HomeMy WebLinkAboutAPPROVED PLAN - 21-00237 - 156 N 2nd E - Shelfology BathroomAuthor Name Author Email Author Phone No.:
Bret Stoddard brets@rexburg.org 208-372-2171
Cody Jones Cody.Jones@rexburg.org 208-372-2173
Description : 156 N 2nd E - Shelfology Bathroom
Address : 156 N 2nd E
Record Type : Commercial - Remodel
Document Filename : PLANS - 21-00237 - 156 N 2nd E - Bathroom.pdf
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 21-00237
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Stamp Cody Jones : Building Open 1
Pg 1 Free text Cody Jones : Building Open 1 One of each gender restroom needs to be in compliance with
ADA requirements.
Pg 1 Free text Cody Jones : Building Open 1 Interior environment of toilet and bathrooms need to comply
with IBC section 1209.
All wood in contact with concrete needs to be pressure
treated.
Pg 1 Free text Cody Jones : Building Open 1 All construction and material needs to comply with the IBC
2018.
Pg 1 Free text Cody Jones : Building Open 1 Doors need to meet the requirements of IBC section 1010.
Pg 1 Free text Cody Jones : Building Open 1 Corridors need to meet the requirements of section 1020.
Pg 1 Line Cody Jones : Building Open 1
Pg 1 Free text Cody Jones : Building Open 1 Interior space dimensions to comply with section 1207.
Pg 1 Free text Cody Jones : Building Open 1 Kevin stated no work is being done on exterior wall.
Commercial - Remodel
Approval of plans does not constitute approval of variance from code
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Callout Bret Stoddard :
Electrical
Open 1 All electrical work must comply with the 2017 NEC.
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
One of each gender restroom needs to be in compliance with ADA
requirements.
Interior environment of toilet and bathrooms need to comply with IBC section
1209.
All wood in contact with concrete needs to be pressure treated.
All construction and material needs to comply with the IBC 2018.
Doors need to meet the requirements of IBC section 1010.
Corridors need to meet the requirements
of section 1020.
Interior space dimensions to comply with section 1207.
All electrical work must comply
with the 2017 NEC.
Kevin stated no work is being done on exterior wall.