HomeMy WebLinkAboutPLANS 4/20/2021 - 21-00120 - 1073 Widdison Ln - Solar Panels·
·
·
·
·
·
·
·
·
TRUE
NORTH
·
·
·
·
·
·
·
·
·
CAUTION:
BOTH TOP AND LOWER SOCKET JAWS MAY BE ENERGIZED
BY SOURCE AND CUSTOMER SOLAR PV SYSTEM
AC
DISCONNECT
(IF USED)
TO ARRAY
INVERTERPV PRODUCTION
METER (IF
USED)
MAIN SERVICE
PANEL
SUB-PANEL
(IF USED)
(IF NO
SUB-PANEL)
CABLE TRAY (IF USED)
TRUE
NORTH
PERMITTING SECTION
BUILDING COST (CONSTRUCTION COST X 0.2)=$3,990
ELECTRICAL COST (CONSTRUCTION COST X 0.8)=$15,962
CONSTRUCTION COST (SYSTEM SIZE X 1.45)=$19,952
UTILITY SERVICE SIZE (IN AMPS)=200A
TOTALS AMPS ADDED TO UTILTY=
47.5A (IF MULITIPLE
INVERTERS MULTIPLY THIS BY
HOW MANY INVERTERS ARE
BEING USED)
ROOF SQ FOOTAGE =1850
PANEL SQ FOOTAGE =781