Loading...
HomeMy WebLinkAboutTEMP CO - 22-00630 - Bodifi - AdditionTemporary Certificate of Occupancy City of Rexburg Department of Community Development 35 N. 1st E. / Rexburg, ID. 83440 Phone (208) 359-3020 / Fax (208) 359-3022 Building Permit Number Site Address 22-00630 730 W 7th S Description of Building or Portion of Building covered by Certificate Bodifi - Addition Ammon commercial Plaza, LLC BDA Bodifi Brian Ball 547 Partridge Lane, Id 83440 Name and Address of Owner Store Master Funding XIII LLC 547 Partridge Ln, ID 83440 Name and Address of Owner Contractor Iron Man Enterprises LLC Applicable Edition of Code IBC 2018 Construction Type IIB A-3 Assembly - General Community halls Libraries Museums Sq Ft N/A Use and Occupancy (sq. ft.) Design Occupant Load N/A Sprinkler System Required?Yes Sprinkler System Provided?Yes This is a Temporary Certificate of Occupancy. A Full Certificate of Occupancy will be issued upon completion of the following items by 06/01/2023: - Landscape must be completed -rooftop unit needs installed and wired. Ensure a gfci protected service receptacle with an in-use cover is installed within 25 feet of new unit on rooftop. Will verify cover is installed on future drinking fountain receptacle at this time. - Landings and grade need to be completed when weather permits. Owner responsible for maintaining landings at doors until then. Currently landings have snow removed and carpet has been put down and grade is level. This Certificate, issued pursuant to the requirements of Section 111 of the International Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date Temp C.O. Issued Building Official:Public Works: There shall be no further change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewed and approved said future changes. 02/14/2023