HomeMy WebLinkAboutAPPROVED INFRASTRUCTURE PLANS - 22-00590 - Transfer Station - New Scale House - Infrastructure AcceptanceAuthor Name Author Email Author Phone No.:
Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167
Joel Gray Joel.Gray@rexburg.org 208-372-2331
Description : Transfer Station - New Scale House
Address : 529 Airport Rd
Record Type : New Commercial Building
Document Filename : INFRASTRUCTURE PLAN Rev. (1) 8.02.22 - 22-00474 - Transfer Station - New Scale House - 529 Airport Rd.pdf
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 22-00474
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
434-G1-CVR G-1
(1)
Stamp Tawnya Grover : P&Z Open 2 Plan Received
867-SD1.3-SPU
SD1.3 (1)
Callout Joel Gray : PW Open 4 With the water meter inside, must have valve box outside for
shutting off line
867-SD1.3-SPU
SD1.3 (1)
Stamp Joel Gray : PW Open 4 Approved - Public Works
New Commercial Building
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
Author Name Author Email Author Phone No.:
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Joel Gray Joel.Gray@rexburg.org 208-372-2331
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Description : Transfer Station - New Scale House
Address : 529 Airport Rd
Application Type :
Document Filename : INFRASTRUCTURE PLAN 7.05.22 - 22-00474 - Transfer Station - New Scale House - 529 Airport Rd.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
SD1.3 Callout Kyle Baldwin : P&Z Open 3 Conflicting information:
Is this the correct orientation?
Or as shown on Lot Layout Plan?
SD1.3 Free text Joel Gray : PW Open 3 Where are other vehicles stacking?
Water meter location not shown?
Where is storm runoff going?
SD1.3 Callout Joel Gray : PW Open 3 Interesting connections
SD1.3 Callout Joel Gray : PW Open 3 Will gates be altered?
# 22-00474
New Commercial Building
Please digitally re-submit all pages of the plan set in response to requested revisions
for our next review cycle, with noted items resolved.
Report Date: 07.25.2022
Approval of plans does not constitute approval of variance from code
Page 1 of 1
Powered by TCPDF (www.tcpdf.org)
See attached drawings
The stacking will occur as it currently is. The water meter will be
internal unless you want it external meter box. Please confirm
what you would like. The storm run off will continue to run to the
east.
See attached drawings
See attached drawings
With the water meter inside, must
have valve box outside for
shutting off line