HomeMy WebLinkAboutEXCAVATION PERMIT - 23-00031 - 1480 N 2nd E - SERVE FIBER INTERET TO THE MOBILE SOURCE-9 3 - 00D31
Excavation Permit Application
Public Works
35 North Ist East kelthd@rexburg.org Phone: 208.359.3020 x2320
Rexburg, ID 83440 www.rexburg.org Fax., 208.359.3022
Applicant/Contractor: MILLENIUM NETWORKS, LLC DBA SILVER STAR COMMUNICATIONS
Mailing Address: 503 S WOODRUFF AVE
Primary Phone ( []Home E]Work ❑CeH) 307-683-6676
CITY 0
[
REXBURG
CW
Date: 10/2012022
City: IDAHO FALLS State: ID Zip: 83401
Email:
HDJENSEN@S ILVERSTAR.NET
Excavation Address: 1480 N 2ND E Description: 3" BORE UNDER ROAD TO PULL FIBER OPTIC
Location of Excavation: IN Street ❑ Alley ❑ Sidewalk ❑ Undeveloped/Landscape Area
Purpose of Excavation: SERVE FIBER INTERNET TO THE MOBILE SOURCE Exe. Date: APPROX 1111/2022
Refund Recipient Name (if different from above):
Phone #:
Refund Recipient Address: City: State: Zip:
CONDITIONS OF PERMIT:
1. No excavation within city right of way limits shall take place prior to the issuance of an excavation permit.
2. Property owners must be made aware of work happening adjacent to their parcels. Aa "Acceptance of Surface Repairs" form must be
signed by the property owner(s) prior to the excavation work being signed off by the City. (See Attachment A)
3. This permit expires 30 days after the issue date. Any work started and not completed within 30 days will be assessed a $100 weekly
inspection fee until work finalized.
4. The contractor is responsible for carrying a minimum of $500,000 general liability insurance coverage for possible damages during
excavation or other accidents. A certificate of liability is required and must be submitted via email at customerservicesRrexburg.or¢.
5. The public right of way fee is $1,200 for any work that will disturb less than 30 square yards of asphalt surfacing. A $200 portion of this
fee will be retained by the city for initial inspection costs.
6. Excavation work which disturbs more than 30 square yards of asphalt surfacing must be individually assessed by the city for additional
fees.
7. All utilities must be placed a minimum of 4 feet below the finished grade unless specifically authorized otherwise in writing.
8. The contractor is responsible for contacting the city prior to placing backfill material and/or asphalt in city street locations. A city
representative will then assess and, if acceptable, the excavation fee less inspection costs will be refunded within 30 calendar days of
completion.
9. If permit conditions are not met the city will hold fees for 1 year from food asphalt placement. If repairs are required, the contractor will
be responsible for completing all repairs. If repairs are not made within 7 days, the city will complete repairs. The permit fee will be
retained and any additional costs will be the responsibility of the permit holder.
10. The contractor must notify Dig Line at 1-800-342-1585 at least two (2) business days in advance of the excavation date.
11. The contractor is responsible for furnishing and maintaining all barricades, signs, and flagmen m required by the Manual on Uniform
Traffic Control Devices (MUTCD).
12. Existing asphalt pavement shall be saw cut prior to placement of asphalt to provide a vertical surface.
13. Excavation and backfill work is to be completed in accordance with the requirements of Sections 300 and 800 of the Idaho Standards for
Public Works Construction (ISPWC). (See Attachment B.)
14. All excavated material, if acceptable for re -use shall be stockpiled or if not acceptable be immediately removed from the site. Excavated
material needs to be kept a safe distance from trenches or traveled roadways.
15. All street excavations must be backfilled with 3 feet of flowable fill, 4 inches of % inch crushed aggregate road base, and 2 V2 inches
minimum thickness of plant mix pavement surface or equal to the existing material thickness, whichever is greater. No exceptions unless
pre -approved by city public works director.
16. Existing asphalt pavement shall be `tacked' prior to new asphalt placement.
17. Final repair of asphalt surfaces must be completed within 10 calendar days of the initial excavation.
18. No excavation permits will be approved from November ld—March 310 except in the case of an emergency which must be approved by
the city public works director. Winter excavation requires a temporary cold mix paving to be placed and maintained by the contractor
until the final paving is completed no later than May 1d.
In completing this application for an excavation permit, I hereby agree to all the above conditions as well as all applicable City of
Rexburg ordinances. I
Alm& U&"t'm 10/20/2022 ; �Gu t r f BL"v
APP licantSi a Date ee
*Applicant will be notified ofpermit application approval and requestfor a deposit to be submitted before exc on can
Revised 12/2/2021
N
4•�.Yi
w
Vi
'�
• IyO
i.
•
•1 H
sum
r
V
O
g�
u°
0
�:` YeT M'+Wk rtMo�.!'IB'vyMl srw<-^�•
t d-. �
-var :e P..
– E
of
°
Ci
...Xsw,. >,—_ .......+..r.:_
--__
-
�. s.s ..ter✓.✓.N .w. �
°
m
-
OI
N
�I
d
>
x v
�
a
O
o
N
A
CN
G
�-
m
W
c
m
O
a
O�
"0
r
0
C
0
—
o
0
m
°
r -
O
N
Z
s
0
N
(cD
Q
C
i
O
o
00
Lf)o
Z
m
p
"O
N
r
O
x
x
O
O
2)�2G1
N
e
r
m m
o -°
x x
x o
\
m
N
N o y
�'
U
Ili
L H
U
d
p
Z
C'
c t�i>
of
Y s
ON
Z a
y
Vj
UO o 2 0
W
1
---sauei