HomeMy WebLinkAboutADDENDUM 1 - 23-00037 - Rexburg Pediatrics - Remodel
December 14, 2022
Re; Mountain View Hospital
Rexburg Clinic Remodel
404 North, 2nd East, Rexburg, Idaho
Addendum Number 1
This addendum modifies the original documents and previous addendums.
1. All new separation walls to be 6” metal studs @ 16” o.c. with acoustic insulation per
Framing Note 3. GWB to extend 10’ (minimum) above finish floor. Wall framing to be tied
to existing roof structure with angled metal stud kickers @ 4’o.c. or attach wall to
underside of concrete tee structure. Bottom of tee at approximately 12’-6”, bottom or
concrete deck at approximately 13’-9”.Contractor to verify existing stud type and size at
areas of patch or tie-in for smooth transition.
2. New and existing suspended ceiling height is approximately 8’-10”. Existing tile appears
to be 2’x4’ USG Radar with square edge. Contractor to verify manufacture and model.
3. Hollow metal doors to be painted to match existing, Prefinished Timely frames to match
existing. Doors & frames may be relocated if in acceptable condition. Door Elevations
were not shown on original sheet A2.1, Updated sheet A2.1 attached.
4. All toilet accessories to be provided by contractor.
5. Contractor to include a $2,500 allowance for material and labor of cushioned rubber
flooring in Pay Room 107.
6. Cabinetry to match existing. See photo below.
7. Picture (below) of existing flooring for reference.
8. Door hardware to match existing. Existing locksets are CAL-ROYAL F.
9. Not all notes on A1.0 apply to project as they standard notes.
End of Addendum Number 1
Thank You
Ted Booth, Architect, AIA
Booth Architecture PLLC