalk must be constructed in Right-of-
Way according to City Engineering standards Site walk is to be installed under previously approved
parking lot permit have been updated on this set.
893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sidewalks shall be provided along the full
length of the building along any facade featuring a customer entrance, and along any facade abutting
public parking areas. See section 6.00.090 See sheet SD1.2
893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Sidewalk connectivity must be provided
from sidewalks in ROW to customer entrance See section 6.00.090 Connectivity has been established to
the south on original project
893-SD1.2-SPL SD1.2 (1) Callout Kyle Baldwin : P&Z Open 4 Sight triangle requirements apply at all
ingress/egress locations Site triangle approved on parking permit review
893-SD1.2-SPL SD1.2 (1) Free text Kyle Baldwin : P&Z Open 4 Please submit Landscape plan to determine
lot coverage requirements, sight triangle requirements and screening requirements etc. See Attached
G1.1 Free text Joel Gray : PW Open 1 Infrastructure approved with parking lot permit Acknowledged