Loading...
HomeMy WebLinkAboutAPPROVED ENGINEER PLANS - 21-00684 - 1104 Cypress Loop - New SFRAuthor Name Author Email Author Phone No.: Larry Beesley Larry.Beesley@rexburg.org 208-372-2176 Description : RPRPNBK2030110 - New SFR Address : Record Type : New Single Family Residence Document Filename : Plan Engineering.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 21-00684 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Bridle Wild Fire SDA-S0 NOTES Stamp Larry Beesley : Building Open 1 Approved - Building Inspector Bridle Wild Fire SDA-S1 DETAILS ftg Stamp Larry Beesley : Building Open 2 Approved - Building Inspector Bridle Wild Fire SDA-S2 DETAILS framing Stamp Larry Beesley : Building Open 3 Approved - Building Inspector Bridle Wild Fire SDA-S3 DETAILS framing Ellipse Larry Beesley : Building Open 4 Bridle Wild Fire SDA-S3 DETAILS framing Stamp Larry Beesley : Building Open 4 Approved - Building Inspector Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 New Single Family Residence Approval of plans does not constitute approval of variance from code Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Ellipse Larry Beesley : Building Open 5 Bridle Wild Fire SDA-S4 FTG Stamp Larry Beesley : Building Open 5 Approved - Building Inspector Bridle Wild Fire SDA-S5 MAIN floor Stamp Larry Beesley : Building Open 6 Approved - Building Inspector Bridle Wild Fire SDA-S6 MAIN shear Stamp Larry Beesley : Building Open 7 Approved - Building Inspector Bridle Wild Fire SDA-S9 ROOF Free text Larry Beesley : Building Open 8 Roof Trusses (designed according to R802.10.1) 35 # Snow and 90 mph winds (Local Conditions) Bridle Wild Fire SDA-S9 ROOF Line Larry Beesley : Building Open 8 Bridle Wild Fire SDA-S9 ROOF Stamp Larry Beesley : Building Open 8 Approved - Building Inspector Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) FLOOR SHEATHING NOTES TRUSS NOTES SHEARWALL NOTES 3 ROOF SHEATHING NOTES 1. SHEATHING SHALL BE 7/16", 24/16, APA RATED SHEATHING. NAIL W/ 8d's @ 6" O.C. 3/8" FROM EDGE OF PANEL AT ALL PANEL ENDS, SUPPORTED EDGES, SHEARWALL TOPS, AND ALL BLOCKING. NAIL @ 12" O.C. ALONG INTERMEDIATE FRAMING MEMBERS. 2. LAY SHEATHING WITH FACE GRAIN AT RIGHT ANGLES TO FRAMING WITH STAGGERED END JOINTS. 113* 131* T-NAIL SPACING 1 1/4"** 3 1/2" 2 1/2" 9 1/2" 5 1/2" 8 1/2" 6 1/2" 6 1/2" TABLE OF EQUIVALENT FASTENERS 10"12"10"8 1/2"10" 10d @ 8d @ * GAUGE ** PENETRATION 4"2" 6" 8" 10" 12" 3 1/2" 4 1/2" 5 12" 6 1/2" 10" 12" 8" 12" 4" 6" 6 1/2" 5 1/2" 8" 2 1/2" 4" 10" 3"2 1/2" 8" 9 1/2" 6 1/2"5 1/2" 8" 7" 4"5"4" 6" 4" 14 1/2" 10" 12" 8"6 1/2" 10" 8" 3 1/2" 5" 12" 8" 5" 12" SPACING COMMON NAIL 6d @ STAPLE SPACING NAILS, STAPLES, & T-NAILS (VALID FOR LATERAL LOADS ONLY) 4" 8" 6" 3 1/2" 6 1/2" 5" 1"** 16* 1"** 14* 9 1/2" 6" 8" 4" 7" 5" 1"** 15* 7" 8" 4" 12" 3 1/2" 8 1/2" 7" 10" 5" 14 1/2" 12" 10" 10" 4" 6" 1/2"** 7 1/2" 10" 5" SHEAR WALL SCHEDULE MARK (20) 16d SINKERSHD1STHD10 HD2 STHD10RJ HOLDOWN SCHEDULE MARK SIMPSON FASTENERS NAILING 22-10d FLOOR TIE SCHEDULE CS16FT1 MARK SIMPSON STUD FRAMING 2x4's @ 12"O.C. 2x6's @ 12"O.C. 2x6's @ 16"O.C. 2x4's @ 16"O.C. OPENING TO BE SPECIFIED BY ENGINEER. WALLS TALLER THAN 16' AND/OR WALLS W/ LARGE HEIGHT 10' TO 12' 14' TO 16' 12' TO 14' 0' TO 10' STUD HEIGHTS GRADE DF OR HF STUD DF OR HF STUD DF OR HF STUD DF OR HF STUD No. Size Length Spacing LENGTHWISE REINFORCING FOOTING SCHEDULE 2CONT9"F-18 18" F-24 F-30 F-20 CONT CONT CONT 24" 30" 20" 10" 10" 10" 2 3 2 MARK WIDTH LENGTH THICK fc = 2500 PSI No. Size Length Spacing CROSSWISE REINFORCING CONT 12" O.C.#4 12" O.C. 14" O.C. 18" O.C. CONT CONT CONT #4 #4 #4 fy = 60000 PSI No. Size Length Spacing LENGTHWISE REINFORCINGMARK WIDTH LENGTH THICK 24" 48" 42" 30" 36" P-30 P-48 P-42 P-36 P-24 12"30" 48" 42" 36" 12" 12" 12" 24"10" fc = 2500 PSI 18" 42" 36" 24" 30" No. Size Length Spacing CROSSWISE REINFORCING #43 6 5 4 #4 #4 #4 2 #4 3EQ. EQ. EQ. EQ. 6 5 4 EQ.2 PAD SCHEDULE EQ. EQ. EQ. EQ. EQ.24"#4 42" 36" 30" #4 #4 #4 18"#4 fy = 60000 PSI (20) 16d SINKERS HD3 STHD14 (24) 16d SINKERS HD4 STHD14RJ (24) 16d SINKERS GENERAL FRAMING NOTES 1. THE CONTRACTOR SHALL USE THE GRADES OF LUMBER SPECIFIED IN THE BEAM SCHEDULES LISTED ON DRAWING. DEEPER, WIDER, OR BETTER GRADES OF LUMBER MAY BE SUBSTITUTED, ANY OTHER CHANGES MUST BE APPROVED BY THE ENGINEEER. 2. (2) 2"x10" DF#2 OR BTR W/FILLER SHALL BE USED FOR ALL LOAD-BEARING WINDOW AND DOOR HEADERS UNLESS NOTED OTHERWISE ON DRAWING. TIMBERSTRAND LSL HEADERS MAY BE SUBSTITUTED FOR THE (2) 2"x10" DF#2 OR BTR. 3. (2) 1-3/4"x9-1/2" LVLs SHALL BE USED FOR ALL HEADERS SUPPORTING A GIRDER TRUSS UNLESS NOTED OTHERWISE ON DRAWING. 4. ALL MULTIPLE BEAMS AND HEADERS SHALL BE NAILED USING 2 ROWS OF 16d NAILS @ 12" O.C. 5. ALL POINT LOADS SHALL BE SOLID BLOCKED TO THE FOUNDATION. 6. USE DOUBLE TRIMMERS TO SUPPORT BEAMS AND HEADERS GREATER THAN 6 FEET UNLESS NOTED OTHERWISE ON DRAWING. 7. USE SIMPSON OR EQUIVALENT HARDWARE TO CONNECT BEAMS 6' AND LONGER TO STUDS OR POSTS. 8. THE CONTRACTOR SHALL FOLLOW THE MINIMUM FASTENING SCHEDULE LISTED IN IBC TABLE 2304.9.1. 9. ANY FASTENER IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE GALVANIZED PER IRC 317.3. 10. ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE 2018 INTERNATIONAL BUILDING CODE. 6"x6"P4 P2 4"x4"DF#1 DF#1 POST SCHEDULE POST SIZEMARK GRADE CONNECTORS* BEAM FOUNDATION SIMPSON AC4/ACE4 SIMPSON AC6/ACE6 * BEAM CONNECTORS ARE FOR BOTH INTERIOR AND EXTERIOR APPLICATIONS. FOUNDATION CONNECTORS ARE FOR EXTERIOR APPLICATIONS ONLY. ANY FASTENER, NAIL, BOLT, ETC., IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE GALVANIZED PER IRC 317.3. SIMPSON EPB44 SIMPSON EPB66 P1 P3 P5 4"x4"x1/4" HSS Fy=46 KSI MULT STUD 4"x6"DF#1 SIMPSON AC4/ACE4 SIMPSON EPB46 N/A N/A SEE DETAIL 8-S1 SEE DETAIL 8-S1 USP STAD10 STAD10RJ STAD14 STAD14RJ RS150 USP FOOTING & FOUNDATION 1. THE FOOTINGS HAVE BEEN DESIGNED TO THE SOIL BEARING PRESSURE SPECIFIED IN THE DESIGN CRITERIA. IT IS THE RESPONISBILITY OF THE HOME OWNER TO VERIFY THE BEARING PRESSURE. ANY ANOMALOUS SOIL BEARING CONDITION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE CONSTRUCTION. 2. ALL FOOTINGS ARE TO REST ON UNDISTURBED SOIL AND SHALL BE A MINIMUM OF 30", OR LOCAL FROST DEPTH, BELOW THE FINISHED GRADE. 3. THE CONTRACTOR SHALL ENSURE THAT THE FOOTINGS ARE PROPERLY DRAINED AND THAT SOIL MOISTURE CONTENT MEETS THE IRC REQUIREMENTS. 4. ANY ANOMALOUS SOIL CONDITION ENCOUNTERED DURING EXCAVATION, SUCH AS SLIPPAGE, HIGH MOISTURE CONTENT, IMPROPER DRAINAGE, ETC., SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING. 5. COMPACT BACKFILL AGAINST FOUNDATION WALL TO 85% OF THE MODIFIED PROCTOR DRY DENSITY TO REDUCE SETTLING OF FILL. 6. FOUNDATION ANCHOR BOLTS SHALL BE EMBEDDED IN AT LEAST 7" OF CONCRETE AND PLACED WITHIN 12" OF SILL PLATE END. IF MULTIPLE PLATES ARE USED, THE ANCHOR BOLTS SHALL EXTEND THROUGH ALL PLATES. THERE SHALL BE A MINIMUM OF 2 ANCHOR BOLTS PER WALL SECTION. SEE CROSS SECTION FOR SIZE AND SPACING. 3"x3"x1/4" SQUARE WASHERS SHALL BE USED BETWEEN ANCHOR BOLT AND PLATE. IF WASHER IS SLOTTED, USE STANDARD WASHER BETWEEN IT AND ANCHOR BOLT NUT. 7. GRADE 60 REBAR SHALL BE USED FOR BOTH VERTICAL AND HORIZONTAL INSTALLATIONS. 8. HOLDOWNS SHALL BE EMBEDDED IN THE FOUNDATION PER MANUFACTURERS REQUIREMENTS. THE CONTRACTOR SHALL ENSURE THAT THE FASTENER HOOKS THE REBAR AND MEETS THE MINIMUM EDGE DISTANCE. 9. ANY FASTENER IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE GALVANIZED PER IRC 317.3. 24-10dHTS30CFT2MTW30C SIMPSON USP 18-10d 14-10d FOUNDATION SCHEDULEfc=3000 PSI 2 FT 9 FT 8 FT 4 FT 6 FT FLOOR OR NONE 8" #4 @ 24" 2-#4 BARS MAX. HEIGHT SUPPORT TOP EDGE MIN. THICKNESS fy=60000 PSI VERTICAL STEEL ROOF DIAPHRAGM 9 FT OVER ENGINEERING REQUIRED #4 @ 16" STEEL HORIZONTAL 2-#4 BARS 4-#4 BARS 5-#4 BARS 6-#4 BARS 7-#4 BARS STEEL AT OPENINGS TOP 1-#4 BAR EACH SIDE 1. Based on 3000 psi concrete and 60.000 psi reinforcing steel. 2. To be placed in the center of the wall, and extended from the footing to within three inches of the top of the wall; dowels of #4 bars to match vertical steel placement shall be provided in the footing, extending 24 inches into the foundation wall. 3. One bar shall be located in the top four inches, one bar in the bottom four inches and the other bars equally spaced between. Such bar placement satisfies the requirements of Section 1805.9. Corner reinforcing shall lap 24 inches. 4. Bars shall be placed within two inches of the openings and extend 24 inches beyond the edge of the opening; vertical bars may terminate three inches from the top of the concrete. 5. Dowels of #4 bar @ 32" O.C. shall be provided in the footing, extending 18 inches into the foundation wall. 6. Diaphragm shall conform to the requirements of Section 2308. 7. Footing shall be a minimum of nine inches thick by 20 inches wide. 8. Soil backfill shall be soil classification types GW, GP, SW, or SP, per Table 1610.1. Soil shall not be submerged or saturated in groundwater. #4 @ 32" NOTE 5 BOTTOM 1-#4 BAR 32 3 FT 6"3-#4 BARS#4 @ 32" 4 MAX LINTEL LENGTH MAX LINTEL DEPTH 6' FOOT OF OPENING3' 2' 2" FOR EACH2' WIDTH; 6" MIN. 1. ALL EXTERIOR WALLS SHALL BE SHEATHED WITH 7 16" APA RATED OSB SHEATHING AND NAILED W/8d @ 4" O.C. EDGE, 12" O.C. FIELD UNLESS NOTED OTHERWISE. 2. SHEATHING SHALL EXTEND CONTINUOUS FROM FLOOR SILL PLATE TO TOP PLATE OF UPPER WALL AND BE NAILED PER REQUIRED EDGE SPACING ALONG SILL PLATE. 3. NAILS SHALL BE PLACED NOT LESS THAN 1 2" FROM EDGE OF PANEL AND DRIVEN SO THAT THEIR HEAD OR CROWN IS FLUSH WITH THE SURFACE OF THE SHEATHING. 4. ALL HORIZONTAL EDGES SHALL BE BLOCKED WITH 2" NOMINAL OR WIDER FRAMING. WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL WITH NAIL SPACING LESS THAN 6" O.C., PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR FRAMING SHALL BE 3" NOMINAL OR THICKER AND NAILS ON EACH SIDE SHALL BE STAGGERED. 5. A NAILING SCHEDULE REQUIRES THAT THE FOUNDATION SILL PLATES AND ALL FRAMING MEMBERS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A 3" NOMINAL MEMBER. NAILS SHALL BE STAGGERED. 1. TYPICAL FLOOR SHEATHING SHALL BE 3 4" T&G WAFER BOARD NAILED W/8d NAILS @ 6" O.C. ON ALL EDGES, AND @ 12" O.C. ALONG INTERMEDIATE FRAMING MEMBERS. 2. SOLID BLOCK JOISTS AT POINT-LOAD BEARING LOCATIONS. 3. INSTALL FLOOR SHEATHING WITH FACE GRAIN AT RIGHT ANGLES TO FRAMINIG WITH END JOINTS STAGGERED. 4. USE DOUBLE FLOOR JOISTS UNDER ALL LOAD BEARING WALLS RUNNING PARALLEL WITH FLOOR JOISTS. 5. USE DOUBLE FLOOR JOISTS UNDER ALL INTERIOR SHEARWALLS RUNNING PARALLEL WITH FLOOR JOISTS. NAIL BOTTOM PLATE TO JOISTS W/16d NAILS @ 3" O.C. 6. USE DOUBLE JOISTS TO SOLID BLOCK UNDER ALL SHEARWALLS RUNNING PERPENDICULAR TO FLOOR JOISTS. NAIL BOTTOM PLATE TO BLOCKING W/16d NAILS @ 3" O.C. 1. ROOF TRUSSES SHALL BE DESIGNED TO MEET THE LOADS SPECIFIED IN THE DESIGN CRITERIA. ALL TRIBUTARY, DRIFT, UNBALANCED SNOW, MECHANICAL, ETC., LOADS SHALL BE CONSIDERED IN THE DESIGN PER IRC REQUIREMENTS. 2. THE CONTRACTOR SHALL BLOCK BETWEEN THE TRUSSES AND CONNECT EACH TRUSS TO WALL TOP PLATE WITH SIMPSON H1 OR USP RT15 CONNECTORS. 3. ANY CHANGES TO THE TRUSS CONFIGURATION SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION. 4. ALL ENGINEERING TRUSS SUBMITTALS SHALL BE STAMPED BY A ENGINEER LICENSED IN THE STATE OF UTAH. S0 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 FOOTING STEP DETAIL HOUSE FOUNDATION DETAIL 8 NOT TO SCALE SUSPENDED PORCH DETAIL 5 NOT TO SCALE6HOLDOWN DETAIL NOT TO SCALE HOLDOWN DETAIL4NOT TO SCALE 3 NOT TO SCALE21 NOT TO SCALE GARAGE FOUNDATION DETAIL INTERIOR FOOTING DETAIL NOT TO SCALE NOT TO SCALE PIER DETAIL7 9 DECK CONNECTION DETAIL NOT TO SCALE FOOTING REBAR PER FOOTING SCHEDULE OVER 4" GRAVEL BASE 4" CONCRETE SLAB #4 HORIZ. 4" FROM TOP 2x TRTD. SILL PLATE W/ 1/2"x10" A.B. @ 32" O.C. 8" CONCRETE FOUNDATION *DBL PLATES MAY BE SUBSTITUTED FOR 3x AS LONG AS A.B. EXTEND THRU BOTH PLATES, AND PLATES ARE GLUED AND NAILED W/16D @ 3" O.C. ONLY BOTTOM PLATE MUST BE TRTD. #4 HORIZ. 4" FROM BOTTOM GRADE 60 REBAR 3000 PSI CONCRETE SHEARWALL DESIGNATION REQUIRES 3x TRTD. PLATE* W/5/8"x12" A.B. @ 24" O.C. OR 2x TRTD. PLATE W/ 5/8"x10" A.B. @ 16" O.C. 3 HORIZONTAL & VERTICAL REBAR PER FOUNDATION SCHEDULE ON FTG/FDN PLAN SEE FTG SCHEDULE FOR SIZE AND REINFORCEMENT REQS. OVER 4" GRAVEL BASE 4" CONCRETE SLAB FLOOR JOISTS PER PLAN *DBL PLATES MAY BE SUBSTITUTED FOR 3x PROVIDED A.B. EXTEND THRU BOTH PLATES, AND PLATES ARE GLUED AND NAILED W/16D @ 3" O.C. ONLY BOTTOM PLATE MUST BE TRTD. 3000 PSI CONCRETE GRADE 60 REBAR SHEARWALL DESIGNATION REQUIRES 3x TRTD. PLATE* W/5/8"x12" A.B. @ 24" O.C. OR 2x TRTD. PLATE W/ 5/8"x10" A.B. @ 16" O.C. 3 2x TRTD PLATE W/ 1/2" A.B. @ 32" O.C. #4 BAR 4" FROM TOP #4 BAR 4" FROM BOTTOM 8" CONCRETE FOUNDATION HORIZONTAL & VERTICAL REBAR PER FOUNDATION SCHEDULE ON FTG/FDN PLAN D' 3' MIN 1.5 X D' FTG DEPTH (2) #5 DIAGONAL IN FDN WALL30 " M A X SEE FTG SCHEDULE FOR SIZE POST PER SCHEDULE 12" DIA. SONOTUBE #3 CIRCULAR TIES @ 6" O.C. (4) #4 DOWELS ON 8" DIA. CIRCLE W/ (3) #3 TIES @ 3" O.C. TOP AND REINFORCEMENT REQS. SIMPSON CB?? POST BASE OR EQUIV. GRAVEL FILL RECOMMENDED NOT REQUIRED 4" CONCRETE SLAB 2x BEARING WALL FOOTING SIZE AND REBAR REQUIREMENT PER FOOTING SCHEDULE 2x TRTD. SILL PLATE W/ POWDER ACTUATED FASTENERS @ 32" O.C. WHERE BRICK OCCURS OTHERWISE MOVE FRAMING FLUSH WITH EXTERIOR FOUNDATION FACE. FLOOR SHEATHING (NAILING @ 6" O.C. MAX., JOIST W/ HOLDOWN) DECK JOISTS PER SCHEDULE FASTEN JOIST TO LEDGER W/ SIMPSON ITT SERIES HANGAR NAIL PER MANU. SPEC. FASTEN 2X LEDGER TO RIM JOIST W/ (1) 5/8"X4" LAG BOLT & (4) 16D NAILS @ 16" O.C. LAG BOLTS SHALL BE HOT-DIPPED GALVANIZED OR STAINLESS STEEL. (3) 8D BOX NAILS CLINCHED @ 6" O.C. I.E. 7 ROWS 4'x3/4" OSB BOTH SIDES 1/8" MIN GAP 1" MAX A A RIM JOIST VIEW A 36" OF SIMPSON CS 16 STRAP. NAIL W/ (26) 8D NAILS, 13 PER SIDE. INSTALL IN NO LESS THAN 2 LOCATIONS. SUBSTITUTION OF SIMILAR 1500 LB TENSION CONNECTION PERMISSIBLE. FOUNDATION # 4 REBAR BOARD FORM NAIL TO POST OR (2) 2X STUDS W/16d @ 24" O.C. EACH SIDE FULL HEIGHT FOUNDATION STRAP PER PLAN SEE FOOTING/FOUNDATION PAGE POST OR (2) 2X STUDS W/16d @ 24" RIM JOIST OR BLOCKING O.C. EACH SIDE FULL HEIGHT FLOOR SHEATHING ENSURE STRAP HOOKS REBAR FOUNDATION FOUNDATION STRAP PER PLAN SEE FOOTING/FOUNDATION PAGE #4 X 24" @ 18" O.C. SHORED 4' O.C. FOR AT LEAST THE SUSPENDED SLAB SHALL BE 4" SUSPENDED CONC. SLAB SEE FTG SCHEDULE FOR SIZE AND REINFORCEMENT REQS. #4 VERTS @ 18" O.C. #4 HORIZ @ 12" O.C. #4 DOWELS @ 18" O.C.14 DAYS 24" 22 GAUGE STEELCO METAL DECKING S1 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 FLOOR TO FLOOR TIE DETAIL NOT TO SCALEFNOT TO SCALE GABLE END DETAILE G SHEARWALL OPENING DETAIL NOT TO SCALE H NOT TO SCALE OVERBUILD DETAIL D NOT TO SCALE CANTILEVER DETAIL CNOT TO SCALEBWOOD I JOIST DETAIL NOT TO SCALE WOOD I JOIST DETAILA WOOD I JOIST DETAIL NOT TO SCALE SOLID BLOCKING DETAIL NOT TO SCALEJ SHEAR WALL NOTES FOR A.B. SPACING) 2 X CONTINUOUS SILL PLATES (SEE 1 3/4" BEARING REQUIRED NAIL RIM JOIST TO PLATE NAIL TO PLATE W/(3) 8d NOTE: RETAINING TYPE FOUNDATION MUST BE USED WHERE JOISTS DO NOT REST DIRECTLY ON TOP OF FOUNDATION WALL AS ILLUSTRATED CONCRETE FOUNDATION ONE TOP AND ONE BOTTOM W/(2) 8d BOX NAILS NAIL RIM JOIST TO FLOOR JOIST W/ 8d @ 6" O.C. WOOD-I JOIST (SEE SHEARWALL NOTES) 16d @ 8" O.C. FLOOR SHEATHING WOOD I-JOIST (SEE PLAN) SHEATHING TO BLKG. W 10d @ 4" O.C. SOLID BLKG. @ 48" O.C. OR DBL TOP PLATE 2 X STUDS @ 16" O.C. (TYPICAL) SHEARWALL SHEATHING EXTENDS CONTINUOUS TO TOP WALL PLATE 2 X CONTINUOUS SILL PLATE RIMJOIST TOENAIL TO PLATE W/8D @ 6" O.C. FOUNDATION WALL SHOWN FOUNDATION OR STUD WALL BEARING WALL LAPS 4'-0" AND NAIL W/16d NAILS AT 4" O.C. @ LAPS, 8" O.C. (TYPICAL) NAIL OSB TO BLOCK W/8d @ 6" O.C. ONE EACH SIDE NAIL TO PLATE W/(2) 8d 2 X STUDS @ 16" O.C. (TYPICAL) DOUBLE TOP PLATE, STAGGER ALL WOOD I-JOIST SOLID BLOCKING BETWEEN JOISTS 3 1/2" MIN. BEARING REQUIRED NAIL BLOCK TO PLATE W/(3) 16d ROOF TRUSS CUT STRUT TO MATCH ROOF SLOPE. BEAR ON BRIDGE PLATE. NAIL STRUT TO PLATE W/(4) 16d TOENAILS, 2 EACH SIDE. 2x PLATE W/(2) 16D NAILS PER TRUSS 2x VERTICAL STRUT W/ 2x BEARING STUD. NAIL STRUT TO RIDGE OR RAFTER SIDE W/ (2) 16D NAILS. NAIL STRUT TO STUD W/ 16D @ 12" O.C. ROOF SHEATHING OVER RIDGE BEAM OR RAFTER STRUT SPACING 6' 10' 8' 4' RIDGE 2"x4" MEMBER SPACING 2"x6" 2"x8" 2"x10" 2"X4" STRUT ASSUMED. RIDGE BEAM AND RAFTERS TO BEAR ON TRUSS OR 2X PLATE. DO NOT BEAR RIDGE OR RAFTERS DIRECTLY ON SHEATHING. WEB STIFFENER BY JOIST MANUFACTURER EACH SIDE OF JOIST TO SUPPORT COLUMN LOAD (LENGTH = JOIST DEPTH + ?) COLUMN LOADS CANNOT BE SUPPORTED BY WOOD I JOISTS 2 x 4 MIN BLOCKS BY CONTR. EA. SIDE OF JOIST BLOCKING PANEL BY JOIST MANUFACTURER 2 2 3 1 1 1 2 3 3 1 2 3 (3) 8D BOX NAILS CLINCHED 4'x3/4" OSB BOTH SIDES 1/8" MIN GAP 1" MAX 8d NAILS @ 4" O.C. 4'x3/4" OSB SHEATHING BOTH SIDES (BEARING WALL ONLY) SOLID BLOCKING I-JOIST OR RIM-JOIST 10d NAILS @ 4" O.C. STAGGERED 3/4" OSB 4" 4" 2 x BEARING OR NON BEARING WALL 7/16" OSB RIMJOIST REQUIRED ONLY FOR FOR BEARING WALLS LENGTH PROVIDE MINIMUM IN EACH END. EQUAL NUMBER OF SPECIFIED NAILS END DISTANCE 8 7"END LENGT H SPANCLEAR LENGTH END CUTUSE EVERY OTHER NAIL HOLE IN A ROW TO PROVIDE THE CODE REQUIRED MINIMUM CENTER-TO-CENTER NAIL SPACING (4) 16 D NAILS DIAGONAL BRACE TO BLOCK 2X BLOCKING - 2 BAYS FASTEN ROOF SHEATHING TO BLOCKING W/8d NAILS @ 6" O.C. WOOD TRUSSES PER PLAN 2X4 DIAGONAL BRACE @ 6' O.C. APPLY CONSTRUCTION ADHESIVE TO KICKER BLOCK INTERFACE 2X4 FULL-LENGTH DRYWALL BLOCKING. FASTEN TO DBL TOP PLATE W/16d NAILS @ 6" O.C. SIMPSON A-35 OR EQUIV. DIAGONAL BRACE TO DRYWALL BLOCKING 6 NAILS TOTAL, 3 PER SIDE. SHEATHING NAIL PER PLAN DBL TOP PLATE STUD WALL PER PLAN 1" SHEATHING GAP IS PERMISSIBLE 8d NAILS PER EDGE NAILING REQ. OSB SHEATHING CUT AROUND SHEARWALL OPENING. BLOCK HORIZONTAL EDGES 32" OF SIMPSON CS16 CENTER ON KING STUD (4 PLACES) 7/16" OSB SHEATHING ONE SIDE SHOWN FOR CLARITY SHEATHING EDGE W/ SOLID BLOCKING SHEAR WALL OPENING(S) FOUNDATION HOLDOWN PER PLAN (NOT ALWAYS REQ.) 16" MIN. OF 2"x SOLID BLOCKING EACH CORNER FLAT BLOCKING AGAINST WALL ACCEPTABLE HD3 FLOOR-TO- FLOOR TIE REQUIRED. 2 STORY STUCTURES ONLY. PER PLAN F - S2 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3" ON CENTER TYP. 1000 LB STRAP OPPOSITE SHEATHING FASTEN SHEATHING TO HEADER WITH 8D COMMON OR GALVANIZED BOX NAILS IN 3" GRID PATTERN AS SHOWN AND 3" O.C. IN ALL FRAMING (STUDS, BLOCKING, AND SILLS) TYP. MIN. WIDTH = 16" FOR ONE STORY STRUCTURES MIN. WIDTH = 24" FOR USE IN THE FIRST OF TWO STORY STRUCTURES MIN. 2x4 FRAMING 3/8" MIN. THICKNESS WOOD STRUCTURAL PANEL SHEATHING SIMPSON STHD14 OR SIM. (EMBEDDED INTO CONCRETE AND NAILED INTO FRAMING) (2) 5 8"X12" ANCHOR BOLTS 6" CONCRETE EMBEDMENT TYPICAL PORTAL FRAME CONSTRUCTION FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED AND OCCUR WITHIN 24" OF MID- HEIGHT. ONE ROW OF TYP. SHEATHING-TO- FRAMING NAILING IS REQUIRED. IF 2x4 BLOCKING IS USED, THE 2x4 MUST BE NAILED TOGETHER WITH 3 16D SINKERS EXTENT OF HEADER DOUBLE PORTAL FRAME (TWO BRACED WALL PANELS) MIN. 3"x11.25" NET HEADER (1) FULL-WIDTH TRTD PLATE W/ (2) 2X BLOCKS GLUED AND NAILED 10 ' M A X 2X4 STUD WALL @ 16" O.C. (3) 16d NAILS TRUSS TO EACH STUD TOP AND BOTTOM CHORDS ROOF TRUSSES FULLY-SHEATHED SECOND-STORY WALL 2X10 BLOCKING BOTTOM FLUSH WITH DBL TOP PLATE 2" GAP BETWEEN SHTG PERMISSIBLE ROOF SHTG NOT SHOWN. SEE ROOF SHTG NOTES FOR SIZE & NAILING. ENERGY-HEEL TRUSS SIMPSON H1 OR EQUIVALENT EACH TRUSS TO DBL TOP PLATE DBL TOP PLATE 2X4 STUD WALL @ 16" O.C. FULLY-SHEATHED SECOND-STORY WALL SIMPSON A-35 EACH TRUSS TO BLOCK 2X BLOCK NAIL TO STUDS W/ (3) 16d NAILS SIMPSON LU24 HANGER BOTTOM CHORD TO RIMJOIST TRUSSES @ 24" O.C. ROOF SHEATHING NAIL TO FRAME PER SHEATHING EDGE NAIL REQUIREMENT TRUSSES @ 24" O.C. FASTEN 7 16" OSB SHEATHING AROUND FRAME PERIMETER W/8D @ 6" O.C. 2X4 WOOD FRAME BY TRUSS MANUFACTURER SIMPSON A-35 @ 24" O.C. FRAME TO TOP PLATE S3 2018 IBC Date: S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 TRUSS CONNECTION DETAIL3NO SCALE GARAGE OPENING DETAIL1NO SCALE TRUSS CONNECTION DETAIL2NO SCALE TRUSS CONNECTION DETAIL4NO SCALE TRUSS BLOCKING DETAIL5NO SCALE 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 5 S1 TYP S1 3 F- 2 0 HD3 F-18 F- 2 4 P2 P2 P-24 P-24 HD3 F-20 HD3 HD3 HD3 HD35 S1 TYP 1 S1 TYP HD2 HD2HD2HD2 HD1 HD1 F-18 F-18 F- 2 0 F-20 HD2 P-24 F- 2 0 F-24 2 S1 TYP F- 2 0 F-20 F-20 2'-91 2"3'-0"9'-41 2"9'-0"25'-41 2" 1'-6"9'-0"1'-6" 2' - 0 " 8" 2' - 0 " HD1 HD3 S1 1 15'-111 2" 6 S1 TYP FOOTING AND FOUNDATION PLAN SCALE: 1/8" = 1'-0" SOIL BEARING PRESSURE DEAD SNOW FLOOR LOADS ROOF LOADS 1.00 DESIGN CRITERIA SEISMIC GOVERNING CODE 1.00 6.5 WIND SPEED BASIC, V SURFACE ROUGHNESS RISK CATEGORY II DECK LOADS DEAD LIVE DEAD LIVE 10 PSF 60 PSF DESIGN CATEGORY IMPORTANCE FACTOR, Ie RESPONSE COEFFICIENT, Rw SITE COEFFICIENT, Fa DESIGN SPECTRAL RESPONSE, S DESIGN SPECTRAL RESPONSE, S S DS 2018 IBC D .96 1.11 .71 105 MPH C 15 PSF 30 PSF 10 PSF 40 PSF 1500 PSF S4 CO U N T R Y W E S T Governing Code: 2018 IBC Date: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 P1 P2 P2 A S2 B S2 S2 A S2 B 16 ' - 2 " 8' - 1 " 15 ' - 7 " 5' - 0 1 2 " FB1FB1FB1 FB2 FB1 18 ' - 4 1 2 " 15 ' - 9 1 2 " 17 ' - 8 1 2 " MAIN FLOOR FRAMING PLAN SCALE: 1/8" = 1'-0" S5 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 GRADE FLOOR BEAM SCHEDULE MARK FB1 BEAM SIZE DEEPER, WIDER, OR BETTER GRADES OF LUMBER MAY BE SUBSTITUTED. ACCEPTABLE SUBSTITUTIONS: LSL FOR DOUG FIR, LVL FOR LSL, PSL FOR LVL. OTHER SUBSTITUTIONS MUST BE APPROVED BY THE ENGINEER. DEAD LOAD = 10 PSF LIVE LOAD = 40 PSF FB2 (3) 2x10 DF#2 or BTR FB3 FB4 FB5 FB6 FB7 (2) 2x10 DF#2 or BTR UNLESS NOTED OTHERWISE ALL FLOOR FRAMING MEMBERS ARE 11-7/8" TJI/210 @ 16" O.C. (3) 2x10 DF#2 or BTR (3) 2x10 DF#2 or BTR (3) 1-3/4"x14"1.9E, 2600 Fb, LVL (2) 2x10 DF#2 or BTR (2) 1-3/4"x11-7/8"1.9E, 2600 Fb, LVL FB8 (2) 1-3/4"x11-7/8"1.9E, 2600 Fb, LVL 2 2 2 4 4 4 4 4 4 2 2 2 3 3 2 2 2 2 2 2 2 3 3 MAIN SHEARWALL PLAN SCALE: 1/8" = 1'-0" S6 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 1 S3 E S2 TYP RB 3 2 S3 TYP P1 P 1 H S2 TYP 1 S3 P1 P 1 P 1 P 1 RB5 RB4 RB4 RB4 RB1 RB4 RB 2 RB4 RB3 RB3 RB3 RB3 RB4 RB4 RB5 RB3 RB3 RB 4 RB 2 RB 4 P1P1 P 1 P 1 RB4 S3 5 1 S3 1 S3 GIRDER ROOF FRAMING PLAN SCALE: 1/8" = 1'-0" GRADE ROOF BEAM SCHEDULE RB3 RB2 MARK RB1 BEAM SIZE DEEPER, WIDER, OR BETTER GRADES OF LUMBER MAY BE SUBSTITUTED. ACCEPTABLE SUBSTITUTIONS: LSL FOR DOUG FIR, LVL FOR LSL, PSL FOR LVL. OTHER SUBSTITUTIONS MUST BE APPROVED BY THE ENGINEER. DEAD LOAD = 15 PSF SNOW LOAD = 30 PSF S7 2018 IBC Date: CO U N T R Y W E S T Governing Code: R. D o u g l a s J o n e s P . E . S. D . A . , I n c . P . C . 17 0 5 N . H i l l F i e l d R d . La y t o n , U T 80 1 - 7 7 6 - 6 5 1 0 BR I D L E W O O D #1 0 8 W i l d F i r e E s t a t e s We s t P o i n t , U T 8 4 0 1 5 05/13/20 156340 D ES O R P S E F EER OI TSIG LAN ER EE IGN N R A T P AAR L TS NO. H T FOE D.J U N O H S E 05/13/ 2 0 RB4 (2) 1-3/4"x9-1/2"1.9E, 2600 Fb, LVL (2) 2x6 DF#2 or BTR RB5 (2) 1-3/4"x11-7/8"1.9E, 2600 Fb, LVL (2) 1-3/4"x14"1.9E, 2600 Fb, LVL (2) 2x10 DF#2 or BTR Roof Trusses (designed according to R802.10.1) 35 # Snow and 90 mph winds (Local Conditions)