HomeMy WebLinkAboutStorm Drain with City BillProject: Dec. 13th, 2017 Attn: Joel Gray City of Rexburg Description: Mtn. Shores Apartments Install Storm Drain Base,cone, riser and grate for tie-in of storm drain. David Beck agreed to split cost with city to install storm drain and tie in on our side of the street and to allow Zollinger Construction to tie in to opposite side for their storm drain. Description Storm Drain Base section 3' Eccentric Cone 2'x48"Riser Section Ring and Cover Mastic Frame and Grate (Old Castle) Storm Chambers End Cap/Entry Cap Piping Geo Fabric Bedding Material Rock Installed Pit Run Compacted Labor to install (Excavate, Place,Filll, Compact) Backhoe Operated Subtotal Overhead and Profit Final Cost to City (Half of total cost) Thanks, Blair Baker Project Manager/D L Beck, Inc. Office: (208) 656-9344 Cell: (208) 351-4877 Email: bbaker@dlbeck.com Blair Baker 2680 West 5200 South Rexburg, ID 83440 (208) 656-9344 Telephone (208) 656-9345 Fax bbaker@dlbeck.com PCO # Quantity 1 1 1 1 1 1 6 4 20 8 20 18 38 8 0.15 0.5 1 Units Base Each Each Each roll Grate Each Each Ft ton ton ton MNHRS Hrs Subtotal above Rate 300 240 160 245 24 439.7 170 60 3.8 50 7.7 13.7 6.8 45 40 5282.7 Extended Price 300 240 160 245 24 439.7 1020 240 76 50 61.6 274 122.4 1710 320 5282.7 792.405 3037.5525 4/23/2013 2/25/2014 Att: Kehl Murray Byu Idaho Byu Idaho Hazardous Waste Storage Subject: Cutting concrete stem wall #1 Description Saw cutting and removal of 25' of concrete stem wall Supervision Subtotal Bond and Insurance Profit & Overhead Total Price Thank you, Ben Munns 2680 West 5200 South Rexburg, ID 83440 (208) 656-9344 Telephone (208) 656-9345 Fax dlbeckfoffice@gmail.com 0.022 0.05 Quantity 25 4 Price Request #1 Units L.F Hrs. Rate 19.5 40 Extended Price 487.5 160 647.5 14.245 32.375 694.12