Loading...
HomeMy WebLinkAboutADDENDUM 1 - 23-00037 - Rexburg Pediatrics - Remodel December 14, 2022 Re; Mountain View Hospital Rexburg Clinic Remodel 404 North, 2nd East, Rexburg, Idaho Addendum Number 1 This addendum modifies the original documents and previous addendums. 1. All new separation walls to be 6” metal studs @ 16” o.c. with acoustic insulation per Framing Note 3. GWB to extend 10’ (minimum) above finish floor. Wall framing to be tied to existing roof structure with angled metal stud kickers @ 4’o.c. or attach wall to underside of concrete tee structure. Bottom of tee at approximately 12’-6”, bottom or concrete deck at approximately 13’-9”.Contractor to verify existing stud type and size at areas of patch or tie-in for smooth transition. 2. New and existing suspended ceiling height is approximately 8’-10”. Existing tile appears to be 2’x4’ USG Radar with square edge. Contractor to verify manufacture and model. 3. Hollow metal doors to be painted to match existing, Prefinished Timely frames to match existing. Doors & frames may be relocated if in acceptable condition. Door Elevations were not shown on original sheet A2.1, Updated sheet A2.1 attached. 4. All toilet accessories to be provided by contractor. 5. Contractor to include a $2,500 allowance for material and labor of cushioned rubber flooring in Pay Room 107. 6. Cabinetry to match existing. See photo below. 7. Picture (below) of existing flooring for reference. 8. Door hardware to match existing. Existing locksets are CAL-ROYAL F. 9. Not all notes on A1.0 apply to project as they standard notes. End of Addendum Number 1 Thank You Ted Booth, Architect, AIA Booth Architecture PLLC