Loading...
HomeMy WebLinkAboutAPPROVED INFRASTRUCTURE PLANS - 22-00590 - Transfer Station - New Scale House - Infrastructure AcceptanceAuthor Name Author Email Author Phone No.: Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Description : Transfer Station - New Scale House Address : 529 Airport Rd Record Type : New Commercial Building Document Filename : INFRASTRUCTURE PLAN Rev. (1) 8.02.22 - 22-00474 - Transfer Station - New Scale House - 529 Airport Rd.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 22-00474 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 434-G1-CVR G-1 (1) Stamp Tawnya Grover : P&Z Open 2 Plan Received 867-SD1.3-SPU SD1.3 (1) Callout Joel Gray : PW Open 4 With the water meter inside, must have valve box outside for shutting off line 867-SD1.3-SPU SD1.3 (1) Stamp Joel Gray : PW Open 4 Approved - Public Works New Commercial Building Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Description : Transfer Station - New Scale House Address : 529 Airport Rd Application Type : Document Filename : INFRASTRUCTURE PLAN 7.05.22 - 22-00474 - Transfer Station - New Scale House - 529 Airport Rd.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments SD1.3 Callout Kyle Baldwin : P&Z Open 3 Conflicting information: Is this the correct orientation? Or as shown on Lot Layout Plan? SD1.3 Free text Joel Gray : PW Open 3 Where are other vehicles stacking? Water meter location not shown? Where is storm runoff going? SD1.3 Callout Joel Gray : PW Open 3 Interesting connections SD1.3 Callout Joel Gray : PW Open 3 Will gates be altered? # 22-00474 New Commercial Building Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 07.25.2022 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) See attached drawings The stacking will occur as it currently is. The water meter will be internal unless you want it external meter box. Please confirm what you would like. The storm run off will continue to run to the east. See attached drawings See attached drawings With the water meter inside, must have valve box outside for shutting off line