HomeMy WebLinkAboutEXCAVATION PERMIT - 22-00865 - 324 E 3rd S - REPAIR SEWER LINEM
NOV 11 20Axcavation Permit Application ;.a..emr<.
CITY OP
Public Works a _ RMURG
'ar re�wM l r.a au
rr p%
35 North Ist East keithd@rexburg.org Phone: 208.359.3020 x2320 AmWW kmily C,mm, t6Y
Rexburg, ID 83440 www.rexburg.org Fax 208.359.3022
Applicant:
DR Heating and PlumbingDate;
1 11/922
Mailing address:
418 N 4014E #4, Rigby ID, 83442
Contact phone:
208-356-9331
Enna. I infoQdrheatingandplumbing.com
Refund recipient name (if different from applicant): I Joshua B Mum e
Contractor:
DR Heating and Plumbing
Phone; 208-356-9331
Utility company:
Phone:
Excavation address:
324 E 3rd S Rexburg, ID 83440
Exc. date: 11/162022
Describe area of excavation right of way: I Frern the house to
the city morn
Purpose of excavation:
Install new sewer line
Location of excavation:
0 Street 0 Alley 0 Sidewalk
0 Undeveloped/Landscape Area
CGINDI LIGNS OF YEttlyllT:
1. No excavation within city right of way limits shall take place prior to the issuance of an excavation permit.
2. Property owners must be made aware of work happening adjacent to their parcels. An "Acceptance of Surface Repairs" form
must be signed by the property owner(s) prior to the excavation work being completed. (See Attachment A)
3. This permit expires 30 days after the issue date. Any work started and not completed within 30 days will be assessed a $100
weekly inspection fee until work finalized.
4. The contractor is responsible for carrying a minimum of $500,000 general liability insurance coverage for possible damages
during excavation or other accidents.
5. The public right of way fee is $1,000 for any work that will disturb less than 30 square yards of asphalt surfacing. A $100 portion
of this fee will be retained by the city for initial inspection costs.
6. Excavation work which disturbs more than 30 square yards of asphalt surfacing must be individually assessed by the city for
additional fees.
7. All utilities must be placed a minimum of 4 feet below the finished grade unless specifically authorized otherwise in writing.
8. The contractor is responsible for contacting the city prior to placing backfill material and/or asphalt in city street locations. A city
representative will then assess and, if acceptable, the excavation fee less inspection costs will be refunded within 30 calendar days
of completion.
9. If permit conditions are not met the city will hold fees for 1 year from final asphalt placement. If repairs are required, the
contractor will be responsible for completing all repairs. If repairs are not made within 7 days, the city will complete repairs. The
permit fee will be retained and any additional costs will be the responsibility of the permit holder.
10. The contractor must notify Dig Line at 1-800-342-1585 at least two (2) business days in advance of the excavation date.
11. The contractor is responsible for famishing and maintaining all barricades, signs, and flagmen as required by the Mammal on
Uniform Traffic Control Devices (MUTCD).
12. Existing asphalt pavement shall be saw cut prior to placement of asphalt to provide a vertical surface.
13. Excavation and backfill work is to be completed in accordance with the requirements of Sections 300 and 800 of the Idaho
Standards for Public Works Construction (ISPWC). (See Attachment B.)
14. All excavated material, if acceptable for reuse shall be stockpiled or if not acceptable be immediately removed from the site.
Excavated material needs to be kept a safe distance from trenches or traveled roadways.
15. All street excavations must be backfilled with 3 feet of flowable fill, 4 inches of % inch crushed aggregate road base, and 2 xh
inches minimum thickness of plant mix pavement surface or equal to the existing material thickness, whichever is greater. No
exceptions unless pre -approved by city public works director.
16. Existing asphalt pavement shall be "tacked" prior to new asphalt placement.
17. Final repair of asphalt surfaces must be completed within 10 calendar days of the initial excavation.
18. No excavation permits will be approved from November l" — March 3l" except in the case of an emergency which must be
approved by the city public works director. Winter excavation requires a temporary cold mix paving to be placed and maintained
by the contractor until the final paving is completed no later than May 1".
In completing this application for an excavation permit, I hereby agree to all the above conditions as well as all applicable
City of Rexburg ordinances.
11/09/2022
be notified ofpermit application approval and request for a deposit to be submitted before excavation can begin.
H 1
Revised 10/7/2019
On this _ day of
Printed Property Owner Name
On this day of
(Attachment A)
Acceptance of Surface Repairs
—20—L , the parcel owner of the property located at
in Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
Date
Acceptance of Surface Repairs
Contact Number
—20-1, , the parcel owner of the property located at
in Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
Printed Property Owner Name Signature Date Contact Number
On this _ day
Printed Property Owner Name
Acceptance of Surface Repairs
201,
the parcel owner of the property located at
Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
Date
Number
Revised 10/7/2019
(Attachment B)
Backfill Material Requirements
Backfill material shall meet the above gradation requirements and be placed in 12 -inch maximum loose lifts and compacted
to 95% of maximum density in accordance with AASHTO T 99.
1/2 -inch Class IH Plant Mix Pavement shall be compacted to between 92% and 95% of maximum density in accordance with
mix design.
Asphalt surfacing must extend 1 foot beyond the trench sides in all directions or a minimum of 4 feet in width, whichever is
greater. Minimum asphalt thickness shall be 2 V2 inches or equal to the existing material thickness, whichever is greater
Final surface deviation must be within +/-'/" or less of surrounding surface conditions unless approved by the City of
Rexburg Engineer.
Damages caused by the excavation must also be repaired at contractors' expense.
Excavation Permit Summary
✓ ❑ Obtain Permit prior to starting excavation
✓ ❑ Notify Dig -line at 1-800-342-1585
✓ ❑ Provide hlsmance
✓ ❑ Backfilled with flowable fill
✓ ❑ Notify city prior to backfilling, or loose refund
✓ ❑ Compact all backfill- see attached specifications
✓ ❑ Fill and compact the tip of trench with approved gravel
✓ ❑ Notify city prior to paving, or loose refund
✓ ❑ Paving surface to be completed within 10 days, or city will complete
✓ ❑ Paving to be done according to attached specifications
✓ ❑ Fix surface repair if it fails or the trench settles
✓ ❑ Notify parcel owner
✓ ❑ Return signed parcel owner acceptance form to the city
Revised 10/7/2019
3" Minus
3/4" crushed Road Base
e I
3 in.
100
1 in.
100
3/4 in
90-100
3/8 in.
No.4
25-fi0
40-65
No. 8
30-50
No. 200
0-12
3-9
Backfill material shall meet the above gradation requirements and be placed in 12 -inch maximum loose lifts and compacted
to 95% of maximum density in accordance with AASHTO T 99.
1/2 -inch Class IH Plant Mix Pavement shall be compacted to between 92% and 95% of maximum density in accordance with
mix design.
Asphalt surfacing must extend 1 foot beyond the trench sides in all directions or a minimum of 4 feet in width, whichever is
greater. Minimum asphalt thickness shall be 2 V2 inches or equal to the existing material thickness, whichever is greater
Final surface deviation must be within +/-'/" or less of surrounding surface conditions unless approved by the City of
Rexburg Engineer.
Damages caused by the excavation must also be repaired at contractors' expense.
Excavation Permit Summary
✓ ❑ Obtain Permit prior to starting excavation
✓ ❑ Notify Dig -line at 1-800-342-1585
✓ ❑ Provide hlsmance
✓ ❑ Backfilled with flowable fill
✓ ❑ Notify city prior to backfilling, or loose refund
✓ ❑ Compact all backfill- see attached specifications
✓ ❑ Fill and compact the tip of trench with approved gravel
✓ ❑ Notify city prior to paving, or loose refund
✓ ❑ Paving surface to be completed within 10 days, or city will complete
✓ ❑ Paving to be done according to attached specifications
✓ ❑ Fix surface repair if it fails or the trench settles
✓ ❑ Notify parcel owner
✓ ❑ Return signed parcel owner acceptance form to the city
Revised 10/7/2019