Loading...
HomeMy WebLinkAboutPLANS - 23-00012 - BYUI Taylor Chapel - ADA RampVICINITY MAP DRAWING INDEX SITE MAP SCALE: A1 DETAIL XXX 2 XX X XX.XX ROOM NUM NAME SYMBOLS LEGEND ROOM IDENTIFICATION NUMBER DOOR NUMBER REFERENCE NOTE GLAZING TYPE PARTITON WALL TYPE INTERIOR ELEVATION WALL SECTION EXTERIOR ELEVATION DETAIL REVISION DELTA ROOM NUMBER ELEVATION NUMBER SHEET NUMBER ELEVATION NUMBER SHEET NUMBER SECTION NUMBER SHEET NUMBER SECTION NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER REVISION NUMBER BUILDING SECTION DETAIL TITLE ROOM NAME SHADE INDICATES ELEVATED WALLA1 A2A4 A3 AFF CMU EIFS ABOVE FINISH FLOOR CONCRETE MASONRY UNIT EXTERIOR INSULATED FINISH EQ EQUAL MAX MAXIMUM MIN MINIMUM NIC NOT IN CONTRACT O.C. ON CENTER SPEC SPECIFICATION SIM SIMILAR TYP TYPICAL T.O. TOP OF B.O. BOTTOM OF ABBREVIATIONS MATERIAL LEGEND CONCRETE STUD WALL GRAVEL COMPACTED FILL AND/OR EARTH BATT INSULATION RIGID INSULATION CMU (CONCRETE MASONRY UNIT) GYPSUM BOARD OR CONCRETE SURFACE PROJECT NUMBER: PROJECT ARCHITECT www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com TAYLOR CHAPEL ADA RAMP Permit Set 1-03-23 TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e 22075 FFKR ARCHITECTS 730 WEST PACIFIC AVE SALT LAKE CITY, UT 84104 (801) 517-4300 TBSE INC. 233 N 1250 WEST #201 CENTERVILLE, UT 84014 (801) 298-8795 STRUCTURAL ENGINEER PROJECT TEAM SHEET NO. SHEET NAME G100 Cover ARCHITECTURAL AD100 DEMOLITION PLAN AE100 CHAPEL PLAN AE201 CHAPEL 3D VIEWS AE410 EXISTING MILLWORK IMAGES AE411 EXISTING MILLWORK IMAGES AE600 SECTIONS, DETAILS & FINISHES STRUCTURAL S-001 GENERAL NOTES S-101 PLAN AND DETAILS 02.08 02.05 02.02 02.05 02.01 02.01 02.01 02.01 02.08 4' - 6 " 5' - 6" 3' - 0" 2' - 6 " 3' - 0" 2' - 6 " CUT INTO CONRETE SLAB TO MAKE LEVEL WITH PODIUM 02.03 REMOVE CABINET BESIDE PODIUM FOR WHEELCHAIR ACCESS. SEE A2/AE410 02.07 02.09 02.09 02.09 02.09 REF. D4/AE411 2 3' - 1 0 " 9 ' - 6 " 3 ' - 9 " 02.10 GENERAL NOTES 1. GENERAL CONTRACTOR TO COORDINATE WITH OWNER HOW TO PROTECT EXISTING FURNISHINGS PRIOR TO CONSTRUCTION. 2. PROTECT CARPET WHERE POSSIBLE 3. PEWS TO BE TAKEN OUT AND REPLACED WITH NEW PEWS. SEE PEW SCHEDULE. FABRIC TO BE FB1 AND WOOD TO MATCH WD1. SEE SPECS 4. SEE SHEETS AE410 AND AE411 FOR REFERENCE ELEVATION IMAGES OF ROSTRUM MILLWORK. 2" 1" 0" 654321 654321 E D C B A REFERENCE NOTES DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 1/ 5 / 2 0 2 3 8 : 3 9 : 0 4 A M AD100 DEMOLITION PLAN TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e Pe r m i t S e t - 1 - 0 3 - 2 3 BY U -I d a h o 22075 SCALE:1/4" = 1'-0"A1 CHAPEL DEMOLITION PLAN 02.01 EXISTING COLUMN, PROTECT DURING CONSTRUCTION 02.02 EXISTING STAIRS, TO REMAIN 02.03 EXISTING STAIRS, TO BE DEMOLISHED 02.05 PROTECT TRAVERTINE SURFACES DURING CONSTRUCTION 02.07 REMOVE EXISTING PEWS 02.08 PROTECT EXISTING CHOIR SEATING DURING CONSTRUCTION. TO BE REUPHOLSTERED AND FINISHED BY OWNER. 02.09 PROTECT EXISTING CARPET WHERE POSSIBLE 02.10 PARTIALLY REMOVE EXT'G CONCRETE UP UP MAIN CHAPEL 190 P-1 P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11P-12 P-13 P-4 P-14 P-12 P-15 P-16 P-10 P-17 P-18 P-3 P-12 P-19 P-20 P-21 P-22 P-23 P-24 P-25 P-26 P-15 12.67A 02.05 02.05 02.05 02.05 12.02 12.01 02.01 13.01 HW1 02.08 02.01 02.01 02.01 03.09 02.02 4' - 6 " 5' - 6" 6' - 5 1 / 2 " AE600 B2 AE600 B1 6' - 0 " 7' - 3" 6 ' - 0 " M I N . C L E A R 4 ' - 0 " M I N . C L E A R 4 ' - 0 " 6 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 6' - 2 1 / 2 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " M I N . C L E A R 4 ' - 0 " MIN. CLEAR 4' - 0" 3 ' - 1 0 1 / 4 " T Y P . 1 0 " 2 ' - 0 " 6' - 2 " 6' - 2 1 / 2 " 8' - 11 25/32" 5' - 1 1 7 / 1 6 " CENTER PEWS TO BE CENTERED IN ROOM EQ EQ 4' - 3 7/8" 150°1 5 0 ° 09.15 CPT1 CPT1 CPT1 CPT1 09.16 CPT1 C/L 09.17 CPT1 09.17 CPT1 09.17 CPT1 GENERAL NOTES 1. FLOORING FINISH TO MATCH EXISTING. SEE FINISH SCHEDULE CPT1 FOR CARPET. 2. GENERAL CONTRACTOR TO COORDINATE WITH OWNER REMOVAL AND REPLACEMENT OF CHOIR SEATING. OWNER IN CHARGE OF REUPHOLSTERY AND REFINISHING OF FURNISHINGS. 3. ALL EXISTING MILLWORK TO BE REFINISHED AND REPLACED WHERE NECESSARY, TO MATCH EXISTING MAPLE. SEE SHEETS AE410 AND AE411 FOR REFERENCE. 4. EXISTING TRAVERTINE TO BE BUFFED AND REFINISHED. 5. PEWS TO BE TAKEN OUT AND REPLACED WITH NEW PEWS. SEE PEW SCHEDULE. FABRIC TO BE FB1 AND WOOD TO MATCH WD1. SEE SPECS 6. ON SITE MOCK UP IS REQUIRED PRIOR TO FABRICATION AND INSTALLATION OF PEWS. 2" 1" 0" 654321 654321 E D C B A REFERENCE NOTES DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 1/ 5 / 2 0 2 3 8 : 3 9 : 0 5 A M AE100 CHAPEL PLAN TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e Pe r m i t S e t - 1 - 0 3 - 2 3 BY U -I d a h o 22075 SCALE: 1/4" = 1'-0" A1 CHAPEL FLOOR PLAN PEW SCHEDULE Type Mark Width Count P-1 7' - 6" 2 P-2 7' - 0" 1 P-3 13' - 0" 2 P-4 14' - 10" 2 P-5 16' - 4" 1 P-6 17' - 10" 1 P-7 19' - 6" 1 P-8 21' - 0" 1 P-9 22' - 6" 1 P-10 21' - 6" 2 P-11 22' - 3" 1 P-12 17' - 6" 3 P-13 13' - 6" 1 P-14 16' - 2" 1 P-15 18' - 10" 2 P-16 20' - 0" 1 P-17 23' - 0" 1 P-18 24' - 2" 1 P-19 19' - 0" 1 P-20 20' - 10" 1 P-21 22' - 5" 1 P-22 23' - 8" 1 P-23 25' - 5" 1 P-24 26' - 8" 1 P-25 25' - 0" 1 P-26 26' - 0" 1 Grand total: 33 02.01 EXISTING COLUMN, PROTECT DURING CONSTRUCTION 02.02 EXISTING STAIRS, TO REMAIN 02.05 PROTECT TRAVERTINE SURFACES DURING CONSTRUCTION 02.08 PROTECT EXISTING CHOIR SEATING DURING CONSTRUCTION. TO BE REUPHOLSTERED AND FINISHED BY OWNER. 03.09 NEW RAMP AND STAIRWAY, POURED CONCRETE 09.15 CARPET TO WRAP SIDES OF ROSTRUM STEPS 09.16 EXTEND CARPET WHERE THE CABINET USED TO BE 09.17 PATCH AND REPAIR EXISTING CARPET AS REQUIRED 12.01 OWNER TO REMOVE OR PROTECT IN PLACE EXISTING ORGAN 12.02 OWNER TO REMOVE OR PROTECT IN PLACE EXISTING PIANO 12.67A 13.01 CABINET PULL, RE FINISH SCHEDULE GENERAL NOTES 1. ALL EXISTING MILLWORK TO BE REFINISHED AND REPLACED WHERE NECESSARY, TO MATCH EXISTING MAPLE. 2. EXISTING TRAVERTINE TO BE BUFFED, CHIP REPAIRED, AND SEALED. 3. CABINET PULLS ON ROSTRUM TO BE REPLACED WITH HW1. REFERENCE FINISH SCHEDULE 4. IMAGES FOR REFERENCE ONLY. MILLWORK STAIN FINISH AND DRAWINGS MUST BE APPROVED BY INTERIOR DESIGNER AND OWNER PRIOR TO CONSTRUCTION. 5. PROTECT EXISTING CARPET DURING CONSTRUCTION. 6. CONTRACTOR TO COORDINATE WITH ELECTRICIAN ON PROTECTING CURRENT TECHNOLOGY DURING CONSTRUCTION. 7. REPLACE EXISTING HANDRAILS TO BE STAINLESS STEEL 1 1/2" ROUND, TO MATCH NEW RAILING ON RAMP. 2" 1" 0" 654321 654321 E D C B A DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 1/ 5 / 2 0 2 3 8 : 3 9 : 0 7 A M AE410 EXISTING MILLWORK IMAGES TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e Pe r m i t S e t - 1 - 0 3 - 2 3 BY U -I d a h o 22075 B4 -ROSTRUM CABINETRY A1 -ROSTRUM CABINETRY A2 -ROSTRUM CABINETRY A3 -ROSTRUM CABINETRY A4 -ROSTRUM CABINETRY A5 -ROSTRUM CABINETRY A6 -ROSTRUM CABINETRY B1 -ROSTRUM CABINETRY B2 -ROSTRUM CABINETRY B3 -ROSTRUM CABINETRY B5 -PODIUM CABINETRY B6 -PODIUM CABINETRY C1 -ROSTRUM BACK MILLWORK C2 -ROSTRUM BACK MILLWORK C3 -ROSTRUM CABINETRY C4 -ROSTRUM CABINETRY C5 -ROSTRUM CABINETRY C6 -ROSTRUM CABINETRY D1 -ROSTRUM FRONT MILLWORK D2 -ROSTRUM FRONT MILLWORK D3 -ROSTRUM FRONT MILLWORK D4 -ROSTRUM FRONT MILLWORK D5 -ROSTRUM FRONT MILLWORK D6 -ROSTRUM FRONT MILLWORK D7 -ROSTRUM FRONT MILLWORK D8 -ROSTRUM SIDE MILLWORK D9 -ROSTRUM BACK MILLWORK E1 -ROSTRUM FRONT MILLWORK E2 -ROSTRUM FRONT MILLWORK E3 -ROSTRUM FRONT MILLWORK E4 -ROSTRUM FRONT MILLWORK E5 -ROSTRUM FRONT MILLWORK E6 -ROSTRUM FRONT MILLWORK E7 -ROSTRUM FRONT MILLWORK E8 -ROSTRUM FRONT MILLWORK E9 -PODIUM FRONT MILLWORK REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REFINISH ALL MILLWORK TO MATCH EXISTING REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REFINISH ALL MILLWORK TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REMOVE CABINET TO THE RIGHT OF PODIUM AND REFINISH MILLWORK TO BE LIKE IMAGE C2/AE410 REFINISH GRILLS TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH GRILLS TO MATCH EXISTING REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REPLACE PULLS WITH HW1 REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK REFINISH MILLWORK GENERAL NOTES 1. ALL EXISTING MILLWORK TO BE REFINISHED AND REPLACED WHERE NECESSARY, TO MATCH EXISTING MAPLE. 2. EXISTING TRAVERTINE TO BE BUFFED, CHIP REPAIRED, AND SEALED. 3. CABINET PULLS ON ROSTRUM TO BE REPLACED WITH HW1. REFERENCE FINISH SCHEDULE 4. IMAGES FOR REFERENCE ONLY. MILLWORK STAIN FINISH AND DRAWINGS MUST BE APPROVED BY INTERIOR DESIGNER AND OWNER PRIOR TO CONSTRUCTION. 5. PROTECT EXISTING CARPET DURING CONSTRUCTION. 6. CONTRACTOR TO COORDINATE WITH ELECTRICIAN ON PROTECTING CURRENT TECHNOLOGY DURING CONSTRUCTION. 7. REPLACE EXISTING HANDRAILS TO BE STAINLESS STEEL 1 1/2" ROUND, TO MATCH NEW RAILING ON RAMP. 2" 1" 0" 654321 654321 E D C B A DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 1/ 5 / 2 0 2 3 8 : 3 9 : 0 8 A M AE411 EXISTING MILLWORK IMAGES TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e Pe r m i t S e t - 1 - 0 3 - 2 3 BY U -I d a h o 22075 E1 -ROSTRUM CABINETRY E2 -ROSTRUM CABINETRY E3 -ROSTRUM CABINETRY E4 -ROSTRUM CABINETRY E5 -ROSTRUM BACK MILLWORK D1 -ROSTRUM BACK MILLWORK D2 -ROSTRUM BACK MILLWORK D3 -ROSTRUM BACK MILLWORK D4 -ROSTRUM SIDE MILLWORK D5 -EXISTING MILLWORK D6 -ROSTRUM COUNTER D7 -ROSTRUM COUNTER C1 -ROSTRUM COUNTER C2 -ROSTRUM COUNTER C3 -ROSTRUM COUNTER C4 -PODIUM LEFT C5 -PODIUM TOP C6 -PODIUM RIGHT B1 -ROSTRUM COUNTER B2 -ROSTRUM COUNTER B3 -ROSTRUM COUNTER B4 -ROSTRUM COUNTER B5 -ROSTRUM COUNTER REPLACE PULLS WITH HW1 REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REFINISH ALL MILLWORK TO MATCH EXISTING KEEP STRUCTURE OF MILLWORK UNLESS DAMAGED. REFINISH ALL PANELS REPLACE HARDWARE WITH HW1 REPLACE RAILING TO MATCH NEW RAILING ON STAIRS THIS STAIR TO BE DEMO'D, EXTEND MILLWORK STYLE ACROSS NEW SURFACE THIS CABINET TO BE REMOVED FOR ADA ACCESS REFINISH MILLWORK TO MATCH EXISTING REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REFINISH STEP IN SAME MILLWORK REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REFINISH MILLWORK REFINISH MILLWORK IN SAME STYLE, AND MATCH TO EXISTING FINISH REFINISH MILLWORK IN SAME STYLE, AND MATCH TO EXISTING FINISH REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REBUFF, FILL IN CHIPS, AND SEAL TRAVERTINE COUNTER REPLACE HARDWARE WITH HW1 KEEP STRUCTURE OF MILLWORK UNLESS DAMAGED. REFINISH ALL PANELS REPLACE HARDWARE WITH HW1 PROTECT CARPET DURING CONSTRUCTION WHERE POSSIBLE REFINISH MILLWORK TO MATCH TO EXISTING REFINISH MILLWORK TO MATCH TO EXISTING REFINISH MILLWORK TO MATCH TO EXISTING REFINISH MILLWORK TO MATCH TO EXISTING 2" 3' - 0 " 06.05 09.13 2" CPT1 WD2 GL1 4" 09.15 05.14 3' - 6 " AE600 C4 D1 AE600 A4 B4 CPT1 1 ' - 0 " 1 ' - 0 " 1 ' - 0 " 1 1 / 2 " 2 1' - 0 " 3 ' - 0 " 02.06 02.05 05.12 CPT1 CPT1 D2 AE600DOWN DO WN 101' - 9" EXT'G 105' - 0" EXT'G 1 ' - 0 " 1 ' - 0 " 1 ' - 0 " 09.14 1 " / 1'- 0 " A1 AE600 ________ D AE600 C1 2" 12.05 11.01 06.05 5' - 6" CPT1 09.17 06.06 09.13 WD2 CPT1 09.15 05.14 4" 3' - 0 " 2" 3' - 6 " 5' - 6" 09.13 05.13 GL1 WD2 09.1409.14 D2 AE600 05.14 06.05 3' - 3 " 101' - 9" 05.12 1 " / 1 '-0 " 3' - 0 " EQ EQ EQ EQ EQ EQ EQ1' - 0"1' - 0" AS REQ'D 1" / 1'-0" GL1 09.13 WD2 05.13 05.1106.05 05.14 SEE STRUCTURAL DRAWINGS FOR RAMP 101' - 9" EXT'G 105' - 0" EXT'G TRAVERTINE 1' - 0" 3' - 3 " ALIGN 3' - 0 " 09.14 GL1 05.14 09.13 05.13 1' - 0" GLASS MOUNTED 101' - 9" 06.05 05.03 3" x 4" GENERAL NOTES 1. ALL EXISTING MILLWORK TO BE REFINISHED AND REPLACED WHERE NECESSARY, TO MATCH EXISTING MAPLE. 2. EXISTING TRAVERTINE TO BE BUFFED, CHIP REPAIRED, AND SEALED. 3. CABINET PULLS ON ROSTRUM TO BE REPLACED WITH HW1. REFERENCE FINISH SCHEDULE 4. IMAGES FOR REFERENCE ONLY. MILLWORK STAIN FINISH AND DRAWINGS MUST BE APPROVED BY INTERIOR DESIGNER AND OWNER PRIOR TO CONSTRUCTION. 5. PROTECT EXISTING CARPET DURING CONSTRUCTION. 6. CONTRACTOR TO COORDINATE WITH ELECTRICIAN ON PROTECTING CURRENT TECHNOLOGY DURING CONSTRUCTION. 7. REPLACE EXISTING HANDRAILS TO BE STAINLESS STEEL 1 1/2" ROUND, TO MATCH NEW RAILING ON RAMP. GENERAL NOTES 1. FLOORING FINISH TO MATCH EXISTING. SEE FINISH SCHEDULE CPT1 FOR CARPET. 2. GENERAL CONTRACTOR TO COORDINATE WITH OWNER REMOVAL AND REPLACEMENT OF CHOIR SEATING. OWNER IN CHARGE OF REUPHOLSTERY AND REFINISHING OF FURNISHINGS. 3. ALL EXISTING MILLWORK TO BE REFINISHED AND REPLACED WHERE NECESSARY, TO MATCH EXISTING MAPLE. SEE SHEETS AE410 AND AE411 FOR REFERENCE. 4. EXISTING TRAVERTINE TO BE BUFFED AND REFINISHED. 5. PEWS TO BE TAKEN OUT AND REPLACED WITH NEW PEWS. SEE PEW SCHEDULE. FABRIC TO BE FB1 AND WOOD TO MATCH WD1. SEE SPECS 6. ON SITE MOCK UP IS REQUIRED PRIOR TO FABRICATION AND INSTALLATION OF PEWS. 3 EQ TREADS @ 12" 3' - 0" 4 E Q R I S E R S @ 5 1 / 4 " 1' - 9 " RE. STRU. DWG 09.14 CPT1 06.03 02.06 05.14 3' - 9 1/2" 3' - 0 " 1' - 0" 3' - 3 " 101' - 9" T.O. LANDING WALL MOUNTED 3' - 0 " MA T C H E X T ' G T R A V E R T I N E H E I G H T 3' - 3 " F . V . 1/2" CLEAR TEMPERED GLASS GUARDRAIL WITH POLISHED EDGES GLAZING GASKET BRUSHED STAINLESS STEEL BASE CLADDING SURFACE MOUNTED BASE SHOE CAST IN PLACE CONCRETE CARPET ANODIZED AL. CARPET EDGE TRIM STAINLESS STEEL STAINLESS STEEL HANDRAIL 1" X 1" SOLID MAPLE TO MATCH WOOD SPECIE AT ROSTRUM,1 1/2" 4" X 4" ANGLE, RE. STRU. DWG. 1/2" CLEAR TEMPERED GLASS GUARDRAIL WITH POLISHED EDGES GLAZING GASKET BRUSHED STAINLESS STEEL BASE CLADDING SURFACE MOUNTED BASE SHOE CONC. STAIRS CARPET ANODIZED AL. CARPET EDGE TRIM 3" X 4" ANGLE, W/ FLUSH BOLTS BLOCKING 2" 1" 0" 654321 654321 E D C B A REFERENCE NOTES DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 1/ 5 / 2 0 2 3 8 : 3 9 : 1 0 A M AE600 SECTIONS, DETAILS & FINISHES TA Y L O R C H A P E L A D A R A M P En t e r a d d r e s s h e r e Pe r m i t S e t - 1 - 0 3 - 2 3 BY U -I d a h o 22075 FINISH LEGEND TAG PRODUCT TYPE SPECIFICATIONS NOTES FLOORING CPT1 CARPET MANF: INTERFACE TYPE: CARPET TILE STYLE/PATTERN: VIEWPOINT II COLLECTION, URBAN GRID II COLOR: 009838 DIMENSIONS: 19.69" X 19.69" PILE HEIGHT: .16" INSTALL: MATCH EXISTING LOCATION: CHAPEL PROVIDED BY: ATTIC STORAGE, AND GC IF THERE IS NOT ENOUGH IN ATTIC STORAGE. INSTALLED BY: GENERAL CONTRACTOR REP: BRIAN TITUS REP PHONE: 801-695-5868 REP EMAIL: BRIAN.TITUS@INTERFACE.COM MILLWORK SPECIALTIES WD1 WOOD/ WOOD FINISH MANF: TREE FROG TYPE: WALNUT WOOD VENEER STYLE/PATTERN: 60416 WALNUT GROOVE COLOR: WALNUT GROOVE LOCATION: CHAPEL PEWS, AND CHOIR SEATING PROVIDED BY: PROCUREMENT INSTALLED BY: PROCUREMENT REP: REP PHONE: REP EMAIL: WD2 WOOD/ WOOD FINISH MANF: TBD TYPE: MAPLE STYLE/PATTERN: MATCH EXISTING COLOR: MATCH EXISTING LOCATION: CHAPEL MILLWORK, RAILINGS PROVIDED BY: INSTALLED BY: REP: REP PHONE: REP EMAIL: MISCELLANEOUS FB1 FABRIC MANF: POLLACK STYLE/PATTERN: HOT SPOT COLOR: 2402/08 MIDNIGHT SKY CONTENTS: 55% POST CONSUMER RECYCLED POLYESTER, 25% NYLON, 20% POLYESTER WIDTH: 54" REPEAT: 3/4" X 3/4" LOCATION: CHAPEL PEWS AND CHOIR SEATING PROVIDED BY: INSTALLED BY: REP: REP PHONE: REP EMAIL: GL1 GLASS MANF: STYLE/PATTERN: COLOR: THICKNESS: EDGE: FSR: INSTALLATION: LOCATION: PROVIDED BY: INSTALLED BY: REP: REP PHONE: REP EMAIL: HW1 HARDWARE MANF: REJUVENATION STYLE/PATTERN: MISSION DRAWER PULL MODEL NO: C7938 COLOR: POLISHED NICKEL CENTER TO CENTER: 4" LOCATION: ROSTRUM CABINETS PROVIDED BY: GENERAL CONTRACTOR INSTALLED BY: GENERAL CONTRACTOR REP: REP PHONE: REP EMAIL: SCALE:1 1/2" = 1'-0"A3 CHORISTER RAILING DETAIL SCALE: 1/2" = 1'-0" B2 STAIR AND RAMP ENLARGED PLAN SCALE: 3/4" = 1'-0" B1 ENLARGED CHAPEL PLAN SCALE: 3/4" = 1'-0" C1 CHORISTER RAILING ELEVATION SCALE: 1/2" = 1'-0" C4 RAMP ELEVATION SCALE: 1/2" = 1'-0" B4 HANDRAIL ELEVATION SCALE: 1/2" = 1'-0" A4 RAMP ELEVATION SCALE: 3/4" = 1'-0" D1 STAIR ELEVATION 02.05 PROTECT TRAVERTINE SURFACES DURING CONSTRUCTION 02.06 REBUFF AND SEAL TRAVERTINE SURFACES 05.03 STEEL ANGLE 05.11 STAINLESS STEEL HANDRAIL SUPPORT 05.12 STAINLESS STEEL, 1.5" DIAMETER, FLAT RAILING END CAP 05.13 STAINLESS STEEL RAILING, ADA COMPLIANT, 1 1/2" DIAMETER 05.14 STAINLESS STEEL SHOE 06.03 REFINISH/SURFACE MILLWORK TO MATCH EXISTING MAPLE FINISH, WD2 06.05 SOLID MAPLE RAILING CAP, TO MATCH EXISTING MILLWORK 06.06 SOLID MAPLE HANDRAIL TO MATCH EXISTING MILLWORK, 1 1/2" DIAMETER 09.13 1/2" CLEAR TEMPERED GLASS WITH POLISHED EDGES 09.14 CARPET 09.15 CARPET TO WRAP SIDES OF ROSTRUM STEPS 09.17 PATCH AND REPAIR EXISTING CARPET AS REQUIRED 11.01 SPEAKER TO BE RE-ROUTED THROUGH FLOOR, RE ELECTRICAL 12.05 NEW PEWS, SEE SPECS AND PEW SCHEDULE SCALE: 3/4" = 1'-0" D2 STAIR SECTION SCALE: 1 1/2" = 1'-0" A2 GUARDRAIL SECTION @ RAMP SCALE: 1 1/2" = 1'-0" A1 GUARD RAIL SECTION @ STAIRS STRUCTURAL GENERAL NOTES BASIS OF DESIGN 1.GOVERNING BUILDING CODE...............................................2018 IBC 2.OCCUPANCY CATEGORY.......................................................II 3.LOAD COMBINATIONS: ASD -GRAVITY AND LATERAL.......................................1605.3.1 4.GRAVITY DESIGN: LIVE LOAD (UNIFORMLY DISTRIBUTED LOADS) RAMP..............................................................................100 PSF 5.LATERAL DESIGN:NA GENERAL 1.THE GENERAL CONTRACTOR SHALL: A.BECOME FAMILIAR WITH ALL PORTIONS OF THE CONTRACT DOCUMENTS AND INSURE THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THOSE PORTIONS PERTAINING TO THEIR AREA OF WORK. NO DEVIATIONS WILL BE ALLOWED UNLESS AGREED UPON BY ALL PARTIES IN WRITING PRIOR TO CONSTRUCTION FABRICATION. B.VERIFY ALL DIMENSIONS AND ELEVATIONS. COORDINATE ALL DOORS, WINDOWS, NON- BEARING INTERIOR AND EXTERIOR WALLS, ELEVATIONS, SLOPES, STAIRS, CURBS, DRAINS, RECESSES, DEPRESSIONS, RAILINGS, WATERPROOFING, FINISHES, CHAMFERS, KERFS, ETC. C.FIELD VERIFY ALL SITE CONDITIONS AND IMMEDIATELY NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER REGARDING ACTUAL CONDITIONS AT THE SITE WHICH ARE NOT PER THE DRAWINGS. D.COORDINATE ALL WORK BETWEEN THE VARIOUS TRADES AND SUBCONTRACTORS. REPORT ANY MODIFICATIONS TO THE STRUCTURAL PORTION OF THE BUILDING BY OTHER TRADES TO THE ARCHITECT AND STRUCTURAL ENGINEER. E.BE RESPONSIBLE FOR SAFETY AND PROTECTION IN AND AROUND THE JOB SITE AND/OR ADJACENT PROPERTIES. F.REPORT PROGRESS OF WORK TO ARCHITECT AND STRUCTURAL ENGINEER. G.COORDINATE ANY CONSTRUCTION SITUATION NOT COVERED BY THESE PLANS, GENERAL NOTES, OR SPECIFICATIONS WITH THE ARCHITECT AND STRUCTURAL ENGINEER. 2.CONTRACT DOCUMENTS: A.DETAILS, SECTIONS AND NOTES SHOWN ON THE STRUCTURAL DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO ALL SIMILAR SITUATIONS ELSEWHERE, UNLESS NOTED OR SHOWN OTHERWISE. B.THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE OVER SHOP DRAWINGS UNLESS SPECIFICALLY NOTED OTHERWISE. C.INFORMATION ON DRAWINGS INDICATING EXISTING CONDITIONS IS BASED ON BEST PRESENT KNOWLEDGE, BUT MAY NOT BE ENTIRELY ACCURATE AND MUST BE FIELD VERIFIED. 3.BUILDING CODE COMPLIANCE: A.INSPECTION, TESTING, CONSTRUCTION, WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE GOVERNING BUILDING CODE AND STANDARDS. ASTM, IBC, AND OTHER DESIGNATIONS SHALL BE AS AMENDED TO LATEST DATE UNLESS NOTED OTHERWISE. 4.CONSTRUCTION SEQUENCE, SHORING, AND BRACING REQUIREMENTS: A.THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE METHOD, MEANS, AND SEQUENCE OF ALL STRUCTURAL ERECTION EXCEPT WHEN SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. 5.OMISSIONS AND/OR CONFLICTS: A.OMISSIONS IN AND/OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND STRUCTURAL ENGINEER AND SHALL BE RESOLVED BEFORE PROCEEDING WITH ANY WORK INVOLVED. B.IN CASE OF CONFLICTS IN THE STRUCTURAL WORK, THE MOST STRINGENT REQUIREMENTS, AS DIRECTED BY THE ARCHITECT AND STRUCTURAL ENGINEER, SHALL BE IMPLEMENTED AT NO ADDITIONAL COST TO THE OWNER. 6.MISCELLANEOUS: A.DURING AND AFTER CONSTRUCTION, THE CONTRACTOR AND/OR OWNER SHALL KEEP THE LOADS ON THE STRUCTURE WITHIN THE LIMITS OF THE DESIGN. B.OBSERVATION VISITS TO THE SITE BY REPRESENTATIVES OF THE ARCHITECT AND/OR STRUCTURAL ENGINEER SHALL NOT BE CONSTRUED AS INSPECTION NOR APPROVAL OF CONSTRUCTION. C.ALL WORK SHALL BE DONE IN ACCORDANCE WITH OSHA REQUIREMENTS. ANY CONFLICTS BETWEEN THESE DOCUMENTS AND OSHA REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND STRUCTURAL ENGINEER BEFORE PROCEEDING WITH WORK. CONCRETE 1.CODES AND STANDARDS: A.CONCRETE CONSTRUCTION, WORKMANSHIP, AND MATERIALS SHALL COMPLY WITH THE AMERICAN CONCRETE INSTITUTE (ACI) EDITIONS OF: I.ACI 301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS". II.ACI 318, "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", EXCEPT AS MODIFIED BY THE IBC. III.ACI 347, "RECOMMENDED PRACTICE FOR CONCRETE FORM WORK". 2.MATERIALS: A.CEMENT SHALL CONFORM TO ASTM C150, PORTLAND CEMENT. I.USE TYPE I OR II FOR EXPOSURE CLASS S0 II.USE TYPE I OR V FOR EXPOSURE CLASS S1 III.USE TYPE V FOR EXPOSURE CLASS S2 AND S3 B.HARD ROCK AGGREGATES SHALL CONFORM TO ASTM C33. LIGHTWEIGHT AGGREGATES SHALL CONFORM TO ASTM C330. C.WATER SHALL BE POTABLE. D.AIR ENTRAINMENT SHALL CONFORM TO ASTM C260. I.LIMIT AIR CONTENT TO 3% AT TROWEL FINISHED FLOOR SLABS OR FINISH PER ACI302.1R-96 "GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION" WHERE AIR CONTENT IS >3%. E.FLY ASH, CLASS F POZZOLAN SHALL CONFORM TO ASTM C618. F.CALCIUM CHLORIDE SHALL NOT BE USED. G.DEFORMED BAR ANCHORS (DBA) SHALL CONFORM TO ASTM A496. H.HEADED ANCHOR STUDS (HAS) SHALL CONFORM TO ASTM A108. I.SILICA FUME (2% TO SUSPENDED PARKING SLABS) SHALL CONFORM TO ASTM C1240 3.MIX DESIGNS: A.ONLY ONE TYPE OF CONCRETE SHALL BE PLACED AT THE SITE AT ANY GIVEN TIME. B.LIMIT SLUMP TO 4" MAXIMUM PRIOR TO THE ADDITION OF PLASTICIZERS AND WATER REDUCING ADD MIXTURES. CONCRETE SUPPLIER SHALL INDICATE FINAL SLUMP OF EACH CONCRETE MIX DESIGN. C.CONCRETE MIXES SHALL CONFORM TO THE FOLLOWING: D. LIMIT FLY ASH TO 25% OF THE TOTAL CEMENTITIOUS MATERIAL. E. PEA GRAVEL AGGREGATE AND/OR PLASTICIZER MAY BE USED IN CONGESTED AREAS WHEN REQUIRED TO PROPERLY FILL ALL VOIDS AND/OR FOR WORKABILITY. (CONTRACTORS OPTION). 4.CONSTRUCTION: A. CONCRETE SHALL BE PROPERLY VIBRATED DURING PLACEMENT. B. PRIOR TO PLACING CONCRETE, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF OPENINGS, BLOCK OUTS, SLEEVES, CURBS, CONDUITS, BOLTS, INSERTS, EMBEDS, DOWELS, ETC. ANCHOR BOLTS AND DOWELS SHALL BE PLACED PRIOR TO CASTING CONCRETE. C. CONSTRUCTION JOINTS AND BULKHEADS SHALL BE FORMED WITH A KEY WAY. ALL CONTACT SURFACES, NEW OR EXISTING, AT CONSTRUCTION JOINTS SHALL BE INTENTIONALLY ROUGHENED TO A 1/4" AMPLITUDE PRIOR TO CASTING ADJACENT POUR. 6.SLABS ON GRADE: A.INTERIOR SLABS ON GRADE SHALL BE A MINIMUM OF 4 INCHES THICK, SHALL BEAR ON A 4 INCH MINIMUM LAYER OF FREE-DRAINING GRAVEL, AND SHALL BE REINFORCED WITH #4 BARS AT 18" O.C. BOTH WAYS, TYPICAL UNLESS NOTED OTHERWISE. PROVIDE CHAIRS WITH SAND PLATES FOR PROPER PLACEMENT. B.SLABS ON GRADE SHALL BE SUBDIVIDED BY CONSTRUCTION AND/OR CONTRACTION (CONTROL) JOINTS INTO ROUGHLY SQUARES WHOSE SIDES SHALL NOT EXCEED 15 FEET IN EITHER DIRECTION. C.SEE ARCHITECTURAL FOR EXTERIOR SLABS ON GRADE, TYPICAL, UNLESS NOTED OTHERWISE. REINFORCING STEEL 1.CODES AND STANDARDS: A.REINFORCING STEEL SHALL COMPLY WITH: I.CONCRETE REINFORCING STEEL INSTITUTE "MANUAL OF STANDARD PRACTICE". II.AMERICAN CONCRETE INSTITUTE "DETAILING MANUAL", ACI 315 (OR SP-66). 2.MATERIALS: A.REINFORCING STEEL SHALL BE NEW STOCK DEFORMED BARS AND SHALL CONFORM TO ASTM A615, GRADE 60, WITH A DESIGN YIELD STRENGTH OF 60,000 PSI, EXCEPT AS NOTED BELOW. I. DOWELS TO BE BENT IN THE FIELD DURING CONSTRUCTION SHALL BE ASTM A615, GRADE 40 OR ASTM A706, GRADE 60, "LOW-ALLOY STEEL". II. REINFORCING TO BE WELDED SHALL BE ASTM A706, GRADE 60,"LOW-ALLOY STEEL". 3.CONSTRUCTION: A.REINFORCING SHALL BE DETAILED, BOLSTERED, AND SUPPORTED PER ACI 315. B.REINFORCING STEEL SHALL BE FREE OF LOOSE FLAKY RUST, SCALE, GREASE, OIL, DIRT, AND OTHER MATERIALS WHICH MIGHT AFFECT OR IMPAIR BOND. C.REINFORCING SHALL BE CONTINUOUS IN WALLS, BEAMS, COLUMNS, SLABS, FOOTINGS, ETC. D.SPLICES IN CONTINUOUS REINFORCING SHALL BE MADE IN AREAS OF COMPRESSION AND/OR AT POINTS OF MINIMUM STRESS, TYPICAL UNLESS NOTED OTHERWISE. MINIMUM LAP SHALL BE 24 INCHES LONG. E.BENDS SHALL BE MADE COLD. DO NOT USE HEAT. BENDS SHALL BE DONE IN THE FABRICATOR'S SHOP UNLESS SPECIFICALLY NOTED FOR THE FIELD. DO NOT UN-BEND OR RE- BEND A PREVIOUSLY BENT BAR. F.REINFORCING STEEL IN CONCRETE SHALL BE SECURELY ANCHORED AND TIED IN PLACE PRIOR TO PLACING CONCRETE AND SHALL BE POSITIONED WITH THE FOLLOWING MINIMUM CONCRETE COVER: CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH................................................................3" CONCRETE NOT EXPOSED TO EARTH OR WEATHER: SLABS ON GRADE.....................................................................CENTER OF SLAB G.NO REINFORCING SHALL BE WELDED UNLESS SPECIFICALLY NOTED AS SUCH. USE E90XX ELECTRODES AND ASTM A706 REINFORCING. COMPLY WITH AWS D1.4 REQUIREMENTS. POST-INSTALLED ANCHORS 1.EPOXY ANCHORS: A.THE FOLLOWING EPOXY ADHESIVES SYSTEMS SHALL BE ALLOWED: FOR CONCRETE: SIMPSON SET-3G SIMPSON SET-XP SIMPSON AT-XP HILTI HIT-RE 500-V3 HILTI HIT-RE 100 B.ALL ANCHORS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. AS A MINIMUM BOLT HOLES SHALL BE WIRE BRUSHED AND CLEANED WITH COMPRESSED AIR. C.PER ACI 318-2014 (Section 17.1.2) ADHESIVE ANCHORS SHALL BE INSTALLLED IN CONCRETE HAVING A MINIMUM AGE OF 21 DAYS AT TIME OF ANCHOR INSTALLATION. FOR INSTALLATIONS SOONER THAN 21 DAYS CONSULT ADHESIVE MANUFACTURER. D.IF TEMPERATURE OF BASE MATERIAL AT TIME OF ADHESIVE INSTALLATION IS AT 45 DEGREES (FAHRENHEIT) OR LESS, AN “ACRYLIC” (COLD WEATHER) ADHESIVE IS REQUIRED –ie HILTI HY200, SIMPSON AT-XP. 2.MECHANICAL ANCHORS A.THE FOLLOWING MECHANICAL ANCHORS SHALL BE ALLOWED: SIMPSON TITEN HD HILTI KWIK HUS-EZ B.ALL ANCHORS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. AS A MINIMUM BOLT HOLES SHALL BE WIRE BRUSHED AND CLEANED WITH COMPRESSED AIR. 3.SUBSTITUTES: CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR APPROVAL TO THE ARCHITECT AND STRUCTURAL ENGINEER. 7.SUBMITTALS: A.THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL ENGINEER FOR REVIEW PRIOR TO FABRICATION, ERECTION, INSTALLATION, OR OTHERWISE BEING INCORPORATED INTO THE WORK. MATERIALS CERTIFICATION FOR ALL CONCRETE MATERIALS. MIX DESIGNS FOR EACH TYPE OF CONCRETE. REINFORCING STEEL SHOP DRAWINGS. STRUCTURAL STEEL SHOP DRAWINGS. WELDING PROCEDURES AND CERTIFICATIONS. B.A MINIMUM OF TWO WEEKS SHALL BE ALLOWED FOR THE REVIEW OF ALL SUBMITTALS BY THE ARCHITECT AND STRUCTURAL ENGINEER. C.REQUESTS FOR SUBSTITUTIONS SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL ENGINEER IN WRITING. REASON(S) FOR THE REQUEST AND COST DIFFERENTIALS SHALL BE INCLUDED IN THE REQUESTS. SUBSTITUTIONS ARE NOT ALLOWED UNLESS APPROVED IN WRITING BY THE ARCHITECT AND STRUCTURAL ENGINEER. 8.DEFERRED SUBMITTALS: A.NO DEFFERRED SUBMITTALS QUALITY ASSURANCE PLAN FOR STRUCTURE 1.INSPECTION: A.THE OWNER SHALL PROVIDE SPECIAL INSPECTION BY QUALIFIED INSPECTORS FOR THE FOLLOWING TYPES OF CONSTRUCTION IN ACCORDANCE WITH IBC, SECTION 1704 AND 1707, THE SPECIFICATIONS, AND THE ATTACHED TABLES INCLUDED IN THESE GENERAL NOTES. REINFORCED CONCRETE:DURING THE CASTING OF ALL CONCRETE AND TAKING OF ALL TEST SPECIMENS, AND SHALL VERIFY THE PLACEMENT OF ALL REINFORCING. INSPECTOR SHALL BE ACI-II OR ICC CERTIFIED. SEE ATTACHED TABLE LABELED REQUIRED VERIFICATION AND INSPECTION OF CONCRETE/STEEL CONSTRUCTION. WELDING: ALL SHOP AND FIELD WELDS. INSPECTOR SHALL BE AWS-QC1 CERTIFIED. SEE ATTACHED TABLE LABELED REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION. POST-INSTALLED ANCHORS:THE FIRST 25 POST-INSTALLED ANCHORS SHALL BE INSPECTED AND 10 PERCENT OF THE REMAINING ANCHORS SHALL BE INSPECTED. 2.TESTING: A.THE OWNER SHALL PROVIDE TESTING BY QUALIFIED TESTING AGENCIES FOR THE FOLLOWING TYPES OF CONSTRUCTION IN ACCORDANCE WITH IBC, SECTION 1708 AND THE SPECIFICATIONS. CONCRETE: STRENGTH, SLUMP, AIR, AND TEMPERATURE. WELDING:TYPE, SIZE, LENGTH, AND QUALITY OF ALL SHOP AND FIELD WELDS BY APPROVED METHODS. ULTRASONICALLY TEST ALL COMPLETE PENETRATION WELDS. 3.STRUCTURAL OBSERVATIONS: A.THE STRUCTURAL ENGINEER SHALL BE NOTIFIED TO PERFORM STRUCTURAL OBSERVATIONS AT SIGNIFICANT STAGES OF CONSTRUCTION IN COORDINATION WITH THE ARCHITECT. B.THE STRUCTURAL ENGINEER SHALL PROVIDE A COPY OF THE OBSERVATION REPORT TO THE ARCHITECT FOR FURTHER DISTRIBUTION. 4.THE CONTRACTOR SHALL: A.SUBMIT A STATEMENT OF RESPONSIBILITY TO THE OWNER AND BUILDING OFFICIAL PRIOR TO COMMENCING WORK ON STRUCTURE THAT INCLUDES AWARENESS OF THE QUALITY ASSURANCE PLAN REQUIREMENTS, ACKNOWLEDGMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN CONFORMANCE TO CONSTRUCTION DOCUMENTS, PROCEDURES FOR EXERCISING CONTROL, METHOD AND FREQUENCY OF REPORTING, AND IDENTIFICATION AND QUALIFICATIONS OF PERSONNEL IN CHARGE OF CONTROL. B.CORRECT ALL WORK FOUND TO BE DEFICIENT AT NO ADDITIONAL COST TO THE OWNER. C.COORDINATE ALL THE REQUIRED INSPECTIONS, TESTING, AND/OR STRUCTURAL OBSERVATIONS OF THE QUALITY ASSURANCE PLAN. DO NOT PROCEED WITH SUBSEQUENT WORK UNTIL THE REQUIRED INSPECTIONS, TESTING, AND STRUCTURAL OBSERVATIONS HAVE BEEN PROVIDED. NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER AT LEAST 48 HOURS PRIOR TO ANY REQUIRED OBSERVATIONS. D.PROVIDE COPIES OF THE DAILY INSPECTION REPORTS AND ALL TESTING RESULTS TO THE ARCHITECT, STRUCTURAL ENGINEER, OWNER, AND BUILDING OFFICIAL. 2" 1" 0" 654321 654321 E D C B A REFERENCE NOTES DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 12 / 2 1 / 2 0 2 2 3 : 2 3 : 5 3 A M S-001 GENERAL NOTES Ta y l o r C h a p e l A D A R a m p CD - 1 2 / 2 2 / 2 0 2 2 BY U -I D A H O 22075 SLAB ON GRADE 3000 0.48 145 1 - 470 F0,S0,P0,C0 INTERIOR MEMBERS TYPE OF MEMBER MIN. STRENGTH @ 28 DAYS (PSI) MAX. W/C (RATIO) DRY WEIGHT (PCF) MAX AGGREGTE SIZE (INCHES) AIR ENTRAIN- MENT (%) MIN. CEMENT PER YARD (LBS) EXPOSURE CLASS CONCRETE MIX DESIGN TABLE FORMWORK X VERIFY THAT THE FORMS ARE PLACED PLUMB AND CONFORM TO THE SHAPES, LINES, AND DIMENSIONS OF THE MEMBERS AS REQUIRED BY THE APPROVED CONSTRUCTION DOCUMENTS. STRENGTH VERIFICATION X VERIFY THAT ADEQUATE STRENGTH HAS BEEN ACHIEVED PRIOR TO THE REMOVAL OF SHORES AND FORMS OR THE STRESSING OF POST-TENSIONED TENDONS. CURING TEMPERATURE AND TECHNIQUES X VERIFY THAT THE AMBIENT TEMPERATURE FOR CONCRETE IS KEPT AT >50°F FOR AT LEAST 7 DAYS AFTER PLACEMENT. HIGH-EARLY-STRENGTH CONCRETE SHALL BE KEPT AT >50°F FOR AT LEAST 3 DAYS. ACCELERATED CURING METHODS MAY BE USED (SEE ACI 318: 5.11.3). THE AMBIENT TEMPERATURE FOR SHOTCRETE SHALL BE >40°F FOR THE SAME PERIOD OF TIME AS NOTED FOR CONCRETE. SHOTCRETE SHALL BE KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 HOURS AFTER SHOTCRETING. ALL CONCRETE MATERIALS, REINFORCEMENT, FORMS FILLERS, AND GROUND SHALL BE FREE FROM FROST. IN HOT WEATHER CONDITIONS ENSURE THAT APPROPRIATE MEASURES ARE TAKEN TO AVOID PLASTIC SHRINKAGE CRACKING AND THAT THE SPECIFIED WATER/CEMENT RATIO IS NOT EXCEEDED. CONCRETE AND SHOTCRETE PLACEMENT X CONCRETE SAMPLING FOR STRENGTH TESTS, SLUMP, AIR CONTENT, AND TEMPERATURE X USE OF REQUIRED MIX DESIGN X VERIFY THAT ALL MIXES USED COMPLY WITH THE APPROVED CONSTRUCTION DOCUMENTS; ACI 318-11: CH. 4,5.2-5.4; AND IBC 1904.3, 1913.2, 1913.3. POST-INSTALLED ANCHORS OR DOWELS X ALL POST-INSTALLED ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS REQUIRED BY THE APPROVED ICC-ES REPORT. CAST-IN BOLTS AND EMBEDS X INSPECTION OF ANCHORS OR EMBEDS CAST IN CONCRETE IS REQUIRED WHEN ALLOWABLE LOADS HAVE BEEN INCREASED OR WHERE STRENGTH DESIGN IS USED. REINFORCING STEEL X VERIFY PRIOR TO PLACING CONCRETE THAT REINFORCING IS OF SPECIFIED TYPE, GRADE AND SIZE; THAT IT IS FREE OF OIL, DIRT, AND RUST; THAT IT IS LOCATED AND SPACED PROPERLY; THAT HOOKS, BENDS, TIES, STIRRUPS, AND SUPPLEMENTAL... CONCRETE CONSTRUCTION (IBC 1705.3) ITEM CONTIN- UOUS PERIODIC DETAILED INSTRUCTION AND FREQUENCIES CONCRETE CONSTRUCTION (IBC 1705.3 AND 1705.12.1) 12/21/2022 UP DN UP DN 7.3 7.4 7.5 8.1 8.2 8.37.27.16.36.26.1 A B C D E F G H I B1 S-101 _______ B3 S-101 B4 S-101 C W-6 A C W-6 A C W-6 A A3 S-101 1 L4X4X1/4 WITH 3/4"Ø HSA BY 5" AT 18"O.C. 6" CONCRETE WALL WITH #4 BARS AT 18"O.C. DRILL AND EPOXY INTO EXISTING SLAB 3" EXTEND BENT DOWEL 2' AND OVER LAP WITH OTHER DOWEL. 4" CONCRETE SLAB ON GRADE/GRAVEL. GRAVEL FILL EXISTING SLAB ON GRADE L4X4X1/4 WITH 3/4"Ø HSA BY 5" AT 18"O.C. 6" CONCRETE WALL WITH #4 BARS AT 18"O.C. EXTEND BENT DOWEL 2' AND OVER LAP WITH OTHER DOWEL. 4" CONCRETE SLAB ON GRADE/GRAVEL. GRAVEL FILL EXISTING SLAB ON GRADE 0' - 8 " M I N I M U M #4 BAR AT 18"O.C., DRILL AND EPOXY, 3" MINIMUM EMBED WITH 4" EXTENSION Level 1 100' -0" LEVEL 1 -T.O. SLAB 100' -0" SEE ARCHITECTURAL FOR HANDRAILS. EXISTING SLAB ON GRADE #3 NOSE BAR #4 AT 18"O.C. (2) #4 BARS DRILLED AND EPOXYED, 3" EMBEDMENT, EVENLY SPACED.S-101 B3 INDICATES NOTES ARE KEYED ON PLAN. REFERENCE NOTES 1.REMOVE EXISTING CONCRTETE SLAB ON GRADE AS SHOWN. EXTENT IS TO KEEP 4" MINIMUM SLAB. GENERAL SHEET NOTES 2" 1" 0" 654321 654321 E D C B A DATE REVISION www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com 05/ 16/2 016 J WS PROJECT NUMBER 12 / 2 1 / 2 0 2 2 3 : 2 3 : 5 6 A M S-101 PLAN AND DETAILS Ta y l o r C h a p e l A D A R a m p CD - 1 2 / 2 2 / 2 0 2 2 BY U -I D A H O 22075 1/8" = 1'-0"S-101 C3 3/4" = 1'-0"S-101 B3 3/4" = 1'-0"S-101 B4 S-101 C1 1/4" = 1'-0"S-101 B1 3/4" = 1'-0"S-101 A3 12/21/2022