HomeMy WebLinkAboutFIELD INFO - 22-00130 - Valley Wide Coop - Fuel Canopy AdditionQualityCan®ob No.: 22-1071 RO Rev. #: Sheet 1 of 2
Canopy Const. Inc.lnC. Location: VALLEY WIDE CO—OP ADDITION Drawn by: D. CYPHERS
1175 WEST MAIN ST
Fax # 208-773-8215 Date: 3-4-2022 REXBURG, ID Checked by:
CONTRACTOR TO PLACE FIELD DIMENSIONS FOR FOUNDATION CENTERS
NEW
CANOPY
ABOVE
O O O O
COL. B COL. D COL. F COL. H
O O O
COL. A COL. C COL. E COL. G
EXISTING
CANOPY
L--------------------------- � ABOVE
NOTE: CONTRACTOR IS RESPONSIBLE FOR MARKING CORRECT
ORIENTATION OF THE CANOPY. PLEASE MARK AT LEAST TWO (2)
SIDES, STORE SIDE OR STREET SIDE. ADDITIONAL CHARGES MAY
BE INCURRED FOR INACCURATE INFORMATION.
INTERNAL DRAIN
DISCHARGE
UNDERGROUND
TOP OF
PAVING
CANOPY
COLUMN
u u CANOPY
FOOTING
BELOW GRADE
FOUNDATION ELEVATION INFORMATION SHEET
PLEASE SEE JIMCO SEALED CONSTRUCTION
DOCUMENTS FOR FOUNDATION MARK ALL COLUMNS ON CANOPY FOOTING PLAN AS SHOWN
LAYOUT AND SIZES BELOW TO INDICATE LOCATIONS AND DIRECTIONS FOR INTERNAL
CONDUIT, VENT AND/OR DRAIN CONNECTIONS AT BASE
CD
J m
J
THRU ISLAND ABOVE GRADE ABOVE GRADE
SPLASH BLOCK/NO PVC
FIELD VERIFIED BY:
DATE:
z
0
3/4" CONDUIT
2 VENT
COL. A
EXAMPLE
(PLEASE PRINT)
CANOPY COLUMN
INTERNAL DRAIN
INTERNAL DRAIN
(NO PVC DRAIN)
DISCHARGE ONTO
DISCHARGE ONTO
PAVING
PAVING
= DIRECTION OF DRAIN
DISCHARGE AT BASE
TOP OF
TOP OF
TOP OF
PAVING
PAVING
PAVING
DIRECTION OF ELECTRICAL
CONDUIT AND/OR VENT
CANOPY
COLUMN
CANOPY
COLUMN
CONNECTIONS AT BASE
FOOTTIING PY
FOOTTIING O '� PY
FOOTTIING
CD
J m
J
THRU ISLAND ABOVE GRADE ABOVE GRADE
SPLASH BLOCK/NO PVC
FIELD VERIFIED BY:
DATE:
z
0
3/4" CONDUIT
2 VENT
COL. A
EXAMPLE
(PLEASE PRINT)
FOR QUESTIONS OR COMMENTS PLEASE CONTACT JIMCO SALES ® 800-735-4626 Location: VALLEY WIDE CO—OP ADDITION
1175 WEST MAIN ST
REXBURG, ID
FIELD INFORMATION CHART
HIGH POINT OF PAVING:
COL.
TOP of FOOTING
TOP of BOLT EL.
(SEE FIELD NOTE BELOW)
INTERNAL PIPES / CONDUITS REQUESTED
TYPE
QTY
TYPE
QTY
A
B
C
D
E
F
G
H
1RVEY ROD
dIGHEST POINT OF
RAVING UNDER CANOPY
FIELD INFORMATION:
GENERAL CONTRACTOR IS TO FILL-IN THESE FIELD INFORMATION
SHEETS WITH THE FOLLOWING INFORMATION AND FAX THEM
BACK TO JIMCO AT LEAST TWO WEEKS PRIOR TO DELIVERY OF
CANOPY:
1.) AS BUILT TOP OF BOLT ELEVATIONS AT EACH COLUMN.
2.) AS -BUILT HIGH POINT OF PAVING UNDER CANOPY.
3.) TYPE, SIZE AND QUANTITY OF CONDUITS AND/OR PIPES
TO BE INSTALLED INSIDE EACH COLUMN.
4.) SHOW ON PLAN VIEW WHICH SIDE OF THE COLUMN EACH
CONDUIT OR PIPE IS GOING INTO. (SEE EXAMPLE ON PLAN)
ADDITIONAL NOTES:
PLEASE CHECK YOUR PROPOSAL TO SEE IF DRAINS, CONDUITS, OR
VENTS ARE INCLUDED.
IF NOT SPECIFICALLY CALLED OUT ON YOUR PROPOSAL, THESE COSTS
WILL BE ADDED TO YOUR INVOICE.
1. FURNISH AND INSTALL 3" PVC INTERNAL DRAINS IN COLUMNS, ADD
125.00 EACH.
2. FURNISH AND INSTALL 3/4" OR 1" CONDUIT WITH SEAL -FF IN
COLUMNS, ADD 150.00 EACH.
3. FURNISH AND INSTALL 2" INTERNAL VENT IN COLUMN, ADD 275.00
EACH.
4. FURNISH AND INSTALL 3" INTERNAL VENT IN COLUMN, ADD 325.00
EACH.
APPLICABLE SALES TAX WILL BE ADDED.
PLEASE INITIAL THAT THIS HAS BEEN READ AND UNDERSTOOD
FIELD VERIFIED BY:
DATE:
nBOLT ELEVATION DETAIL
r` SCALE: N.T.S.
(PLEASE PRINT)