Loading...
HomeMy WebLinkAboutPLANS 3/25/21 - 21-00120 -1073 Widdison Ln - Solar Panels· · · · · · · · · TRUE NORTH · · · · · · · · · CAUTION: BOTH TOP AND LOWER SOCKET JAWS MAY BE ENERGIZED BY SOURCE AND CUSTOMER SOLAR PV SYSTEM AC DISCONNECT (IF USED) TO ARRAY INVERTERPV PRODUCTION METER (IF USED) MAIN SERVICE PANEL SUB-PANEL (IF USED) (IF NO SUB-PANEL) CABLE TRAY (IF USED) TRUE NORTH PERMITTING SECTION BUILDING COST (CONSTRUCTION COST X 0.2)=$3,990 ELECTRICAL COST (CONSTRUCTION COST X 0.8)=$15,962 CONSTRUCTION COST (SYSTEM SIZE X 1.45)=$19,952 UTILITY SERVICE SIZE (IN AMPS)=200A TOTALS AMPS ADDED TO UTILTY= 47.5A (IF MULITIPLE INVERTERS MULTIPLY THIS BY HOW MANY INVERTERS ARE BEING USED) ROOF SQ FOOTAGE =1850 PANEL SQ FOOTAGE =781