Loading...
HomeMy WebLinkAboutELECTRICAL PLANS - 22-00839 - Teton Lakes Golf Course - Fiber Hut - Bldg 1NEW FIBER HUTNEW GENERATORNEW UTILITY RACKEXISTING 480V P.C. XFMR12GROUNDING DETAIL NOTES10FT. COPPER GROUND ROD.PARALLEL HORIZONTAL TAP EXOTHERMIC WELD.#2 BARE SOLID TINNED COPPER TO GROUND IN BUILDING.STAND OFF GROUND BAR SUCH AS: ERICO #B543A010 MOUNT VERTICALLY ADJACENT TO ITHUT ELECTRICAL PANEL.GROUND BARWATER MAIN (WHERE APPLICABLE)BLDG STEELMAIN SERVICE BUILDING GROUNDBUILDING GROUND RINGGROUNDBAR#6 CU43IT HUTSCALE:IT HUT GROUNDING DETAILNONE12341111234LOCATE GROUND RING IN NATIVE SOIL.LOCATE PER OWNER IN FIELD.Pocatello, Idaho 83201 1823 E. Center tel (208) 232-4439 Consulting EngineersSheet Title:Sheet:Designed By:Project Number:REXBURG IT HUTS REXBURG, ID21121Date:7-5-2022Checked By:BRPTEPScale:As Indicated#Date Revision ORIGINAL SIGNED BY:TODD E. PAYNEDATED ORIGINAL SIGNED:7-5-2022ON FILE AT:PAYNE ENGINEERING INC.E1.0NORTHWELL I.T.HUTKEY NOTESPROVIDE AND INSTALL A GROUND RING PER SILVER STAR SPECIFICATIONSCOORDINATE EXACT ROUTING WITH OWNER AND ROCKY MOUNTAIN POWER.1M1453EXISTING 480V P.C.TRANSFORMERPOWER RISER EQUIPMENTNEW DIESEL GENERATOR FURNISHED BY OWNER INSTALLED BY E.C.INSTALL ON CONCRETEHOUSE KEEPING PAD, SET GENERATOR TO 120/240V 1Ø OUTPUT. INSTALL CONDUIT ANDCONTROL CONDUCTORS BETWEEN GENERATOR AND TRANSFER SWITCH. INSTALL AGENERATOR NETWORK CONTROLLER INSIDE OF FIBER HUT W/ INTERNET CONNECTION.NEW 200A TRANSFER SWITCH, FURNISHED BY OWNER INSTALLED BY E.C.NEW 50KVA 240X480-120/240 1Ø, NEMA 3R DRY TYPE TRANSFORMER BY E,C. INSTALL ON HOUSEKEEPING PAD.IT HUT LOAD CENTER. INSTALL FEEDER TO AND MAKE ALL REQUIRED CONNECTIONS PER FIBERHUT PROVIDER.NEW 480V PANEL BOARD SEE PANEL SCHEDULE2" CONDUIT PER ROCKY MOUNTAIN POWER SPECIFICATIONS.1 1/2"C., 2-#1CU + GROUND.2"C., 3-#3/0CU + GROUND.PROVIDE AND INSTALL (2) 20A 1P CIRCUITS FROM IT HUT PANEL TO GENERATOR, BATTERYCHARGER AND HEATER.INSTALL ON UNISTRUT SERVICE RACK.12345SCALE:NORTH WELL HUT POWER RISERNONESCALE:NORTH WELL I.T. HUT SITE1" = 20'20'0"40'10'NGND PER NECAND DETAILGND PER NECGND PER NECGND PER NEC2678996788815,244 AFC9,572 AFC2"C., 4-#3/0CU-SQ D NF (NEMA 3R)277/480V 3Ø 4WSPARE--201-"NITM"20"x39"x5 3/4"20-1200--------DETERMINEDTO BEBMAIN BRKR. AMPSLOAD/POLEMAIN LUGS ONLY19FEEDER CONDUCTOR SIZE:TOTAL LOAD/PHASEREMARKS:AMPSWATTS4129373935333127252123CLASSLOCATIONMAKE/MODELLOAD NAMEAAMPWATTSNO. 917151113 7 5 1 3EBRKCIRLOADMAIN SW.OPL20S.C. INT CAP/BKR.40CONDUIT SIZE42303836343228262422AMPS.NO.WATTSECAMP1018161412 8 6 2 4FEED BOTTOMFEED TOPDIMENSIONSBRKAMPSLOPLOADCIRSURFACEFLUSHLOAD NAMESUPPLY WITH INTEGRAL SPD.PREPARED SPACENEW IT HUT TRANSFORMER1002---PREPARED SPACE102101010277/480V 3Ø MAINSERVICE METERPER RMP NEW FIBER HUTNEW GENERATOR1123EXISTINGPOWERPOLEGARAGEBUILDING #2BUILDING #1NEW POWER CO. TRANSFORMER576498M-1M-3M-2GROUNDING DETAIL NOTES10FT. COPPER GROUND ROD.PARALLEL HORIZONTAL TAP EXOTHERMIC WELD.#2 BARE SOLID TINNED COPPER TO GROUND IN BUILDING.STAND OFF GROUND BAR SUCH AS: ERICO #B543A010 MOUNT VERTICALLY ADJACENT TO ITHUT ELECTRICAL PANEL.GROUND BARWATER MAIN (WHERE APPLICABLE)BLDG STEELMAIN SERVICE BUILDING GROUNDBUILDING GROUND RINGGROUNDBAR#6 CU43IT HUTSCALE:IT HUT GROUNDING DETAILNONE12341111234LOCATE GROUND RING IN NATIVE SOIL.LOCATE PER OWNER IN FIELD.Pocatello, Idaho 83201 1823 E. Center tel (208) 232-4439 Consulting EngineersSheet Title:Sheet:Designed By:Project Number:REXBURG IT HUTS REXBURG, ID21121Date:7-5-2022Checked By:BRPTEPScale:As Indicated#Date Revision ORIGINAL SIGNED BY:TODD E. PAYNEDATED ORIGINAL SIGNED:7-5-2022ON FILE AT:PAYNE ENGINEERING INC.E2.0GOLFCOURSE I.T.HUTSCALE:GOLF COURSE I.T. HUT SITE1" = 20'20'0"40'10'NPOWER RISER EQUIPMENTNEW DIESEL GENERATOR FURNISHED BY OWNER INSTALLED BY E.C.INSTALL ON CONCRETEHOUSE KEEPING PAD, SET GENERATOR TO 120/240V 1Ø OUTPUT. INSTALL CONDUIT ANDCONTROL CONDUCTORS BETWEEN GENERATOR AND TRANSFER SWITCH. INSTALL AGENERATOR NETWORK CONTROLLER INSIDE OF FIBER HUT W/ INTERNET CONNECTION.NEW 200A TRANSFER SWITCH, FURNISHED BY OWNER INSTALLED BY E.C.IT HUT LOAD CENTER. INSTALL FEEDER TO AND MAKE ALL REQUIRED CONNECTIONS PER FIBERHUT PROVIDER.2"C., 3-#3/0CU + GROUND2"C., 4-#1CU + GROUND2"C., 4-#3/0CU + GROUNDPROVIDE AND INSTALL (2) 20A 1P CIRCUITS FROM IT HUT PANEL TO GENERATOR, BATTERYCHARGER AND HEATER.123KEY NOTESREMOVE EXISTING FEEDERS TO THIS BUILDING AND REPLACE W/ NEW 100A FEEDER AND MAKEREQUIRED CONNECTIONS.PROVIDE AND INSTALL A NEW 100A LOAD CENTER.PROVIDE AND INSTALL A GROUND RING PER DETAIL.E.C. SHALL PROVIDE A 4" CONDUIT FROM EXISTING POWER POLE. BORE UNDER N. 2000 W. TONEW TRANSFORMER. INSTALLATION PER RMP SPECIFICATIONS.POWER CO. WILL INTERCEPT EXISTING RMP PRIMARY FED\ED TO NEW TRANSFORMER. E.C.SHALL COORDINATE INSTALLATION W/ RMP.EXISTING 100A 120/208V 3Ø FEEDER. E.C. SHALL SPLICE NEW 100A FEEDER TO THIS FEEDER TORESTORE POWER TO SOUTH SHOP BUILDING #2.DISCONNECT AND REMOVE EXISTING UTILITY FEED TO THIS BUILDING COORDINATE W/ RMP.PROVIDE AND INSTALL (6) GFCI DUPLEX RECEPTACLES. LOCATE PER OWNER IN FIELD.PROVIDE AND INSTALL (5) LED STRIP LIGHTS SUCH AS LITHONIA CLX L48 5000LM SEF RDLMVOLT 40K 80CRI WH.1234567SCALE:GOLF COURSE POWER RISERNONENEW POWER CO.TRANSFORMER CONCRETE PADBY E.C. PER RMP SPECSMM200A200A22NEW PANEL M3P2P31BLDG#1BLDG#2EXISTING BUILDINGSERVICES SEE PLANINTERCEPT EXISTING FEEDER FROM BLDG #1TO BLDG #2 SPLICE TO NEW 100A FEEDER FROMPANEL M4" C., CONDUCTORS PER RMP.E.C. SHALL COORDINATEBORE UNDER ROADWAYNEW 4" C., W/STAND-OFFS PERRMP SPECSGRADEHUT LEVELEXISTING POWERPOLE ON WESTSIDE OF STREET894567-SQ D NQOD (NEMA 3R)120/208V 3Ø 4WSPARE--201-"M"20"x39"x5 3/4"20-1225--------DETERMINEDTO BEBMAIN BRKR. AMPSLOAD/POLEMAIN LUGS ONLY19FEEDER CONDUCTOR SIZE:TOTAL LOAD/PHASEREMARKS:AMPSWATTS4129373935333127252123CLASSLOCATIONMAKE/MODELLOAD NAMEAAMPWATTSNO. 917151113 7 5 1 3EBRKCIRLOADMAIN SW.OPL20S.C. INT CAP/BKR.40CONDUIT SIZE42303836343228262422AMPS.NO.WATTSECAMP1018161412 8 6 2 4FEED BOTTOMFEED TOPDIMENSIONSBRKAMPSLOPLOADCIRSURFACEFLUSHLOAD NAMESUPPLY WITH INTEGRAL SPD.PREPARED SPACE-----PREPARED SPACEBUILDING 11003-RECEPTACLESRECEPTACLES--3--100-BUILDING 1-SPARELIGHTS13,418 AFC11,097 AFC9,796 AFC646GROUNDPER NECLOCATE ON BACK OF EXISTING GARAGE4455GROUNDPER NEC74GROUND PER NECAND DETAILPANEL-"M" BREAKERIT HUT BREAKER NEW FIBER HUT51342NEW METERBANKEXISTING GROUND BOXTO REMAIN. SEE POWERRISERGROUNDING DETAIL NOTES10FT. COPPER GROUND ROD.PARALLEL HORIZONTAL TAP EXOTHERMIC WELD.#2 BARE SOLID TINNED COPPER TO GROUND IN BUILDING.STAND OFF GROUND BAR SUCH AS: ERICO #B543A010 MOUNT VERTICALLY ADJACENT TO ITHUT ELECTRICAL PANEL.GROUND BARWATER MAIN (WHERE APPLICABLE)BLDG STEELMAIN SERVICE BUILDING GROUNDBUILDING GROUND RINGGROUNDBAR#6 CU43IT HUTSCALE:IT HUT GROUNDING DETAILNONE12341111234LOCATE GROUND RING IN NATIVE SOIL.LOCATE PER OWNER IN FIELD.Pocatello, Idaho 83201 1823 E. Center tel (208) 232-4439 Consulting EngineersSheet Title:Sheet:Designed By:Project Number:REXBURG IT HUTS REXBURG, ID21121Date:7-5-2022Checked By:BRPTEPScale:As Indicated#Date Revision ORIGINAL SIGNED BY:TODD E. PAYNEDATED ORIGINAL SIGNED:7-5-2022ON FILE AT:PAYNE ENGINEERING INC.E3.0PARKS I.T.HUTKEY NOTESREPLACE EXISTING TRANSFER SWITCH WITH NEW TRANSFER SWITCH. INSTALL NEW FEEDER.SEE POWER RISER. TURN OVER EXISTING TRANSFER SWITCH TO OWNER.REMOVE EXISTING BRANCH PANELS AND REPLACE WITH NEW 84 SPACE PANEL. (SEESCHEDULE) INTERCEPT AND REWORK ALL EXISTING BRANCH CIRCUITS INTO NEW PANEL.CAREFULLY REMOVE EXISTING GENERATOR AND DELIVER TO OWNER SPECIFIED LOCATION INREXBURG.PROVIDE AND INSTALL NEW GENERATOR AT EXISTING LOCATION ENLARGE HOUSE KEEPINGPAD AS NECESSARY. SEE POWER RISER.PROVIDE AND INSTALL A GROUND RING PER DETAIL.123SCALE:PARKS SHOP I.T. HUT SITE1" = 20'20'0"40'10'N-SQ D NQOD120/208V 3Ø 4WEXISTING LOAD (GFCI)--201-"PS"20"x39"x5 3/4"20-1-400 A--------DETERMINEDTO BEBMAIN BRKR. AMPSLOAD/POLEMAIN LUGS ONLY19FEEDER CONDUCTOR SIZE:TOTAL LOAD/PHASEREMARKS:AMPSWATTS4129373935333127252123CLASSLOCATIONMAKE/MODELLOAD NAMEAAMPWATTSNO. 917151113 7 5 1 3EBRKCIRLOADMAIN SW.OPL20S.C. INT CAP/BKR.40CONDUIT SIZE42303836343228262422AMPS.NO.WATTSECAMP1018161412 8 6 2 4FEED BOTTOMFEED TOPDIMENSIONSBRKAMPSLOPLOADCIRSURFACEFLUSHLOAD NAMESUPPLY WITH INTEGRAL SPD.618371798177757369676365515957535549474345628284728078767470686664526058565450484446EXISTING LOAD (GFCI)201EXISTING LOAD202---202---202---602---602---302---302---302---302---603------503------153------201-EXISTING LOAD201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-201-SPARE201201SPARESPARE201201SPARESPARE201201SPARESPARE201201SPARESPARE201201SPARESPARE201201SPARESPARE201201SPARESPARE201201SPAREEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOADEXISTING LOAD54SCALE:PARK SHOP COURSE POWER RISERNONEMM200A200A2NEW PANEL PS3P2P1NEW 4"C., BY E.C.PER RMP SPECSEXISTING GROUNDBOX TO REMAINEXISTINGSERVICE FEEDERTO REMAINEXISTING TRANSFORMER POLERMP TO RECONFIGURETRANSFORMERS TO 120/208V 3ØPOWER RISER EQUIPMENTNEW DIESEL GENERATOR FURNISHED BY OWNER INSTALLED BY E.C.INSTALL ON CONCRETEHOUSE KEEPING PAD, SET GENERATOR TO 120/240V 1Ø OUTPUT. INSTALL CONDUIT ANDCONTROL CONDUCTORS BETWEEN GENERATOR AND TRANSFER SWITCH. INSTALL AGENERATOR NETWORK CONTROLLER INSIDE OF FIBER HUT W/ INTERNET CONNECTION.NEW 200A TRANSFER SWITCH, FURNISHED BY OWNER INSTALLED BY E.C.IT HUT LOAD CENTER. INSTALL FEEDER TO AND MAKE ALL REQUIRED CONNECTIONS PER FIBERHUT PROVIDER.PROVIDE AND INSTALL (2) 20A 1P CIRCUITS FROM IT HUT PANEL TO GENERATOR, BATTERYCHARGER AND HEATER.12332GND PER NEC& DETAILGND PER NEC& DETAIL2" C., 3-#3/0 CU +GND2" C., 4-#3/0 CU +GND2" C., 4-#3/0 CU +GNDGRADESHOP LEVEL4PANEL-"M" BREAKERIT HUT BREAKER4GROUNDPER NEC NEW I.T. HUTNEW GENERATOR1NEW SERVICE RACKEXISTING POWER POLEGROUNDING DETAIL NOTES10FT. COPPER GROUND ROD.PARALLEL HORIZONTAL TAP EXOTHERMIC WELD.#2 BARE SOLID TINNED COPPER TO GROUND IN BUILDING.STAND OFF GROUND BAR SUCH AS: ERICO #B543A010 MOUNT VERTICALLY ADJACENT TO ITHUT ELECTRICAL PANEL.GROUND BARWATER MAIN (WHERE APPLICABLE)BLDG STEELMAIN SERVICE BUILDING GROUNDBUILDING GROUND RINGGROUNDBAR#6 CU43IT HUTSCALE:IT HUT GROUNDING DETAILNONE12341111234LOCATE GROUND RING IN NATIVE SOIL.LOCATE PER OWNER IN FIELD.Pocatello, Idaho 83201 1823 E. Center tel (208) 232-4439 Consulting EngineersSheet Title:Sheet:Designed By:Project Number:REXBURG IT HUTS REXBURG, ID21121Date:7-5-2022Checked By:BRPTEPScale:As Indicated#Date Revision ORIGINAL SIGNED BY:TODD E. PAYNEDATED ORIGINAL SIGNED:7-5-2022ON FILE AT:PAYNE ENGINEERING INC.E4.0WELL ONE& SIX IT HUTKEY NOTESPROVIDE AND INSTALL A GROUND RING PER DETAIL.1M123POWER RISER EQUIPMENTNEW DIESEL GENERATOR FURNISHED BY OWNER INSTALLED BY E.C.INSTALL ON CONCRETEHOUSE KEEPING PAD, SET GENERATOR TO 120/240V 1Ø OUTPUT. INSTALL CONDUIT ANDCONTROL CONDUCTORS BETWEEN GENERATOR AND TRANSFER SWITCH. INSTALL AGENERATOR NETWORK CONTROLLER INSIDE OF FIBER HUT W/ INTERNET CONNECTION.NEW 200A TRANSFER SWITCH, FURNISHED BY OWNER INSTALLED BY E.C.IT HUT LOAD CENTER. INSTALL FEEDER TO AND MAKE ALL REQUIRED CONNECTIONS PER FIBERHUT PROVIDER.PROVIDE AND INSTALL (2) 20A 1P CIRCUITS FROM IT HUT PANEL TO GENERATOR, BATTERYCHARGER AND HEATER.INSTALL ON UNISTRUT SERVICE RACK.123SCALE:WELL ONE & SIX POWER RISERNONEEXISTING POLE MOUNTEDTRANSFORMERNEW 120/240VSERVICE & METER2" C., 3-#3/0 CU+GNDSCALE:WELL ONE & SIX I.T. HUT SITE1" = 20'20'0"40'10'NGND PER NEC &DETAILS200A 2PBREAKER INNEMA 3RENCLOSURE2"C., BY E.C. PER RMPGND PER NEC2" C., 3-# 3/0 CU2" C., 3-# 3/0 CU + GND448,027 AFCGND PER NEC5555 I.T. HUTEXISTING 480V P.C. XFMRNEW GENERATOREXISTING SWITCH GEAR1NEW UTILITY RACK2GROUNDING DETAIL NOTES10FT. COPPER GROUND ROD.PARALLEL HORIZONTAL TAP EXOTHERMIC WELD.#2 BARE SOLID TINNED COPPER TO GROUND IN BUILDING.STAND OFF GROUND BAR SUCH AS: ERICO #B543A010 MOUNT VERTICALLY ADJACENT TO ITHUT ELECTRICAL PANEL.GROUND BARWATER MAIN (WHERE APPLICABLE)BLDG STEELMAIN SERVICE BUILDING GROUNDBUILDING GROUND RINGGROUNDBAR#6 CU43IT HUTSCALE:IT HUT GROUNDING DETAILNONE12341111234LOCATE GROUND RING IN NATIVE SOIL.LOCATE PER OWNER IN FIELD.Pocatello, Idaho 83201 1823 E. Center tel (208) 232-4439 Consulting EngineersSheet Title:Sheet:Designed By:Project Number:REXBURG IT HUTS REXBURG, ID21121Date:7-5-2022Checked By:BRPTEPScale:As Indicated#Date Revision ORIGINAL SIGNED BY:TODD E. PAYNEDATED ORIGINAL SIGNED:7-5-2022ON FILE AT:PAYNE ENGINEERING INC.E5.0BURTON ST.I.T. HUTM12453EXISTING 480V P.C.TRANSFORMERSCALE:BURTON ST. POWER RISERNONEKEY NOTESPROVIDE AND INSTALL A GROUND RING PER SILVER STAR SPECIFICATIONS.COORDINATE EXACT ROUTING WITH OWNER AND ROCKY MOUNTAIN POWER.1SCALE:BURTON ST. I.T. HUT SITE1" = 20'20'0"40'10'NGND PER NECGND PER NEC &DETAILPOWER RISER EQUIPMENTNEW DIESEL GENERATOR FURNISHED BY OWNER INSTALLED BY E.C.INSTALL ON CONCRETEHOUSE KEEPING PAD, SET GENERATOR TO 120/240V 1Ø OUTPUT. INSTALL CONDUIT ANDCONTROL CONDUCTORS BETWEEN GENERATOR AND TRANSFER SWITCH. INSTALL AGENERATOR NETWORK CONTROLLER INSIDE OF FIBER HUT W/ INTERNET CONNECTION.NEW 200A TRANSFER SWITCH, FURNISHED BY OWNER INSTALLED BY E.C. INSTALL ONUNISTRUT SERVICE RACK.NEW 50KVA 240X480-120/240 1Ø, NEMA 3R DRY TYPE TRANSFORMER BY E,C. INSTALL ON HOUSEKEEPING PAD.IT HUT LOAD CENTER. INSTALL FEEDER TO AND MAKE ALL REQUIRED CONNECTIONS PER FIBERHUT PROVIDER.NEW 480V PANEL BOARD SEE PANEL SCHEDULE. MOUNT ON UNISTRUT SERVICE RACK.2" CONDUIT PER ROCKY MOUNTAIN POWER SPECIFICATIONS.1 1/2"C., 2-#1CU + GROUND.2"C., 3-#3/0CU + GROUND.PROVIDE AND INSTALL (2) 20A 1P CIRCUITS FROM IT HUT PANEL TO GENERATOR, BATTERYCHARGER AND HEATER.INSTALL ON UNISTRUT SERVICE RACK.1234567892-SQ D NF (NEMA 3R)277/480V 3Ø 4WSPARE--201-"BITM"20"x39"x5 3/4"20-1200--------DETERMINEDTO BEBMAIN BRKR. AMPSLOAD/POLEMAIN LUGS ONLY19FEEDER CONDUCTOR SIZE:TOTAL LOAD/PHASEREMARKS:AMPSWATTS4129373935333127252123CLASSLOCATIONMAKE/MODELLOAD NAMEAAMPWATTSNO. 917151113 7 5 1 3EBRKCIRLOADMAIN SW.OPL20S.C. INT CAP/BKR.40CONDUIT SIZE42303836343228262422AMPS.NO.WATTSECAMP1018161412 8 6 2 4FEED BOTTOMFEED TOPDIMENSIONSBRKAMPSLOPLOADCIRSURFACEFLUSHLOAD NAMESUPPLY WITH INTEGRAL SPD.PREPARED SPACENEW IT HUT TRANSFORMER1002---PREPARED SPACE9888715,244 AFC12,730 AFC2"C., 4-#3/0 CUELECTRICAL SPECIFICATIONS1.INTENT:Provide and install complete and operable electrical systemsincluding but not not limited to; lighting, power, receptacles,data, fire alarm ande etc.Provide all required connections to all Mechanical andPlumbing equipment, as indicated and required, including allconduits, wiring and controls. Coordinate with mechanicalcontractor and drawings.2.COMPLIANCE WITH CODES:All work and material shall comply with all applicable codes,safety orders, laws, ordinances and regulations of governingauthorities and other agencies having jurisdiction includingregulations of the State and Local Fire Marshall, unlessdetailed as specified to a more restrictive standard or higherrequirement.3.INTERPRETATION OF DRAWINGS:The electrical drawings are essentially diagrammatic in thatall provisions necessary to conform to structural,architectural, mechanical and plumbing systems can not beshown. All installations shall be adjusted as necessary toconform and to avoid obstructions, without additional cost tothe owner.All work, material and equipment called for by notes,schedules or otherwise indicated on the drawings shall befurnished and isntalled as though fully set forth in thesespecifications.4.VISITING THE SITE:Contractor shall visit the site and become acquainted withconditions to be encounterd. Extra funds will not be alloweddue to failuer to examine the site and to included existingconditions in bid price.5.COORDINATION WITH UTILITIES:These plans have been prepared without utility companycomments. The contractor shall verify exact requirements forthe electrical, telephone and communication services with theutility company representatives and provide all work and payall costs for a complete and operating systems, as directedbythe governing utilities.6.MATERIALS AND WORKMANSHIP:All workmanship shall be performed by skilled electriciansusing the best standard practives of the trade. All materialsshall, unless otherwise noted, be new and in perfectcondition and working order. All material for similar uses shallbe of the same type, material and manufacturer for ease offuture maintaenance.All equipment shall be readily accessible for maintenance andrepairs. All materials, fixtures and equipment shall becovered or sealed upon installation so as to provide forsafetyand to insure that operation and appearance will bemaintained after subsequent construction operations.7.EXECUTION:Raceway installation: Seperate underground conduits in acommon trench 4" minimum horizontally, 12" minimum fromother utility lines. Minimum conduit depth shall be 18".Coordinate conduit installation with pipes, steel, footings andducts installed by other trades. Install conduit runs exposed toview parallel or at right angles to structural members, walls orbuilding lines. Support conduit with one-hole malleable factorymade pipe straps, fastended with screws.8.OPERATING AND ADJUSTING:The owner reserves the right to operate any systems ofequipment prior to final comletion and acceptance of the work.Such perliminary operation shall not be construed as anacceptance of any work.Each piece of equipment and all of the systems shall beadjusted to insure proper functioning and shall be left in firstclass operating condition.9.CUTTING AND PATCHING:Do all drilling and cutting as necessary for installation ofequipment or conduit. Cutting or drilling of structure is onlypermitted with prior approval of the owner and structuralengineer.Where cutting and patching of work is necessary, use thesame materials, workmanship and finish to neatly match allsurrounding work.10.CONDUIT:All conduit material and installation methods shall be asallowed by the NEC, local AHJ and as directed by theowner.11.CONDUCTORS:Type THWN or THHN copper wire insulated for 600V.Smallest wire shall be #14 AWG unless noted otherwise.All wiring shall be Copper unless indicated otherwise.Type MC cable shall be permitted, provided it is installed inconcealed areas and installation complies with the Local AHJand NEC requirements.Type NM cable is only permitted in Dwelling unit spacesas permitted by the Local AHJ and NEC.Use "Ideal Yellow" pulling compound for all wire pulls.Use Scotchlock connectors for all splices in #12 wire andtape bolted pressure connectors for larger wire.12.GROUNDING:All conduit, branch circuits, feeders and etc. shall beprovided with a grounding conductor. All groundingconductors shall be insulated and green in color, size asshown.13.WIRING DEVICES:Devices shall be Standard type, Specification grade, coloras selected by owner. Decora style devices are prohibited.Utilize GFCI and Tamper-proof devices in all locations asdefined by the NEC.Wiring devices shall be as installedas allowed by theNEC, local AHJ.14.DEVICE PLATES:Devices plate type and color shall be as directed by ownerand as required by the NEC.15.LIGHTING FIXTURES:As selected by owner and/or indicated in schedules. All lightfixtures shall be installed and connected by the ElectricalContractor.16.SERVICE EQUIPMENT & PANELBOARDS:Service Equipment: Shall be rated as such and shall complywith local utility co. requirments. .Panelbards: Shall be provided with typed writtend directoriesindicating loads being served.Maintain all required clearances around equipment asrequired by the NEC.All equpment dimensions to be field verified.17.CLEAN-UP:Upon completion of the work, prior to final inspection,thoroughly clean all exposed fixtures, trim and equipmentand leave the entire installation in a neat, clean and usablecondition. Remove all cement, paint, grease, oil and otherforeign substances.18.TEST:Test all conductors for shorts, opens, grounds or otherdefects. Correct any defective work and re-test.Demonstrate continuous satisfactory operation of allelectrical systems and equipment.Provide training to the owner on electrical systems asneeded for owner operation and maintenance of building.19.GUARANTEE:Prior to final acceptacne of the project, deliver to the ownera written one year guarantee on all workmanship, materialsand equipment and agree to repair or replace all suchdefective items promptly that may occure during thewarranty period; including repair or replacement of thepremises that may be damaged due to faulty work andmaterials furnished under contract.10GND PER NECGND PER NEC1010277/480V 3Ø MAINSERVICE METERPER RMP10