Loading...
HomeMy WebLinkAboutAPPROVED PLAN - 21-00237 - 156 N 2nd E - Shelfology BathroomAuthor Name Author Email Author Phone No.: Bret Stoddard brets@rexburg.org 208-372-2171 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : 156 N 2nd E - Shelfology Bathroom Address : 156 N 2nd E Record Type : Commercial - Remodel Document Filename : PLANS - 21-00237 - 156 N 2nd E - Bathroom.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 21-00237 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Stamp Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 One of each gender restroom needs to be in compliance with ADA requirements. Pg 1 Free text Cody Jones : Building Open 1 Interior environment of toilet and bathrooms need to comply with IBC section 1209. All wood in contact with concrete needs to be pressure treated. Pg 1 Free text Cody Jones : Building Open 1 All construction and material needs to comply with the IBC 2018. Pg 1 Free text Cody Jones : Building Open 1 Doors need to meet the requirements of IBC section 1010. Pg 1 Free text Cody Jones : Building Open 1 Corridors need to meet the requirements of section 1020. Pg 1 Line Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 Interior space dimensions to comply with section 1207. Pg 1 Free text Cody Jones : Building Open 1 Kevin stated no work is being done on exterior wall. Commercial - Remodel Approval of plans does not constitute approval of variance from code Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Callout Bret Stoddard : Electrical Open 1 All electrical work must comply with the 2017 NEC. Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) One of each gender restroom needs to be in compliance with ADA requirements. Interior environment of toilet and bathrooms need to comply with IBC section 1209. All wood in contact with concrete needs to be pressure treated. All construction and material needs to comply with the IBC 2018. Doors need to meet the requirements of IBC section 1010. Corridors need to meet the requirements of section 1020. Interior space dimensions to comply with section 1207. All electrical work must comply with the 2017 NEC. Kevin stated no work is being done on exterior wall.