Loading...
HomeMy WebLinkAboutAPPROVED INFRASTRUCTURE PLANS - 22-00771 - U-Haul - Bldg A - InfrastructureAuthor Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : U-Haul - New Commercial Bldg A Address : 328 N 2nd E Record Type : New Commercial Building Document Filename : 718081 UHaul Rexburg - Compiled Set Resubmittal 20221013.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 22-00610 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments T1.1 Stamp Todd Smith : Broadband Open 1 Approved - Broadband Inspector T1.1 Stamp Stan Crittenden : Fire Open 1 Approved - Fire Dept C5-11 Stamp Stan Crittenden : Fire Open 16 Approved - Fire Dept T1.1 Stamp Katie Saurey : P&Z Open 1 Plan Received C4-11 Stamp Joel Gray : PW Open 15 Approved - Public Works New Commercial Building Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- XXXXX A 1 NAME. D W G XXXXX A 1 NAME. D W G XXXXX A 1 NAME. D W G XXXXX A 1 NAME. D W G 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z C O V E R P A G E T 1 . 1 NEW BUILDING SELF-STORAGE PROJECT DESCRIPTIONGOVERNING BUILDING C O D E S 2018 INTERNATIONAL BUILDING CODE (IBC), W/ AMENDMENTS2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC), W / A M E N D M E N T S 2017 IDAHO (UNIFORM) PLUMBING CODE2018 IDAHO FIRE CODE (IFC) W/ AMENDMENTS2017 NATIONAL ELECTRICAL CODE (NEC)2018 MECHANICAL CODE (IMC) W/ AMENDMENTS2018 FUEL AND GAS CODE (IFGC), W/ AMENDMENTS U-HAUL INTERNATIONALU-HAUL MOVING & STORAGEOF REXBURG328 N 2ND EREXBURG, ID 83440AERIAL MAP G E N E R A L N O T E S : S H E E T N U M B E R G E N E R A L 1 . A L L W O R K S H A L L C O M P L Y W I T H A L L A P P L I C A B L E C O D E S A N D O R D I N A N C E S . 2 . C O N T R A C T O R S H A L L B E C O M E F A M I L I A R W I T H A L L A M E R C O ' S R E Q U I R E M E N T S P R I O R T O B I D D I N G A N D S H A L L B E R E S P O N S I B L E F O R C O M P L I A N C E W I T H T H O S E R E Q U I R E M E N T S . 3 . F I E L D V E R I F Y A L L D I M E N S I O N S P R I O R T O C O N S T R U C T I O N . N O T I F Y A R C H I T E C T / A M E R C O R E P R E S E N T A T I V E O F A N Y D I S C R E P A N C I E S . 4 . I T E M S N O T I N D I C A T E D I N T H E S E D O C U M E N T S T H A T C A N B E L E G I T I M A T E L Y A N D R E A S O N A B L Y I N F E R R E D T O C O M P L E T E T H E W O R K A T H A N D S H A L L B E F U R N I S H E D B Y T H E C O N T R A C T O R A S T H O U G H I T W E R E D E T A I L E D H E R E I N . C H A N G E R E Q U E S T S F O R S A I D I T E M S W I L L N O T B E A P P R O V E D . 5 . D R A W I N G S S H A L L B E D I S T R I B U T E D T O S U B - C O N T R A C T O R S I N C O M P L E T E S E T S A S I N D I C A T E D B Y T H E S H E E T I N D E X . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E F O R E N S U R I N G S U B - C O N T R A C T O R S B I D O N A L L I T E M S A S S O C I A T E D W I T H T H E I R R E S P E C T I V E T R A D E S . NAME:CITY OF REXBURGADDRESS:35 N. 1ST E, REXBURG, ID 83440PHONE:208-359-3020 JURISDICTIONSEPERATE SUBMITTALS• AUTOMATIC FIRE SPRINKLER SYSTEM. DESIGN/BUILDING BY L O C A L C O N T R A C T O R A N D L O C A L F I R E SPRINKLER INSTALLER. UHI OWNER'S REPRESENTATIVE OR E N E R A L C O N T R A C T O R T O P R O C U R E . SEE FIRE SPRINKLER DEFERRED NOTES ON PLUMBING DRAWI N G S A N D U H I S P E C I F I C A T I O N S F O R • FIRE ALARM AND DETECTION SYSTEM. DESIGN/BUILDING BY L O C A L C O N T R A C T O R A N D L O C A L FIRE ALARM AND DETECTION SYSTEM INSTALLER . UHI OWNE R ' S R E P R E S E N T A T I V E O R G E N E R A L CONTRACTOR TO PROCURE. SEE FIRE ALARM DEFERRED NO T E S O N E L E C T R I C A L D R A W I N G S A N D 6 . T H E C O N T R A C T O R W I L L I N S P E C T T H E P R E M I S E S P R I O R T O B I D D I N G T O V E R I F Y E X I S T I N G W O R K I N G C O N D I T I O N S ; S H O U L D C O N D I T I O N S B E I D E N T I F I E D W H I C H A R E B E L I E V E D T O I M P E D E I N T E N D E D W O R K , T H E N S U C H C O N D I T I O N S M U S T B E D O C U M E N T E D A N D R E P O R T E D I M M E D I A T E L Y T O A R C H I T E C T / A M E R C O R E P R E S E N T A T I V E . F A I L U R E T O S O A D V I S E W I L L C O N S T I T U T E N O T I C E T H A T C O N T R A C T O R I S F U L L Y S A T I S F I E D W I T H T H E E X I S T I N G C O N D I T I O N S A N D I N T E N D S T O P E R F O R M P E R 7 . C O N T R A C T O R S H A L L I S S U E W R I T T E N N O T I F I C A T I O N T O A R C H I T E C T / A M E R C O R E P R E S E N T A T I V E O F A N Y D I S C R E P A N C I E S A N D F O L L O W U P I N W R I T I N G W I T H I N T W O W O R K I N G D A Y S O F I N S P E C T I O N . 8 . C O N T R A C T O R S H A L L V E R I F Y A L L D I M E N S I O N S A N D C O N D I T I O N S I N T H E F I E L D . I F D I M E N S I O N A L E R R O R O C C U R S O R C O N D I T I O N N O T C O V E R E D I N T H E D R A W I N G S I S E N C O U N T E R E D , C O N T R A C T O R S H A L L S U B M I T A C L A R I F I C A T I O N R E Q U E S T T O A R C H I T E C T / A M E R C O R E P R E S E N T A T I V E A N D O B T A I N R E S O L U T I O N B E F O R E C O M M E N C I N G T H A T P O R T I O N O F T H E W O R K . 9 . A L L M A N U F A C T U R E D A R T I C L E S , M A T E R I A L S A N D E Q U I P M E N T S H A L L B E A P P L I E D , I N S T A L L E D , C O N N E C T E D , E R E C T E D , U S E D , C L E A N E D , A N D C O N D I T I O N E D I N A C C O R D A N C E W I T H T H E M A N U F A C T U R E R S W R I T T E N S P E C I F I C A T I O N S O R I N S T R U C T I O N S U N L E S S H E R E I N A F T E R S P E C I F I E D 1 0 . T H E C O N T R A C T O R S H A L L S U P E R V I S E A N D D I R E C T T H E W O R K , U S I N G H I S B E S T S K I L L A N D A T T E N T I O N . H E S H A L L B E S O L E L Y R E S P O N S I B L E F O R A L L C O N S T R U C T I O N A N D / O R I N S T A L L A T I O N M E A N S , M E T H O D S , T E C H N I Q U E S , S E Q U E N C E S , A N D P R O C E D U R E S A N D F O R C O O R D I N A T I N G A L L BUILDING CODE ANALY S I S : NATIONAL ACCOUNTS 1 1 . D I M E N S I O N S T A K E P R E C E D E N C E O V E R S C A L E O N C O N S T R U C T I O N D O C U M E N T S . 1 2 . A L L W O R K S H A L L B E E X E C U T E D I N A N E A T A N D W O R K M A N L I K E M A N N E R , A C C E P T A B L E T O O W N E R . 1 3 . W H E N W O R K N O T S P E C I F I C A L L Y C A L L E D O U T I S R E Q U I R E D T O C O M P L E T E T H E P R O J E C T , T H E W O R K S H A L L B E P R O V I D E D I N A C C O R D A N C E W I T H G E N E R A L N O T E S 1 2 , 1 4 A N D 1 6 . 1 4 . C O N T R A C T O R S H A L L G U A R A N T E E , I N W R I T I N G , A L L W O R K M A N S H I P A N D M A T E R I A L S F O R A P E R I O D O F O N E Y E A R F R O M T H E D A T E O F S U B S T A N T I A L C O M P L E T I O N . 1 5 . U N L E S S O T H E R W I S E S P E C I F I C A L L Y N O T E D , T H E C O N T R A C T O R S H A L L P R O V I D E A N D P A Y F O R A L L L A B O R , M A T E R I A L S , E Q U I P M E N T , T O O L S , C O N S T R U C T I O N E Q U I P M E N T A N D M A C H I N E R Y , T R A N S P O R T A T I O N , A N D O T H E R F A C I L I T I E S A N D S E R V I C E S N E C E S S A R Y F O R P R O P E R E X E C U T I O N 1 6 . T H E C O N T R A C T O R W A R R A N T S T O A M E R C O A N D A R C H I T E C T / A M E R C O R E P R E S E N T A T I V E T H A T A L L M A T E R I A L S A N D E Q U I P M E N T F U R N I S H E D U N D E R T H I S C O N T R A C T W I L L B E N E W U N L E S S O T H E R W I S E S P E C I F I E D , A N D T H A T A L L W O R K W I L L B E G O O D Q U A L I T Y F R E E F R O M F A U L T S A N D D E F E C T S A N D I N C O N F O R M A N C E W I T H T H E C O N S T R U C T I O N D O C U M E N T S . A L L W O R K N O T S O C O N F O R M I N G T O T H E S E S T A N D A R D S M A Y B E C O N S I D E R E D D E F E C T I V E . I T I S U N D E R S T O O D T H A T N O I N F E R I O R O R N O N - C O N F O R M I N G W O R K O R M A T E R I A L S W I L L B E A C C E P T E D W H E T H E R D I S C O V E R E D A T T H E T I M E T H E Y A R E I N C O R P O R A T E D I N T O T H E W O R K O R A T A N Y T I M E B E F O R E O R A F T E R T H E F I N A L A C C E P T A N C E . I F R E Q U I R E D B Y T H E A R C H I T E C T O R A M E R C O R E P R E S E N T A T I V E , T H E C O N T R A C T O R 1 7 . T H E W A R R A N T I E S A N D G U A R A N T I E S R E Q U I R E D B Y T H E C O N S T R U C T I O N D O C U M E N T S S H A L L B E I N A D D I T I O N T O A N D N O T I N L I M I T A T I O N O F A N Y O T H E R W A R R A N T Y O R G U A R A N T Y O R R E M E D Y R E Q U I R E D B Y L A W O R B Y T H E C O N S T R U C T I O N D O C U M E N T S . 1 8 . C O N T R A C T O R T O C O O R D I N A T E W I T H A H J , S P R I N K L E R C O N T R A C T O R , C I V I L E N G I N E E R A N D P L U M B I N G E N G I N E E R A S N E E D E D F O R A L L B A C K F L O W P R E V E N T E R R E Q U I R E M E N T S . L O C A T I O N S H A L L B E A P P R O V E D B Y O W N E R P R I O R T O I N S T A L L A T I O N O R F A B R I C A T I O N . PROJECT TEAMARCHITECTURAL:HILLSIDE ARCHITECTURE409 S. 8TH ST, STE. 201BOISE, ID 83702PHONE: 208-A.O.R.: DANIEL ZIMMERMAN, A.I.A.CONTACT: BRETT GULASH, AIALEGENDXA11#XGRID LINEKEYNOTEDOOR TYPEWINDOW TYPECOLOR / FINISHWALL TYPEAN.T.S.1PLAN NOTESDRAWING IS NOTTO SCALEPLAN NORTH(ARCHITECTURALDRAWINGS)XX DXCXXENLARGED PLAN SYMBOLENLARGED PLAN DESIGNATIONLOCATION OF ENLARGED PLAN DETAIL (SHEET)DETAIL SYMBOLDETAIL DESIGNATIONLOCATION OF DETAIL (SHEET)B INTERIOR ELEVATION DETAIL SYMBOLOBSERVATION DIRECTION FOR ELEVATIONLOCATION OF ELEVATION DETAIL (SHEET)VAPOR BARRIERAIR BARRIER CLASS I OR IIREQUIRED I N T E R I O R S I D E S E C T I O N 1 4 0 5 . 3 S E C T I O N C 4 0 2 . 5 XXXXBUILDING SECTION DETAIL SYMBOLOBSERVATION DIRECTION FOR SECTIONSECTION DESIGNATIONLOCATION OF SECTION DETAIL (SHEET)GENERAL AREA OF "CUT" FOR SECTIONWALL SECTION DETAIL SYMBOLOBSERVATION DIRECTION FOR SECTIONSECTION DESIGNATIONLOCATION OF SECTION DETAIL (SHEET)GENERAL AREA OF "CUT" FOR SECTIONXXELEVATION DETAIL SYMBOLOBSERVATION DIRECTION FOR ELEVATIONELEVATION DESIGNATIONLOCATION OF ELEVATION DETAIL (SHEET)ACCESSIBLESELF - SERVICESTORAGEFACILITIES LOCATIONBUILDING A TOTALLOCKERS1,102 M I N I M U M A C C E S S I B L E 2 9 ENERGY CODE ANALYSI S : BUILDINGENVELOPEREQUIREMENTSCLIMATE ZONEINSULATIONROOFWALLS ABOVE GRADEMASS (TILT - UP)METAL BUILDINGMETAL FRAMED WALLS.O.G (UNHEATED)OPAQUE DOORSSWINGINGNON - SWINGINGFENESTRATIONFIXED 6BR - 19.0 + R - 11 . 0 W / R - 5 THERM. BLKSNOT REQUIREDR - 18 ciR - 18 ciNOT REQUIREDU - 0.61R - 4.74SHGC = 0.25U - 0.50 C O M M E N T S C O D E R E F E R E N C E B U I L D I N G T H E R M A L E N V E L O P E C O N F O R M S T O T H E P R E S C R I P T I V E B U I L D I N G E N V E L O P E R E Q U I R E M E N T S O F S E C T I O N C 4 0 2 . 1 O F T H E C O D E . T A B L E 1 1 0 8 . 3 S H E E T N A M E T 1 . 1 C O V E R P A G E T 1 . 2 T Y P I C A L A D A S T A N D A R D S T 2 . 1 F I R S T F L O O R E G R E S S P L A N T 2 . 2 S E C O N D F L O O R E G R E S S P L A N T 2 . 3 T H I R D F L O O R E G R E S S P L A N T 4 . 2 F I R E - R A T E D W A L L S E C T I O N S T 4 . 3 F I R E R A T E D A S S E M B L Y ( N O T U S E D ) C I V I L L A N D S C A P E C 1 C O V E R S H E E T L 1 L A N D S C A P E L A Y O U T 1 A R C H I T E C T U R A L A 1 . 1 B U I L D I N G S I T E P L A N A 2 . 1 F I R S T F L O O R L O C K E R P L A N A 2 . 2 S E C O N D F L O O R L O C K E R P L A N A 2 . 3 T H I R D F L O O R L O C K E R P L A N A 2 . 4 F I R S T F L O O R D I M E N S I O N P L A N A 2 . 5 S E C O N D F L O O R D I M E N S I O N P L A N A 2 . 6 T H I R D F L O O R D I M E N S I O N P L A N A 3 . 1 R O O F P L A N & N O T E S A 4 . 1 B U I L D I N G E L E V A T I O N S A 5 . 1 B U I L D I N G S E C T I O N S A 5 . 2 W A L L S E C T I O N S A 6 . 4 E N L A R G E D S T A I R P L A N S A N D S E C T I O N S A 6 . 5 E N L A R G E D E X T E R I O R S T A I R P L A N S A N D S E C T I O N S A 7 . 0 D O O R T Y P E S A 7 . 1 D O O R S C H E D U L E A N D D O O R D E T A I L S A 7 . 2 F I N I S H S C H E D U L E S A 7 . 5 E N L A R G E D R E S T R O O M P L A N A N D M O P / C O O M R O O M A 8 . 1 T Y P I C A L A I S L E L A Y O U T A 8 . 2 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 3 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 4 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 5 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 6 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 7 A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 9 . 1 S I N G L E L E V E L L O A D B E A R I N G S T O R A G E A S S E M B L Y A 9 . 7 S T O R A G E L O C K E R C O M P O N E N T S A 9 . 8 T Y P I C A L L O A D B E A R I N G P A R T I T I O N L O C K E R D E T A I L S S T R U C T U R A L S 0 G E N E R A L S T R U C T U R A L N O T E S S 0 . 1 S P E C I A L I N S P E C T I O N S 1 F O U N D A T I O N P L A N S 1 . 1 F I R S T F L O O R S H E A R W A L L P L A N S 2 S E C O N D F L O O R F R A M I N G P L A N S 2 . 1 S E C O N D F L O O R S H E A R W A L L P L A N S 3 . 0 T H R I D F L O O R F R A M I N G P L A N S 3 . 1 T H I R D F L O O R S H E A R W A L L P L A N S 4 . 0 R O O F F R A M I N G P L A N S H E E T N U M B E R S H E E T N A M E S 5 . 1 F O U N D A T I O N D E T A I L S S 5 . 2 F O U N D A T I O N D E T A I L S S 6 . 0 F L O O R F R A M I N G D E T A I L S S 7 . 0 R O O F F R A M I N G D E T A I L S S 8 . 0 S T A I R F R A M I N G P L A N S S 8 . 1 S T A I R F R A M I N G A N D D E T A I L S S 9 . 0 C A N O P Y F R A M E S 1 0 . 0 C O M P O S I T E T I L T - U P P A N E L W A L L E L E V A T I O N S S 1 0 . 1 T I L T - U P P A N E L D E T A I L S M E C H A N I C A L M 0 . 1 M E C H A N I C A L C O V E R S H E E T M 0 . 2 M E C H A N I C A L S C H E D U L E S M 0 . 3 M E C H A N I C A L S P E C I F I C A T I O N S M 1 . 1 M E C H A N I C A L P L A N - F I R S T F L O O R M 1 . 2 M E C H A N I C A L P L A N - S E C O N D F L O O R M 1 . 3 M E C H A N I C A L P L A N - T H I R D F L O O R M 1 . 4 M E C H A N I C A L E N L A R G E D P L A N - S H O W R O O M M 2 . 1 M E C H A N I C A L D E T A I L S E L E C T R I C A L E 0 . 1 E L E C T R I C A L L E G E N D S A N D N O T E S E 0 . 2 E L E C T R I C A L S C H E D U L E S A N D D E T A I L S E 1 . 1 S I T E E L E C T R I C A L P L A N - B U I L D I N G A E 1 . 3 S I T E L I G H T I N G P H O T O M E T R I C - B U I L D I N G A E 2 . 1 P O W E R P L A N - F I R S T F L O O R E 2 . 2 P O W E R P L A N - S E C O N D F L O O R E 2 . 3 P O W E R P L A N - T H I R D F L O O R E 2 . 4 P O W E R P L A N - E N L A R G E D A R E A S E 3 . 1 H V A C A N D P L U M B I N G P O W E R P L A N - F I R S T F L O O R E 3 . 2 H V A C A N D P L U M B I N G P O W E R P L A N - S E C O N D F L O O R E 3 . 3 H V A C A N D P L U M B I N G P O W E R P L A N - T H I R D F L O O R E 4 . 1 L I G H T I N G P L A N - F I R S T F L O O R E 4 . 2 L I G H T I N G P L A N - S E C O N D F L O O R E 4 . 3 L I G H T I N G P L A N - T H I R D F L O O R E 4 . 4 E M L I G H T I N G P H O T O M E T R I C - F I R S T F L O O R E 4 . 5 E M L I G H T I N G P H O T O M E T R I C - S E C O N D F L O O R E 4 . 6 E M L I G H T I N G P H O T O M E T R I C - T H I R D F L O O R P L U M B I N G P 0 . 1 P L U M B I N G C O V E R S H E E T P 0 . 2 P L U M B I N G S C H E D U L E S A N D C A L C U L A T I O N S P 0 . 3 P L U M B I N G S P E C I F I C A T I O N S P 1 . 1 P L U M B I N G P L A N - F I R S T F L O O R P 1 . 2 P L U M B I N G P L A N - S E C O N D F L O O R P 1 . 3 P L U M B I N G P L A N - T H I R D F L O O R ADDITIONAL INFORMATION.UHI SPECIFICATIONS FOR ADDITIONAL INFORMATION. B I D W I T H N O A L L O W A N C E E I T H E R I N T I M E O R M O N E Y F O R A N Y I M P E D I M E N T S T O I N T E N D E D W O R K . T O T H E C O N T R A R Y . P O R T I O N S O F T H E W O R K U N D E R T H E C O N T R A C T . A N D C O M P L E T I O N O F T H I S P R O J E C T S H A L L F U R N I S H S A T I S F A C T O R Y E V I D E N C E A S T O T H E K I N D A N D Q U A L I T Y O F M A T E R I A L S A N D E Q U I P M E N T . A 6 . 6 S T A I R D E T A I L S A N D S E C T I O N S A 6 . 7 S T A I R D E T A I L S A 9 . 1 0 T Y P I C A L L O C K E R D E T A I L S CIVIL/LANDSCAPE:HLE, INC.101 S. PARK AVE #210IDAHO FALLS, ID 83402PHONE: 208-524-0212CONTACT: GILMORE JENKINSMECHANICAL/ PLUMBING:APEX ENGINEERINGPO BOX 5221BOISE, ID 83705PHONE: 208-914-5087CONTACT: CHAD PACKER FIRE PROTECTION:PROTECTION CONSULTANTS, INC.1199 SOUTH MAIN STREET, STE 101CENTERVILLE, UT 84014PHONE: 801-295-6070CONTACT: GREG JONES, P.E.OWNER:U-HAUL INT'L / AMERCO REAL ESTATE1545 W. BROADWAY STIDAHO FALLS, ID 83402PHONE: 208-881-7297CONTACT: DREX JOHNSONSTRUCTURAL:STRUCTURAL EDGE5509 N GLENWOOD STBOISE, ID 83714PHONE: 208-501-2289CONTACT: DAVID SANSOTTA, P.E.N NN.T.S.CONTRACTOR:BATEMAN HALL1405 FOOTE DRIVEIDAHO FALLS, ID 83402PHONE: 208-523-2681CONTACT: SHAY MOON T 4 . 4 F I R E R A T E D A S S E M B L Y ( N O T U S E D ) T 4 . 5 F I R E R A T E D A S S E M B L Y ( N O T U S E D ) T 4 . 6 F I R E R A T E D A S S E M B L Y ( N O T U S E D ) E 5 . 1 O N E - L I N E D I A G R A M E 5 . 2 P A N E L S C H E D U L E S E 6 . 1 E N E R G Y C O D E C O M P L I A N C E M 2 . 2 M E C H A N I C A L D E T A I L S P 2 . 1 P L U M B I N G E N G L A R G E D P L A N S P 2 . 2 P L U M B I N G D E T A I L S C 2 G E N E R A L N O T E S C 3 D E M O L I T I O N C 4 G E N E R A L L A Y O U T C 5 G R A D I N G P L A N C 6 U T I L I T Y P L A N C 9 D E T A I L S C 1 0 S T O R M T E C H D E T A I L S S 5 . 0 F O U N D A T I O N D E T A I L S T 4 . 1 E N E R G Y C O D E C O M P L I A N C E S 6 . 1 F L O O R F R A M I N G D E T A I L S S 6 . 2 F L O O R F R A M I N G D E T A I L S S 7 . 1 R O O F F R A M I N G D E T A I L S Q T Y L O C K E R S I Z E 5 x 1 0 7 x 1 0 1 0 x 1 0 1 0 x 1 5 T O T A L 5 x 5 I N T E R I O R T O T A L P R O P O S E D M I X S Q . F T . % 9 3 3 8 5 3 0 6 5 3 8 4 1 4 8 3 , 7 0 0 1 9 , 2 0 0 3 5 0 3 0 , 6 0 0 1 2 , 7 5 0 6 7 , 0 0 0 1 0 0 1 9 4 6 0 2 9 5 2 n d F l r I N T E R I O R S Q . F T . % 3 3 5 3 1 1 1 2 2 1 3 4 5 5 1 , 3 7 5 6 , 7 0 0 1 4 0 1 1 , 2 0 0 4 , 6 5 0 2 4 , 1 4 5 3 r d F l r S Q . F T . % 3 3 4 3 1 1 1 0 1 1 3 4 5 5 1 , 3 7 5 6 , 7 0 0 7 0 1 1 , 0 0 0 4 , 6 5 0 2 4 , 0 3 5 Q T Y T O T A L S Q . F T . % 1 , 1 0 2 8 5 4 7 5 5 3 8 4 1 4 8 3 , 7 0 0 1 9 , 2 0 0 3 5 0 4 7 , 5 0 0 1 2 , 7 5 0 8 3 , 9 0 0 % % % % % % 1 0 0 1 9 4 6 1 2 8 6 % % % % % % 1 0 0 1 9 4 6 0 2 8 6 % % % % % % 1 0 0 1 5 5 7 0 2 3 4 % % % % % % 1 0 x 8 5 4 0 0 1 1 8 0 3 2 4 0 5 4 0 0 % 0 % 1 % 1 % 1 s t F l r S Q . F T . % 2 6 4 2 3 8 4 2 1 1 6 3 8 9 5 0 5 , 8 0 0 1 4 0 8 , 4 0 0 3 , 4 5 0 1 8 , 8 2 0 1 0 0 1 8 4 5 1 3 1 5 % % % % % % 1 8 0 0 % M I N I S S Q . F T . % 1 6 9 0 1 6 9 0 0 0 0 0 0 1 6 , 9 0 0 0 1 6 , 9 0 0 1 0 0 0 1 0 0 0 0 0 % % % % % % 0 0 0 % E X T E R I O R ' C ' - ' M ' P R O P O S E D L O C K E R S T O R A G E U N I T M I X A 5 . 3 W A L L S E C T I O N S A 6 . 8 E N L A R G E D E L E V A T O R P L A N S A N D D E T A I L S A 6 . 1 1 E N L A R G E D L O A D / U N L O A D P L A N A N D E L E V A T I O N S A 6 . 1 2 E N L A R G E D L O A D / U N L O A D W A L L S E C T I O N C 7 S T O R M T E C H P L A N A N D P R O F I L E S C 8 S E W E R P L A N A N D P R O F I L E C 1 1 S T O R M W A T E R P O L L U T I O N P R E V E N T I O N P L A N L 2 L A N D S C A P E L A Y O U T 2 E 1 . 2 S I T E E L E C T R I C A L P L A N - B U I L D I N G B E 1 . 4 S I T E L I G H T I N G P H O T O M E T R I C - B U I L D I N G B F I R E P R O T E C T I O N F P 1 0 1 F I R E S P R I N K L E R P L A N - B L D G A L E V E L 1 F P 1 0 2 F I R E S P R I N K L E R P L A N - B L D G A L E V E L 2 F P 1 0 3 F I R E S P R I N K L E R P L A N - B L D G A L E V E L 3 F P 5 0 0 F I R E S P R I N K L E R N O T E S A N D D E T A I L S A 6 . 1 E N L A R G E D S H O W R O O M P L A N 1 1 BUILDINGHEIGHT / AREA SEPARATED MIXED OCCUPANCYSHOWROOM - M MERCANTILESTORAGE - S1 STORAGESTORIESHEIGHT (FT)AREA (SF / FLOOR)BUILDINGFIRST FLOORSTORAGESELF - STORAGE1ST FLOOR TOTAL2ND FLOOR TOTAL3RD FLOOR TOTALTOTAL ACTUAL1/343.53,09327,42033,41033,41033,410100,230 U L 7 8 , 0 0 0 7 8 , 0 0 0 2 3 4 , 0 0 0 A L L O W E D 4 7 5 C H A P T E R 5 OCCUPANCYSEPARATIONFIREPREVENTIONEGRESSOCCUPANT LOAD NO SEPARATION REQUIREDFIRE SPRINKLER(S)FIRE EXTINGUISHER(S)FIRE ALARM(S)LOCATIONBUILDINGFIRST FLOOR TOTALSECOND FLOOR TOTALEGRESSILLUMINATIONEXIT ACCESS 1 FOOT - CANDLE (11 LUX) MINOCCUPANCY: M COMMON PATH OF EGRESS TRAVEL (FT)EXIT ACCESS TRAVEL DISTANCE (FT)MAX DEAD END CORRIDOR (FT)REQUIREDPLUMPINGFIXTURESOCCU -PANTSSELF-STORAGE(S-1)WATERCLOSET3LAVA -TORIES3 2 5 0 5 0 D R I N K I N G F O U N T A I N 2 S E R V I C E S I N K 6 S E C T I O N 1 0 1 4 . 3 T A B L E 1 0 1 7 . 2 S E C T I O N 1 0 2 0 . 4 I P C T A B L E 4 0 3 . 1 A N D S E C T I O N 4 0 3 . 2 S E C T I O N 1 0 0 6 A N D 2 7 0 2 PROVIDED THR O U G H O U T PROVIDED THR O U G H O U T PROVIDED THR O U G H O U T FIRE DEPT. CONNECTION TO BE PROVIDEDAREA30,85333,410 FAC T O R O C C U P A N T S 7 9 1 9 T A B L E 5 0 8 . 4 S E C T I O N 9 0 3 S E C T I O N 9 0 6 S E C T I O N 9 0 7 S E C T I O N 9 1 2 S E C T I O N 1 0 0 4 117 MERCANTILE2,970MERCANTILE2,97060 5 0 STORAGE1,460300 5 SELF-STORAGE8,632500 1 8 STORAGE1,633300 6 R M 1 0 0 , 1 0 1 , 1 0 2 , 1 0 3 , R M 1 0 4 , 1 1 1 R M 1 0 5 , 1 0 6 , 1 0 7 , 1 0 8 , 1 0 9 , 1 1 0 , 1 1 2 , R M 2 0 8 , 2 1 2 R M 3 0 6 , 3 0 8 , 3 1 2 R M 1 0 0 , 1 0 1 , 1 0 2 , 1 0 3 , 1 0 4 , 1 0 5 , 1 0 6 , 1 0 7 , 1 0 8 , 1 0 9 , 1 1 0 , 1 1 1 , 1 1 2 , R M 2 0 8 , 2 1 2 R M 3 0 6 , 3 0 8 , 3 1 2 WAREHOUSE*18,788 * N O N - O C C U P I A B L E SELF-STORAGE9,261500 1 9 WAREHOUSE*24,149 * N O N - O C C U P I A B L E THIRD FLOOR TOTAL33,410 1 9 SELF-STORAGE9,371500 1 9 WAREHOUSE*24,039 * N O N - O C C U P I A B L E 7 5 S - 1 2 5 0 5 0 1 0 0 F O R M O R E I N F O R M A T I O N S E E S H E E T T 4 . 1 E N E R G Y C O D E C O M P L I A N C E OCCUPANCYGROUP(S) C H A P T E R 3 C O M M E N T S / C O D E R E F E R E N C E R M 1 0 0 , 1 0 1 , 1 0 2 , 1 0 3 , R M 1 0 4 , 1 0 5 , 1 0 6 , 1 0 7 , 1 0 8 , 1 0 9 , 1 1 0 , 1 1 1 , 1 1 2 , 2 0 8 , 2 1 2 , 3 0 6 , 3 0 8 , 3 1 2 3 PERMIT APPLICANT:UHC OF IDAHO8155 CHINDEN BLDGBOISE, ID 83714 STANDING SEAM METAL ROOF SYSTEMS:BUTLER (ROOF & PURLINS)Contact: Mike Coffeymdcoffey@butlermfg.com EXTERIOR DOORS:CLOPAY (OVERHEAD DOORS)Contact: Chris Remickcremick@clopay.comSTANLEY (SLIDING DOORS)Contact: Bill Gerardinwilliam.gerardin@sbdinc.comELECTRICAL:GRAYBARContact: Bruce Ledgerboardbruce.Iedgerwood@graybar.com STORAGE MATERIAL:MBCI (INT. & EXT METAL STUDS, D&UPANELS Contacts: Chris Robertschristopher.roberts@mbci.comJANUS (DOORS, TRIM & KICK PLATE)Contact: Beth Bryantbethb@janusintl.comDYNAMIC FASTENERS (ALL COLD-FORMEDSTEEL & SHEATHING FASTENERS)Contact: Jason RichardsonJasonRichardson@Dynamicfastener.com INSULATED METAL PANEL (IMP) &NON-INSULATED EXTERIORMETAL PANELS:ATASCONTACT: Minnie Roblesmrobles@atas.comMBCIContacts: Brian Garrybrian.garry@metlspan.com GALVANIZED REINFORCING:COMMERCIAL METAL COMPANYContact: Tim WollTim.Woll@cmc.comCOVERED PARKING CANOPIES:BAJA CARPORTSContact: Jeremy Cecacijeremy@bajacarsports.comBUILDING CANOPIES:(OTHER THAN AT STORAGE ENTRANCE)SKYSCAPE CANOPIESContact: Chase Kingchase@skypecanopies.comMECHANICAL:TRANE (EQUIPMENT)CONTACT: Chad Barnettchad.barnett2@trane.comAIR DISTRIBUTION CONCEPTS (FABRIC DUCT)Contacts: Chris Pavlatoscpav@adctubes.com EXTERIOR PRE-FABRICATED STORAGE LOCKERS:TRACHTECONTACT: Kirsten Menzieskmenzies@trachte.com MILLER BUILDINGSContacts: Louis GilmoreLouisGilmore@MillerBldgs.com 1 9 . C O N T R A C T O R T O C O O R D I N A T E E X P A N D A B I L I T Y O F A L L S T A N D A L O N E P R E - E N G I N E E R E D M E T A L B U I L D I N G ( P E M B ) W I T H O W N E R R E P R E S E N T A T I V E . 2 0 . E L E V A T I O N S S H O W N A R E B A S E D O F F T H E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K ( D S D B o o k ) . P R I O R T O O R D E R I N G A N D I N S T A L L A T I O N O F M A T E R I A L , C O O R D I N A T I O N W I T H T H E L A T E S T D S D B O O K . C O N T A C T F A C I L I T Y I M A G I N G G R O U P , . O W N E R S R E P , A N D A R C H I T E C T I F A N Y E X T E R I O R M E C H A N I C A L , E L E C T R I C A L , P L U M B I N G , O R O T H E R C O N F L I C T S E X I S T . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L , I N S U L A T I O N A N D F I N I S H R E Q U I R E M E N T S . E L E V A T I O N S S H O W N A R E B A S E D O F F O F T H E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K ( D S D B O O K ) . P R I O R T O O R D E R I N G A N D I N S T A L L A T I O N O F M A T E R I A L , C O O R D I N A T E W I T H T H E L A T E S T D S D B O O K . C O N T A C T F A C I L I T Y I M A G I N G G R O U P , O W N E R S R E P , A N D A R C H I T E C T I F A N Y E X T E R I O R M E C H A N I C A L , E L E C T R I C A L , P L U M B I N G , O R O T H E R C O N F L I C T S E X I S T . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 33 II-BCONSTRUCTIONTYPE C H A P T E R 6 U L 7 8 , 0 0 0 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 C O N V E N T I O N 12" MIN30520" MAX51012" MIN305TOP LANDINGXRAMPS< 4" MAX100OBSTRUCTED HIGHFORWARD REACHFIGURE 308. 2. 2. A OBSTRUCTED HIGHFORWARD REACHFIGURE 308. 2. 2. B 1 0 " M A X 2 5 5 U N O B S T R U C T E D S I D E R E A C H F I G U R E 3 0 8 . 3 . 1 . > 1 0 " - 2 4 " M A X 2 5 5 - 6 1 0 O B S T R U C T E D H I G H S I D E R E A C H F I G U R E 3 0 8 . 3 . 2 . B U N O B S T R U C T E D F O R W A R D R E A C H F I G U R E 3 0 8 . 2 . 1 T Y P I C A L R E S T R O O M S I G N S 2 0 1 2 I B C A R T I C L E 2 9 0 2 . 4 3 3 - 3 6 4 8 0 - 9 1 5 BOTTOM LANDINGNOTE: X = TREAD DEPTHSTAIRSHANDRAIL EXTENSIONSRADIUS1/2" MAX1330°MAX(A)RADIUS OF TREAD EDGE( TYPICAL FOR ALL PROFILES)(B)ANGLED RISER (C)CURVED NOSINGSTAIR NOSINGDOJ 2010 STANDARDS: FIGURE 504.5 W A L K I N G S U R F A C E A P E R M I T T E D E L E M E N T O R I T S E X T E N S I O N FRONT APPROACH,PUSH SIDE, DOORPROVIDED WITH BOTHCLOSER AND LATCHFIGURE 404. 2. 3. 1. A(C)(A)STAIRS (B)RAMPS WALKINGSURFACESHANDRAIL HEIGHTDOJ 2010 STANDARDS: TITLES II & III - 505.4 MANEUVERI N G C L E A R A N C E S A T M A N U A L S W I N G D O O R S A N D G A T E S D O J 2 0 1 0 S T A N D A R D S : T I T L E S I I & I I I - F I G U R E S A S N O T E D 54"min.13706" MAX15091536"12" MAX305990 - 1040 39"- 41"42" min1065T.P.H.7"-9"16" - 18"455FRONT ELEVATIONMETAL CANEDETECTIONBARRIERCUPSHANDMAIN LEVEL UNDERSTAIRDRYER SIDE ELEVATIONSOAPDISPENSERTOWELSTOWELS LIGHTSWASTE SANITARYNAPKINSTRASH 8 " 2 0 5 M I N K N E E C L E A R 1 7 " m i n 4 3 0 6 " 1 5 0 m a x T O E C L E A R L A V A T O R Y C L E A R A N C E S I N S U L A T E D P I P E S P R O V I D E C A N E D E T E C T I O N A P R O N C O M P L I A N T W I T H A N S I A 1 1 7 8 " 2 0 5 M I N 6 " 1 5 0 m a x D R I N K I N G F O U N T A I N S & W A T E R C O O L E R S C O N T R O L S A N D O P E R A T I N G M E C H A N I S M S S H A L L B E O P E R A B L E W I T H O N E H A N D A N D S H A L L N O T R E Q U I R E T I G H T G R A S P I N G , P I N C H I N G , O R T W I S T I N G O F T H E W R I S T T H E F O R C E R E Q U I R E D T O A C T I V A T E C O N T R O L S S H A L L B E N O G R E A T E R T H A N 5 L B S ( 2 2 2 N ) I N C O M P L I A N C E W I T H A R T I C L E 3 0 9 . 4 0 F I C C A N S I A 1 1 7 . 1 2 0 0 3 . L E V E R - O P E R A T E D , P U S H - T Y P E , A N D E L E C T R O N I C A L L Y C O N T R O L L E D F A U C E T M E C H A N I S M S A R E E X A M P L E S O F A C C E P T A B L E D E S I G N S I F S E L F - C L O S I N G V A L V E S A R E U S E D T H E F A U C E T S H A L L R E M A I N O P E N F O R A T L E A S T 1 0 S E C O N D S I N C O M P L I A N C E W I T H A R T I C L E 6 0 6 . 4 0 F I C C A N S I A 1 1 7 . 1 2 0 0 3 . VERTICAL CLEARANCEDOJ 2010 STANDARDS: TITLES II & III - FIGURE 307.41' - 0"VANACCESSIBLEMOUNTED SIGN(NOT IN THE PATH OF TRAVEL)RESERVEDPARKINGRAMP1:12 MAX S L O P E VERIFY FINE AMOUNT PRIORTO FABRICATION OF SIGN$250 FINESLOPENOTE:PRIOR TO FABRICATION / INSTALLATIONCOORDINATE WITH LOCAL AUTHORITYCODE REQUIREMENTS.ADJOINING SURFACEMAXIMUM SLOPE201FINISH SURFACEAS OCCURSWALL MOUNTED SIGN DETAILNOT TO SCALE CUR B R A M P DOJ 2010 STANDARDS: TITLES II & III - FIGURE 406.2, 4 0 6 . 3 , 4 0 6 . 4 36" min915CURB RAMP SLOPE S E E P L A N S F O R S I G N T Y P E A N D D I M E N S I O N S SLOPECURB W A L K I N G S U R F A C E FLARED S I D E S 1:10 MA X S L O P E 2 . LANDING C L ALL SIGNS SHALL MEET ADAACCESSIBILITY VEHICLE CODEREQUIREMENTS.MISC. FIXTURES M O U N T I N G H E I G H T S S C A L E : 1 / 4 " = 1 ' - 0 " 9 " A R E A T O B E M A R K E D M I N . E X I T S T A I R D O W N E X I T 2 4 " x 4 8 " M I R R O R 6 1 0 X 1 2 2 0 1 7 " - 1 9 " 4 3 0 - 4 8 5 T A C T I L E S I G N P O S I T I O N A T R E S T R O O M S I C C A N S I A 1 1 7 . 1 2 0 0 9 S E C T I O N 7 0 3 / D O J 2 0 1 0 S T A N D A R D T I T L E S I I & I I I S E C T I O N 7 0 3 A R E A O F R E F U G E A C C E S S I B L E E X I T T Y P I C A L T A C T I L E S I G N S A H I G H L I G H T E D E L E M E N T I N E L E V A T I O N O R P L A N L O C A T I O N Z O N E O F E L E M E N T , C O N T R O L O R F E A T U R E FRONT APPROA C H , PUSH SIDE, D O O R PROVIDED WITH B O T H CLOSER AND L A T C H FIGURE 404. 2. 3 . 1 . C L A T C H A P P R O A C H , P U S H S I D E , F I G U R E 4 0 4 . 2 . 3 . 1 . H H I N G E A P P R O A C H , P U S H S I D E , F I G U R E 4 0 4 . 2 . 3 . 1 . F W O M E N / M E N / U N I S E X A D A S I G N ( S ) S E E P L A N S F O R R E S T R O O M T Y P E A W A L L , F L O O R , C E I L I N G O R O T H E R E L E M E N T C U T I N S E C T I O N O R P L A N (D)BEVELED NOSING18" min45512" min305 2 4 " m i n 6 1 0 1 8 0 d e g r e e Q C E N T E R L I N E 2 4 " m i n 6 1 0 B O U N D A R Y O F C L E A R F L O O R S P A C E O R M A N E U V E R I N G C L E A R A N C E Q G R E A T E R T H A N O R E Q U A L T O 1 1/2"MAX38 1 1/2"MAX38 HINGE APPROACH,PUSH SIDE, DOORFIGURE 404. 2. 3 1 C R E A C H R A N G E S D O J 2 0 1 0 S T A N D A R D S : T I T L E S I I & I I I - F I G U R E S A S N O T E D 9 " 2 0 1 2 I B A R T I C L E 2 9 0 2 . 4 T A C T I L E S I G N ( S E E P L A N F O R R E S T R O O M T Y P E ) B O T T O M O F T A C T I L E C H A R A C I D T E R S G R E A T E R T H A N L E S S T H A N O R E Q U A L T O M I N M A X D I M E N S I O N S H O W I N G A R A N G E W I T H M I N I M U M - M A X I M U M 12" MIN305 > 20" - 25" MAX510 - 635 W O M E N M E N R E S T R O O M 3 6 9 1 5 6 1 5 0 D I M E N S I O N F O R S M A L L M E A S U R E M E N T S D E S C R I P T I O N D I M E N S I O N S H O W I N G E N G L I S H U N I T S ( I N I N C H E S U N L E S S O T H E R W I S E S P E C I F I E D ) A B O V E T H E L I N E A N D S I U N I T S ( I N M I L L I M E T E R S U N L E S S O T H E R W I S E S P E C I F I E D ) B E L O W T H E L I N E M I N I M U M M A X I M U M L E S S T H A N D I R E C T I O N O F T R A V E L O R A P P R O A C H B O T T O M O F T O P T A C T I L E C H A R A C I D T E R S B O T T O M O F L O W E S T B R A I L L E C H E A R A C T E R S A C C E S S I B I L I T Y N O T E S : - 1 . A L L W O R K / I M P R O V E M E N T S S H A L L C O M P L Y W I T H A L L A P P L I C A B L E R E Q U I R E M E N T S O F A L L G O V E R N M E N T A L A U T H O R I T I E S H A V I N G J U R I S D I C T I O N O V E R T H E W O R K / I M P R O V E M E N T S ( I N C L U D I N G , W I T H O U T L I M I T A T I O N , A L L A P P L I C A B L E Z O N I N G , B U I L D I N G , F I R E , H E A L T H , H A N D I C A P A C C E S S I B I L I T Y A N D E N V I R O N M E N T A L L A W S ) . T H E S L O P E O F P U B L I C W A L K S S H A L L N O T E X C E E D M A X I M U M C R O S S S L O P E O F 2 % . 3 . W A L K I N G S U R F A C E S L O P I N G G R E A T E R T H A N 2 % S H A L L B E S L I P R E S I S T A N T . 4 . 9 6 " M I N 9 6 " M I N A C C E S S A I S L E V E H I C L E P A R K I N G S P A C E S D O J 2 0 1 0 S T A N D A R D S : T I T L E S I I & I I I - F I G U R E 5 0 5 . 2 , T A C T I L E S I G N P O S I T I O N A T E X I T D O O R S I C C A N S I A 1 1 7 . 1 2 0 0 3 : S E C T I O N 7 0 3 L E G E N D A N D A C C E S S I B I L I T Y N O T E S 9 6 " M I N P R O V I D E A 6 0 " X 6 0 " M I N I M U M L A N D I N G O N S T R I K E S I D E O F D O O R W I T H 4 4 " M I N I M U M W I D T H I N D I R E C T I O N O F T R A V E L . 5 . W A L K S S H A L L E X T E N D 2 4 " T O T H E S I D E O F T H E S T R I K E E D G E O F A N E X I T D O O R T H A T S W I N G S T O W A R D T H E W A L K . 80" MIN. @ PEDESTRIAN AREA 60" @ LANDSCAPED AREA 60" TO F.F.34" - 38"865 - 965 27"MAX 6856"1' - 6"6"34" - 38"865 - 965 34" - 38"865 - 96527" MAX 585 X < 80"2030 39"-41"48" MAX 1220 990 - 1040 33" - 36"480 - 915 18"MIN 455 60" min 1525 48" MAX 122036" min 915 44" MAX 430 - 485 17" - 19"1120 33" - 36"480 - 91548" MAX 1220 44" MAX 1120 1 9 " M I N 4 6 5 4 8 " m i n 1 2 2 0 7 4 " 1 8 8 3 m i n 4 0 " 1 0 2 5 m a x 3 4 " 8 6 5 m a x 2 9 " 7 3 6 m i n 2 7 " 6 2 5 m i n 9 " 3 2 0 m i n 4 8 " m i n 1 2 2 0 1 5 " M I N 3 8 0 4 8 " M A X 1 2 2 0 3 4 " M A X 4 6 " M A X 1 1 7 0 9 " 3 2 0 m i n 2 7 " m i n 3 8 6 3 6 " M A X 9 1 5 4 8 " m i n 1 2 2 0 1 5 " M I N 3 8 0 4 8 " M A X 1 2 2 0 4 8 " 1 2 2 0 6 0 " 1 5 2 5 4 8 " - 6 0 " 1 2 2 0 - 1 5 2 5 F U L L L E N G T H P A R K I N G S P A C E B G D Z T Y P I C A L A D A S T A N D A R D S T 1 . 2 T R U E N O R T H P R O J E C T N O R T H EGRESS NOTES E G R E S S S Y M B O L S 1 / 1 6 " = 1 ' - 0 " S C A L E F I R S T F L O O R E G R E S S P L A N 1 N N ABCED 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 9 1. THE PATH OF EXIT TRAVEL TO EXITS IN THE BUILDING SHALL BE IDENTIFIED BY EXIT SIGNSCONFORMING TO THE REQUIREMENTS OF I.F.C. EXIT SIGNS SHALL BE READILY VISIBLE FROMANY DIRECTION OF APPROACH. EXIT SIGNS SHALL BE LOCATED, AS NECESSARY, TOCLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL. NO POINT SHALL BE MORE THAN100 FEET (30480 MM) FROM THE NEAREST VISIBLE SIGN.2. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. WHEN THE FACE OF ANEXIT SIGN IS ILLUMINATED FROM AN EXTERNAL SOURCE, IT SHALL HAVE AN INTENSITY OFNOT LESS THAN 5-FOOT-CANDLES (54") FROM EITHER OF TWO ELECTRIC LAMPS.INTERNALLY ILLUMINATED SIGNS SHALL PROVIDE EQUIVALENT LUMINANCE AND BE LISTEDFOR THE PURPOSE.3. THE EXIT SIGNS SHALL ALSO BE CONNECTED TO AN EMERGENCY ELECTRICAL. SYSTEMFROM STORAGE BATTERIES, UNIT EQUIPMENT AND THE SYSTEM SHALL BE INSTALLED INACCORDANCE WITH THE ELECTRICAL CODE.4. ANY TIME A BUILDING OR PORTION OF A BUILDING IS OCCUPIED, THE MEANS OF EGRESSSERVING THE OCCUPIED PORTION SHALL BE ILLUMINATED AT THE INTENSITY OF NOT LESSTHAN 1 FOOT-CANDLE AT THE FLOOR LEVEL. THE POWER SUPPLY FOR MEANS OF EGRESSILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES OF ELECTRICAL SUPPLY. 5 . P R O V I D E T A C T I L E E X I T S I G N S I M M E D I A T E L Y A D J A C E N T T O T H E D O O R O N T H E S T R I K E S I D E A T 6 0 " A B O V E F I N I S H E D F L O O R , S O T H E Y A R E F U L L Y V I S I B L E W H E N T H E D O O R I S I N A N O P E N O R C L O S E D P O S I T I O N I N T H E F O L L O W I N G L O C A T I O N S : A . E A C H G R A D E L E V E L E X T E R I O R E X I T D O O R S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T W I T H T H E W O R D , " E X I T " . B . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A S T A I R W A Y O R R A M P S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E F O L L O W I N G W O R D S A S A P P R O P R I A T E : 1 . " E X I T S T A I R D O W N " 2 . " E X I T R A M P D O W N " 3 . " E X I T S T A I R U P " 4 . " E X I T R A M P U P " C . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A N E X I T E N C L O S U R E O R A N E X I T P A S S A G E W A Y S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , ' E X I T R O U T E " . D . E A C H E X I T A C C E S S D O O R F R O M A N I N T E R I O R R O O M O R A R E A T O A C O R R I D O R H A L L W A Y T H A T I S R E Q U I R E D T O H A V E V I S U A L E X I T S I G N . S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , " E X I T R O U T E " . 6 . P R O V I D E A M I N I M U M O F ( 1 ) 2 A - 1 0 B : C F I R E E X T I N G U I S H E R P E R 3 , 0 0 0 S Q U A R E F E E T O F F L O O R A R E A W I T H A M A X I M U M T R A V E L D I S T A N C E O F 7 5 F E E T . M O U N T E D I N A N A C E S S I B L E L O C A T I O N . 7 . L O C A T E F I R E E X T I N G U I S H E R S A T A M A X T R A V E L D I S T A N C E O F 7 5 ' - 0 " A P A R T O R P E R T H E D I R E C T I O N O F T H E F I R E M A R S H A L L . E X T I N G U I S H E R L O C A T I O N S A R E N O T E D B Y P L A N S Y M B O L . 8 . P R O V I D E A K N O X B O X A N D F I R E R I S E R R O O M S I G N A G E A T T H E F I R E S P R I N K L E R R I S E R R O O M . 9 . S E E F L O O R P L A N S F O R W A L L I N F O R M A T I O N A N D F I R E R E S I S T A N C E R A T I N G . 1 F I R E E X T I N G U I S H E R F I N A L L O C A T I O N A N D Q U A N T I T Y T O B E F I E L D V E R I F I E D E X I T S I G N S P A T H O F E G R E S S T R A V E L 1 - H O U R F I R E R A T E D P A R T I T I O N N O E X I T - E X I S T I N G D O O R M A I N T A I N E D I N A C L O S E D A N D L O C K E D P O S I T I O N T A C T I L E E X I T S I G N L O C A T I O N T A C T I L E A C C E S S I B L E E X I T S I G N L O C A T I O N S E E T 1 . 3 F O R M O R E I N F O R M A T I O N W I D T H C A P A C T A C T U A L E X I T C A P A C I T Y T R A V E L D I S T A N C E A L L O W E D : S E E T 1 . 1 M A X I M U M T R A V E L D I S T A N C E : 2 1 5 ' - 0 " C L E A R W I D T H M A X I M U M E X I T C A P A C I T Y T R A V E L D I S T A N C E T O E X I T = 9 4 ' - 1 0 " S - 1 O C C U P A N C Y 8 , 6 3 2 S . F . / 5 0 0 O L = 1 8 S - 1 O C C U P A N C Y 1 , 6 3 3 S . F . / 3 0 0 O L = 6 S-1 OCCUP A N C Y 1,460 S.F. / 3 0 0 OL = 5 M OCCUPANCY2,970 S.F. / 300OL = 50 2 3 F 1 - H O U R S H A F T E N C L O S U R E ( C O N S T R U C T E D A S F I R E B A R R I E R ) 3 2 5 ' - 6 1 4 " B U I L D I N G D I A G O N A L 3 2 5 ' - 6 1 4 " / 3 = 1 0 8 ' - 6 " M I N I M U M S E P A R A T I O N O F E X I T S 2 ' - 1 0 " 1 7 0 6 D O O R 4 ' - 0 " 1 6 0 9 S T A I R 4 ' - 0 " 2 4 0 5 D O O R 4'-0"24025 DOOR2'-10"17025 DOOR 2 ' - 1 0 " 1 7 0 1 5 D O O R 2 ' - 1 0 " 1 7 0 6 D O O R 4 ' - 0 " 1 6 0 1 0 S T A I R 2 0 2 ' - 9 7 1 6 " 2'-10"1706 DOOR TRAVEL DISTANCE TO EXIT = 98'-9" T R A V E L D I S T A N C E T O E X I T = 1 5 3 ' - 7 " F F F F F F F F F F F F 33 3 3 3 TRAVEL DISTANCE TO EXIT = 100'-9" S E L F - S T O R A G E 1 1 2 S E L F - S T O R A G E 1 1 1 R&D ARE A 104 SHOWROOM100TRAVEL DISTANCE TO EXIT = 172'-6" S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z F I R S T F L O O R E G R E S S P L A N T 2 . 1 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 3 T R U E N O R T H P R O J E C T N O R T H EGRESS NOTES E G R E S S S Y M B O L S 1 / 1 6 " = 1 ' - 0 " S C A L E S E C O N D F L O O R E G R E S S P L A N 1 N N 1. THE PATH OF EXIT TRAVEL TO EXITS IN THE BUILDING SHALL BE IDENTIFIED BY EXIT SIGNSCONFORMING TO THE REQUIREMENTS OF I.F.C. EXIT SIGNS SHALL BE READILY VISIBLE FROMANY DIRECTION OF APPROACH. EXIT SIGNS SHALL BE LOCATED, AS NECESSARY, TOCLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL. NO POINT SHALL BE MORE THAN100 FEET (30480 MM) FROM THE NEAREST VISIBLE SIGN.2. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. WHEN THE FACE OF ANEXIT SIGN IS ILLUMINATED FROM AN EXTERNAL SOURCE, IT SHALL HAVE AN INTENSITY OFNOT LESS THAN 5-FOOT-CANDLES (54") FROM EITHER OF TWO ELECTRIC LAMPS.INTERNALLY ILLUMINATED SIGNS SHALL PROVIDE EQUIVALENT LUMINANCE AND BE LISTEDFOR THE PURPOSE.3. THE EXIT SIGNS SHALL ALSO BE CONNECTED TO AN EMERGENCY ELECTRICAL. SYSTEMFROM STORAGE BATTERIES, UNIT EQUIPMENT AND THE SYSTEM SHALL BE INSTALLED INACCORDANCE WITH THE ELECTRICAL CODE.4. ANY TIME A BUILDING OR PORTION OF A BUILDING IS OCCUPIED, THE MEANS OF EGRESSSERVING THE OCCUPIED PORTION SHALL BE ILLUMINATED AT THE INTENSITY OF NOT LESSTHAN 1 FOOT-CANDLE AT THE FLOOR LEVEL. THE POWER SUPPLY FOR MEANS OF EGRESSILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES OF ELECTRICAL SUPPLY. 5 . P R O V I D E T A C T I L E E X I T S I G N S I M M E D I A T E L Y A D J A C E N T T O T H E D O O R O N T H E S T R I K E S I D E A T 6 0 " A B O V E F I N I S H E D F L O O R , S O T H E Y A R E F U L L Y V I S I B L E W H E N T H E D O O R I S I N A N O P E N O R C L O S E D P O S I T I O N I N T H E F O L L O W I N G L O C A T I O N S : A . E A C H G R A D E L E V E L E X T E R I O R E X I T D O O R S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T W I T H T H E W O R D , " E X I T " . B . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A S T A I R W A Y O R R A M P S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E F O L L O W I N G W O R D S A S A P P R O P R I A T E : 1 . " E X I T S T A I R D O W N " 2 . " E X I T R A M P D O W N " 3 . " E X I T S T A I R U P " 4 . " E X I T R A M P U P " C . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A N E X I T E N C L O S U R E O R A N E X I T P A S S A G E W A Y S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , ' E X I T R O U T E " . D . E A C H E X I T A C C E S S D O O R F R O M A N I N T E R I O R R O O M O R A R E A T O A C O R R I D O R H A L L W A Y T H A T I S R E Q U I R E D T O H A V E V I S U A L E X I T S I G N . S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , " E X I T R O U T E " . 6 . P R O V I D E A M I N I M U M O F ( 1 ) 2 A - 1 0 B : C F I R E E X T I N G U I S H E R P E R 3 , 0 0 0 S Q U A R E F E E T O F F L O O R A R E A W I T H A M A X I M U M T R A V E L D I S T A N C E O F 7 5 F E E T . M O U N T E D I N A N A C E S S I B L E L O C A T I O N . 7 . L O C A T E F I R E E X T I N G U I S H E R S A T A M A X T R A V E L D I S T A N C E O F 7 5 ' - 0 " A P A R T O R P E R T H E D I R E C T I O N O F T H E F I R E M A R S H A L L . E X T I N G U I S H E R L O C A T I O N S A R E N O T E D B Y P L A N S Y M B O L . 8 . P R O V I D E A K N O X B O X A N D F I R E R I S E R R O O M S I G N A G E A T T H E F I R E S P R I N K L E R R I S E R R O O M . 9 . S E E F L O O R P L A N S F O R W A L L I N F O R M A T I O N A N D F I R E R E S I S T A N C E R A T I N G . ABC 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D 9 1 F I R E E X T I N G U I S H E R F I N A L L O C A T I O N A N D Q U A N T I T Y T O B E F I E L D V E R I F I E D E X I T S I G N S P A T H O F E G R E S S T R A V E L 1 - H O U R F I R E R A T E D P A R T I T I O N N O E X I T - E X I S T I N G D O O R M A I N T A I N E D I N A C L O S E D A N D L O C K E D P O S I T I O N T A C T I L E E X I T S I G N L O C A T I O N T A C T I L E A C C E S S I B L E E X I T S I G N L O C A T I O N S E E T 1 . 3 F O R M O R E I N F O R M A T I O N W I D T H C A P A C T A C T U A L E X I T C A P A C I T Y T R A V E L D I S T A N C E A L L O W E D : S E E T 1 . 1 M A X I M U M T R A V E L D I S T A N C E : 1 8 9 ' - 9 " C L E A R W I D T H M A X I M U M E X I T C A P A C I T Y 2 3 F 1 - H O U R S H A F T E N C L O S U R E ( C O N S T R U C T E D A S F I R E B A R R I E R ) S - 1 O C C U P A N C Y 9 , 2 6 1 S . F . / 5 0 0 O L = 1 9 3 2 5 ' - 6 1 4 " B U I L D I N G D I A G O N A L 3 2 5 ' - 6 1 4 " / 3 = 1 0 8 ' - 6 " M I N I M U M S E P A R A T I O N O F E X I T S 4 ' - 0 " 1 6 0 9 S T A I R 2 ' - 1 0 " 1 7 0 9 D O O R 2 ' - 1 0 " 1 7 0 1 0 D O O R 4 ' - 0 " 1 6 0 1 0 S T A I R 2 0 2 ' - 9 7 1 6 " T R A V E L D I S T A N C E T O E X I T = 1 8 9 ' - 9 " 3 TRAVEL DISTANCE TO EXIT = 172'-6" T R A V E L D I S T A N C E T O E X I T = 1 1 4 ' - 1 1 " F F F F F F F F F F F F F F S E L F - S T O R A G E 2 1 2 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z S E C O N D F L O O R E G R E S S P L A N T 2 . 2 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 3 T R U E N O R T H P R O J E C T N O R T H EGRESS NOTES E G R E S S S Y M B O L S 1 / 1 6 " = 1 ' - 0 " S C A L E T H I R D F L O O R E G R E S S P L A N 1 N N 1. THE PATH OF EXIT TRAVEL TO EXITS IN THE BUILDING SHALL BE IDENTIFIED BY EXIT SIGNSCONFORMING TO THE REQUIREMENTS OF I.F.C. EXIT SIGNS SHALL BE READILY VISIBLE FROMANY DIRECTION OF APPROACH. EXIT SIGNS SHALL BE LOCATED, AS NECESSARY, TOCLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL. NO POINT SHALL BE MORE THAN100 FEET (30480 MM) FROM THE NEAREST VISIBLE SIGN.2. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. WHEN THE FACE OF ANEXIT SIGN IS ILLUMINATED FROM AN EXTERNAL SOURCE, IT SHALL HAVE AN INTENSITY OFNOT LESS THAN 5-FOOT-CANDLES (54") FROM EITHER OF TWO ELECTRIC LAMPS.INTERNALLY ILLUMINATED SIGNS SHALL PROVIDE EQUIVALENT LUMINANCE AND BE LISTEDFOR THE PURPOSE.3. THE EXIT SIGNS SHALL ALSO BE CONNECTED TO AN EMERGENCY ELECTRICAL. SYSTEMFROM STORAGE BATTERIES, UNIT EQUIPMENT AND THE SYSTEM SHALL BE INSTALLED INACCORDANCE WITH THE ELECTRICAL CODE.4. ANY TIME A BUILDING OR PORTION OF A BUILDING IS OCCUPIED, THE MEANS OF EGRESSSERVING THE OCCUPIED PORTION SHALL BE ILLUMINATED AT THE INTENSITY OF NOT LESSTHAN 1 FOOT-CANDLE AT THE FLOOR LEVEL. THE POWER SUPPLY FOR MEANS OF EGRESSILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES OF ELECTRICAL SUPPLY. 5 . P R O V I D E T A C T I L E E X I T S I G N S I M M E D I A T E L Y A D J A C E N T T O T H E D O O R O N T H E S T R I K E S I D E A T 6 0 " A B O V E F I N I S H E D F L O O R , S O T H E Y A R E F U L L Y V I S I B L E W H E N T H E D O O R I S I N A N O P E N O R C L O S E D P O S I T I O N I N T H E F O L L O W I N G L O C A T I O N S : A . E A C H G R A D E L E V E L E X T E R I O R E X I T D O O R S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T W I T H T H E W O R D , " E X I T " . B . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A S T A I R W A Y O R R A M P S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E F O L L O W I N G W O R D S A S A P P R O P R I A T E : 1 . " E X I T S T A I R D O W N " 2 . " E X I T R A M P D O W N " 3 . " E X I T S T A I R U P " 4 . " E X I T R A M P U P " C . E A C H E X I T D O O R T H A T L E A D S D I R E C T L Y T O A G R A D E - L E V E L E X T E R I O R E X I T B Y M E A N S O F A N E X I T E N C L O S U R E O R A N E X I T P A S S A G E W A Y S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , ' E X I T R O U T E " . D . E A C H E X I T A C C E S S D O O R F R O M A N I N T E R I O R R O O M O R A R E A T O A C O R R I D O R H A L L W A Y T H A T I S R E Q U I R E D T O H A V E V I S U A L E X I T S I G N . S H A L L B E I D E N T I F I E D B Y A T A C T I L E E X I T S I G N W I T H T H E W O R D S , " E X I T R O U T E " . 6 . P R O V I D E A M I N I M U M O F ( 1 ) 2 A - 1 0 B : C F I R E E X T I N G U I S H E R P E R 3 , 0 0 0 S Q U A R E F E E T O F F L O O R A R E A W I T H A M A X I M U M T R A V E L D I S T A N C E O F 7 5 F E E T . M O U N T E D I N A N A C E S S I B L E L O C A T I O N . 7 . L O C A T E F I R E E X T I N G U I S H E R S A T A M A X T R A V E L D I S T A N C E O F 7 5 ' - 0 " A P A R T O R P E R T H E D I R E C T I O N O F T H E F I R E M A R S H A L L . E X T I N G U I S H E R L O C A T I O N S A R E N O T E D B Y P L A N S Y M B O L . 8 . P R O V I D E A K N O X B O X A N D F I R E R I S E R R O O M S I G N A G E A T T H E F I R E S P R I N K L E R R I S E R R O O M . 9 . S E E F L O O R P L A N S F O R W A L L I N F O R M A T I O N A N D F I R E R E S I S T A N C E R A T I N G . ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D 1 F I R E E X T I N G U I S H E R F I N A L L O C A T I O N A N D Q U A N T I T Y T O B E F I E L D V E R I F I E D E X I T S I G N S P A T H O F E G R E S S T R A V E L 1 - H O U R F I R E R A T E D P A R T I T I O N N O E X I T - E X I S T I N G D O O R M A I N T A I N E D I N A C L O S E D A N D L O C K E D P O S I T I O N T A C T I L E E X I T S I G N L O C A T I O N T A C T I L E A C C E S S I B L E E X I T S I G N L O C A T I O N S E E T 1 . 3 F O R M O R E I N F O R M A T I O N W I D T H C A P A C T A C T U A L E X I T C A P A C I T Y T R A V E L D I S T A N C E A L L O W E D : S E E T 1 . 1 M A X I M U M T R A V E L D I S T A N C E : 1 8 9 ' - 9 " C L E A R W I D T H M A X I M U M E X I T C A P A C I T Y 2 3 F 1 - H O U R S H A F T E N C L O S U R E ( C O N S T R U C T E D A S F I R E B A R R I E R ) T R A V E L D I S T A N C E T O E X I T = 1 1 4 ' - 1 1 " S - 1 O C C U P A N C Y 9 , 3 7 1 S . F . / 5 0 0 O L = 1 9 4 ' - 0 " 1 6 0 9 S T A I R 2 ' - 1 0 " 1 7 0 9 D O O R 2 ' - 1 0 " 1 7 0 1 0 D O O R 4 ' - 0 " 1 6 0 1 0 S T A I R 2 0 2 ' - 9 7 1 6 " T R A V E L D I S T A N C E T O E X I T = 1 8 9 ' - 9 " F F F F F F F F F F F 3 3 F F FTRAVEL DISTANCE TO EXIT = 172'-6" 3 2 5 ' - 6 1 4 " B U I L D I N G D I A G O N A L 3 2 5 ' - 6 1 4 " = 1 0 8 ' - 6 " M I N I M U M S E P A R A T I O N O F E X I T S S E L F - S T O R A G E 3 1 2 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.09.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z T H I R D F L O O R E G R E S S P L A N T 2 . 3 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 3 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z E N E R G Y C O D E C O M P L I A N C E T 4 . 1 S H E E T 3 FIRE RATED WALL ASSEMBLIESTILT UP CONCRETE WALL (2 HOUR)TYPE:CTEXTERIORINTERIORR-VALUE:----UL ASSEMBLY #:SEE NOTE 3TYPE:MP INSULATED METAL WALL PANEL AT EXTERIOR (2 HOUR)EXTERIORINTERIORR-VALUE:SEET1.1FURRING STRIPS AS REQUIR E D UL ASSEMBLY #:W413TYPE:G CMU WALL ASSEMBLY (*)INTERIORINTERIORR-VALUE:----UL ASSEMBLY #:*SEE NOTE 5TYPE:H INTERIOR COLD FORMED STEEL WALL ASSEMBLY (1 HOUR)INTERIORINTERIORR-VALUE:----UL ASSEMBLY #:SEE NOTE 6TYPE:H1 INTERIOR COLD FORMED STEEL WALL ASSEMBLY (1 HOUR)INTERIORINTERIOR(STORAGE / AISLE SID E ) R-VALUE:----U-PANEL OR D-PANEL PER PL A N S UL ASSEMBLY #:SEE NOTE 6TYPE:H3 KICK PLATE (AISLE SIDE)INTERIOR COLD FORMED STEEL WALL ASSEMBLY (3 HOUR)INTERIORINTERIOR(STORAGE / AISLE SID E ) R-VALUE:----U-PANEL OR D-PANEL PER PL A N S UL ASSEMBLY #:UL W460 KICK PLATE (AISLE SIDE) 3 9 ' - 3 " T O P O F P A R A P E T 4 2 ' - 3 " A P P R O X . B L D G H E I G H T ( T . O . P A R A P E T - H I G H S I D E ) 7 5 ' - 0 " M A X I M U M A L L O W A B L E B L D G H E I G H T 2 3 ' - 2 " 3 R D F L O O R F . F . E . 1 2 ' - 6 " 2 N D F L O O R F . F . E . S E E E L E V A T I O N S T . O . S L A B F I R S T F L O O R 75'-0" 32'-9" 3'-0" 16'-1" 51'-0" 10'-8"12'-0" G L T Y P E I I - B S - 1 O C C U P A N C Y S - 1 ( 2 ) T Y P E I I - B S - 1 O C C U P A N C Y S - 1 ( 1 ) T Y P E I I - B M / S - 1 O C C U P A N C Y M / S - 1 ( 1 ) 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D T O W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E - F I N I S H E D D - P A N E L T O A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 - 1 / 2 " E Q U I V A L E N T T H I C K N E S S - 2 H O U R S F I R E R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 " E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 5 . 7 - 5 / 8 " E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 S Y S T E M B E Q U I V A L E N T . 6 . N O N - L O A D B E A R I N G - 2 H O U R F I R E R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E N U M B E R W P - 1 0 7 2 O R I B C C H A P T E R 7 . U L D E S I G N N O . V 4 9 7 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . N O T E S (3) LAYERS OF 5/8" GYPSUMWALLBOARD (TYPE X)INSULATED METAL PANEL (IM P ) PER PLANSCOLD FORMED STEEL"C" GIRT PER PLANSCONCRETE MASONRY UNIT ( C M U ) PER PLANS3-5/8" COLD FORMED STEEL S T U D S PER PLANS5/8" GYPSUM WALLBOARD (T Y P E X ) BOTH SIDES3-5/8" COLD FORMED STEEL S T U D S PER PLANS(3) 5/8" LAYERS GYPSUM WAL L B O A R D (TYPE X) BOTH SIDES 3-5/8" COLD FORMED STEEL S T U D S PER PLANS5/8" GYPSUM WALLBOARD (T Y P E X ) BOTH SIDES REINFORCED CONCRETETILT-UP PANEL PER PLANS 1 / 2 " = 1 ' - 0 " S C A L E B U I L D I N G S E C T I O N 1 NOT USED S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z F I R E - R A T E D W A L L S E C T I O N S T 4 . 2 NO T U S E D S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z F I R E - R A T E D A S S E M B L Y T 4 . 3 NO T U S E D S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z F I R E - R A T E D A S S E M B L Y T 4 . 4 NO T U S E D S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z F I R E - R A T E D A S S E M B L Y T 4 . 5 N O T U S E D S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z F I R E - R A T E D A S S E M B L Y T 4 . 6 ( S E C . 2 0 , T . 6 N . , R . 4 0 E . B . M . ) C O N S T R U C T I O N D R A W I N G S F O R : U H A U L O F R E X B U R G R E X B U R G , I D A H O S E P T E M B E R 2 0 2 2 c i v i l & s t r u c t u r a l e n g i n e e r i n g m a t e r i a l s t e s t i n g & l a n d s u r v e y i n g 1 0 1 S . P a r k A v e n u e , I d a h o F a l l s , I D 8 3 4 0 2 , ( 2 0 8 ) 5 2 4 - 0 2 1 2 8 0 0 W . J u d i c i a l S t r e e t , B l a c k f o o t , I D 8 3 2 2 1 , ( 2 0 8 ) 7 8 5 - 2 9 7 7 h l e i n c c . c o m PROJECT LOCATION S H E E T C 1 C O V E R S H E E T S H E E T C 2 G E N E R A L N O T E S S H E E T C 3 D E M O L I T I O N S H E E T C 4 G E N E R A L L A Y O U T S H E E T C 9 G R A D I N G P L A N S H E E T C 6 U T I L I T Y P L A N S H E E T C 7 S T O R M T E C H P L A N A N D P R O F I L E S S H E E T C 8 S E W E R P L A N A N D P R O F I L E S H E E T C 9 D E T A I L S S H E E T C 1 0 S T O R M T E C H D E T A I L S S H E E T C 1 1 S T O R M W A T E R P O L L U T I O N P R E V E N T I O N P L A N V I C I N I T Y M A P C i t y o f R e x b u r g D a t e : H L E , I n c . D a t e : A P P R O V A L S I G N A T U R E S : D e p a r t m e n t o f E n v i r o n m e n t a l Q u a l i t y D a t e : S I T E BOISEIDAHOFALLSBLACKFOOTTWINFALLSPOCATELLOINKOM RIGBY REXBURG15 1520868484202630MERIDIAN CIT Y O F REX B U R G 9 - 2 9 - 2 2 1 C i v i l D e s i g n C h a n g e s a f t e r B i d S e t p r i o r t o C i t y A p p r o v a l S h e e t C 4 G e n e r a l L a y o u t 1 . S i d e w a l k a g a i n s t 2 n d E a s t p u s h e d 7 ' f r o m c u r b a n d g u t t e r p e r c i t y r e q u i r e m e n t s 2 . N o t e a d d e d t o r e m o v e e x i s t i n g c u r b c u t s a n d r e p l a c e w i t h t y p i c a l h i g h b a c k c u r b 3 . S i d e w a l k a d d e d a r o u n d B u i l d i n g A c o n n e c t i n g a l l d o o r s t o t h e p a r k i n g s t a l l s . 4 . S i d e w a l k c o n n e c t i n g f r o m B u i l d i n g A t o t h e s i d e w a l k a g a i n s t 2 n d E a s t p r o v i d i n g P e d e s t r i a n a c c e s s i n t o t h e s i t e p e r c i t y r e q u e s t 5 . C u r b a n d g u t t e r a r o u n d r e n t a l v e h i c l e p a r k i n g a g a i n s t 2 n d e a s t t o a c c o u n t f o r t h e l o s t s t a l l f r o m t h e a d d e d s i d e w a l k . C u r b r a d i u s c h a n g e d n e a r W e s t a c c e s s . 6 . R e t a i n i n g W a l l A d d e d s o u t h o f t h e n e w s i d e w a l k c o n n e c t i n g b u i l d i n g A t o 2 n d E a s t . 7 . R e t a i n i n g W a l l a d d e d n e a r t h e p r o p e r t y c o r n e r N o r t h o f B u i l d i n g A S o u t h w e s t o f b u i l d i n g A 8 . S i d e w a l k a g a i n s t 3 r d E a s t s h o w n a n d n o t e d t o r e t a i n a n d p r o t e c t . 9 . E n t r a n c e d e s i g n a d j u s t m e n t s a m e n d e d t o m a t c h C i t y s t a n d a r d 1 0 . B u i l d i n g B d i m e n s i o n s c h a n g e d s e e A r c h i t e c t u r a l D r a w i n g s f o r d e t a i l s 1 1 . B u i l d i n g B L o a d i n g D o c k T r a n s i t i o n s c h a n g e d p e r U - H a u l C o m m e n t s 1 2 . A D A S t a l l a d d e d t o t h e s o u t h s i d e o f B u i l d i n g B 1 3 . V a l l e y g u t t e r s b e t w e e n s t o r a g e u n i t s r e r o u t e d t o a c c o u n t f o r g r a d e c h a n g e s 1 4 . C u r b a n d g u t t e r a l l c h a n g e d t o r o l l e d c u r b 1 5 . R e t a i n i n g p o n d a r e a s a d j u s t e d S h e e t C 5 G r a d i n g 1 . B u i l d i n g F i n i s h f l o o r e l e v a t i o n s R a i s e d t o m e e t c i t y f l o o d p l a i n r e q u i r e m e n t s 2 . S i t e e l e v a t i o n s r a i s e d i n c o n s e q u e n c e t o b u i l d i n g e l e v a t i o n c h a n g e s . 3 . S w a l e s a n d w a l l s a d d e d 4 . T r u c k d o c k g r a d i n g c h a n g e d a t U - H a u l R e q u e s t . S h e e t C 6 U t i l i t i e s 1 . A l l W a t e r m e t e r s j o i n e d i n t o o n e 2 ” w a t e r m e t e r a t d i r e c t i o n f r o m t h e c i t y s e r v i c e l i n e s f o r b u i l d i n g A , B u i l d i n g B a n d L a n d s c a p e a l l t e e o f f a f t e r m e t e r . S e r v i c e l i n e s r e r o u t e d t o m e e t b u i l d i n g t i e i n p o i n t s . 2 . U n d e r g r o u n d s t o r m s y s t e m s i z i n g a n d l o c a t i o n s c h a n g e d d u e t o g r a d i n g c h a n g e s f o r f l o o d p l a i n c o n s i d e r a t i o n s . 3 . S e w e r m a i n s i z e c h a n g e d t o a n 8 ” m a i n . M a n h o l e d e p t h s a d j u s t e d t o a c c o u n t f o r l o w e r s l o p e a l l o w a n c e . 4 . R e r o u t e o f e x i s t i n g s e w e r s e r v i c e c o n n e c t i o n f r o m B a n k p r o p e r t y t o t h e s o u t h . 5 . C i t y f i b e r J b o x e s a n d c o n d u i t s a d d e d t o a l l r o a d f r o n t a g e s . S h e e t C 7 1 . P l a n a n d p r o f i l e s u p d a t e d t o r e f l e c t n e w g r a d e s S h e e t C 8 1 . P i p e s i z e o n s e w e r m a i n u p d a t e d t o 8 ” 2 . G r a d e s c h a n g e d t o r e f l e c t u p d a t e d g r a d i n g . 3 . M a n h o l e s a d j u s t e d w e s t t o s t a y o u t f r o m u n d e r p a r k i n g s t a l l s . S h e e t C 9 1 . F o u n d a t i o n r e v e a l s a n d s w a l e c r o s s s e c t i o n d e t a i l s a d d e d 2 . R o l l e d c u r b t e r m i n a t i o n d e t a i l a d d e d . 1 0 - 1 2 - 2 2 2 C i v i l D e s i g n C h a n g e s a f t e r B i d S e t p r i o r t o C i t y A p p r o v a l S h e e t C 3 D e m o l i t i o n 1 . E x i s t i n g c u r c u t s t o b e r e m o v e d . S h e e t C 4 G e n e r a l L a y o u t 1 . S t r e e t L a m p s a d d e d t o t h e e n t r a n c e o f f o f 4 t h N o r t h a n d 3 r d E a s t K e y n o t e a d d e d t o t h e n o t e l a m p p o s t l o c a t i o n s S h e e t C 5 G r a d i n g 1 . F i r e D e p a r t m e n t C o n n e c t i o n N o t a t i o n s . S h e e t C 6 U t i l i t i e s 1 . P l a c e d l i g h t c l o s e r t o s i d e w a l k 2 . 4 " s e r v i c e l i n e t i e - i n l o c a t i o n c h a n g e d 3 . F i r e D e p a r t m e n t C o n n e c t i o n N o t a t i o n s . 1 0 / 1 3 / 2 0 2 2 C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c GENERAL NOTES C 2 GENERAL NOTES1. All materials, workmanship, and construction of site improvements shall meet or exceed the work standards and specifications set forth by the CITY OF REXBURG Water, Street, and Sanitation Departments and/or requirements of the Idaho Standards for Public Works Construction, (ISPWC) current edition.2. All material furnished on or for the project must meet the minimum requirements of the approving agencies or as set forth herein, whichever is more restrictive.3. The Contractor is cautioned that the location and/or elevation of existing utilities, as shown on these plans, is based on records of the various utility companies and where possible, measurements taken in the field. The Contractor must call the local utility location center at least 48 hours before any excavation to request exact field locations of the utilities.4. A Pre-Construction Conference shall be held a minimum of three (3) working days prior to start of work. All Contractors, Subcontractors and/or Utility Contractors shall be present.5. All lot dimensions and easements are to be taken from the Final Plat of the recorded subdivision plat.6. The Contractor shall maintain all existing drainage facilities within the construction area until the drainage improvements are in place and functioning.7. All Contractors working within the project boundaries are responsible for compliance with all applicable safety laws of any jurisdictional body including but not limited to, barricades, safety devices, control of traffic, excavation, trenching, shoring, and security within and around the construction area.8. Contractors must furnish proof that all materials installed on this project meet the requirements of Note # 2 above at the request of the agency and/or Engineer.9. HLE must give approval prior to (a) backfilling trenches for pipe; (b) placing of aggregate base; (c) placing of concrete; (d) placing of asphalt pavement. Work done without such approval shall not relieve the Contractor from the responsibility of performing the work in an acceptable manner. Contract work will not be accepted by the CITY OF REXBURG without the approval of the Project Engineer.10. Inspection SHALL be conducted by the CITY OF REXBURG, Public Works Inspector on all work performed within the public road right-of-way. Twenty-four (24) hours notice shall be given prior to any construction and inspection.11. Developmental drawings must be submitted to the CITY OF REXBURG Public Works Dept. prior to final approval.12. Only plan sets marked "Approved for Construction" shall be used by the project contractor(s). Use of any plans on the job without the "Approved for Construction" stamp shall be grounds for the issuance of a stop work order. Contractor must also maintain a set of plans stamped with approval by the Department of Environmental Quality on site.13. Each Contractor shall be responsible for acquiring any necessary NPDES permits, filing any NOI's or NOT's, and preparing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the Environmental Protection Agency. Contact the EPA at 208.378.5776 for the required information. Said permit shall be presented to the Engineer at least forty-eight (48) hours prior to the beginning of construction.14. The Contractor shall be responsible for keeping roadways free and clear of all construction debris and dirt tracked in from the site.15. All measures possible shall be taken to ensure erosion control with Best Management Practices.16. Quantities shown are estimates by the Engineer. The Contractor must verify all quantities. If there is a large discrepancy contact the Engineer.17. All work must meet standards set forth by the American Disabilities Act (ADA).18. Trench backfill Type 2A compaction "Water Settling" will not be an acceptable method of trench backfill compaction.19. All water valves, blow-offs and manholes will be placed so as not to conflict with any concrete curb, gutter, valley gutter, and sidewalk improvements.20. Harper-Leavitt Engineering and/or Inspector shall make periodic visits to the project location to ensure that the site improvements meet or exceed standards and design as per the approved construction drawings.21. To receive final acceptance, Contractor must submit copy of field plans complete with construction notes and As-Built information, corrections, changes, etc.22. Contractor must have ISPWC Manual (current edition) on-site during all phases of construction. Failure to do so JUNE result in non-acceptance of the site by DEQ, Engineer, City, etc.23 A copy of the Quality Control Signature sheet (with all applicable signatures) shall be delivered to HLE prior to the walk-thru. STREET CONSTRUCTION1. All construction within public right-of-way shall conform to the current edition of the ISPWC. No exceptions to Policy Standards and the ISPWC will be allowed unless specifically and previously approved in writing by the CITY OF REXBURG.2. No construction shall begin before the Pre-Construction meeting, which the Contractor is required to attend.3. Sanitary sewer and storm drain manhole structures shall be set to specified elevation by their respective contractors. All remaining manhole materials, except concrete collars, necessary to construct manhole to finished grade in pavement areas shall be furnished by the Contractor for placement at finished grade. For manholes not within pavement areas, the manhole rings shall be set to finished grade by their respective contractor. Contractor shall contact the CITY OF REXBURG twenty-four (24) hours prior to pouring concrete collars.4. Contractor shall construct three and one-half inches (3-1/2") of asphalt pavement thickness at joint locations for all pavement matches.5. All reinforced concrete pipe shall conform to ASTM C-76 Specifications for the class of pipe indicated, and shall be installed watertight.6. All work will be inspected by the CITY OF REXBURG in accordance with the latest edition of the "Construction Quality Assurance Manual".7. Borrow shall be obtained from sources designated or approved in writing by the Engineer.8. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials. Under no circumstances shall roadways be placed on frozen or objectionable material.9. The subgrade shall be excavated and bladed to remove all uneven areas and to secure a uniform surface true to grade and line. The subgrade material shall then be scarified to a depth of eight inches (8"), adjusted to within approximately 2% of optimum moisture content and compacted to the minimum density required as stated in ISPWC.10. All concrete used shall be Class 4 and have a strength of four thousand (4000) PSI in twenty-eight (28) days. The mix design for this concrete shall be approved by the Engineer. All concrete shall be cured by a liquid membrane-forming curing compound method, unless otherwise specified in writing by the Engineer.11. All road stripping and excess topsoil shall be stockpiled out of the right-of-way and stored at Contractor's expense. D E P A R T M E N T O F E N V I R O N M E N T A L Q U A L I T Y W I L L I A M T E U S C H E R , W A T E R Q U A L I T Y E N G I N E E R 9 0 0 N S K Y L I N E D R I V E S U I T E B I D A H O F A L L S , I D A H O 8 3 4 0 2 ( 2 0 8 ) 5 2 8 - 2 6 5 0 C E N T U R Y L I N K N A T H A N B U R K E 4 8 N C E N T E R S T R E E T R E X B U R G , I D A H O 8 3 4 4 0 ( 2 0 8 ) 5 2 5 - 4 2 6 2 C O N T A C T S I N T E R M O U N T I A N G A S C O M P A N Y S A R A H R O B I N S O N , C O N S U M E R S A L E S R E P . 1 5 2 7 H O L L I P A R K D R I V E P O B O X 5 1 2 2 0 I D A H O F A L L S , I D A H O 8 3 4 0 1 ( 2 0 8 ) 5 4 2 - 6 6 1 2 R O C K Y M O U N T A I N P O W E R V I N C E P H I L L I P S , C O N S T R U C T I O N C O N T A C T ( 2 0 8 ) 3 9 0 - 8 0 3 1 H A R L E Y L A U R S E N , E S T I M A T O R ( 2 0 8 ) 3 5 9 - 4 2 3 7 R E X B U R G , I D A H O 8 3 4 4 0 C A B L E O N E H E I N Z S H R E I E R ( 2 0 8 ) 5 8 9 - 2 4 0 1 1 5 2 5 S H E R R Y D R I V E I D A H O F A L L S , I D A H O 8 3 4 0 3 ( 2 0 8 ) 5 2 3 - 4 5 6 7 W A T E R C O N S T R U C T I O N 1. Fi n a l a p p r o v a l a n d a c c e p t a n c e o f a l l w a t e r c o n s t r u c t i o n w i l l b e b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p a r t m e n t . 2. N o c o n s t r u c t i o n s h a l l b e g i n b e f o r e t h e P r e - C o n s t r u c t i o n m e e t i n g , w h i c h t h e C o n t r a c t o r i s r e q u i r e d t o a t t e n d . 3. W a t e r i n s p e c t i o n s w i l l b e b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p a r t m e n t a n d t h e i r d e c i s i o n s h a l l b e c o n s i d e r e d f i n a l . 4. A l l s e r v i c e l i n e s s h a l l b e N S F 6 1 a p p r o v e d P o l y t u b i n g a n d i n s t a l l e d u s i n g t h e f o l l o w i n g o r e q u a l . A l l s e r v i c e l i n e s s h a l l b e i n s t a l l e d t o e n s u r e e l e c t r i c a l c o n t i n u i t y f o r t h e f u l l l e n g t h o f t h e s e r v i c e l i n e s u p t o w a t e r m e t e r . T h e u s e o f c o u p l i n g s f o r s e r v i c e l i n e s s h a l l b e r e s t r i c t e d f r o m b e i n g u s e d . S e r v i c e l i n e s s h a l l b e o n e - i n c h ( 1 " ) o r o n e a n d o n e - h a l f ( 1 . 5 " ) u n l e s s o t h e r w i s e d i r e c t e d b y t h e D e p a r t m e n t o f W a t e r . 5. T h e h o r i z o n t a l s e p a r a t i o n o f t h e w a t e r a n d s e w e r m a i n s s h a l l b e a m i n i m u m o f t e n f e e t ( 1 0 ' ) . W h e r e i t i s n e c e s s a r y f o r s e w e r , s t o r m d r a i n o r i r r i g a t i o n ( n o n - p o t a b l e l i n e s ) a n d w a t e r t o c r o s s e a c h o t h e r a n d t h e n o n - p o t a b l e l i n e i s l e s s t h a n e i g h t e e n i n c h e s ( 1 8 " ) b e l o w , o r t h e n o n - p o t a b l e l i n e i s a b o v e t h e w a t e r m a i n , t h e n o n - p o t a b l e l i n e s h a l l b e P V C p r e s s u r e p i p e c o n f o r m i n g t o A W W A C - 9 0 0 a n d w a t e r t i g h t j o i n t s f o r a d i s t a n c e o f t e n f e e t ( 1 0 ' ) o n b o t h s i d e s o f t h e w a t e r m a i n , o r s l e e v e n o n - p o t a b l e o r p o t a b l e m a i n w i t h p o t a b l e w a t e r c l a s s p i p e f o r t e n ( 1 0 ) f e e t e i t h e r s i d e o f c r o s s i n g i n a c c o r d a n c e w i t h S e c t i o n 5 4 2 . 0 7 o f t h e I d a h o P u b l i c D r i n k i n g W a t e r S t a n d a r d s . O n e f u l l l e n g t h o f b o t h w a t e r m a i n a n d n o n - p o t a b l e l i n e s h a l l b e c e n t e r e d o v e r t h e c r o s s i n g p o i n t s o t h a t b o t h j o i n t s w i l l b e a s fa r f r o m t h e c r o s s i n g p o i n t a s p o s s i b l e . I n l i e u o f c o n s t r u c t i n g o r r e c o n s t r u c t i n g t h e n o n - p o t a b l e w a t e r m a i n e i t h e r t h e n o n - p o t a b l e w a t e r m a i n o r w a t e r m a i n J U N E b e e n c a s e d w i t h a s l e e v i n g m a t e r i a l a c c e p t a b l e to t h e D e p a r t m e n t f o r a d i s t a n c e o f t e n h o r i z o n t a l f e e t ( 1 0 ' ) o n b o t h s i d e s o f t h e c r o s s i n g . 6. T h e w a t e r m a i n s h a l l b e t e s t e d f o r p r e s s u r e , f l u s h i n g , a n d d i s i n f e c t i o n i n a c c o r d a n c e w i t h I S P W C S e c t i o n 4 0 1 a n d i n a c c o r d a n c e w i t h A W W A S t a n d a r d C 6 5 1 . 7. W a t e r m e t e r s a n d a l l r e l a t e d a p p u r t e n a n c e ' s , i n c l u d i n g r a d i o r e a d h a r d w a r e , w i l l b e p r o v i d e d b y t h e C I T Y O F R E X B U R G W a t e r D e p a r t m e n t a t t h e r e q u e s t e r ' s e x p e n s e . 8. T h e p a v i n g c o n t r a c t o r s h a l l s e t a n d p o u r c o n c r e t e c o l l a r s o n a l l v a l v e s a n d m a n h o l e s p e r I S P W C S t a n d a r d D r a w i n g S D - 4 0 5 . 9. D o n o t r e i n s t a l l o r l e a v e i n - p l a c e d a m a g e d p i p e d . 10. W a t e r D e p a r t m e n t a p p r o v e d " M a r k i n g / D e t e c t T a p e " s h a l l b e p l a c e d o v e r a l l w a t e r l i n e s . T a p e s h a l l b e p l a c e d a m i n i m u m o f s i x i n c h e s ( 6 " ) a n d m a x i m u m o f t w e l v e i n c h e s ( 1 2 " ) a b o v e a l l p i p e . 11. A l l w a t e r s e r v i c e s s h a l l b e r e c o n n e c t e d t o e x i s t i n g s e r v i c e l i n e s . 12. A l l p r o d u c t s i n c o n t a c t w i t h p o t a b l e w a t e r m u s t c o m p l y w i t h N S F 6 1 r e g u l a t i o n s . 13. 1 2 g a u g e w i r e s h a l l b e s h i e l d e d a n d t a p e d t o w a t e r l i n e . 14. T h r u s t b l o c k s s h a l l b e i n s t a l l e d p e r t h e l a t e s t e d i t i o n o f I S P W C S D - 4 0 3 . R E X B U R G P U B L I C W O R K S J O E L G R A Y , E N G I N E E R 3 5 N O R T H 1 S T E A S T R E X B U R G , I D A H O 8 3 4 4 0 ( 2 0 8 ) 3 5 9 - 3 0 2 0 S E W E R C O N S T R U C T I O N 1. F i n a l a p p r o v a l a n d a c c e p t a n c e o f a l l s e w e r c o n s t r u c t i o n w i l l b e b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p a r t m e n t . 2. S e w e r i n s p e c t i o n w i l l b e b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p a r t m e n t a n d t h e i r d e c i s i o n s s h o u l d b e c o n s i d e r e d a s f i n a l . T h e C o n t r a c t o r w i l l n o t i f y t h e C I T Y O F R E X B U R E G P u b l i c W o r k s D e p t . f o r t y - e i g h t ( 4 8 ) h o u r s p r i o r t o c o n s t r u c t i o n . T h e C I T Y O F R E X B U R G w i l l p r o v i d e p e r i o d i c i n s p e c t i o n s o f a n e i g h t - h o u r ( 8 ) d a y f r o m 8 : 0 0 a . m . t o 5 : 0 0 p . m . , f o r a f o r t y - h o u r ( 4 0 ) w e e k . 3. S e r v i c e l i n e s s h a l l b e m a r k e d i n a c c o r d a n c e w i t h t h e I S P W C s p e c i f i c a t i o n s a n d S t a n d a r d D r a w i n g S D - 5 1 2 . S e r v i c e l i n e m a r k e r s s h a l l r e m a i n i n p l a c e d u r i n g c o n s t r u c t i o n a n d b e p r e s e n t f o r f i n a l i n s p e c t i o n . 4. P r i o r t o F i n a l A c c e p t a n c e , a f t e r a l l u t i l i t i e s a r e i n s t a l l e d a n d p r i o r t o p a v i n g , a w a t e r t e s t s h a l l b e c o n d u c t e d . T h e C o n t r a c t o r s h a l l c o n t a c t t h e C I T Y O F R E X B U R G a m i n i m u m o f t w e n t y - f o u r ( 2 4 ) h o u r s p r i o r t o t e s t i n g . A l l m a n h o l e s s h a l l b e t e s t e d i n a c c o r d a n c e w i t h t h e I S P W C . 5. T h e s e w e r c o n t r a c t o r s h a l l s u p p l y a l l l i d a s s e m b l i e s a n d t h e r e q u i r e d n u m b e r o f r i s e r s a n d g r a d e r i n g s . T h e s e w e r c o n t r a c t o r s h a l l f i e l d v e r i f y t h e e l e v a t i o n o f t h e t o p o f t h e m a n h o l e c o n e t o a s s u r e t h a t r i n g e l e v a t i o n s m a t c h f i n a l s t r e e t g r a d e s . T h e m a x i m u m h e i g h t o f t h e g r a d e r i n g s s h a l l b e s u c h t h a t t h e f i n i s h g r a d e e l e v a t i o n o f t h e m a n h o l e f r a m e a n d c o v e r s h a l l n o t b e m o r e t h a n t w e l v e i n c h e s ( 1 2 " ) a b o v e t h e m a n h o l e c o n e . 6. T h e p a v i n g c o n t r a c t o r s h a l l s e t t h e g r a d e r i n g s a n d p o u r t h e c o n c r e t e c o l l a r s p e r I S P W C S t a n d a r d D r a w i n g S D - 5 0 8 . T h e p a v i n g c o n t r a c t o r s h a l l c o n t a c t t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p t . t w e n t y - f o u r ( 2 4 ) h o u r s p r i o r t o p o u r i n g c o n c r e t e c o l l a r s . 7. T h e h o r i z o n t a l s e p a r a t i o n o f t h e w a t e r a n d s e w e r m a i n s s h a l l b e a m i n i m u m o f t e n f e e t ( 1 0 ' ) . W h e r e i t i s n e c e s s a r y f o r s e w e r , s t o r m d r a i n , o r i r r i g a t i o n ( n o n - p o t a b l e l i n e s ) a n d w a t e r t o c r o s s e a c h o t h e r a n d t h e n o n - p o t a b l e l i n e i s l e s s t h a n e i g h t e e n i n c h e s ( 1 8 " ) b e l o w , o r t h e n o n - p o t a b l e l i n e i s a b o v e t h e w a t e r m a i n , t h e n o n - p o t a b l e l i n e s h a l l b e a P V C p r e s s u r e p i p e c o n f o r m i n g t o A W W A C - 9 0 0 a n d w a t e r t i g h t j o i n t s f o r a d i s t a n c e o f t e n f e e t ( 1 0 ' ) o n b o t h s i d e s o f t h e w a t e r m a i n , i n a c c o r d a n c e w i t h S e c t i o n 5 5 0 . 0 6 o f t h e I d a h o P u b l i c D r i n k i n g W a t e r S t a n d a r d s . O n e f u l l l e n g t h o f b o t h w a t e r m a i n a n d n o n - p o t a b l e l i n e s h a l l b e c e n t e r e d o v e r t h e c r o s s i n g p o i n t s o t h a t b o t h j o i n t s w i l l b e a s f a r f r o m t h e c r o s s i n g p o i n t a s p o s s i b l e . 8. G r o u n d w a t e r l e v e l s s h a l l b e m a i n t a i n e d b e l o w t h e b o t t o m o f t h e t r e n c h d u r i n g t h e p i p e l a y i n g a n d p i p e j o i n i n g o p e r a t i o n s . 9. A l l s t a t i o n i n g o n t h e S a n i t a r y S e w e r l i n e r e l a t e s t o t h e s t r e e t c e n t e r l i n e s t a t i o n i n g . 10. T h e s e w e r m a i n s h a l l b e t e s t e d f o r d e f l e c t i o n i n a c c o r d a n c e w i t h t h e I S P W C . A l l s e w e r l i n e s s h a l l b e t e l e v i s e d w i t h a c l o s e d c i r c u i t t e l e v i s i o n c a m e r a i n a c c o r d a n c e w i t h t h e I S P W C . N o s t a n d i n g w a t e r s h a l l b e p r e s e n t . 11. T h e C o n t r a c t o r s h a l l l e a v e t h e e x c a v a t i o n f o r t h e u p s t r e a m e n d o f a l l s e r v i c e l i n e s o p e n f o r f i e l d v e r i f i c a t i o n o f t h e i n v e r t e l e v a t i o n b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p t . I n s p e c t o r . T h e C o n t r a c t o r s h a l l n o t b a c k f i l l t h e e n d s o f s e r v i c e l i n e s u n t i l h e h a s o b t a i n e d a p p r o v a l f r o m t h e C I T Y O F R E X B U R G P u b l i c W o r k s I n s p e c t o r o r m a d e o t h e r a r r a n g e m e n t s f o r t h e v e r i f i c a t i o n o f s e r v i c e l i n e i n v e r t e l e v a t i o n s . I n v e r t e l e v a t i o n s s h o w n o n p l a n s a r e c a l c u l a t e d a t t h e e n d o f t h e s e r v i c e l i n e s . 12. T h e C o n t r a c t o r s h a l l c o n s t r u c t t h e s a n i t a r y s e w e r i n a c c o r d a n c e w i t h t h e p l a n s a p p r o v e d b y t h e C I T Y O F R E X B U R G P u b l i c W o r k s D e p a r t m e n t . T h e s e p l a n s w i l l b e p r o v i d e d t o t h e C o n t r a c t o r b y t h e P r o j e c t I n s p e c t o r p r i o r t o c o n s t r u c t i o n . W o r k s h a l l n o t b e d o n e w i t h o u t t h e c u r r e n t s e t o f a p p r o v e d p l a n s . 13. A l l s a n i t a r y s e w e r s e r v i c e l i n e s s h a l l b e f o u r i n c h ( 4 " ) P V C , s t u b b e d f i f t e e n f e e t ( 1 5 ' ) i n t o t h e l o t s . S e w e r s e r v i c e s m u s t b e p l a c e d w i t h a m i n i m u m o f 2 % s l o p e a n d i d e n t i f i e d b y a 2 " x 4 " b o a r d p l a c e d a t t h e e n d o f s t u b a n d p a i n t e d g r e e n . 14. S t a n d a r d s a n i t a r y s e w e r m a n h o l e s t o b e c o n s t r u c t e d i n a c c o r d a n c e w i t h I S P W C S t a n d a r d D r a w i n g S D - 5 0 1 , a n d D r o p M a n h o l e s p e r I S P W C S D - 5 0 4 w i t h a w y e a n d 4 5 ° e l b o w i n l i e u o f a t e e a n d 9 0 ° e l b o w . 15. A l l s a n i t a r y s e w e r s e r v i c e l i n e t r e n c h e s s h a l l b e t e s t e d f o r c o m p a c t i o n i n a c c o r d a n c e w i t h t h e I S P W C S t a n d a r d s . 16. S t o r m d r a i n a n d i r r i g a t i o n s t r e e t c r o s s i n g s h a l l u t i l i z e T y p e 1 b e d d i n g m a t e r i a l , p l a c e d i n s i x i n c h ( 6 " ) l a y e r s a s p e r I S P W C T y p i c a l T r e n c h D e t a i l , D r a w i n g S D - 3 0 1 . 17. S t o r m d r a i n m a n h o l e s t o b e c o n s t r u c t e d i n a c c o r d a n c e w i t h I S P W C S t a n d a r d D r a w i n g S D - 6 1 2 . 18. D o n o t r e i n s t a l l o r l e a v e i n - p l a c e d a m a g e d p i p e . 19. S e w e r D e p a r t m e n t a p p r o v e d " M a r k i n g / D e t e c t T y p e " s h a l l b e p l a c e d o v e r a l l s a n i t a r y s e w e r l i n e s . T a p e i s t o b e p l a c e d a m i n i m u m o f s i x i n c h e s ( 6 " ) a n d m a x i m u m o f t w e l v e i n c h e s ( 1 2 " ) a b o v e a l l p i p e . C I V I L E N G I N E E R H L E , I N C . L U K E J O L L E Y , P . E . 8 0 0 J U D I C I A L S T R E E T B L A C K F O O T , I D A H O 8 3 2 2 1 ( 2 0 8 ) 2 2 6 - 5 7 6 4 S U R V E Y O R H L E , I N C . C L I N T M . J O L L E Y , P . L . S . 9 8 5 N O R T H C A P I T A L I D A H O F A L L S , I D A H O 8 3 4 0 2 ( 2 0 8 ) 5 2 4 - 0 2 1 2 O W N E R A M E R C O 2 7 2 7 N O R T H C E N T R A L P H O E N I X , A R I Z O N A 8 5 0 0 4 6 0 2 - 2 6 3 - 6 5 0 2 E L E C T R I C A L C O N S T R U C T I O N C o o r d i n a t e a l l n e w e l e c t r i c a l f a c i l i t i e s w i t h R o c k y M o u n t a i n P o w e r p r i o r t o c o n s t r u c t i o n . W A T E R H Y D R A N T W A T E R V A L V E W A T E R M E T E R W A T E R H Y D R A N T W A T E R V A L V E W A T E R M E T E R S T O R M M A N H O L E C A T C H B A S I N S T O R M M A N H O L E C A T C H B A S I N S E W E R M A N H O L E S E W E R M A N H O L E E L E C T R I C P O L E E L E C T R I C P O L E D I T C H F L O W L I N E E P E D G E O F P V M T R W R O A D C E N T E R L I N E R I G H T O F W A Y E A S E M E N T L I N E B O U N D A R Y L O T S E C T I O N L I N E S I G N S I G N R O W R O A D C E N T E R L I N E R I G H T O F W A Y E A S E M E N T L I N E B O U N D A R Y L O T X X X F E N C E E D G E O F W A T E R O H P 1 2 ' ' W T R 8 ' ' S A N ( 1 2 ' ' I R R ( S S S S S S S S S S O V E R H E A D P O W E R 1 2 ' ' S T M ) 1 2 ' ' W W A T E R L I N E 8 ' ' S S ( S E W E R L I N E 1 2 ' ' I ( I R R I G A T I O N W S W S W S W S W S W A T E R S E R V I C E 1 2 ' ' S D ( S T O R M D R A I N W S W S W S W S S S S S S S S S S S S E W E R S E R V I C E W A T E R L I N E S E W E R L I N E W A T E R S E R V I C E S T O R M D R A I N S E W E R S E R V I C E I R R I G A T I O N L A N D S C A P I N G S I D E W A L K A S P H A L T C O N T O U R C O N T O U R D E M O L I T I O N G B G B G B G B G B G R A D E B R E A K L A N D S C A P I N G S I D E W A L K A S P H A L T G A S M E T E R / R I S E R G A S M E T E R / R I S E R G A S G A S G A S L I N E G A S L I N E L I G H T P O L E L I G H T P O L E F O C I T Y F I B E R ( C O M M ) F O C O M M U N I C A T I O N / F I B E R F I B E R O P T I C R I S E R F I B E R O P T I C R I S E R 1 0 / 1 3 / 2 0 2 2 UGP 8''SAN )8''SAN ) X X X X X X X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRW R W R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRW R W R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X EOEOEOXXXXXXXOHPOHPOHP8''WTR 8''WTR 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN ( S S 8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)12'' SAN (12'' SAN (4''SAN ) 8 ' ' S A N ) 4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN ) 6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R N89° 44' 25 " E 4 8 0 . 0 0 ' N0° 15' 35"W 291.00' N 8 9 ° 4 4 ' 2 5 " E 2 0 0 . 0 0 ' S0° 15' 35"E 291.00' S 8 9 ° 4 4 ' 2 5 " W 2 0 0 . 0 0 ' N 6 7 ° 1 1 ' 1 1 " W 2 8 . 0 2 ' N 5 5 ° 0 6 ' 3 5 " W 3 5 . 5 7 ' N 3 8 ° 3 1 ' 1 8 " W 2 9 . 9 0 ' N 4 3 ° 3 9 ' 5 5 " W 7 2 . 1 8 ' N 5 5 ° 0 0 ' 3 5 " W 9 . 8 0 ' N 7 3 ° 1 1 ' 2 7 " W 1 5 . 1 9 ' N 8 9 ° 4 3 ' 3 3 " W 4 6 . 0 0 ' S42° 23' 27"W55.43'S30° 11' 12"W23.72'N0° 15' 35"W 180.00'S89° 44' 25"W 175.00'N0° 15' 35"W 220.00' N 8 3 ° 1 3 ' 5 4 " W 3 5 . 3 1 ' 7' C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c DEMOLITION PLAN C 3 N SECOND EAST E 4 T H N O R T H N THIRD EAST REX B U R G C O M P A N Y I R R I G A T I O N 1 0 0 - A S A W C U T A N D R E M O V E E X I S T I N G A S P H A L T T O T H E L I M I T S S H O W N R E T A I N A N D P R O T E C T E X I S T I N G P O W E R P O L E A N D O V E R H E A D W I R E S R E T A I N A N D P R O T E C T E X I S T I N G R O A D W A Y R E T A I N A N D P R O T E C T E X I S T I N G C U R B A N D G U T T E R R E T A I N A N D P R O T E C T E X I S T I N G F I R E H Y D R A N T R E T A I N A N D P R O T E C T E X I S T I N G W A T E R L I N E R E T A I N A N D P R O T E C T E X I S T I N G S I D E W A L K D E M O L I T I O N N O T E S : 1 0 0 - B 1 0 0 - C 1 0 0 - D 1 0 0 - E 1 0 0 - F 100-A100-A100-A 100-A100-B 100-B100-B 100-C 1 0 0 - C 1 0 0 - C 6 0 ' R W 99'RW 60' RW 1 0 0 - D 1 0 0 - D 100-E 100-F REMOVE EXISTINGCONCRETE AND ASPHALTREMOVE EXISTINGSEPTIC AND APPURTANCES C O O R D I N A T E W I T H E L E C T R I C P R O V I D E R F O R A L L E L E C T R I C A P P U R T A N A N C E R E M O V A L REMOVE EXISTINGDRIVEWAYREMOVE EXISTINGDRIVEWAY AND CURB CUT C U T C U R B A N D G U T T E R F O R N E W D R I V E W A Y I N T A L L A T I O N R E M O V E A P O R T I O N O F S I D E W A L K T O A C C O M O D A T E D R I V E W A Y W I D E N I N G A N D A D A C O M P L I A N C E EXISTING HYDRANT TO REMAIN R E M O V E E X I S T I N G S E W E R L I N E . S E E N E W S E W E R D E S I G N . EXISTING ELECTRIC POLE TO REMAINREMOV E E X I S T I N G FRENC H D R A I N ABANDON WATER METERABANDON WATER METER AND VALVE REMOVE MONUMENT SIGN, CONCRETE PADS AND BOLLARDS 1 0 0 - G 100-G100-G 1 0 0 - G 1 0 0 - G 1 0 0 - G 1 0 0 - G E X I S T I N G C U R B C U T T O B E R E M O V E D E X I S T I N G C U R B C U T T O B E R E M O V E D 2 2 1 0 / 1 3 / 2 0 2 2 TETON GROUP OF REXBURG LLCRPR0000002002AUGP 8''SAN )8''SAN ) XXX X X X X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRWRW R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRW R W R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X X X X X X X X 8''WTR 8''WTR 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN ( S S 8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)12'' SAN (4''SAN )8''SAN )4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN ) 6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 8'' SS (8'' SS (8'' SS (4"S) s t a i r N89° 44' 25"E 480.00' N0° 15' 35"W 291.00' N 8 9 ° 4 4 ' 2 5 " E 2 0 0 . 0 0 ' S0° 15' 35"E 291.00' S 8 9 ° 4 4 ' 2 5 " W 2 0 0 . 0 0 ' N 6 7 ° 1 1 ' 1 1 " W 2 8 . 0 2 ' N 5 5 ° 0 6 ' 3 5 " W 3 5 . 5 7 ' N 3 8 ° 3 1 ' 1 8 " W 2 9 . 9 0 ' N 4 3 ° 3 9 ' 5 5 " W 7 2 . 1 8 ' N 5 5 ° 0 0 ' 3 5 " W 9 . 8 0 ' N 7 3 ° 1 1 ' 2 7 " W 1 5 . 1 9 ' N89° 43' 33"W46.00'S42° 23' 27"W55.43'S30° 11' 12"W23.72'N0° 15' 35"W 180.00'S89° 44' 25"W 175.00'N0° 15' 35"W 220.00' N 8 3 ° 1 3 ' 5 4 " W 3 5 . 3 1 ' 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/2'' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' WR=2.5' R = 2 5 . 5 ' R = 9 . 5 ' R = 1 4 . 5 ' R = 1 5 . 0 ' 12'' SD (12'' SD ( s t a i r R=4.5' H A W K E R R Y A N R P R 0 0 0 0 0 0 2 0 0 2 B EAST IDAHO CREDIT UNIONRPRRXB10175952LEWIS SCOTT R DDS PCRPR0000017002A T W J I N V E S T M E N T S L L C R P R 0 0 0 0 0 1 7 0 0 1 A E R E D E T T I L L C R P R 6 N 4 0 E 2 0 4 1 0 1 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 FF=4870.67 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 BUILD I N G A 3-ST O R Y HEIGHT = 4 3 ' - 6 " FF=48 7 1 . 2 0 B U I L D I N G B 1 - S T O R Y H E I G H T = 5 1 ' - 8 " F F = 4 8 7 1 . 6 0 7' 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W I N S T A L L 2 7 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 3 . 9 8 % FO FO FO FO FO FO FO FO F O F O 4 8 6 9 . 8 1 T S W - T B C 48704869486848674869 4 8 6 7 4866 4 8 6 7 4 8 6 7 48674868 4 8 6 6 4 8 6 7 48684867 4869 4 8 6 6 486 7 4868 4 8 6 8 4 8 6 9 4 8 7 0 4 8 6 8 4 8 6 9 4 8 7 1 4870 4868 4 8 7 0 4 8 6 9 4 8 6 8 4 8 7 0 4 8 6 9 4 8 6 8 4 8 6 8 4 8 6 9 4 8 7 0 4870 4869 4869 4867 4866 4870 487048684869 4 8 7 0 4870 4 8 7 0 4 8 7 0 4870 4 8 7 0 4 8 6 9 4 8 7 1 48704869 4871 4 8 6 8 FO FO C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c GENERAL LAYOUT C 4 6 0 ' R W N SECOND EAST E 4 T H N O R T H N THIRD EAST REXBURG C O M P A N Y I R R I G A T I O N 1 0 ' S E T B A C K 99'RW 60' RW 40' 4 0 ' 40' E L E C T R I C B O X T O R E M A I N F I B E R O P T I C B O X T O R E M A I N S I T E N O T E S : I N S T A L L P A R K I N G L O T P A I N T P E R A R C H I T E C T U R A L P L A N A N D C U R R E N T M U T C D S T A N D A R D S . I N S T A L L 9 ' X 2 0 ' S T A N D A R D A D A S T A L L , I N S T A L L A P P R O P R I A T E S U R F A C E M A R K I N G S A N D S I G N S . S A W C U T 2 ' M I N I M U M A N D R E P L A C E A S P H A L T P E R I S P W C S T A N D A R D D E T A I L S D - 3 0 3 . I N S T A L L D R I V E W A Y , S T A N D A R D C U R B A N D S I D E W A L K P E R C I T Y O F R E X B U R G S T A N D A R D D E T A I L N O . 7 . 6 ' C O N C R E T E P A R K I N G B U M P E R . S E E A R C H I T E C T U R A L S I T E P L A N . I N S T A L L F L E X I B L E P A V E M E N T B A L L A S T P E R D E T A I L 2 O N S H E E T C 9 . I N S T A L L 3 " R O L L E D C U R B A N D G U T T E R P E R I S P W C S T A N D A R D D W G S D - 7 0 2 . I N S T A L L 3 " R E V E R S E P A N R O L L E D C U R B A N D G U T T E R P E R I S P W C S T A N D A R D D W G S D - 7 0 R . I N S T A L L C U R B D R A I N P E R I S P W C S T A N D A R D D E T A I L S D - 7 1 5 . I N S T A L L T E R M I N A T I O N O F R O L L C U R B . S E E D E T A I L 4 O N S H E E T 9 . I N S T A L L 3 ' W I D E V A L L E Y G U T T E R P E R D E T A I L 2 O N S H E E T C 9 . I N S T A L L 4 " T H I C K F L U S H S I D E W A L K P E R I S P W C S T A N D A R D . D W G . S D - 7 0 9 . N O T U S E D . N E W U T I L I T Y I N S T A L L A T I O N . S E E U T I L I T Y / S T O R M D R A I N P L A N O N S H E E T 6 . E L E C T R I C A L A P P U R T E N A N C E F O R R E F E R E N C E O N L Y . S E E E L E C T R I C A L D R A W I N G S F O R D E T A I L . T R U C K W E L L / L O A D I N G D O C K . S E E A R C H I T E C T U R A L P L A N S S H E E T S A 2 . 1 , A 1 0 . 7 A N D A 1 0 . 1 0 F O R D E T A I L . I N S T A L L I N L E T A T C U R B T Y P E I I C A T C H B A S I N A N D G R A T E P E R I S P W C S T A N D A R D D E T A I L S D - 6 0 2 . I N S T A L L I N L E T T Y P E I I I C A T C H B A S I N A N D G R A T E P E R I S P W C S T A N D A R D D E T A I L S D - 6 0 3 . I N S T A L L 4 8 " M A N H O L E W I T H 2 4 " F R A M E A N D T R A F F I C R A T E D C O V E R P E R I S P W C S T A N D A R D D E T A I L S D - 6 1 1 . I N S T A L L S T O R M T E C H I N F I L T R A T I O N S Y S T E M . S E E S H E E T C 7 F O R S E C T I O N S A N D C 1 0 F O R D E T A I L S . I N S T A L L R I P - R A P E R O S I O N P R O T E C T I O N . I N S T A L L B U B B L E U P C A T C H B A S I N P E R D E T A I L 4 O N S H E E T C 9 . F O U N D A T I O N R E V E A L . D E T A I L P E R A R C H I T E C T U R A L P L A N S . R E T A I N I N G W A L L B Y O T H E R S . G A S M E T E R F O R R E F E R E N C E O N L Y . T O B E I N S T A L L E D B Y G A S U T I L I T Y . F D C C O N N E C T I O N . S E E S E P A R A T E S H E E T F P 1 0 1 F O R M O R E I N F O R M A T I O N . K N O X B O X M O U N T E D A T 6 0 " A . F . F . ( B . O . D . K N O X B O X 3 2 0 0 ) . S E E S E P A R A T E P L A N S F O R M O R E I N F O R M A T I O N . I N S T A L L C I T Y S T R E E T L I G H T P E R C I T Y O F R E X B U R G S T A N D A R D D E T A I L S H E E T 9 . C O O R D I N A T E W I T H C I T Y O F R E X B U R G A N D R O C K Y M O U N T A I N P O W E R F O R P O W E R H O O K U P . T O B E O W N E D A N D M A I N T A I N E D B Y C I T Y O F R E X B U R G A F T E R C O N S T R U C T I O N 32.8'210.00' 104' 87.8' 63.78'10.0' 1 0 ' 1 0 . 0 ' 1 1 6 . 3 3 ' 298'35.0'70.0'10.0'12.0'20.0'9.0'10.0' 2 0 . 0 ' 9 . 0 ' 9 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 4 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' 3 0 . 0 ' G E N E R A L N O T E S : 1 . A L L R A D I I S H O W I S T O P B A C K O F C U R B . S I T E I N F O R M A T I O N : E X I S T I N G S I T E : G R O S S A R E A : 3 1 0 , 3 0 3 S F O R 7 . 1 2 4 A C R E S Z O N I N G : C O M M U N I T Y B U S N I E S S C E N T E R ( C B C ) B U I L D I N G A : F O O T P R I N T = 3 3 , 8 3 8 G . S . F . B U I L D I N G T Y P E : I - A ( F I R S T F L O O R O N L Y , I I - B B U I L D I N G B : F O O T P R I N T = 2 4 , 7 5 6 G . S . F . B U I L D I N G T Y P E : I - A T O T A L L A N D S C A P E A R E A : 4 4 , 3 4 2 S F ( T O T A L S I T E 3 1 0 , 3 0 3 ) = 1 4 % S N O W S T O R A G E A R E A : A : 3 , 2 0 0 S F B : 3 , 0 0 0 S F C : 1 0 , 7 3 0 S F T O T A L = 1 6 , 9 3 0 S F ( T O T A L P A R K I N G / A S P H A L T 1 6 9 , 2 8 7 ) = 1 0 % 8.0'5.0' 1 0 . 0 ' 280.0'315.0' 10.0' T Y P T Y P 2 7 ' 3 1 ' 1 5 ' 30.4'6" PVC STORM DRAIN PIPE(INV=4867.0-BOTH SIDES)CURB RAMP PER DETAIL 5ON SHEET 9RETAIN AND PROTECTEXISTING SIDEWALK R E T A I N A N D P R O T E C T E X I S T I N G S I D E W A L K R E T A I N A N D P R O T E C T E X I S T I N G S I D E W A L K R E T A I N A N D P R O T E C T E X I S T I N G S I D E W A L K R E T A I N A N D P R O T E C T E X I S T I N G S I D E W A L K 2 4 ' DRAINAGE CONTINUESNORTH TO GUTTER R E T R O F I T C U R B R A M P S T O A D A C O M P L I A N C E B E N C H M A R K / F L O O D P L A I N I N F O R M A T I O N : F L O O D P L A I N E L E V A T I O N S : ( F E M A M A P N O . 1 6 0 6 5 C 0 0 2 0 D , D A T E D J U N E 3 , 1 9 9 1 ) W E S T H A L F O F S I T E ( B L D G A ) = 4 6 7 0 . 2 0 ( 1 . 0 ' F R E E B O A R D ) E A S T H A L F O F S I T E ( B L D G R ) = 4 8 7 0 . 6 0 ( 1 . 0 ' F R E E B O A R D ) S I T E D A T U M = N A V D 8 8 F L O O D P L A I N D A T U M = N G V D 2 9 ( - 3 . 4 ' B E L O W S I T E D A T U M ) 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 1 1 12 3 3 3 3 4 4 4 5 5 5 6 6 6 6 6 668 1 4 8 7 7 7 7 7 8 8 8 1 5 1 1 1 1 1 1 1 2 1212 1 4 1 4 1414152 1 1 6 1 7 1 8 1 9 2 0 2 0 2 0 1 9 1 9 1 9 2 0 15 11 2 0 2 1 2 5 2 5 1 5 1 5 2 2 2 3 2 4 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 1 7 7 2 2 1 8 1 7 1 8 1 8 1 8 24 2 3 23 1212 1 2 2 5 2 4 2 1 1 7 1 7 15 1 1010 1 0 1 0 2 6 2 7 27 2 6 2 7 S N O W S T O R A G E A S N O W S T O R A G E B SAWCUT AND REPLACE EXISTING LOW BACK CURB WITH STANDARD CURB AND GUTTERPER REXBURG STANDARD DETAILNO. 7 12 S N O W S T O R A G E C TYP 15 1 4 dfhjt 2 7 2 7 26 1 1 1 120' 1 2 5 ' 2 2 2 8 2 8 2 8 2 2 2 1 0 / 1 3 / 2 0 2 2 TETON GROUP OF REXBURG LLCRPR0000002002AUGP 8''SAN )8''SAN ) XXXXX X X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRWRW R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRWRW R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X EOEOEOXXXXXXX8''WTR 8''WTR 8'' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN ( S S S S 8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)12'' SAN (4''SAN )8''SAN )4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN ) 6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R G B GB R O O F D R A I N S R O O F D R A I N S 8'' SS (8'' SS (8'' SS (4"S) s t a i r 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/2'' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' W G B G B G B G B G B G B GBGBGBGBGBGB G B G B G B 12'' SD (12'' SD ( G B G B G B G B G B G B G B G B G B T W = 4 8 7 0 . 0 0 N G = 4 8 6 7 . 0 0 T W = 4 8 7 0 . 0 0 N G = 4 8 6 7 . 0 0 TW=4873.00NG=4868.00 s t a i r TW=4873.00NG=4868.00 H A W K E R R Y A N R P R 0 0 0 0 0 0 2 0 0 2 B EAST IDAHO CREDIT UNIONRPRRXB10175952LEWIS SCOTT R DDS PCRPR0000017002A T W J I N V E S T M E N T S L L C R P R 0 0 0 0 0 1 7 0 0 1 A E R E D E T T I L L C R P R 6 N 4 0 E 2 0 4 1 0 1 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 FF=4870.67 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 BUILDING A3-STORYHEIGHT=43'-6"FF=4871.20 B U I L D I N G B 1 - S T O R Y H E I G H T = 5 1 ' - 8 " F F = 4 8 7 1 . 6 0 7' 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W FO FO FO FO FO FO FO FO F O F O - 0 . 4 0 % - 0 . 4 5 % - 0 . 6 9 % - 0 . 4 1 % - 0 . 6 4 % -1.45%-1.06%-4.42%-2.84%-1.92% - 3 . 2 2 % - 5 . 2 9 % -3.00% -2.67% -2.00%-2.67% -2.00% -3.33%-2.33%-2.01% -2.01% -2.81% - 3 . 4 8 % -3.43% - 2 . 7 9 % -5.22% - 0 . 6 2 % -12.21% -3.46% - 5 . 6 2 % - 5 . 0 5 % -2.17%-2.02%-2.61% -2.01% -2.99% -3.17%-0.41%-0.41%-2.23%-2.88% - 1 . 2 7 % -2.67% -2.00% - 0 . 9 6 % - 0 . 7 2 % - 1 . 2 6 % -2.67% -4.99%-4.93% -5.05%-5.02% -4.87%-4.87% -0.45% -0.40% - 2 . 0 8 % - 4 . 0 9 % - 2 . 0 0 % - 5 . 2 3 % - 2 . 0 0 % -3.40% -4.95% - 2 . 9 2 % - 2 . 3 6 % -0.40% -3.93% -3.55% - 3 . 1 5 % - 4 . 1 7 % -4.04% - 2 . 1 8 % - 2 . 8 2 % - 2 . 0 0 % -3.52% -1.19%-0.68%-3.29% -3.24% - 0 . 4 3 % - 2 . 0 1 % -3.22%-3.34% -4.16% - 0 . 5 2 % - 2 . 4 2 % -3.02%-0.58% -1.04%-0.78% -4.08% -2.71%-1.74%-0.40% - 2 . 8 4 % - 0 . 4 1 % - 0 . 4 0 % -1.20% -6.83%-6.84%-0.18% - 4 . 1 5 % EP:4869.76EP:4869.69 E P : 4 8 6 8 . 6 0 E P : 4 8 6 8 . 6 6 E P : 4 8 6 8 . 8 5 E P : 4 8 6 8 . 5 0 EP:4869.70EP:4869.64EP:4869.53EP:4869.37 N G : 4 8 6 6 . 4 8 N G : 4 8 6 6 . 6 5 E P : 4 8 6 7 . 5 1 E P : 4 8 6 7 . 6 5 E P : 4 8 6 7 . 7 4 E P : 4 8 6 8 . 1 2 E P : 4 8 6 8 . 3 9 E P : 4 8 6 8 . 2 8 E P : 4 8 6 8 . 8 8 E P : 4 8 6 9 . 6 0 E P : 4 8 7 1 . 0 6 NG:4867.45NG:4869.08NG:4869.43 N G : 4 8 6 6 . 9 5 NG:4868.14NG:4868.27NG:4869.05NG:4869.08 N G : 4 8 6 6 . 8 5 N G : 4 8 6 8 . 5 7 N G : 4 8 6 6 . 9 5 N G : 4 8 6 7 . 4 2 N G : 4 8 7 1 . 3 2 4870.76TBC-HP 4870.22TBC-PC 4 8 6 9 . 0 5 T B C - P C 4 8 6 9 . 6 0 T B C - P C 4 8 6 8 . 6 5 T B C 4 8 6 7 . 8 2 T B C 4 8 6 7 . 9 5 T B C 4 8 6 9 . 5 2 T B C 4 8 7 0 . 3 0 T B C 4 8 6 9 . 0 5 T B C - H P 4 8 6 9 . 2 5 T B C - P C 4 8 7 1 . 8 5 T B C 4 8 7 1 . 6 0 T O A 4 8 7 1 . 6 0 C 4 8 7 1 . 4 6 C 4 8 7 0 . 4 5 T B C - P C 4 8 6 9 . 3 6 T B C - H P 4 8 6 9 . 2 5 T B C - P C 4 8 6 9 . 1 6 T B C - P C 4 8 7 0 . 0 0 T O A 4 8 6 9 . 1 6 G R 4 8 6 9 . 5 0 V G 4 8 7 0 . 1 0 V G 4 8 6 9 . 6 0 V G 4 8 6 9 . 7 0 V G 4 8 6 9 . 6 0 V G 4870.71TBC-PC 4869.93TBC-PC4869.92TBC-PC4870.85TBC4869.35TSW 4870.10TBC4870.80TBC 4871.10TOA 4 8 7 1 . 1 0 T O A 4 8 7 1 . 4 5 T B C 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 6 8 . 7 5 T B C 4 8 7 1 . 3 0 T B C 4 8 7 0 . 0 5 T B C - H P 4871.10TOA 4868.80VG4869.80VG 4 8 6 7 . 3 0 T B C - G B 4 8 7 0 . 7 5 T B C 4870.20TBC-PC 4 8 6 8 . 7 1 T B C - P C 4 8 6 9 . 7 5 T B C - P C 4 8 7 1 . 2 0 C 4 8 7 1 . 2 0 C 4871.04C 4871.10C 4 8 7 0 . 4 5 T B C 4 8 7 0 . 2 5 T B C 4 8 7 0 . 7 5 T B C - E N D 4869.00VG 4 8 6 9 . 8 1 T S W - T B C 4868.40TBC4867.99TBC4870.65TOA 4 8 7 0 . 6 5 T O A 4 8 6 8 . 9 0 G R 4 8 6 9 . 1 5 V G 4 8 6 9 . 6 5 V G 4 8 6 9 . 5 5 V G 4 8 6 9 . 7 0 V G 4 8 6 9 . 6 0 V G 4 8 6 9 . 6 0 V G 4 8 6 9 . 1 9 G R 4 8 7 0 . 0 0 V G 4 8 7 0 . 0 0 T O A 4 8 7 0 . 8 0 T O A 4 8 6 9 . 0 7 G R 4 8 6 9 . 5 0 V G 4 8 6 8 . 0 0 V G 4 8 7 0 . 6 0 T B C - H P 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 5 T O A 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 7 0 . 0 0 T O A 4 8 7 1 . 6 0 T O A 4 8 7 0 . 3 0 T O A 4 8 7 1 . 5 8 T O A 4 8 7 1 . 6 0 T O A 4 8 6 7 . 6 5 G R 4867.00NG-FL 4868.50NG-FL 4869.90NG4869.90NG4869.90NG 4868.90NG-FL 4 8 6 7 . 0 0 N G 4 8 6 9 . 9 0 T O A 4 8 6 8 . 4 0 G R 4 8 6 9 . 2 7 G R 4 8 7 0 . 9 0 N G 4 8 7 0 . 9 0 N G 4871.35TBC 4871.04C4870.10TBC4870.30TOA 4 8 7 1 . 0 5 T O A 4 8 7 0 . 1 5 T B C - P C 4 8 6 8 . 5 0 G R 4 8 6 7 . 1 1 G R 4869.87TBC 4 8 7 1 . 4 0 T O A 4 8 7 1 . 4 0 T O A 4 8 7 1 . 6 0 T O A - 4 . 9 2 % - 5 . 7 8 % 4 8 7 1 . 6 0 T O A 4870486948684867486948674866 4 8 6 7 4 8 6 7 48674868 4 8 6 6 4 8 6 7 48684867 4869 4 8 6 6 48 6 7 4868 486 8 4 8 6 9 4 8 7 0 4 8 6 8 4 8 6 9 4 8 7 1 4870 4868 4 8 7 0 4 8 6 9 4 8 6 8 4 8 7 0 4 8 6 9 4 8 6 8 4 8 6 8 4 8 6 9 4 8 7 0 4870 4869 4869 4867 4866 4870 487048684869 4 8 7 0 4870 4 8 7 0 4 8 7 0 4870 4 8 7 0 486 9 4 8 7 1 48704869 4871 4 8 6 8 FO FO 4 8 7 1 . 5 0 T O A -1.98% 4 8 7 1 . 1 9 T O A 4 8 7 1 . 1 9 T O A 4 8 7 1 . 6 0 T O A 3 / 4 ' ' W G B 4 8 7 1 . 6 0 C 4 8 7 1 . 6 0 C 4 8 7 1 . 4 6 C 4 8 7 1 . 6 0 A & C 4 8 7 1 . 4 0 T O A 4 8 7 1 . 4 0 T O A 4 8 6 7 . 6 0 G R 4 8 7 0 . 5 2 A & C 4 8 7 0 . 5 2 A & C 4 8 6 7 . 8 8 R I M 4 8 7 1 4871 C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c GRADING PLAN C 5 6 0 ' R W N SECOND EAST E 4 T H N O R T H N THIRD EAST REXBURG C O M P A N Y I R R I G A T I O N 1 0 ' S E T B A C K 99'RW 60' RW E L E V A T I O N O F T O P B A C K O F C U R B P O I N T O F C U R V A T U R E H I G H P O I N T S W A L E L O W P O I N T S W L H P P C L P 4 7 1 0 . 5 4 7 1 0 . 5 4 7 1 0 . 5 4 7 1 0 . 5 T S W 4 7 1 0 . 5 T O P O F S I D E W A L K T B C 4 7 1 0 . 5 M A T C H E X I S T I N G M A T C H 4 7 1 0 . 5 4 7 1 0 . 5 C T O P O F C O N C R E T E T O P B A C K W A L L 4 7 1 0 . 5 4 7 1 0 . 5 V A L L E Y G U T T E R G B T B W V G 4 7 1 0 . 5 G R A D E B R E A K T O P O F G R O U N D / L A N D S C A P E N G 4 7 1 0 . 5 G R A D I N G L E G E N D : T O P O F A S P H A L T T O A 4 7 1 0 . 5 4 7 1 0 . 5 E N D C U R B E N D STORM AREA A69,388 sfVR=5,229 cfVP=5,456 cf S T O R M A R E A C 1 9 , 4 4 0 s f V R = 1 , 4 6 2 c f V P = 1 , 6 3 5 c f S T O R M A R E A B 3 2 , 3 0 0 s f V R = 2 , 4 3 4 c f V P = 2 , 5 5 8 c f S T O R M A R E A F 1 2 7 , 0 2 8 s f V R = 9 , 5 7 4 s f V P = 9 , 7 5 0 s f S T O R M A R E A D 3 1 , 0 0 0 s f V R = 2 , 3 3 6 c f V P = 3 , 2 9 0 c f T R U C K W E L L D E T A I L 1 " = 2 0 ' F F = 4 8 7 1 . 6 0 S T O R M A R E A E ( t r u c k w e l l ) 2 , 3 8 0 s f V R = 1 7 9 c f V P = 2 1 1 c f 0 . 5 0 % M I N 0.50% MIN 5.6% 55.83' ( 1 2 " S D STORM AREA G3,253 sfVR=245 sfVP=250 sf (12"SD B C 9 EC9 F O U N D A T I O N R E V E A L 1 . 0 ' ± A C9 DC9 C C 9 FOUNDATIONREVEAL 1.3'±FOUNDATIONREVEAL 1.3'± F C 9 6" PVC STORM DRAIN PIPE(INV=4867.0-BOTH SIDES) W A L L H E I G H T = 0 . 0 ' W A L L H E I G H T = 4 . 0 ' 4 " F O U N D A T I O N R E V E A L ( D O W N 0 . 3 3 ' ) ( S E E A R C H I T E C T U R A L P L A N S ) W A L L H E I G H T = 4 8 7 1 . 2 7 ( 0 . 7 5 ' F R O M R A M P G R A D E ) 4 8 7 0 4 8 6 9 4 8 6 8 4 8 7 1 4 8 7 1 G B 10' 1 0 ' I N S T A L L R I G I D C O N C R E T E B A L L S T S E C T I O N P E R D E T A I L 3 O N S H E E T C 9 DRAINAGE CONTINUESNORTH TO GUTTER I N V = 4 8 6 6 . 0 7 I N V = 4 8 6 5 . 9 6 I N V = 4 3 6 5 . 6 5 I N V = 4 3 6 5 . 4 2 I N V = 4 3 6 5 . 3 3 SAWCUT AND REPLACE EXISTING LOW BACK CURB WITH STANDARD CURB AND GUTTERPER REXBURG STANDARD DETAILNO. 7 CONTRACTOR TO TERMINATE SIDEWALKAT EXISTING DRIVEWAY(COORDINATE WITH CITY OF REXBURG) F O U N D A T I O N R E V E A L 1 . 3 ' ± F O U N D A T I O N R E V E A L 0 . 7 ' ± F O U N D A T I O N R E V E A L 0 . 7 ' ± 1 1 1 F D C FDC120' 1 2 5 ' 2 2 1 0 / 1 3 / 2 0 2 2 TETON GROUP OF REXBURG LLCRPR0000002002AUGP 8''SAN )8''SAN ) XXX X X X X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRW R W R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRW R W R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X EOEOEOXXXXXXX8''WTR 8''WTR 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN ( S S S S 8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)12'' SAN (4''SAN )8''SAN )4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN ) 6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 8'' SS (8'' SS (8'' SS (4"S) s t a i r N89° 44' 25"E 480.00' N0° 15' 35"W 291.00' N 8 9 ° 4 4 ' 2 5 " E 2 0 0 . 0 0 ' S0° 15' 35"E 291.00' S 8 9 ° 4 4 ' 2 5 " W 2 0 0 . 0 0 ' N 6 7 ° 1 1 ' 1 1 " W 2 8 . 0 2 ' N 5 5 ° 0 6 ' 3 5 " W 3 5 . 5 7 ' N 3 8 ° 3 1 ' 1 8 " W 2 9 . 9 0 ' N 4 3 ° 3 9 ' 5 5 " W 7 2 . 1 8 ' N 5 5 ° 0 0 ' 3 5 " W 9 . 8 0 ' N 7 3 ° 1 1 ' 2 7 " W 1 5 . 1 9 ' N89° 43' 3 3 " W 46.00 ' S42° 23' 27"W55.43'S30° 11' 12"W23.72'N0° 15' 35"W 180.00'S89° 44' 25"W 175.00'N0° 15' 35"W 220.00' N 8 3 ° 1 3 ' 5 4 " W 3 5 . 3 1 ' 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/ 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' W 12'' SD (12'' SD ( s t a i r H A W K E R R Y A N R P R 0 0 0 0 0 0 2 0 0 2 B EAST IDAHO CREDIT UNIONRPRRXB10175952LEWIS SCOTT R DD S P C RPR0000017002 A T W J I N V E S T M E N T S L L C R P R 0 0 0 0 0 1 7 0 0 1 A E R E D E T T I L L C R P R 6 N 4 0 E 2 0 4 1 0 1 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 FF=4870.67 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 B U I L D I N G A 3 - S T O R Y H E I G H T = 4 3 ' - 6 " F F = 4 8 7 1 . 2 0 B U I L D I N G B 1 - S T O R Y H E I G H T = 5 1 ' - 8 " F F = 4 8 7 1 . 6 0 7' 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W I N S T A L L 2 7 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 3 . 9 8 % FO FO FO FO FO FO FO FO F O F O FO FO C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c UTILITY PLAN C 6 E 4 T H N O R T H 60' RW 5 0 0 - 2 1 0 0 - 1 6 0 ' R W N SECOND EAST N THIRD EAST REXBURG C O M P A N Y I R R I G A T I O N 1 0 ' S E T B A C K 99'RW C O N S T R U C T I O N N O T E S : G E N E R A L : R E T A I N A N D P R O T E C T E X I S T I N G U T I L I T Y . W A T E R : I N S T A L L 6 " F I R E L I N E . I N S T A L L F I R E H Y D R A N T A S S E M B L Y P E R I S P W C S T A N D A R D D W G S D - 4 0 4 . I N S T A L L 2 " W A T E R S E R V I C E L I N E C O N N E C T I O N P E R C I T Y O F R E X B U R G S T A N D A R D D R A W I N G 1 6 . I N S T A L L 1 " W A T E R L A N D S C A P E S E R V I C E W I T H B A C K F L O W P R E V E N T E R . I N S T A L L W A T E R F I T T I N G ( T E E O R B E N D ) A N D T H R U S T B L O C K P E R I S P W C S T A N D A R D D W G S D - 4 0 3 . S I Z E A N D A N G L E P E R P L A N . I N S T A L L 6 " X 6 " B E N D A N D T H R U S T B L O C K P E R I S P W C S T A N D A R D D W G S D - 4 0 3 . S E W E R : I N S T A L L 6 " S A N I T A R Y S E W E R S E R V I C E L I N E A T 1 % M I N S L O P E P E R I S P W C S T A N D A R D D E T A I L S D - 5 1 1 . I N S T A L L 4 " S A N I T A R Y S E W E R S E R V I C E L I N E A T 1 % M I N S L O P E . S E E P L U M B I N G P L A N S F O R C O N T I N U A T I O N . I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C S T A N D A R D . D W G . I F - 5 0 1 S E E S E W E R M A I N P L A N A N D P R O F I L E S H E E T . I N S T A L L S A N I T A R Y S E W E R C L E A N O U T A N D T R A F F I C R A T E D C O V E R P E R I S P W C S T A N D A R D D R A W I N G S D 5 0 6 A . S T O R M D R A I N : I N S T A L L 6 " S T O R M P I P E A T 0 . 0 0 % M I N S L O P E ( E Q U A L I Z E R P I P E ) . I N S T A L L 1 2 " S T O R M P I P E A T 0 . 2 2 % M I N S L O P E . I N S T A L L I N L E T A T C U R B T Y P E I I C A T C H B A S I N A N D G R A T E P E R I S P W C S T A N D A R D D E T A I L S D - 6 0 2 . I N S T A L L I N L E T T Y P E I I I C A T C H B A S I N A N D G R A T E P E R I S P W C S T A N D A R D D E T A I L S D - 6 0 3 . I N S T A L L 4 8 " M A N H O L E W I T H 2 4 " F R A M E A N D T R A F F I C R A T E D C O V E R P E R I S P W C S T A N D A R D D E T A I L S D - 6 1 1 . I N S T A L L S T O R M T E C H I N F I L T R A T I O N S Y S T E M . S E E S H E E T C 7 F O R S E C T I O N S A N D C 1 0 F O R D E T A I L S . I N S T A L L B U B B L E U P C A T C H B A S I N P E R D E T A I L 5 O N S H E E T C 9 . 4 0 0 - 1 4 0 0 - 2 4 0 0 - 3 4 0 0 - 4 4 0 0 - 5 4 0 0 - 6 5 0 0 - 1 5 0 0 - 2 6 0 0 - 1 6 0 0 - 2 6 0 0 - 3 1 0 0 - 1 400-3 4 0 0 - 2 4 0 0 - 4 4 0 0 - 6 400-6 4 0 0 - 5 400-5 5 0 0 - 3 500-1 5 0 0 - 3 500-3500-3100-1 1 0 0 - 1 6 0 0 - 3 6 0 0 - 5 6 0 0 - 6 6 0 0 - 6 6 0 0 - 4 6 0 0 - 5 6 0 0 - 6 6 0 0 - 6 400-3400-3SEE FIRE P R O T E C T I O N PLANS FOR C O N T I N U A T I O N F I R E R I S E R R O O M S E E F I R E P R O T E C T I O N P L A N S F O R C O N T I N U A T I O N 600-5 6 0 0 - 5 90° 9 0 ° 9 0 ° 90° 4 0 0 - 3 2 " 1 " 4 0 0 - 5 5 0 0 - 4 5 0 0 - 4 5 0 0 - 4 5 0 0 - 2 500- 2 400-1 4 0 0 - 1 6 0 0 - 4 6 0 0 - 2 6 0 0 - 5 6 0 0 - 6 600-1 6 0 0 - 2 6 0 0 - 2 6 0 0 - 2 6 0 0 - 2 6 0 0 - 4 6 0 0 - 4 6 0 0 - 4 6 0 0 - 4 6 0 0 - 4 6 0 0 - 7 6 0 0 - 7 6 0 0 - 5 400-2RELOCATE EXISTING HYDRANTIN LANDSCAPE SPACE 1-1/2"New Sewer Service Connection to be Installed at 1.00% min.(Contractor to connect to new 4" sewer service using 4" sweeps.Verify location and depth prior to any construction. 25' N E W C I T Y F I B E R O P T I C T O B E I N S T A L L E D 3 ' ± B E H I N G P R O P E R T Y L I N E . C O O R D I N A T E W I T H T H E C I T Y O F R E X B U R G NEW CITY FIBER OPTIC TO BE INSTALLED3'± BEHING PROPERTY LINE.COORDINATE WITH THE CITY OF REXBURG 1 1 1 F D C FDC120' 1 2 5 ' 2 2 2 1 0 / 1 3 / 2 0 2 2 4858 4860 4862 4864 4866 4868 4870 4 8 5 6 4 8 5 8 4 8 6 0 4 8 6 2 4 8 6 4 4 8 6 6 4 8 6 8 4 8 7 0 0+000+501+001+50 2 + 0 0 2 + 5 0 3 + 0 0 3 + 2 5 STORM CB#3GRATE:4867.1112" S INV OUT:4863.80 S T O R M C B # 2 G R A T E : 4 8 6 7 . 6 5 2 4 " E I N V O U T : 4 8 6 3 . 1 5 CHAMBER BOTT:ELEV:4862.64 T O P O F S T O N E : E L E V : 4 8 6 6 . 1 4 B O T T O F S T O N E : E L E V : 4 8 6 1 . 6 5 C H A M B E R B O T T : E L E V : 4 8 6 3 . 1 5 STORM SDMH#3GRATE:4867.9312" N INV IN:4862.7424" W INV OUT:4862.64 TOP OF STONE:ELEV:4865.63BOTT OF STONE:ELEV:4861.14 8''SAN )8''SAN )XXXXXXXXXXXXXXXXXXXXXXXXXXXX FO FO RW RW RW XX 8''WTR 8''WTR 6''WTR6''WTR6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R G B G B 0+001+00 2 + 0 0 3 + 0 0 3 + 2 3 GB GB GB GB GB 1-1/2'' W 1-1/2'' W INSTALL 27' OF 12" ADS N-12. STORM PIPE @ 3. 9 8 % FO FO E P : 4 8 6 8 . 6 0 E P : 4 8 6 8 . 6 6 NG:4866.48NG:4867.454868 4 8 7 0 4 8 6 8 4 8 6 9 4869 4869 X X X X X X X X X X X X X X X X 8 ' ' W T R 8 ' ' W T R F O F O 0 + 0 0 1 + 0 0 1 + 0 0 4 ' ' S S ) 4 ' ' S S ) 4 ' ' S S ) G B G B 0+00 F O E P : 4 8 6 7 . 6 5 N G : 4 8 6 6 . 9 5 4 8 7 0 4868 4 8 6 2 4 8 6 4 4 8 6 6 4 8 6 8 4 8 7 0 4 8 6 0 4 8 6 2 4 8 6 4 4 8 6 6 4 8 6 8 4 8 7 0 0 + 0 0 0 + 5 0 1 + 0 0 1 + 5 0 S T O R M C B # 4 G R A T E : 4 8 6 8 . 4 0 1 2 " E I N V O U T : 4 8 6 4 . 1 9 I N S T A L L 4 3 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 4 . 9 2 % C H A M B E R B O T T : E L E V : 4 8 6 4 . 0 7 T O P O F S T O N E : E L E V : 4 8 6 7 . 0 7 B O T T O F S T O N E : E L E V : 4 8 6 2 . 5 7 S T O R M C B # 5 G R A T E : 4 8 6 9 . 3 0 1 2 " S W I N V O U T : 4 8 6 6 . 2 7 S T O R M S D M H # 4 G R A T E : 4 8 6 8 . 6 6 1 2 " N E I N V I N : 4 8 6 4 . 1 8 1 2 " W I N V I N : 4 8 6 4 . 1 8 2 4 " S I N V O U T : 4 8 6 4 . 0 8 4862 4864 4866 4868 4870 487248604862486448664868487048720+000+500+82 STORM SDMH#1GRATE:4867.886" N INV IN:4864.5924" S INV OUT:4863.59 INSTALL 5' OF 6" PVC PIPE AND FITTINGSINSTALL 8' OF 24" ADS N-12. STORM PIPE @ 0.22%TOP OF STONE:ELEV:4866.66BOTT OF STONE:ELEV:4862.16 CHAMBER BOTT:ELEV:4863.66 -5.6%0+000+82 3/4'' W4871 4871 C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c STORMTECH PLAN AND PROFILE C 7 22" MIN.TRAFFIC RATEDTRENCH DRAINSC-740 S C - 7 4 0 S C - 7 4 0 SC-7408" SEWER LINEINV=4857.00±FIELD VERIFY ELEVATION 22" MIN. 22" MIN. LOADING DOCK22"MIN.111 1 0 / 1 3 / 2 0 2 2 4860 4862 4864 4866 4868 4870 4 8 5 8 4 8 6 0 4 8 6 2 4 8 6 4 4 8 6 6 4 8 6 8 4 8 7 0 0+000+50 1 + 0 0 1 + 5 0 2 + 0 0 2 + 5 0 3 + 0 0 3 + 5 0 3 + 8 7 San. MH #1Rim:4870.64N 8" INV OUT:4861.65 S a n . M H # 2 R i m : 4 8 6 9 . 7 4 S 8 " I N V I N : 4 8 6 0 . 6 6 E 8 " I N V O U T : 4 8 6 0 . 5 6 I n s t a l l 2 4 5 ' o f 8 " A S T M D - 3 0 3 4 S a n . P i p e @ 0 . 4 0 % S a n . M H # 3 R i m : 4 8 7 0 . 2 4 W 8 " I N V I N : 4 8 5 9 . 5 8 Install 99' of 8" ASTM D-3034 San. Pipe @ 1 . 0 0 % UGP U G P U G P 8''SAN )8''SAN )8''SAN ) RW X X X X 8''WTR 8''WTR 8''WTR 4 ' ' S A N ) 4 ' ' S A N ) 8 ' ' S A N ) 8 ' ' S A N ) 8 ' ' S A N ) 4'' S A N ) 8'' SS (8'' SS ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S ( 0 + 0 0 1 + 0 0 2 + 0 0 2 + 9 2 0+00 1+00 2 + 0 0 3 + 0 0 3 + 8 7 4"S) S 8 9 ° 4 4 ' 2 5 " W 1 7 5 . 0 0 ' N0° 15' 35"W 220.00' 4'' SS ) 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1-1/2'' W 6'' W G B G B G B G B G B G B G B G B G B G B G B G B G B G B G B G B B U I L D I N G A 3 - S T O R Y H E I G H T = 4 3 ' - 6 " F F = 4 8 7 1 . 2 0 4 ' ' S S ( NG:4868.14 NG: 4 8 6 8 . 2 7 4 8 6 9 4 8 6 8 4 8 6 7 4 8 6 8 4870 487 0 48684869 4 8 7 0 4 8 7 1 FO FO FO486 0 486 2 486 4 486 6 486 8 487 0 4 8 5 8 4 8 6 0 4 8 6 2 4 8 6 4 4 8 6 6 4 8 6 8 4 8 7 0 0 + 0 0 0 + 5 0 1 + 0 0 1 + 5 0 2 + 0 0 2 + 5 0 2 + 9 2 E x i s t i n g 4 " S a n . P i p e @ - 1 . 0 0 % ± E x i s t i n g 8 " S a n . P i p e @ 1 . 0 0 % ± S a n . M H # E X S S M H # 1 R i m : 4 8 6 6 . 4 9 W 8 " I N V I N : 4 8 6 0 . 8 6 I n s t a l l 6 4 ' o f 4 " A S T M D - 3 0 3 4 S a n . P i p e @ - 1 . 0 0 % I n s t a l l 3 3 ' o f 4 " A S T M D - 3 0 3 4 S a n . P i p e @ 1 . 0 0 % N e w I n v e r t : 4 8 6 3 . 0 9 ' ± C o n n e c t t o e x i s t i n g s e w e r s e r v i c e f r o m B a n k ( C o n t r a c t o r t o v e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . N o t i f y C i v i l E n g i n e e r o f a n y v a r i a t i o n f r o m t h e s e p l a n s . ) C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c SEWER PLAN AND PROFILE C 8 T h i s S e c t i o n o f S e w e r M a i n t o b e R e m o v e d 1 - 1 / 2 " S E R V I C E L I N E 6 " F I R E L I N E 18" MIN. C o n n e c t t o e x i s t i n g s e w e r I n v = 4 8 5 9 . 5 8 ± E x i s t i n g S e w e r S e r v i c e f r o m B a n k ( C o n t r a c t o r t o v e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . N o t i f y C i v i l E n g i n e e r o f a n y v a r i a t i o n f r o m t h e s e p l a n s . ) E x i s t i n g S e w e r M a n h o l e n o t f o u n d a t t i m e o f s u r v e y ( C o n t r a c t o r t o v e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . N o t i f y C i v i l E n g i n e e r o f a n y v a r i a t i o n f r o m t h e s e p l a n s . ) E x i s t i n g S e w e r M a n h o l e n o t f o u n d a t t i m e o f s u r v e y ( C o n t r a c t o r t o v e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . N o t i f y C i v i l E n g i n e e r o f a n y v a r i a t i o n f r o m t h e s e p l a n s . ) T h i s S e c t i o n o f S e w e r M a i n t o b e R e m o v e d N e w S e w e r S e r v i c e C o n n e c t i o n t o b e I n s t a l l e d a t 1 . 0 0 % m i n . ( C o n t r a c t o r t o c o n n e c t t o n e w 4 " s e w e r s e r v i c e u s i n g 4 " s w e e p s . V e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . N e w S e w e r S e r v i c e C o n n e c t i o n t o b e I n s t a l l e d a t 1 . 0 0 % m i n . ( C o n t r a c t o r t o c o n n e c t t o n e w 4 " s e w e r s e r v i c e u s i n g 4 " s w e e p s . V e r i f y l o c a t i o n a n d d e p t h p r i o r t o a n y c o n s t r u c t i o n . 1 1 2 2 2 1 0 / 1 3 / 2 0 2 2 C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c 6 " T Y P 4 " C O M P A C T E D B A S E 4" TYP 2 - # 4 B A R , C O N T 1.5" 3 ' - 0 " 8" 3 ' W I D E V A L L E Y G U T T E R N o S c a l e 1 DETAILS C 9 6 " 6 " 6 " O F 1 " - 2 " W A S H E D R O C K S E C T I O N 4 ' - 0 " 1 2 " M I N F O R S U M P S L O P E I S P W C S D 6 1 0 G R A T E P L A N V I E W 5' MIN WALL T Y P . 0 . 2 2 % S L O P E DIA. 12" MIN. 2 ' - 0 " F L E X I B L E C O N N E C T I O N # 4 B A R S @ 1 2 " O . C E A C H W A Y S L O P E G R A T E 6 " A B O V E P O N D B T M 2 4 " D I A D R A I N H O L E C O N C R E T E C O L L A R B U B B L E U P C A T C H B A S I N N o S c a l e 3 R I G I D B A L L A S T S E C T I O N S N o S c a l e 2 H E A V Y A S P H A L T C O N C R E T E A T T R U C K W E L L SECTIONNo ScaleA 30' R/W23.5' B/C5'S/W1.5'11'20'DRIVESECTIONNo ScaleB 3 0 ' R / W 2 2 ' B / C 5 ' S / W 3'11'SECTIONNo ScaleD 1'±10'SECTIONNo ScaleE 4.5'10'SECTIONNo ScaleCSECTIONNo ScaleF X 15'2'EAST 4TH NORTH4:1 BLDG R/W 3RD EAST 2:1 BLDG R/Wdrainage ditch2:1 BLDG PLdrainage ditchVARIESPL2:1 BLDGPL3:1drainage ditch 5' 5 ' 5 ' 3 C U R B R A M P N o S c a l e 1 : 1 2 ( m a x ) 6 " 3 " R O L L C U R B T E R M I N A T I O N 4 2 . 0 ' ± 4 " D E P T H C R U S H E D 3 4 " M I N U S A G G R E G A T E L E V E L I N G C O U R S E C O M P A C T E D T O 9 5 % A S T M D 6 9 8 1 2 " D E P T H U N C R U S H E D A G G R E G A T E S U B B A S E C O U R S E C O M P A C T E D T O 9 5 % A S T M D 6 9 8 S U B G R A D E E A R T H C O M P A C T E D T O 9 2 % A S T M D 6 9 8 3 " D E P T H A S P H A L T P L A N T M I X 6 " D E P T H C R U S H E D 3 4 " M I N U S A G G R E G A T E L E V E L I N G C O U R S E C O M P A C T E D T O 9 5 % A S T M D 6 9 8 6 " D E P T H C O N C R E T E S L A B . 3 5 0 0 P S I C O N C R E T E . # 4 B A R 1 8 " O . C . S P A C I N G G R I D 1 2 " D E P T H U N C R U S H E D A G G R E G A T E S U B B A S E C O U R S E C O M P A C T E D T O 9 2 % A S T M D 6 9 8 COMPACTED ANGULARGRAVEL FOR EROSIONPROTECTION0.7'± FOUNDATIONREVEAL (VARIES)1.3' F O U N D A T I O N REV E A L 0.7'± FOUNDATIONREVEAL1.5'± FOUNDATIONREVEAL (VARIES)RETAINING WALLSEE SEPARATE PLANS EXISTING CURBAND SIDEWALK E X I S T I N G C U R B A N D S I D E W A L K EXISTING CURBEXISTING CURBEXISTING FENCE COMPACTED ANGULARGRAVEL FOR EROSIONPROTECTION 3 " R O L L E D C U R B A N D G U T T E R P E R I S P W C S T A N D A R D D W G S D - 7 0 2 3 " R O L L C U R B 1 1 10/13/2022 C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c STORM TECH DETAILS C 1 0 ACCEPTABLE FILL MATERIALS: STORM T E C H S C - 7 4 0 C H A M B E R S Y S T E M S PLEASE NOTE:1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A S P E C I F I C A T I O N F O R # 4 S T O N E W O U L D S T A T E : " C L E A N , C R U S H E D , A N G U L A R N O . 4 ( A A S H T O M 4 3 ) S T O N E " . 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS U S I N G T W O F U L L C O V E R A G E S W I T H A V I B R A T O R Y C O M P A C T O R . 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY B E A C H I E V E D B Y R A K I N G O R D R A G G I N G W I T H O U T C O M P A C T I O N E Q U I P M E N T . F O R S P E C I A L L O A D D E S I G N S , C O N T A C T S T O R M T E C H F O R COMPACTION REQUIREMENTS.4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS C A N B E U S E D T O R E P L A C E T H E M A T E R I A L R E Q U I R E M E N T S O F L A Y E R ' C ' O R ' D ' A T T H E S I T E D E S I G N E N G I N E E R ' S D I S C R E T I O N . NOTES:1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL S T O R M W A T E R C O L L E C T I O N C H A M B E R S " . 2.SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLA S T I C C O R R U G A T E D W A L L S T O R M W A T E R C O L L E C T I O N C H A M B E R S " . 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRAD E S O I L S A N D T H E D E P T H O F F O U N D A T I O N S T O N E W I T H CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.5.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING L U G S . ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2 . 8 O F A S T M F 2 4 1 8 S H A L L B E G R E A T E R T H A N O R E Q U A L T O 5 5 0 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAM B E R S S H A L L B E P R O D U C E D F R O M R E F L E C T I V E G O L D O R Y E L L O W COLORS.MATERIAL LOCATIONDESCRIPTION A A S H T O M A T E R I A L C L A S S I F I C A T I O N S C O M P A C T I O N / D E N S I T Y R E Q U I R E M E N T D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C'LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHEDGRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D'LAYER.ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGIN E E R ' S P L A N S . CHECK PLANS FOR PAVEMENT SUBGRADE REQUIRE M E N T S . N / A P R E P A R E P E R S I T E D E S I G N E N G I N E E R ' S P L A N S . P A V E D I N S T A L L A T I O N S M A Y H A V E S T R I N G E N T M A T E R I A L A N D P R E P A R A T I O N R E Q U I R E M E N T S . C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THEEMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THECHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C'LAYER.GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <3 5 % F I N E S O R PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN L I E U O F T H I S LAYER. A A S H T O M 1 4 5 ¹ A - 1 , A - 2 - 4 , A - 3 O R A A S H T O M 4 3 ¹ 3 , 3 5 7 , 4 , 4 6 7 , 5 , 5 6 , 5 7 , 6 , 6 7 , 6 8 , 7 , 7 8 , 8 , 8 9 , 9 , 1 0 B E G I N C O M P A C T I O N S A F T E R 1 2 " ( 3 0 0 m m ) O F M A T E R I A L O V E R T H E C H A M B E R S I S R E A C H E D . C O M P A C T A D D I T I O N A L L A Y E R S I N 6 " ( 1 5 0 m m ) M A X L I F T S T O A M I N . 9 5 % P R O C T O R D E N S I T Y F O R W E L L G R A D E D M A T E R I A L A N D 9 5 % R E L A T I V E D E N S I T Y F O R P R O C E S S E D A G G R E G A T E M A T E R I A L S . R O L L E R G R O S S V E H I C L E W E I G H T N O T T O E X C E E D 1 2 , 0 0 0 l b s ( 5 3 k N ) . D Y N A M I C F O R C E N O T T O E X C E E D 2 0 , 0 0 0 l b s ( 8 9 k N ) . BEMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THEFOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONE A A S H T O M 4 3 ¹ 3 , 3 5 7 , 4 , 4 6 7 , 5 , 5 6 , 5 7 N O C O M P A C T I O N R E Q U I R E D . AFOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TOTHE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE A A S H T O M 4 3 ¹ 3 , 3 5 7 , 4 , 4 6 7 , 5 , 5 6 , 5 7 P L A T E C O M P A C T O R R O L L T O A C H I E V E A F L A T S U R F A C E . 2 , 3 1 8 " ( 4 5 0 m m ) M I N * 8 ' ( 2 . 4 m ) M A X 6 " ( 1 5 0 m m ) M I N DCBA12" (300 mm) MIN 1 2 " ( 3 0 0 m m ) T Y P 5 1 " ( 1 2 9 5 m m ) 6 " ( 1 5 0 m m ) M I N 3 0 " ( 7 6 0 m m ) D E P T H O F S T O N E T O B E D E T E R M I N E D B Y S I T E D E S I G N E N G I N E E R 6 " ( 1 5 0 m m ) M I N S E E P L A N S H E E T S * T O B O T T O M O F F L E X I B L E P A V E M E N T . F O R U N P A V E D I N S T A L L A T I O N S W H E R E R U T T I N G F R O M V E H I C L E S J U N E O C C U R , I N C R E A S E C O V E R T O 2 4 " ( 6 0 0 m m ) . P A V E M E N T L A Y E R ( D E S I G N E D B Y S I T E D E S I G N E N G I N E E R ) SC-740END CAP EXCAVATION WALL (CANBE SLOPED OR VERTICAL)PERIMETER STONE(SEE NOTE 5)SUBGRADE SOILS(SEE NOTE 4)ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALLAROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS I N S P E C T I O N & M A I N T E N A N C E S T E P 1 ) I N S P E C T I S O L A T O R R O W P L U S F O R S E D I M E N T A . I N S P E C T I O N P O R T S ( I F P R E S E N T ) A . 1 . R E M O V E / O P E N L I D O N N Y L O P L A S T I N L I N E D R A I N A . 2 . R E M O V E A N D C L E A N F L E X S T O R M F I L T E R I F I N S T A L L E D A . 3 . U S I N G A F L A S H L I G H T A N D S T A D I A R O D , M E A S U R E D E P T H O F S E D I M E N T A N D R E C O R D O N M A I N T E N A N C E L O G A . 4 . L O W E R A C A M E R A I N T O I S O L A T O R R O W P L U S F O R V I S U A L I N S P E C T I O N O F S E D I M E N T L E V E L S ( O P T I O N A L ) A . 5 . I F S E D I M E N T I S A T , O R A B O V E , 3 " ( 8 0 m m ) P R O C E E D T O S T E P 2 . I F N O T , P R O C E E D T O S T E P 3 . B . A L L I S O L A T O R P L U S R O W S B . 1 . R E M O V E C O V E R F R O M S T R U C T U R E A T U P S T R E A M E N D O F I S O L A T O R R O W P L U S B . 2 . U S I N G A F L A S H L I G H T , I N S P E C T D O W N T H E I S O L A T O R R O W P L U S T H R O U G H O U T L E T P I P E i ) M I R R O R S O N P O L E S O R C A M E R A S J U N E B E U S E D T O A V O I D A C O N F I N E D S P A C E E N T R Y i i ) F O L L O W O S H A R E G U L A T I O N S F O R C O N F I N E D S P A C E E N T R Y I F E N T E R I N G M A N H O L E B . 3 . I F S E D I M E N T I S A T , O R A B O V E , 3 " ( 8 0 m m ) P R O C E E D T O S T E P 2 . I F N O T , P R O C E E D T O S T E P 3 . S T E P 2 ) C L E A N O U T I S O L A T O R R O W P L U S U S I N G T H E J E T V A C P R O C E S S A . A F I X E D C U L V E R T C L E A N I N G N O Z Z L E W I T H R E A R F A C I N G S P R E A D O F 4 5 " ( 1 . 1 m ) O R M O R E I S P R E F E R R E D B . A P P L Y M U L T I P L E P A S S E S O F J E T V A C U N T I L B A C K F L U S H W A T E R I S C L E A N C . V A C U U M S T R U C T U R E S U M P A S R E Q U I R E D S T E P 3 ) R E P L A C E A L L C O V E R S , G R A T E S , F I L T E R S , A N D L I D S ; R E C O R D O B S E R V A T I O N S A N D A C T I O N S . S T E P 4 ) I N S P E C T A N D C L E A N B A S I N S A N D M A N H O L E S U P S T R E A M O F T H E S T O R M T E C H S Y S T E M . N O T E S 1 . I N S P E C T E V E R Y 6 M O N T H S D U R I N G T H E F I R S T Y E A R O F O P E R A T I O N . A D J U S T T H E I N S P E C T I O N I N T E R V A L B A S E D O N P R E V I O U S O B S E R V A T I O N S O F S E D I M E N T A C C U M U L A T I O N A N D H I G H W A T E R E L E V A T I O N S . 2 . C O N D U C T J E T T I N G A N D V A C T O R I N G A N N U A L L Y O R W H E N I N S P E C T I O N S H O W S T H A T M A I N T E N A N C E I S N E C E S S A R Y . SNOUT (VENTEDHOOD/TRAP)SC-740 ISOLATOR R O W P L U S D E T A I L NT S STORMTECH HIGHLY RECOMMENDSFLEXSTORM INSERTS IN ANY UPSTREAMSTRUCTURES WITH OPEN GRATES COVER ENTIRE ISOLATOR ROW PLUS WITH ADSGEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE8' (2.4 m) MIN WIDE SC-7 4 0 C H A M B E R O P T I O N A L I N S P E C T I O N P O R T S C - 7 4 0 E N D C A P 24" (600 mm) HDPE ACCESS PIPE REQUIRE D USE FACTORY PRE-FABRICATED END CAPWITH FLAMP PART #: SC740EPE24BR O N E L A Y E R O F A D S P L U S 1 2 5 W O V E N G E O T E X T I L E B E T W E E N F O U N D A T I O N S T O N E A N D C H A M B E R S 5 ' ( 1 . 5 m ) M I N W I D E C O N T I N U O U S F A B R I C W I T H O U T S E A M S SUMP DEPTH TBD BYSITE DESIGN ENGINEER(24" [600 mm] MIN RECOMMENDED) N O M I N A L C H A M B E R S P E C I F I C A T I O N S S I Z E ( W X H X I N S T A L L E D L E N G T H ) 5 1 . 0 " X 3 0 . 0 " X 8 5 . 4 " ( 1 2 9 5 m m X 7 6 2 m m X 2 1 6 9 m m ) C H A M B E R S T O R A G E 4 5 . 9 C U B I C F E E T ( 1 . 3 0 m ³ ) M I N I M U M I N S T A L L E D S T O R A G E * 7 4 . 9 C U B I C F E E T ( 2 . 1 2 m ³ ) W E I G H T 7 5 . 0 l b s . ( 3 3 . 6 k g ) * A S S U M E S 6 " ( 1 5 2 m m ) S T O N E A B O V E , B E L O W , A N D B E T W E E N C H A M B E R S S C - 7 4 0 T E C H N I C A L S P E C I F I C A T I O N N T S B U I L D R O W I N T H I S D I R E C T I O N O V E R L A P N E X T C H A M B E R H E R E ( O V E R S M A L L C O R R U G A T I O N ) S T A R T E N D 9 0 . 7 " ( 2 3 0 4 m m ) A C T U A L L E N G T H 8 5 . 4 " ( 2 1 6 9 m m ) I N S T A L L E D L E N G T H A A C B 5 1 . 0 " ( 1 2 9 5 m m ) 3 0 . 0 " ( 7 6 2 m m ) 4 5 . 9 " ( 1 1 6 6 m m ) 1 2 . 2 " ( 3 1 0 m m ) 2 9 . 3 " ( 7 4 4 m m ) P A R T # S T U B A B C S C 7 4 0 E P E 0 6 T / S C 7 4 0 E P E 0 6 T P C 6 " ( 1 5 0 m m ) 1 0 . 9 " ( 2 7 7 m m ) 1 8 . 5 " ( 4 7 0 m m ) - - - S C 7 4 0 E P E 0 6 B / S C 7 4 0 E P E 0 6 B P C - - - 0 . 5 " ( 1 3 m m ) S C 7 4 0 E P E 0 8 T / S C 7 4 0 E P E 0 8 T P C 8 " ( 2 0 0 m m ) 1 2 . 2 " ( 3 1 0 m m ) 1 6 . 5 " ( 4 1 9 m m ) - - - S C 7 4 0 E P E 0 8 B / S C 7 4 0 E P E 0 8 B P C - - - 0 . 6 " ( 1 5 m m ) S C 7 4 0 E P E 1 0 T / S C 7 4 0 E P E 1 0 T P C 1 0 " ( 2 5 0 m m ) 1 3 . 4 " ( 3 4 0 m m ) 1 4 . 5 " ( 3 6 8 m m ) - - - S C 7 4 0 E P E 1 0 B / S C 7 4 0 E P E 1 0 B P C - - - 0 . 7 " ( 1 8 m m ) S C 7 4 0 E P E 1 2 T / S C 7 4 0 E P E 1 2 T P C 1 2 " ( 3 0 0 m m ) 1 4 . 7 " ( 3 7 3 m m ) 1 2 . 5 " ( 3 1 8 m m ) - - - S C 7 4 0 E P E 1 2 B / S C 7 4 0 E P E 1 2 B P C - - - 1 . 2 " ( 3 0 m m ) S C 7 4 0 E P E 1 5 T / S C 7 4 0 E P E 1 5 T P C 1 5 " ( 3 7 5 m m ) 1 8 . 4 " ( 4 6 7 m m ) 9 . 0 " ( 2 2 9 m m ) - - - S C 7 4 0 E P E 1 5 B / S C 7 4 0 E P E 1 5 B P C - - - 1 . 3 " ( 3 3 m m ) S C 7 4 0 E P E 1 8 T / S C 7 4 0 E P E 1 8 T P C 1 8 " ( 4 5 0 m m ) 1 9 . 7 " ( 5 0 0 m m ) 5 . 0 " ( 1 2 7 m m ) - - - S C 7 4 0 E P E 1 8 B / S C 7 4 0 E P E 1 8 B P C - - - 1 . 6 " ( 4 1 m m ) S C 7 4 0 E P E 2 4 B * 2 4 " ( 6 0 0 m m ) 1 8 . 5 " ( 4 7 0 m m ) - - - 0 . 1 " ( 3 m m ) S C 7 4 0 E P E 2 4 B R * 2 4 " ( 6 0 0 m m ) 1 8 . 5 " ( 4 7 0 m m ) - - - 0 . 1 " ( 3 m m ) A L L S T U B S , E X C E P T F O R T H E S C 7 4 0 E P E 2 4 B / S C 7 4 0 E P E 2 4 B R A R E P L A C E D A T B O T T O M O F E N D C A P S U C H T H A T T H E O U T S I D E D I A M E T E R O F T H E S T U B I S F L U S H W I T H T H E B O T T O M O F T H E E N D C A P . F O R A D D I T I O N A L I N F O R M A T I O N C O N T A C T S T O R M T E C H A T 1 - 8 8 8 - 8 9 2 - 2 6 9 4 . * F O R T H E S C 7 4 0 E P E 2 4 B / S C 7 4 0 E P E 2 4 B R T H E 2 4 " ( 6 0 0 m m ) S T U B L I E S B E L O W T H E B O T T O M O F T H E E N D C A P A P P R O X I M A T E L Y 1 . 7 5 " ( 4 4 m m ) . B A C K F I L L M A T E R I A L S H O U L D B E R E M O V E D F R O M B E L O W T H E N - 1 2 S T U B S O T H A T T H E F I T T I N G S I T S L E V E L . N O T E : A L L D I M E N S I O N S A R E N O M I N A L P R E - F A B S T U B A T B O T T O M O F E N D C A P W I T H F L A M P E N D W I T H " B R " P R E - F A B S T U B S A T B O T T O M O F E N D C A P F O R P A R T N U M B E R S E N D I N G W I T H " B " P R E - F A B S T U B S A T T O P O F E N D C A P F O R P A R T N U M B E R S E N D I N G W I T H " T " P R E - C O R E D E N D C A P S E N D W I T H " P C " 60" MANHOLE W/GRATE ORISPWC SD-611 1 0 / 1 3 / 2 0 2 2 TETON GROUP OF REXBURG LLCRPR0000002002AUGP8''SAN )8''SAN )XXXXXX X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRWRW R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRWRW R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X EOEOEOXXXXXXXOHPOHPOHP8''WTR 8''WTR 8'' SAN ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN (8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)4''SAN )8''SAN )4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN )6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 8'' SS (8'' SS (8'' SS (4"S) s t a i r N89° 44' 25"E 480.00' N0° 15' 35"W 291.00' N 8 9 ° 4 4 ' 2 5 " E 2 0 0 . 0 0 ' S0° 15' 35"E 291.00' S 8 9 ° 4 4 ' 2 5 " W 2 0 0 . 0 0 ' N 6 7 ° 1 1 ' 1 1 " W 2 8 . 0 2 ' N 5 5 ° 0 6 ' 3 5 " W 3 5 . 5 7 ' N 3 8 ° 3 1 ' 1 8 " W 2 9 . 9 0 ' N 4 3 ° 3 9 ' 5 5 " W 7 2 . 1 8 ' N55° 00' 35"W9.80'N73° 11' 27"W15.19'N89° 43' 33"W46.00'S42° 23' 27"W55.43'S30° 11' 12"W23.72'N0° 15' 35"W 180.00'S89° 44' 25"W 175.00'N0° 15' 35"W 220.00' N 8 3 ° 1 3 ' 5 4 " W 3 5 . 3 1 ' 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/2'' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' W 12'' SD (12'' SD ( s t a i r HAWK E R R Y A N RPR00 0 0 0 0 2 0 0 2 B EAST IDAHO CREDIT UNIONRPRRXB10175952LEWIS SCOTT R DDS PCRPR0000017002A T W J I N V E S T M E N T S L L C R P R 0 0 0 0 0 1 7 0 0 1 A E R E D E T T I L L C R P R 6 N 4 0 E 2 0 4 1 0 1 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 FF=4870.67 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 BUILDING A3-STORYHEIGHT=43'-6"FF=4871.20 B U I L D I N G B 1 - S T O R Y H E I G H T = 5 1 ' - 8 " F F = 4 8 7 1 . 6 0 7' 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W I N S T A L L 2 7 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 3 . 9 8 % C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 O c t o b e r 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c S W P P P L A Y O U T F O R : U - H A U L STORM WATER POLLUTION PREVENTION PLAN C 1 1 N SECOND EAST E 4 T H N O R T H N THIRD EAST REXBURG C O M P A N Y I R R I G A T I O N 60' RW 4 0 ' SEQUENCE OF MAJOR ACTIVITIESACTIVITYSTART DATEEND DATE P O T E N T I A L P O L L U T A N T S C H E M I C A L M S D S # L O C A T I O N TO BE FILLED OUT BY CONTRACTOR T O B E F I L L E D O U T B Y C O N T R A C T O R OFFSITE OPERATONSSTART DATEEND DATETO BE FILLED OUT BY CONTRACTOR B E S T M A N A G E M E N T P R A C T I C E S N O T E S 1 . T h i s p l a n s h o u l d b e r e v i s e d a n d u p d a t e d t o a d d r e s s c h a n g e s i n s i t e c o n d i t i o n s , n e w o r r e v i s e d g o v e r n m e n t r e g u l a t i o n s , a n d a d d i t i o n a l o n - s i t e s t o r m w a t e r p o l l u t i o n . A d d i t i o n a l e r o s i o n c o n t r o l m e a s u r e s J U N E b e r e q u i r e d . 2 . A l l r e v i s i o n s t o t h i s p l a n m u s t b e d o c u m e n t e d o n t h e S W P P P R e v i s i o n D o c u m e n t a t i o n F o r m . 3 . C u r r e n t v e r s i o n s o f t h e S W P P P , t h e N O I , a n d t h e N O C w i l l b e k e p t o n s i t e f o r t h e d u r a t i o n o f t h e p r o j e c t . T h e s e i t e m s w i l l b e a v a i l a b l e f o r t h e u s e o f a l l o p e r a t o r s a n d s i t e p e r s o n a l i n v o l v e d w i t h e r o s i o n a n d s e d i m e n t c o n t r o l s , a n d b e a v a i l a b l e t o E P A v i s i t i n g t h e s i t e . A n o t i c e w i l l b e p o s t e d n e a r t h e c o n s t r u c t i o n e n t r a n c e d u r i n g c o n s t r u c t i o n , c o n t a i n i n g t h e S W P P P , t h e N O I a n d t h e N O C . 4 . F u g i t i v e d u s t b l o w i n g f r o m t h e s i t e s h a l l b e c o n t r o l l e d b y s p r a y i n g w a t e r a n d d u s t c o n t r o l p o l y m e r s a s n e e d e d o n d r y a r e a s o f t h e s i t e . 5 . T h e c o n t r a c t o r w i l l b e r e s p o n s i b l e f o r s u p e r v i s i o n a n d i n s p e c t i o n o f a l l e r o s i o n a n d s e d i m e n t a t i o n c o n t r o l s a n d f o r e n s u r i n g t h e S W P P P i s i m p l e m e n t e d . 6 . P r i o r t o b e g i n n i n g e a r t h - m o v i n g a c t i v i t i e s , i n c l u d i n g c l e a r i n g a n d g r u b b i n g , a l l c l e a r i n g l i m i t s , e a s e m e n t s , s e t b a c k s , s e n s i t i v e a r e a s a n d t h e i r b u f f e r s w i l l b e c l e a r l y m a r k e d t o p r e v e n t e n v i r o n m e n t a l d a m a g e b o t h o n a n d o f f t h e s i t e . 7 . I f s e d i m e n t i s a c c i d e n t a l l y t r a n s p o r t e d o n t o t h e s t r e e t i t w i l l b e r e m o v e d f r o m t h e s t r e e t s u r f a c e o n a d a i l y b a s i s . 8 . A l l o f f - s i t e c o n s t r u c t i o n s h a l l b e s t a b i l i z e d a t t h e e n d o f t h e w o r k i n g d a y . 9 . A l l w a s t e m a t e r i a l w i l l b e c o l l e c t e d a n d s t o r e d i n a s e c u r e l y l i d d e d d u m p s t e r . T h e d u m p s t e r w i l l m e e t a l l l o c a l a n d s t a t e s o l i d w a t e r m a n a g e m e n t r e g u l a t i o n s . 1 0 . P o r t a b l e s a n i t a r y u n i t s w i l l b e p r o v i d e d f o r u s e b y a l l w o r k e r s f o r t h e e n t i r e p r o j e c t . S a n i t a r y w a s t e w i l l b e c o l l e c t e d r e g u l a r l y f o r t h e p o r t a b l e u n i t s b y a n a p p r o v e d s a n i t a r y w a s t e m a n a g e m e n t c o n t r a c t o r . 1 1 . A l l e x p o s e d s o i l s w i l l b e s t a b i l i z e d w i t h v e g e t a t i o n o r c o v e r e d n o m o r e t h a n 1 4 d a y s a f t e r t h e c o n s t r u c t i o n a c t i v i t y i n t h a t p o r t i o n o f t h e s i t e h a s t e m p o r a r i l y o r p e r m a n e n t l y c e a s e d . 1 2 . E x i s t i n g a n d n e w v e g e t a t i o n w i l l b e m a i n t a i n e d t o t h e m a x i m u m e x t e n t p r a c t i c a b l e t o p r e v e n t t h e c o n t a m i n a t i o n o f s t o r m w a t e r w i t h s e d i m e n t . 1 3 . T h e c o n t r a c t o r s h a l l b e r e s p o n s i b l e f o r a d j u s t i n g t h e e r o s i o n c o n t r o l m e a s u r e ; d u e t o g r a d e c h a n g e s d u r i n g t h e d e v e l o p m e n t o f t h e p r o j e c t . 1 4 . M a i n t a i n o n t h e s i t e o r h a v e r e a d i l y a v a i l a b l e s u f f i c i e n t o i l a n d g r e a s e a b s o r b i n g m a t e r i a l s t o c o n t a i n a n d c l e a n u p f u e l o r c h e m i c a l s p i l l s a n d l e a k s . 1 5 . A d e q u a t e e n e r g y d i s s i p a t i o n , e r o s i o n c o n t r o l , a n d s o i l s t a b i l i z a t i o n m e a s u r e s w i l l b e p r o v i d e d f o r a l l p o i n t s o u r c e d i s c h a r g e s o f s t o r m w a t e r , i n c l u d i n g r u n - o n d i s c h a r g e s a n d o u t l e t s f o r o n s i t e d i s c h a r g e s . 1 6 . T e m p o r a r y a n d p e r m a n e n t s w e l l s a n d s m a l l d e t e n t i o n p o n d s w i l l b e u s e d a s n e c e s s a r y t o r e d u c e t h e v e l o c i t y o f r u n o f f a n d e n h a n c e p a r t i c l e s e t t l i n g . 1 7 . C o n s i s t e n t w i t h t h e g e n e r a l p e r m i t r e q u i r e m e n t s , a l l p o t e n t i a l p o l l u t a n t s o t h e r t h a n s e d i m e n t w i l l b e h a n d l e d a n d d i s p o s e d o f i n a m a n n e r t h a t d o e s n o t a f f e c t c o n t a m i n a t i o n o f s t o r m w a t e r . 1 8 . M a t e r i a l s u s e d d u r i n g c o n s t r u c t i o n w i t h t h e p o t e n t i a l t o i m p a c t s t o r m w a t e r , w i l l b e s t o r e d , m a n a g e d , u s e d , a n d d i s p o s e d o f i n a m a n n e r t h a t m i n i m i z e s t h e p o t e n t i a l f o r r e l e a s e s t o t h e e n v i r o n m e n t a n d e s p e c i a l l y i n t h e s t o r m w a t e r . 1 9 . I f a s p i l l o f p o l l u t a n t s t h r e a t e n s s t o r m w a t e r a t t h e s i t e , t h e s p i l l r e s p o n s e p r o c e d u r e s m u s t b e i m p l e m e n t e d i n a t i m l e y m a n n e r t o p r e v e n t t h e r e l e a s e o f p o l l u t a n t s . 2 0 . A l l t e m p o r a r y a n d p e r m a n e n t e r o s i o n a n d s e d i m e n t c o n t r o l B M P s w i l l b e m a i n t a i n e d a n d r e p a i r e d a s n e e d e d t o a s s u r e c o n t i n u e d p e r f o r m a n c e o f t h e i r i n t e n d e d u s e . 2 1 . A l l t e m p o r a r y e r o s i o n c o n t r o l a n d s e d i m e n t c o n t r o l B M P s w i l l b e r e m o v e d w i t h i n 3 0 d a y s a f t e r f i n a l s i t e s t a b i l i z a t i o n i s a c h i e v e d o r a f t e r t h e t e m p o r a r y B M P s a r e n o l o n g e r n e e d e d . 2 2 . R e g a r d l e s s o f r e c o m m e n d e d m a i n t e n a n c e s c h e d u l e , a l l c o n t r o l m e a s u r e s a n d i n s p e c t i o n s s h a l l b e p e r f o r m e d w i t h i n 2 4 h o u r s f o l l o w i n g a n y s t o r m o f 0 . 2 5 i n c h e s o r g r e a t e r . A n i n s p e c t i o n r e p o r t s h a l l b e k e p t a t a l l t i m e s a n d s h o u l d b e r e t a i n e d f o r a t l e a s t t h r e e ( 3 ) y e a r s f r o m t h e d a t e t h e s i t e i s s t a b i l i z e d . 2 3 . A l l c o n t r a c t o r s p r o v i d i n g s e r v i c e s o n t h e p r o j e c t w h i c h J U N E c a u s e s t o r m w a t e r p o l l u t i o n w i l l b e g i v e n a c o p y o f t h e S W P P P a n d a p p r o p r i a t e t r a i n i n g r e g a r d i n g s t o r m w a t e r p o l l u t i o n p r e v e n t i o n . N O T E : 1 . A F T E R A S P H A L T P A V I N G H A S T A K E N P L A C E S T O R M W A T E R D E V E L O P E D W I L L B E D I R E C T E D T O D R A I N A G E S W A L E S P E R T H E A P P R O V E D S I T E P L A N A N D P E R C O L A T E I N D E S I G N A T E D A R E A S 2 . I N L E T P R O T E C T I O N T O B E P L A C E D O N A L L S T O R M D R A I N I N L E T S A F T E R I N S T A L L A T I O N T H R O U G H T H E D U R A T I O N O F T H E P R O J E C T . A R E A T O B E D I S T U R B E D S T A B I L I Z E C O N S T R U C T I O N E N T R A N C E / E X I T 2 0 ' W I D E X 5 0 ' L I N G 2 " - 4 " C L E A N C R U S H E D R O C K A P P R O X . 6 " T H I C K C O M B I N A T I O N S T A G I N G A R E A & V E H I C L E E Q U I P M E N T C L E A N I N G , F U E L I N G A N D M A I N . M A T E R I A L S S T O R A G E A R E A & S T O C K P I L E M A N A G E M E N T S I L T F E N C E O R F I B E R R O L L O U T H O U S E S T O R M W A T E R D R A I N A G E L E G E N D S E D I M E N T A T I O N A R E A L E A K P R O O F C O N C R E T E W A S H O U T C H E M I C A L S T O R A G E A R E A U L T R A G U A R D I N L E T P R O T E C T I O N A K A W I T C H H A T C O C O N U T M A T I N L E T P R O T E C T I O N S W P P P S I G N P R O J E C T : C O N T R A C T O R : P L A N L O C A T I O N : O N S I T E C O N T A C T : S W P P P 1 0 / 1 3 / 2 0 2 2 TETON GROUP OF REXBURG LLCRPR0000002002AUGP 8''SAN )8''SAN ) XXX X X X X X X X X X X X X X FO FO FO FO FO FO FO FORW RWRWRWRW R W R W RW RW RWRWRW RW RW RW RW RW RW RW RW RW RW RW RWRWRW R W R W R W R W R W R W RW RW RWRWRWRWRWRW X X X X X X X X X X X X X X X X X X X X X X X X X 8''WTR 8''WTR 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8 ' ' S A N ( 8'' SAN ( S S 8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)8''SAN)12'' SAN (4''SAN )8''SAN )4''SAN )OHP OHP OHP RW RW RW 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 8''SAN )8''SAN )8''SAN ) 6''WTR 6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R 8'' SS (8'' SS (8'' SS (4"S) s t a i r 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/2'' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' W 12'' SD (12'' SD ( s t a i r H A W K E R R Y A N R P R 0 0 0 0 0 0 2 0 0 2 B EAST IDAHO CREDIT UNIONRPRRXB10175952LEWIS SCOTT R DDS PCRPR0000017002A T W J I N V E S T M E N T S L L C R P R 0 0 0 0 0 1 7 0 0 1 A E R E D E T T I L L C R P R 6 N 4 0 E 2 0 4 1 0 1 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 FF=4870.67 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 F F = 4 8 7 0 . 1 7 BUILD I N G A 3-ST O R Y HEIGHT = 4 3 ' - 6 " FF=48 7 1 . 2 0 B U I L D I N G B 1 - S T O R Y H E I G H T = 5 1 ' - 8 " F F = 4 8 7 1 . 6 0 7' 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W I N S T A L L 2 7 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 3 . 9 8 % FO FO FO FO FO FO FO FO F O F O FO FO S I T E I N F O R M A T I O N : E X I S T I N G S I T E : G R O S S A R E A : 3 1 0 , 3 0 3 S F O R 7 . 1 2 4 A C R E S Z O N I N G : C O M M U N I T Y B U S N I E S S C E N T E R ( C B C ) F U L L S I T E W I T H I N F L O O D Z O N E A E B U I L D I N G A : F O O T P R I N T = 3 3 , 8 3 8 G . S . F . B U I L D I N G T Y P E : I - A ( F I R S T F L O O R O N L Y , I I - B F I N I S H F L O O R E L E V A T I O N = 4 8 7 0 . 9 ( N A V D 1 9 8 8 D A T U M ) B U I L D I N G B : F O O T P R I N T = 2 4 , 7 5 6 G . S . F . B U I L D I N G T Y P E : I - A F I N N I S H F L O O R E L E V A T I O N = 4 8 7 1 . 5 ( N A V D 1 9 8 8 D A T U M ) T O T A L L A N D S C A P E A R E A : 4 4 , 3 4 2 S F ( T O T A L S I T E 3 1 0 , 3 0 3 ) = 1 4 % B E N C H M A R K / F L O O D P L A I N I N F O R M A T I O N : F L O O D P L A I N E L E V A T I O N S : ( F E M A M A P N O . 1 6 0 6 5 C 0 0 2 0 D , D A T E D J U N E 3 , 1 9 9 1 ) F I R M D A T U M = N A V D 1 9 2 9 W E S T H A L F O F S I T E = 4 6 6 9 . 9 0 ( 1 . 0 ' F R E E B O A R D ) E A S T H A L F O F S I T E = 4 8 7 0 . 4 0 ( 1 . 0 ' F R E E B O A R D ) S I T E D A T U M = N A V D 1 9 8 8 F L O O D P L A I N D A T U M = N G V D 2 9 ( - 3 . 4 ' B E L O W S I T E D A T U M ) C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 S E P T E M B E R 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c FIRM OVERLAY F 1 F 1 UGP XXXXXXXXXXX X X X X X FO FO FO FO FO FO FO FO RWRWRWRWRW R W RW RW RWRWRW X X X X X X X X X X X X X X X X X X EOEOEOXXXXXXX8''WTR 8''WTROHP OHP OHP 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR 8''WTR8''WTR8''WTR8''WTR 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R 8 ' ' W T R F O F O 6''WTR6''WTR6''WTR 6 ' ' W T R 6 ' ' W T R 6 ' ' W T R G B GBROOFDRAINS R O O F D R A I N S 8'' SS (8'' SS (8'' SS (4"S) s t a i r N89° 44' 25"E 480.00' N0° 15' 35"W 291.00' N 8 9 ° 4 4 ' 2 5 " E 2 0 0 . 0 0 ' S0° 15' 35"E 291.00' N 5 5 ° 0 6 ' 3 5 " W N38° 31' 18"W 29.90'N43° 39' 55"W 72.18'N55° 00' 35"W9.80'N73° 11' 27"W15.19'N89° 43' 33"W46.00'S42° 23' 27"W55.43'S30° 11' 12"W23.72'N0° 15' 35"W 180.00'S89° 44' 25"W 175.00'N0° 15' 35"W 220.00' 4'' SS )4'' SS ) 6'' W3/4'' W 1-1/2'' W1-1/2'' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 1 - 1 / 2 ' ' W 6'' W G B G B G B G B G B G B GBGBGBGBGBGBGBGBGB 12'' SD (12'' SD ( G B G B G B G B G B G B G B G B G B T W = 4 8 7 0 . 0 0 N G = 4 8 6 7 . 0 0 T W = 4 8 7 0 . 0 0 N G = 4 8 6 7 . 0 0 TW=4873.00NG=4868.00 s t a i r TW=4873.00NG=4868.00 1-1/2'' W 3 / 4 ' ' W 3 / 4 ' ' W I N S T A L L 2 7 ' O F 1 2 " A D S N - 1 2 . S T O R M P I P E @ 3 . 9 8 % FO FO FO FO FO FO FO FO F O F O FO FO L A N D S C A P E L A Y O U T F O R : R E X B U R G U - H A U L LANDSCAPE LAYOUT 1 L 1 L E G E N D D E C I D U O U S T R E E E V E R G R E E N T R E E D E C I D U O U S S H R U B E V E R G R E E N S H R U B R O C K B E D S O D P E R E N N I A L B E D F U T U R E 3 1 6 " x 5 " S T E E L E D G I N G F I N I S H E D G R A D E S E E D F I N I S H E D G R A D E S O D 1 2"1" 2" MIN M U L C H O R R O C K T R E E R I N G / S T E E L E D G I N G 2 " M U L C H / R O C K T H R E E 2 " x 8 ' R O U N D T R E E S T A K E S T R I A N G U L A R L Y S P A C E D D R I V E N I N T O U N D I S T U R B E D S U B G R A D E 5 0 / 5 0 O R G A N I C B A R K C O M P O S T A N D N A T I V E S O I L B A C K F I L L A R O U N D R O O T B A L L S T A N D I N G U P O N U N D I S T U R B E D S O I L 6 " P L A N T W E L L S E C U R E A L L S T A K E S T O T R E E U S I N G 1 " C H A I N L O C K T R E E T I E T R E E P L A N T I N G D E T A I L N T S N T S 3 ' T Y P VARIES 4 " S C H 4 0 P V C S L E E V E SIDEWALK R A M P / S I D E W A L K 6" TYP 3 ' T Y P I R R I G A T I O N S L E E V E D E T A I L N T S P L A N V I E W P R O F I L E V I E W C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 S E P T E M B E R 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c L 2 S T E E L E D G I N G : S T A N D A R D H E I G H T : 5 " O V E R A L L M A T E R I A L T H I C K N E S S : 3 1 6 " S T A N D A R D I N S T A L L D E P T H : B O T T O M E D G E S H A L L B E P L A C E D 4 " B E L O W O U T S I D E G R A D E F O R S O D D E D L A W N S A N D 4 . 5 " B E L O W O U T S I D E G R A D E F O R S E E D E D L A W N S . I N T E R I O R B E D G R A D E S H A L L B E 2 . 5 " B E L O W T O P O F E D G E . S E E D E T A I L T H I S P A G E . A G G R E G A T E S O U R C E D L O C A L L Y F R O M L O C A L S U P P L I E R L I S T E D B E L O W O R E Q U I V A L E N T , 1 " N O M I N A L T O B E I N S T A L L E D T O N O L E S S T H A N 2 " O F D E P T H . C O L O R : T O B E C H O S E N F R O M S U P P L I E R ' S F U L L R A N G E B Y O W N E R O R O W N E R ' S R E P R E S E N T A T I V E D E C O R A T I V E L A N D S C A P E R O C K : S O D C O O L S E A S O N T U R F G R A S S C O M P O S E D O F A T L E A S T 5 0 % K E N T U C K Y B L U E G R A S S . P E R E N N I A L R Y E A N D F E S C U E S P E R M I T T E D B U T N O T T O E X C E E D 5 0 % V O L U M E B Y W E I G H T . L A N D S A P E N O T E S : I R R I G A T I O N U N D E R G R O U N D I R R I G A T I O N P O I N T O F C O N N E C T I O N I S L O C A T E D B E H I N D N O R T H C U R B A T E A S T A C C E S . S E E U T I L I T Y P L A N F O R C O N T I N U A T I O N . S Y S T E M D E S I G N A N D I N S T A L L A T I O N T O B E P E R F O R M E D B Y L I C E N S E D C O N T R A C T O R . A L L H E A D S A N D L I N E S T O B E I N S T A L L E D P R I O R T O P L A N T M A T E R I A L I N S T A L L A T I O N , D R I P E M I T T E R S P L A C E D A F T E R I N S T A L L A T I O N O F P L A N T M A T E R I A L . Z O N E S S H A L L H A V E H E A D T O H E A D C O V E R A G E A N D B E C O M P R I S E D O F L O W F L O W S P R I N K L E R H E A D S . T R E E S / S H R U B S / P E R E N N I A L S S H A L L B E D R I P I R R I G A T E D . 3 0 ' S I G H T T R I A N G L E 3 0 ' S I G H T T R I A N G L E 30' SIGHT TRIANGLE S V D T O T A L L A N D S C A P E A R E A : 4 4 , 3 4 2 S Q . F T . ADJUSTMENTS TOMATCH CIVILCHANGES A D J U S T M E N T S T O A C C O U N T F O R S L O P E F R O M B U I L D I N G XFO FO FO FO FO FO FO FOXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXX 8''WTR8''WTR8''WTR8''WTR8''WTR 8 ' ' W T R FOFOFOFOFO6''WTR6''WTR6''WTR6''WTR6''WTR 6 ' ' W T R GB N0° 15' 35"W 291.00'N89° 44' 25"E 200.00'S0° 15' 35"E 291.00'4'' SS )4'' SS )4'' SS )4'' SS )6'' W 6'' W 6'' W3/4'' W 3/4'' W 3/4'' WGB GB GB stair1-1/2'' W 3/4'' W3/4'' W3/4'' W3/4'' WINSTALL 27' OF 12" ADS N-12. STORM PIPE @ 3.98%FO FO FO FO FO FO FO FO FOFOFOFO U G P U G P E O E O 8''WTR 8''WTR 8''WTR 8''WTR OHP OHP OHP OHP OHP OHP 6 ' ' W T R GB GB N0° 15' 35"W 220.00'FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO L A N D S C A P E L A Y O U T 2 F O R : R E X B U R G U - H A U L LANDSCAPE LAYOUT 2 L 2 L E G E N D D E C I D U O U S T R E E E V E R G R E E N T R E E D E C I D U O U S S H R U B E V E R G R E E N S H R U B R O C K B E D S O D P E R E N N I A L B E D F U T U R E C H E C K B Y D A T E S H E E T S D R A W N B Y R E V I S I O N S O F S H E E T N O . D E S I G N B Y B L J S W R H L E J O B N O : D A T E : 2 2 - 5 2 6 S E P T E M B E R 2 0 2 2 REXBURG, IDAHO U-HAUL OF REXBURG 1 1 COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c civil & structural engineering materials testing & land surveying 101 S. Park Avenue, Idaho Falls, ID 83402, (208)524-0212 800 W. Judicial Street, Blackfoot, ID 83221, (208)785-2977hleinc.com COPYRIGHT 2022 HLE ALL RIGHTS RESERVED.c L 2 P L A N T L I S T : 1 2 3 B A B Y B L U E E Y E S S P R U C E ( P i c e a p u n g e n s ' B a b y B l u e E y e s ' ) C H A N T I C L E E R P E A R ( P y r u s c a l l e r y a n a ' G l e n ' s F o r m ' ) C O L U M N A R N O R W A Y M A P L E ( A c e r p l a t a n o i d e s ' C o l u m n a r e ' ) C R I M S O N S P I R E O A K ( W u e r c u s r o b u r x a l b a ' C r i m s c h m i d t ' ) I V O R Y S I L K L I L A C T R E E ( S y r i n g a r e t i c u l a t a ' I v o r y S i l k ' ) C I M M A R O N G R E E N A S H ( F r a x i n u s p e n n s y l v a n i c a ' C i m m a r o n ' ) N O R T H E R N A C C L A I M H O N E Y L O C U S T ( G l e d i t s i a t r i a . f . i n e r m i s ' H a r v e ' ) D E B O R A H M A P L E ( A c e r p l a t a n o i d e s ' D e b o r a h ' ) G R E E N S P I R E L I N D E N ( T i l i a c o r d a t a ' G r e e n s p i r e ' ) T R E E P E R E N N I A L L O C A T I O N S T O B E D E T E R M I N E D B Y I N S T A L L E R S H A D E W H I T E B L E E D I N G H E A R T ( D i c e n t r a s p e c t a b i l i s ' A l b a ' ) F I R E A L A R M C O R A L B E L L S ( H e u c h e r a ' F i r e A l a r m ' ) T W I S T O F L I M E C O R A L B E L L S ( H e u c h e r a ' T w i s t o f L i m e ' ) A U G U S T M O O N H O S T A ( H o s t a x ' A u g u s t M o o n ' ) P A T R I O T H O S T A ( H o s t a ' P a t r i o t ' ) L O C A T I O N S T O B E D E T E R M I N E D B Y I N S T A L L E R S U N O V E R D A M F E A T H E R R E E D G R A S S ( C a l a m a g r o s t i s a c u t i f o l i a ' O v e r d a m ' ) K A R L F O E R S T E R F E A T H E R R E E D G R A S S ( C a l a m a g r o s t i s a c u t i f o l i a ' K a r l F o e r s t e r ' ) E L I J A H B L U E D W A R F F E S C U E G R A S S ( F e s t u c a o v i n a ' E l i j a h B l u e ' ) C A R A D O N N A S A L V I A ( S a l v i a n e m o r o s a ' C a r a d o n n a ' ) D W A R F R E B L O O M I N G D A Y L I L Y ( H e m e r o c a l l i s ' P u r p l e d ' O r o ' ' L i t t l e B u s i n e s s ' e t c . ) 4 5 6 7 8 9 3 S H R U B 4 6 7 8 9 2 1 B A I L E Y R E D T W I G D O G W O O D ( C o r n u s s e r i c e a ' B a i l e y i ' ) I V O R Y H A L O D O G W O O D ( C o r n u s a l b a ' B a i l h a l o ' ) S E M A S H L E A F S P I R E A ( S o r b a r i a s o r b i f o l i a ' S e m ' ) L I M O N C E L L O B A R B E R R Y ( B e r b e r i s t h u n b e r g i i ' B a i l E r i n ' ) L I T T L E L I M E H Y D R A N G E A ( H y d r a n g e a p a n i c u l a t a ' J a n e ' ) D W A R F E U R O P E A N V I B U R N U M ( V i b u r n u m o p u l u s ' N a n u m ' ) L E M O N C A N D Y N I N E B A R K ( P h y s o c a r p u s o p u l i f o l i u s ' P o d a r a s ' ) K E L S E Y D O G W O O D ( C o r n u s s e r i c e a ' K e l s e y i ' ) I N V I N C I B E L L E W E E W H I T E H Y D R A N G E A ( H y d r a n g e a a r b o r e s c e n s ' N C H A 5 ' ) C I T R U S T A R T P O T E N T I L L A ( P o t e n t i l l a f r u t i c o s a ' B a i l c i t r u s ' ) F I N E L I N E B U C K T H O R N ( R h a m n u s f r a n g u l a ' R o n W i l l i a m s ' ) C A M P F I R E R O S E ( R o s a ' C a m p f i r e ' ) O S O E A S Y I T A L I A N I C E R O S E ( R o s a ' C h e w n i c e b e l l ' ) S H O W O F F S T A R L E T F O R S Y T H I A ( F o r s y t h i a x i n t e r m e d i a ' M i n f o r 6 ' ) A M B E R J U B I L E E N I N E B A R K ( P h y s o c a r p u s o p u f o l i u s ' J e f a m ' ) S L O W M O U N D M U G O P I N E ( P i n u s m u g o ' S l o w m o u n d ' ) G O L D F L A M E S P I R E A ( S p i r e a x b u m a l d a ' G o l d f l a m e ' ) 5 1 0 1 1 1 6 1 7 1 2 1 3 1 4 1 5 NORTHEAST S O U T H E A S T W E S T 9 9 9 8 8 8 88 7 7 7 77 2 2 22 3 3 3 3 4 4 4 4 5 5 5 6 1 1 112163 1 1 1 1 1 1 1 1 111111 2 2 2 2 2 2 2 2 1 5 1 5 1 5 3 1 5 6 6 6 1 6 1 6 5 5 1 4 7 7 8 8 8 1 0 1 3 1 3 1 2 3 1 4 6 6 6 1 7 1 7 1 7 4 4 4 8 8 1 2 9 1212998844417176614145688710LANDSCAPE IRRIGATIONPOINT OF CONNECTION30' SIGHT TRIANGLE 30' SIGHT TRIANGLE 3 0 ' S I G H T T R I A N G L E 3 0 ' S I G H T T R I A N G L E S V D Course B e a r i n g D i s t a n c e L1 N 8 2 ° 5 8 ' 1 9 " W 3 5 . 3 1 ' L2 N 6 6 ° 5 5 ' 3 6 " W 2 8 . 0 2 ' L3 N 5 4 ° 5 1 ' 0 0 " W 3 5 . 5 7 ' L4 N 3 8 ° 1 5 ' 4 3 " W 2 9 . 9 0 ' L5 N 4 3 ° 2 4 ' 2 0 " W 7 2 . 1 8 ' L6 N 5 4 ° 4 5 ' 0 0 " W 9 . 8 0 ' L7 N 5 2 ° 3 1 ' 3 3 " W 9 . 8 1 ' L8 N 7 2 ° 5 5 ' 5 2 " W 1 5 . 1 9 ' L9 N 8 1 ° 5 2 ' 4 7 " W 2 1 . 3 1 ' L10 N 8 9 ° 2 7 ' 5 8 " W 4 6 . 0 0 ' L11 S 4 2 ° 3 9 ' 0 2 " W 5 5 . 4 3 ' L12 S 3 0 ° 2 6 ' 4 7 " W 2 3 . 7 2 ' PROP40' ACCESS P R O P 4 0 ' A C C E S S 55BLDG. " A " 3-STO R Y FOOTPRINT = 3 3 , 8 3 8 G . S . F . TOTAL AREA = 1 0 1 , 5 1 4 G . S . F . TRUCK DISPLAY P R O P S T O R . B L D G . ' F ' 1 , 2 0 0 ± S . F . P R O P S T O R . B L D G . ' G ' 1 , 8 0 0 ± S . F . P R O P S T O R . B L D G . ' I ' 1 , 2 0 0 ± S . F . P R O P S T O R . B L D G . ' J ' 1 , 8 0 0 ± S . F . P R O P S T O R . B L D G . ' K ' - 2 , 0 0 0 ± S . F . PROP STOR. BLDG. 'L' - 2,600± S.F. 1 0 PROP40' ACCESS B L D G . " B " 1 - S T O R Y T O T A L A R E A = 2 4 , 7 5 6 G . S . F . 5 P R O P S T O R . B L D G . ' E ' 1 , 8 0 0 ± S . F . P R O P S T O R . B L D G . ' D ' 1 , 8 0 0 ± S . F . P R O P S T O R . B L D G . ' C ' 1 , 8 0 0 ± S . F . TRUCK SHARING TRUCK SHARING P R O P 4 0 ' A C C E S S A T E X S T G C U R B C U T P R O P S T O R . B L D G . ' M ' 1 , 2 0 0 ± S . F . ± KNOX BOX MOUNTED A T 6 0 " A . F . F . (B.O.D. KNOXBOX 3200).CONTRACTOR TO CON F I R M F I N A L LOCATION :ITH FIRE M A R S H A L L . FDC CONNECTION -SEE SHEET FP101 FORMORE INFORMATION K N O X B O X M O U N T E D A T 6 0 " A . F . F . ( B . O . D . K N O X B O X 3 2 0 0 ) . C O N T R A C T O R T O C O N F I R M F I N A L L O C A T I O N : I T H F I R E M A R S H A L L . K N O X B O X M O U N T E D A T 6 0 " A . F . F . ( B . O . D . K N O X B O X 3 2 0 0 ) C O N T R A C T O R T O C O N F I R M F I N A L L O C A T I O N : I T H F I R E M A R S H A L L . F D C C O N N E C T I O N - S E E S H E E T F P 1 0 1 F O R M O R E I N F O R M A T I O N K N O X B O X M O U N T E D A T 6 0 " A . F . F . ( B . O . D . K N O X B O X 3 2 0 0 ) C O N T R A C T O R T O C O N F I R M F I N A L L O C A T I O N : I T H F I R E M A R S H A L L . S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL 10.13.22 -CITY RESUBMITTAL 2 -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 4 B G D Z B U I L D I N G S I T E P L A N A 1 . 1 1 " = 4 0 ' - 0 " S C A L E B U I L D I N G S I T E P L A N 1 T R U E N O R T H P R O J E C T N O R T H N N C O O R D I N A T E W I T H R I C H B A R A N S K I A T ( 6 0 2 ) 2 6 3 - 6 5 0 2 E X T . 5 1 6 8 0 1 O R E R I C T A Y L O R E X T . 5 1 6 8 0 2 F O R A L L L O W V O L T A G E C O N D U I T R U N S A N D P O W E R R E Q U I R E M E N T S F O R C O M M U N I C A T I O N C L O S E T S . A L L L O W V O L T A G E U N D E R G R O U N D & P O W E R R E Q U I R E M E N T S T O B E I N C L U D E D I N T H E G E N E R A L C O N T R A C T O R S F I N A L B I D P R O P O S A L . R E F E R T O C I V I L D R A W I N G S F O R A D D I T I O N A L S I T E D I M E N S I O N S , I N F O R M A T I O N A N D P A R K I N G D I M E N S I O N S . 3 3 3 4 4 4 4 ABC131'-0"35'-6"30'-6"29'-6"35'-6"10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " SHOWROOM100OFFICE101BREAKROOM102STO R A G E 1 0 4 S T A I R 1 1 2 0 R E S T R O O M 1 0 6 R E F U S E 1 0 5 S T O R A G E 1 1 1 S T A I R 2 1 2 1 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 S E L F - S T O R A G E 1 1 2 R M F I R E R I S E R 1 0 7 E L E V A T O R RESTROOM103ED 10'-6"10'-0" 1 0 ' - 0 " 10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 9 COUNTER PLACEMENT ANDORIENTATION PER RETAIL GROUP R E - U S E A R E A 7 ' - 0 " 8'-0" 12'-7" 7'-6"12'-6"26'-0"6'-10"10'-2"12'-8" 1 9 ' - 1 0 " 2 2 ' - 0 " 5 ' - 4 " 1 4 ' - 1 0 " 9 ' - 3 " 2 1 ' - 1 " 1 3 ' - 6 " 1 3 ' - 6 " 8 ' - 0 " 2 0 ' - 4 " 1 6 ' - 0 " 2 0 ' - 0 " 1 6 ' - 0 " 2 2 ' - 8 " 3 " 4"15'-6"4"47'-6"3'-0"3"3" 3 " 3 " 3"3"20'-5"17'-7"2'-8" 4 5 ' - 0 " 35'-0" T R U E N O R T H * MINIMUM CLEAR HEIGHT IN ROOM 111 SHALL BE EQUAL OR GREATER THAN T H E T A L L E S T O V E R H E A D D O O R . CC3CC4 G J 1 H RH1 K L L 2 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E F I R S T F L O O R L O C K E R P L A N 1 N N 5'-0"5'-0"10'-0"5'-0"10'-0"5'-0"10'-0"5'-0"10'-0"10'-0"5'-0"10'-0" 7 ' - 0 " 50'-0"10'-0"5'-0"CC1 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE STORAGE SIDE AND 58" G.W.B.OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE;G.W.B. PER NOTE 16" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE SELF-STORAGE SIDE AND D-PANELOTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL BOTH SIDES; UNFACED R-19BATT INSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O.C. W I T H 5 8 " MOISTURE RESISTANCE (M. R . ) G . W . B . E A C H SIDE PER NOTE 1 TO STRU C T U R E A B O V E . 8" CMU WALL PER STRUCTU R A L D R A W I N G S ; FIRE-RESISTNACE RATED U L A S S E M B L Y PER NOTE 5.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E ABOVE; 1 HOUR FIRE - RESI S T A N C E R A T E D PER NOTE 6.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E AND MBCI U-PANEL OR D-P A N E L A N D K I C K PLATE STORAGE SIDE; 1 HO U R F I R E - RESISTANCE RATED PER N O T E 6 . 3 - 5 / 8 " M E T A L S T U D S A T 2 4 " O . C . W I T H S I N G L E L A Y E R 5 8 " G . W . B . I N T E R I O R S I D E A N D M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S T O R A G E S I D E ; U N F A C E D R - 1 3 B A T T I N S U L A T I O N A T A L L R E S T R O O M W A L L S T O S T R U C T U R E A B O V E - P R O V I D E M O I S T U R E R E S I S T A N T G . W . B . P E R N O T E 1 . L O A D B E A R I N G L O C K E R P A R T I T I O N . 4 ' X 2 1 2 " S T E E L C E E S T U D P O S T S W I T H M B C I U - P A N E L O N E S I D E ( T Y P . ) ; R E F E R T O S T R U C T U R A L D R A W I N G S F O R G A U G E A N D S P A C I N G . N O N - L O A D B E A R I N G L O C K E R P A R T I T I O N . 2 1 2 " X 1 5 8 " C E E S T U D S A T 5 ' - 0 " O . C . W I T H M B C I U - P A N E L O N E S I D E . P R E F I N I S H E D M B C I D - P A N E L A T A I S L E S . C O L D F O R M E D M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S E L F - S T O R A G E S I D E A N D M B C I D - P A N E L A N D K I C K P L A T E O T H E R S I D E . W A L L P A N E L E A S I D E T O B E H E L D 1 0 " B E L O W S T R U C T U R E / C E I L I N G A S S E M B L Y A B O V E . S T U D S I Z E S H A L L B E A S F O L L O W S : U P T O 1 5 F E E T = 3 5 8 " X 1 5 8 " X 1 8 G A U P T O 2 0 F E E T = 6 " X 1 5 8 " X 1 8 G A U P T O 2 5 F E E T = 6 " X 2 " X 1 8 G A CC2 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL STORAGE SIDE AND 58"G.W.B. OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABVOE;G.W.B PER NOTE 1. 1 0 5 1 1 1 B 1 1 1 C 1 1 1 D A 5 . 2 1 A 4 . 1 4 A 4 . 1 1 A 4 . 1 2 A4.13 1 1 1 A 104A 1 0 4 B 1 1 0 A 1 1 0 B 1 2 0 A 1 2 0 B 1 0 6 1 0 9 104C 100B 100A103102 1 2 1 10111210'x5'LOCKERTYP.CC1 C C 3 7 A T Y P . C C 3 8 ' x 1 0 ' L O C K E R L 2 L 2 L 2 1 0 ' x 1 5 ' L O C K E R T Y P . 1 0 ' x 1 0 ' L O C K E R T Y P . 5 ' x 5 ' L O C K E R T Y P . 6 B 6 A T Y P . T Y P . L K T Y P . T Y P . 5 ' x 1 0 ' L O C K E R T Y P . S I M . A 9 . 1 1 A 6 . 5 1 K T Y P . A6.1 1 A 6 . 4 2 A 7 . 5 6 A 7 . 5 9 A 6 . 8 1 A 6 . 8 2 S I M . A 7 . 5 7 10'-0"15'-0"5'-0"10'-0" 5 ' - 0 " 30'-0"55'-0" A 5 . 1 2 1 0 8 354 2 ' - 4 " 3 ' - 0 " 5 ' - 0 " 2 ' - 1 0 " 6 ' - 6 " 9 ' - 6 " 4 ' - 0 " 6 ' - 0 " 7 ' - 6 " 1 0 7 5 ' - 0 " 5'-0" L 5 ' - 0 " 10'x5' 5 ' - 0 " 5 ' - 0 " 5 ' - 0 " A 7 . 5 7 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z F I R S T F L O O R L O C K E R P L A N A 2 . 1 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 1 1 1 2 22 2 2 3 3 3 3 3 3 T R U E N O R T H P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E S E C O N D F L O O R L O C K E R P L A N 1 N N ABC131'-0"35'-6"30'-6"29'-6"35'-6"12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0" 9 ' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " E D S T A I R 1 2 2 0 S T A I R 2 2 2 1 C O M M M O P / 2 0 8 S E L F - S T O R A G E 2 1 2 E L E V A T O R 9 1 ' - 0 " 5 6 ' - 0 " C A N O P Y 4"20'-6"25'-6" 1 1 6 ' - 6 " 3 8 ' - 0 " 2 2 ' - 1 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 0 ' - 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 2 ' - 8 " 3 " 15'-6"4"46'-8"3'-10"4"18'-0"4"19'-0"42'-9" 3 " 3"38'-0"3" 3 " 3 " 3"CC3CC4 G J 1 H RH1 K L L 2 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . CC1 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE STORAGE SIDE AND 58" G.W.B.OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE;G.W.B. PER NOTE 16" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE SELF-STORAGE SIDE AND D-PANELOTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL BOTH SIDES; UNFACED R-19BATT INSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O. C . W I T H 5 8 " MOISTURE RESISTANCE (M . R . ) G . W . B . E A C H SIDE PER NOTE 1 TO STRU C T U R E A B O V E . 8" CMU WALL PER STRUCT U R A L D R A W I N G S ; FIRE-RESISTNACE RATED U L A S S E M B L Y PER NOTE 5.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E ABOVE; 1 HOUR FIRE - RES I S T A N C E R A T E D PER NOTE 6.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E AND MBCI U-PANEL OR D-P A N E L A N D K I C K PLATE STORAGE SIDE; 1 H O U R F I R E - RESISTANCE RATED PER N O T E 6 . 3 - 5 / 8 " M E T A L S T U D S A T 2 4 " O . C . W I T H S I N G L E L A Y E R 5 8 " G . W . B . I N T E R I O R S I D E A N D M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S T O R A G E S I D E ; U N F A C E D R - 1 3 B A T T I N S U L A T I O N A T A L L R E S T R O O M W A L L S T O S T R U C T U R E A B O V E - P R O V I D E M O I S T U R E R E S I S T A N T G . W . B . P E R N O T E 1 . L O A D B E A R I N G L O C K E R P A R T I T I O N . 4 ' X 2 1 2 " S T E E L C E E S T U D P O S T S W I T H M B C I U - P A N E L O N E S I D E ( T Y P . ) ; R E F E R T O S T R U C T U R A L D R A W I N G S F O R G A U G E A N D S P A C I N G . N O N - L O A D B E A R I N G L O C K E R P A R T I T I O N . 2 1 2 " X 1 5 8 " C E E S T U D S A T 5 ' - 0 " O . C . W I T H M B C I U - P A N E L O N E S I D E . P R E F I N I S H E D M B C I D - P A N E L A T A I S L E S . C O L D F O R M E D M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S E L F - S T O R A G E S I D E A N D M B C I D - P A N E L A N D K I C K P L A T E O T H E R S I D E . W A L L P A N E L E A S I D E T O B E H E L D 1 0 " B E L O W S T R U C T U R E / C E I L I N G A S S E M B L Y A B O V E . S T U D S I Z E S H A L L B E A S F O L L O W S : U P T O 1 5 F E E T = 3 5 8 " X 1 5 8 " X 1 8 G A U P T O 2 0 F E E T = 6 " X 1 5 8 " X 1 8 G A U P T O 2 5 F E E T = 6 " X 2 " X 1 8 G A CC2 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL STORAGE SIDE AND 58"G.W.B. OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABVOE;G.W.B PER NOTE 1. 1 5 ' x 1 0 ' L O C K E R T Y P . 7 ' x 1 0 ' L O C K E R 7 A T Y P . 5 ' - 0 " 1 0 ' x 5 ' L O C K E R T Y P . 2 0 8 2 2 0 A 5 . 1 1 A 5 . 1 2 A 6 . 4 4 A 6 . 8 3 A 7 . 5 9 A 4 . 1 4 A 4 . 1 1 A 4 . 1 2 A4.13 1 0 ' x 1 0 ' L O C K E R T Y P . 5 ' x 5 ' L O C K E R T Y P . 6 B 6 A T Y P . T Y P . L K T Y P . T Y P . 5 ' x 1 0 ' L O C K E R T Y P . S I M . A 9 . 1 1 K T Y P . 15'-0"5'-0"10'-0"5'-0"10'-0"10'-0"5'-0"5'-0"10'-0"10'-0"5'-0"10'-0"10'-0"5'-0"5'-0"10'-0" 7 ' - 0 " 5'-0"10'-0"5'-0"10'-0"15'-0"10'-0"5'-0"5'-0" 2 2 1 6 18'-0"18'-0"618'-0"6 9B9B9B9B6B6B6B6B6B6B6B6B6B5'-0"5'-0"6B6B6B6B6B9B 5 ' - 0 " 5 ' - 0 " L T Y P . 9 B 9 B 9 B 9 B 9 B 6 B 6 B 6 B 6 B 6 B 6 B 6 B 6 B A 6 . 5 4 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z S E C O N D F L O O R L O C K E R P L A N A 2 . 2 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 1 1 1 22 3 3 333 T R U E N O R T H P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E T H I R D F L O O R L O C K E R P L A N 1 N N ABC131'-0"35'-6"30'-6"29'-6"35'-6"12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0" 9 ' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " E D S T A I R 1 3 2 0 R E S T R O O M 3 0 6 S T A I R 2 3 2 1 C O M M M O P / 3 0 8 S E L F - S T O R A G E 3 1 2 E L E V A T O R 4"20'-6"25'-6" 1 1 6 ' - 6 " 3 8 ' - 0 " 2 2 ' - 1 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 0 ' - 0 " 6 ' - 6 " 3 ' - 6 " 6 ' - 6 " 2 2 ' - 8 " 3 " 15'-6"4"46'-8"3'-10"4"18'-0"4"19'-0"42'-9" 3 " 3"38'-0"3" 3" 3 " 3 " CC3CC4 G J 1 H RH1 K L L 2 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . CC1 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE STORAGE SIDE AND 58" G.W.B.OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE;G.W.B. PER NOTE 16" METAL STUDS AT 24" O.C. (UNO) WITHMBCI U-PANEL OR D-PANEL AND KICKPLATE SELF-STORAGE SIDE AND D-PANELOTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL BOTH SIDES; UNFACED R-19BATT INSULATION TO STRUCTURE ABOVE.6" METAL STUDS AT 24" O.C. W I T H 5 8 " MOISTURE RESISTANCE (M. R . ) G . W . B . E A C H SIDE PER NOTE 1 TO STRU C T U R E A B O V E . 8" CMU WALL PER STRUCTU R A L D R A W I N G S ; FIRE-RESISTNACE RATED U L A S S E M B L Y PER NOTE 5.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E ABOVE; 1 HOUR FIRE - RESI S T A N C E R A T E D PER NOTE 6.3 58" METAL STUDS AT 24" O . C . W I T H 5 8 " TYPE X G.W.B. EACH SIDE T O S T R U C T U R E AND MBCI U-PANEL OR D-P A N E L A N D K I C K PLATE STORAGE SIDE; 1 HO U R F I R E - RESISTANCE RATED PER N O T E 6 . 3 - 5 / 8 " M E T A L S T U D S A T 2 4 " O . C . W I T H S I N G L E L A Y E R 5 8 " G . W . B . I N T E R I O R S I D E A N D M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S T O R A G E S I D E ; U N F A C E D R - 1 3 B A T T I N S U L A T I O N A T A L L R E S T R O O M W A L L S T O S T R U C T U R E A B O V E - P R O V I D E M O I S T U R E R E S I S T A N T G . W . B . P E R N O T E 1 . L O A D B E A R I N G L O C K E R P A R T I T I O N . 4 ' X 2 1 2 " S T E E L C E E S T U D P O S T S W I T H M B C I U - P A N E L O N E S I D E ( T Y P . ) ; R E F E R T O S T R U C T U R A L D R A W I N G S F O R G A U G E A N D S P A C I N G . N O N - L O A D B E A R I N G L O C K E R P A R T I T I O N . 2 1 2 " X 1 5 8 " C E E S T U D S A T 5 ' - 0 " O . C . W I T H M B C I U - P A N E L O N E S I D E . P R E F I N I S H E D M B C I D - P A N E L A T A I S L E S . C O L D F O R M E D M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S E L F - S T O R A G E S I D E A N D M B C I D - P A N E L A N D K I C K P L A T E O T H E R S I D E . W A L L P A N E L E A S I D E T O B E H E L D 1 0 " B E L O W S T R U C T U R E / C E I L I N G A S S E M B L Y A B O V E . S T U D S I Z E S H A L L B E A S F O L L O W S : U P T O 1 5 F E E T = 3 5 8 " X 1 5 8 " X 1 8 G A U P T O 2 0 F E E T = 6 " X 1 5 8 " X 1 8 G A U P T O 2 5 F E E T = 6 " X 2 " X 1 8 G A CC2 6" METAL STUDS AT 24" O.C. (UNO) WITHMBCI D-PANEL STORAGE SIDE AND 58"G.W.B. OTHER SIDE; UNFACED R-19 BATTINSULATION TO STRUCTURE ABVOE;G.W.B PER NOTE 1. 1 5 ' x 1 0 ' L O C K E R T Y P . 1 0 ' x 8 ' L O C K E R 7 A T Y P . 5 ' - 0 " 1 0 ' x 5 ' L O C K E R T Y P . 3 0 8 3 2 0 A 5 . 1 1 A 5 . 1 2 A 6 . 4 6 A 6 . 8 3 A 7 . 5 9 A 4 . 1 4 A 4 . 1 1 A 4 . 1 2 A4.13 1 0 ' x 1 0 ' L O C K E R T Y P . 5 ' x 5 ' L O C K E R T Y P . 6 B 6 A T Y P . T Y P . L K T Y P . T Y P . 5 ' x 1 0 ' L O C K E R T Y P . S I M . A 9 . 1 1 K T Y P . 15'-0"5'-0"10'-0"5'-0"10'-0"10'-0"5'-0"5'-0"10'-0"10'-0"5'-0"10'-0"10'-0"5'-0"5'-0"10'-0" 7 ' - 0 " 5'-0"10'-0"5'-0"10'-0"15'-0"10'-0"5'-0"5'-0" 3 0 6 3 2 1 A 6 . 5 6 A 7 . 5 5 6 18'-0"18'-0"618'-0"6 5 ' - 0 " 9B9B9B9B6B6B6B6B6B6B6B6B6B5'-0"6B6B6B6B6B9B L T Y P . 9 B 9 B 9 B 9 B 9 B 6 B 6 B 6 B 6 B 6 B 6 B 6 B 6 B S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z T H I R D F L O O R L O C K E R P L A N A 2 . 3 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 1 1 1 1 22 3 3 33 T R U E N O R T H * MINIMUM CLEAR HEIGHT IN ROOM 121 SHALL BE EQUAL OR GREATER THAN T H E T A L L E S T O V E R H E A D D O O R . P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E F I R S T F L O O R D I M E N S I O N P L A N 1 N N CT 5 12" CONCRETE TILT-UP PANEL WALL, LIGHT BROOMFINISH (EXTERIOR SIDE ONLY), PANEL EDGES TORECEIVE 34" CHAMFER ON EXTERIOR SIDE, 90 ONINTERIOR SIDE SEE NOTE 3.G 8" CMU WALL PER STRUCTURAL DRAWINGS; FIRE- RESISTANCE RATED UL ASSEMBLY PER NOTE 5.M1 HORIZONTAL META L G I R T S P E R STRUCTURAL DRA W I N G S ABC131'-0"35'-6"30'-6"29'-6"35'-6"10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " SHOWROOM100OFFICE101BREAKROOM102STO R A G E 1 0 4 S T A I R 1 1 2 0 R E S T R O O M 1 0 6 R E F U S E 1 0 5 S T O R A G E 1 1 1 S T A I R 2 1 2 1 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 S E L F - S T O R A G E 1 1 2 R M F I R E R I S E R 1 0 7 E L E V A T O R RESTROOM103ED 10'-6"10'-0" 1 0 ' - 0 " 10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 9 COUNTER PLACEMENT ANDORIENTATION PER RETAIL GROUP R E - U S E A R E A 7 ' - 0 " 8'-0" 12'-7" 7'-6"12'-6"26'-0"6'-10"10'-2"12'-8" 1 9 ' - 1 0 " 2 2 ' - 0 " 5 ' - 4 " 1 4 ' - 1 0 " 9 ' - 3 " 2 1 ' - 1 " 1 3 ' - 6 " 1 3 ' - 6 " 8 ' - 0 " 2 0 ' - 4 " 1 6 ' - 0 " 2 0 ' - 0 " 1 6 ' - 0 " 2 2 ' - 8 " 3 " 4"15'-6"4"47'-6"3'-0"3"3" 3 " 3 " 3"3"20'-5"17'-7"2'-8" 4 5 ' - 0 " 35'-0" 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . A 5 . 1 1 A 7 . 5 6 A4.13 A 8 . 3 2 A 8 . 3 2 A8.3 2 A8.3 2SIM . S I M . S I M . A 8 . 3 9 CT C T C T C T M2 INSULATED METAL P A N E L S E C U R E D T O HORIZONTAL STRU C T U R A L G I R T S W I T H INSULATION AND V A P O R / A I R B A R R I E R S P E R W A L L TYPE NOTES.HH1 3 58" METAL STUDS AT 24" O.C. WITH 58"TYPE X G.W.B. EACH SIDE TO STRUCTUREABOVE; 1 HOUR FIRE - RESISTANCE RATEDPER NOTE 6.3 58" METAL STUDS AT 24" O.C. WITH 58"TYPE X G.W.B. EACH SIDE TO STRUCTUREAND MBCI U-PANEL OR D-PANEL AND KICKPLATE STORAGE SIDE; 1 HOUR FIRE -RESISTANCE RATED PER NOTE 6.A8.3 2SIM.A8.3 2TYP.A8.3 9TYP. A 8 . 3 9 S I M . SIM. A 8 . 3 9 T Y P . A 5 . 1 2 A 8 . 3 9 T Y P . A 8 . 3 9 S I M . C T A8.3 2SIM . CT H 1 H 1 G G A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 Z-FURRING CHANN E L S S P A C E D 2 4 " O . C . W I T H INSULATION PER W A L L T Y P E N O T E S . C H A N N E L DEPTH TO MATCH I N S U L A T I O N S T H I C K N E S S . S I N G L E LAYER 5/8" GWB PE R R O O M F I N I S H S C H E D U L E . Z-FURRING CHANN E L S S P A C E D 2 4 " O . C . W I T H INSULATION PER W A L L T Y P E N O T E S . C H A N N E L DEPTH TO MATCH I N S U L A T I O N S T H I C K N E S S . PREFINISHED D-PA N E L A T C O R R I D O R S O R U - P A N E L AT STORAGE TO ST R U C T U R E A B O V E . Y3 Y2 S E E E L E V A T I O N S F O R M A T E R I A L A C C E N T S , T Y P I C A L SEE ELEVATIONSFOR MATERIALACCENTS, TYPICALSEE ELEVATIONSFOR MATERIALACCENTS, TYPICAL M 3 I N S U L A T E D M E T A L P A N E L S E C U R E D T O C O N C R E T E T I L T - U P P A N E L W A L L . M 3 M3 M 3 M 3 M 3 C T CTM3 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z F I R S T F L O O R D I M E N S I O N P L A N A 2 . 4 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 3 33 3 3 3 3 3 3 3 T R U E N O R T H P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E S E C O N D F L O O R D I M E N S I O N P L A N 1 N N ABC131'-0"35'-6"30'-6"29'-6"35'-6"12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " E D S T A I R 1 2 2 0 S T A I R 2 2 2 1 C O M M M O P / 2 0 8 S E L F - S T O R A G E 2 1 2 E L E V A T O R 9 1 ' - 0 " 5 6 ' - 0 " C A N O P Y 4"20'-6"25'-6" 1 1 6 ' - 6 " 3 8 ' - 0 " 2 2 ' - 1 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 0 ' - 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 2 ' - 8 " 3 " 15'-6"4"46'-8"3'-10"4"18'-0"4"19'-0"42'-9" 3 " 3"38'-0"3" 3 " 3 " 3"CT 5 12" CONCRETE TILT-UP PANEL WALL, LIGHT BROOMFINISH (EXTERIOR SIDE ONLY), PANEL EDGES TORECEIVE 34" CHAMFER ON EXTERIOR SIDE, 90 ONINTERIOR SIDE SEE NOTE 3.G 8" CMU WALL PER STRUCTURAL DRAWINGS; FIRE- RESISTANCE RATED UL ASSEMBLY PER NOTE 5.M1 HORIZONTAL META L G I R T S P E R STRUCTURAL DRA W I N G S 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . M2 MBCI INSULATED M E T A L P A N E L S E C U R E D T O HORIZONTAL STRU C T U R A L G I R T S W I T H INSULATION AND V A P O R / A I R B A R R I E R S P E R W A L L TYPE NOTES.HH1 3 58" METAL STUDS AT 24" O.C. WITH 58"TYPE X G.W.B. EACH SIDE TO STRUCTUREABOVE; 1 HOUR FIRE - RESISTANCE RATEDPER NOTE 6.3 58" METAL STUDS AT 24" O.C. WITH 58"TYPE X G.W.B. EACH SIDE TO STRUCTUREAND MBCI U-PANEL OR D-PANEL AND KICKPLATE STORAGE SIDE; 1 HOUR FIRE -RESISTANCE RATED PER NOTE 6. A 5 . 1 1 A 5 . 1 2 A 8 . 4 1 0 A 8 . 4 1 0 A8 . 4 1 0 A8.4 10 S I M . S I M . S I M . A8.4 10SIM. A 4 . 1 4 A 4 . 1 1 A 4 . 1 2 A4.13 G G M2 M 2 M 2 M 2 M 2 A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 S E E E L E V A T I O N S F O R M A T E R I A L A C C E N T S , T Y P I C A L S E E E L E V A T I O N S F O R M A T E R I A L A C C E N T S , T Y P I C A L SEE ELEVATIONSFOR MATERIALACCENTS, TYPICALSEE ELEVATIONSFOR MATERIALACCENTS, TYPICAL SEE ELEVATIONSFOR MATERIALACCENTS, TYPICAL S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z S E C O N D F L O O R D I M E N S I O N P L A N A 2 . 5 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 1 11 3 33 T R U E N O R T H 1 . W A T E R - R E S I S T A N T G Y P S U M W A L L B O A R D T O B E U S E D A T W E T L O C A T I O N S ( V E R I F Y L O C A T I O N S B A S E D O N P L U M B I N G W A L L S A N D P L U M B I N G F I X T U R E S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 2 . P R E F I N I S H E D D - P A N E L T O A P P L I E D O V E R A L L G Y P S U M W A L L B O A R D A T M E T A L S T U D W A L L T Y P E S T H A T O C C U R A T A I S L E S ( V E R I F Y L O C A T I O N S A S S H O W N O N T H E B U I L D I N G F L O O R P L A N S . ) 3 . 5 1 / 2 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G ( M A X ) P E R I B C C H A P T E R 7 . 4 . 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 3 H O U R F I R E - R E S I S T A N C E R A T E D P E R I B C C H A P T E R 7 . 5 . 7 5 / 8 I N C H E S E Q U I V A L E N T T H I C K N E S S - 2 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N F U L L Y G R O U T E D A N D 1 H O U R F I R E - R E S I S T A N C E R A T I N G W H E N P A R T I A L L Y G R O U T E D O R H O L L O W , P E R I B C C H A P T E R 7 O R U L D E S I G N N O . U 9 3 5 . 6 . N O N - L O A D B E A R I N G - 1 H O U R F I R E - R E S I S T A N C E U L A S S E M B L Y R A T I N G P E R G E N E R I C A S S E M B L Y G Y P S U M A S S O C I A T I O N F I L E C H A P T E R 7 . U L D E S I G N N O . U 4 1 9 C A N B E U T I L I Z E D A S A N A L T E R N A T E A S S E M B L Y . 7 . A L L W A L L A N D R O O F I N S U L A T I O N I N F O R M A T I O N S H A L L B E P E R E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 , U N L E S S N O T E D O T H E R W I S E . 8 . S E E E N E R G Y C O D E A N A L Y S I S O N T 1 . 1 F O R V A P O R A N D A I R B A R R I E R R E Q U I R E M E N T S A N D L O C A T I O N . P R O J E C T N O R T H TYPICAL WALL TYPE LIST W A L L T Y P E N O T E S 1 / 1 6 " = 1 ' - 0 " S C A L E T H I R D F L O O R D I M E N S I O N P L A N 1 N N A 5 12" CONCRETE TILT-UP PANEL WALL, LIGHT BROOMFINISH (EXTERIOR SIDE ONLY), PANEL EDGES TORECEIVE 34" CHAMFER ON EXTERIOR SIDE, 90 ONG8" CMU WALL PER STRUCTURAL DRAWINGS;FIRE - RESISTANCE RATED UL ASSEMBLYPER NOTE 5.INTERIOR SIDE SEE NOTE 3.M2 MBCI INSULATED METAL PANEL SECURED TOHORIZONTAL STRUCTURAL GIRTS WITHINSULATION AND VAPOR/AIR BARRIERS PERWALL TYPES NOTES.ABC131'-0"35'-6"30'-6"29'-6"35'-6"12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 10'-6"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"9' - 6 " 1 0 ' - 6 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 7 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 6 " 2 9 8 ' - 0 " E D S T A I R 1 3 2 0 R E S T R O O M 3 0 6 S T A I R 2 3 2 1 C O M M M O P / 3 0 8 S E L F - S T O R A G E 3 1 2 E L E V A T O R 4"20'-6"25'-6" 1 1 6 ' - 6 " 3 8 ' - 0 " 2 2 ' - 1 0 " 6 ' - 6 " 3 ' - 0 " 6 ' - 6 " 2 0 ' - 0 " 6 ' - 6 " 3 ' - 6 " 6 ' - 6 " 2 2 ' - 8 " 3 " 15'-6"4"46'-8"3'-10"4"18'-0"4"19'-0"42'-9" 3 " 3"38'-0"3" 3" 3 " 3 " A 7 . 5 6 H 1 G A 5 . 1 2 A 8 . 4 1 0 A 8 . 4 1 0 A8 . 4 1 0 A8.4 10 S I M . S I M . S I M . A8.4 10SIM. A 4 . 1 4 A 4 . 1 2 A4.13 G M2 M 2 M 2 M 2 M 2 A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 A 5 . 2 4 A 5 . 2 2 A 5 . 2 3 A 5 . 2 3 A5.2 1 A 5 . 2 3 A 5 . 1 1 S E E E L E V A T I O N S F O R M A T E R I A L A C C E N T S , T Y P I C A L S E E E L E V A T I O N S F O R M A T E R I A L A C C E N T S , T Y P I C A L SEE ELEVATIONSFOR MATERIALACCENTS, TYPICALSEE ELEVATIONSFOR MATERIALACCENTS, TYPICAL SEE ELEVATIONSFOR MATERIALACCENTS, TYPICAL S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z T H I R D F L O O R D I M E N S I O N P L A N A 2 . 6 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 1 1 11 3 33 T R U E N O R T H P R O J E C T N O R T H ROOF PLAN GENERAL NOTES 1 / 1 6 " = 1 ' - 0 " S C A L E R O O F P L A N 1 N N R O O F P L A N K E Y N O T E S 3/8" PER FT. MIN. 0 1 O U T L I N E O F I N T E R I O R S T A I R C A S E S H A F T O U T L I N E O F I N T E R I O R E L E V A T O R S H A F T L O W E A V E D R I P - E D G E T R I M 0 2 0 3 A.CONTRACTOR SHALL INFORM OWNER OF ANY METAL COMPONENTS THAT ARE DAMAGED OR UNSUITABLE FOR NEW ROOF APPLI C A T I O N . A L L MATERIALS MUST BE INVENTORIED WITHIN 48 HOURS OF DELIVERY OR CONTRACTOR WILL BE LIABLE FOR COST ASSOCIATED WIT H C O S T O F ADDITIONAL MATERIALS AND LABOR REQUIRED.B.PROVIDE PRE-FINISHED GUTTERS AND DOWNSPOUTS AT LOCATIONS INDICATED.C.METAL BUILDING COMPONENTS SHALL BE BUTER MFG. OR OWNER APPROVED EQUAL ALL TRIM COMPONENTS (DOWNSPOUTS, R A K E T R I M , GUTTERS, FLASHING, ETC.) SHALL BE PRE-FINISHED.D.ALL DETAILS SHALL CONFORM TO MANUFACTURER'S STANDARD DETAILS AND SPECIFICATIONS.E.CONTRACTOR SHALL VERIFY SHOP DRAWINGS AND DESIGN CALCULATION SEALED BY ROOFING MANUFACTURER AND/OR REGIST E R E D ENGINEER THAT MEETS BUILDING DESIGN REQUIRMENTS AND DIMENSIONS.F.ROOF PANELS SHALL BE A DOUBLE LOCKING STANDING SEAM ROOF SYSTEM, BY BUTLER MANUFACTURING.G.REFER TO MECHANICAL FOR QUANTITY OF VENTS THRU ROOF. FIELD VERIFY LOCATION OF PENETRATION IN A MANNER THAN PE N E T R A T I O N DOES NOT OCCUR AT STANDING SEAM.H.ALL DIVERTERS AND CURBS TO BE MANUFACTURED BY BUTLER SPEC OR L & M CURB (WELDED ASSEMBLIES ONLY).I.PROVIDE ROOF INSULATION AND VAPOR BARRIER PER ENERGY CODE ANALYSIS ON T1.1. PROVIDE R-5 THERMAL BLOCKS AT PURL I N S . UNLESS NOTED OTHERWISE. 0 4 0 5 0 6 0 7 0 8 0 9 1 0 D O U B L E L O C K I N G S T A N D I N G S E A M R O O F ( M E C H A N I C A L L Y S E A M E D ) W I T H G A L V A L U M E F I N I S H . N O T U S E D B U T L E R M O D U L E Z E I I F A S C I A P A N E L , 2 4 A G . N O T U S E D N O T U S E D P R E - F I N I S H E D P A R A P E T C A P C R I C K E T , T Y P 0 4 A 8 . 7 8 S I M . 0 1 0 2 0 3 03 1 0 0 9 0 6 0 9 0909 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z R O O F P L A N A N D N O T E S A 3 . 1 3 3 E C A 0 ' - 0 " 1 s t F L O O R F . F . E . 1 2 ' - 6 " 2 n d F L O O R F . F . E . 2 3 ' - 2 " 3 r d F L O O R F . F . E . 3 9 ' - 3 " T O P O F P A R A P E T 3 8 ' - 3 " T . O . P U R L I N H I G H S I D E 4 2 ' - 2 " T O P O F P A R A P E T 3 4 ' - 2 " T . O . P U R L I N L O W S I D E G E N E R A L N O T E S A - B - C - D - F - C O L O R F I N I S H L E G E N D 1 - - 2 - 3 4 - 5 - 6 - C O L O R : P R E - F I N I S H E D M B C I " U - H A U L " G R E E N C O L O R : A T A S " B O N E W H I T E " G - H - B E S T P A N E L C O M P A N Y R E V O L U T I O N S E R I E S T U M B L E D 1 ' H x 4 3 ' W x 2 ' D M E T A L C A N O P Y E - A T A S W O O D L A N D S E R I E S H O R I Z O N T A L S H I P L A P P A N E L I N G M A T E R I A L F I N I S H L E G E N D K E Y E D N O T E S X 1 . G E N E R A L C O N T R A C T O R T O C O O R D I N A T E E L E C T R I C A L C O N D U I T L A Y O U T A N D L O C A T I O N S W I T H S I G N A G E C O N T R A C T O R . 2 . S I G N A G E P R O V I D E D A N D I N S T A L L E D U N D E R A S E P A R A T E P E R M I T . 3 . G E N E R A L C O N T R A C T O R S H A L L S U B M I T P A I N T S A M P L E S T O T H E A R C H I T E C T P R I O R T O A P P L I C A T I O N O R O R D E R I N G F O R A P P R O V A L . 4 . P A I N T A L L E X T E R I O R S U R F A C E S , I N C L U D I N G H A N D R A I L S , C O N D U I T , J - B O X E S , R O O F S C R E E N W A L L S , E T C . I N C L U D I N G T R A S H E N C L O S U R E . 5 . S E E S P E C I F I C A T I O N M A N U A L F O R A D D I T I O N A L I N F O R M A T I O N . 6 . A L L M E T A L R O O F I N G , C O P I N G , P A R A P E T F L A S H I N G A N D M E T A L G U T T E R S S H A L L B E P A I N T E D T O M A T C H C O L O R L E G E N D . S U B M I T S A M P L E S T O A R C H I T E C T F O R A P P R O V A L P R I O R T O P L A C I N G O R D E R . 0 1 E X T E R I O R M E T A L S T A I R R O O F L I N E B E Y O N D E X P A N S I O N J O I N T S I D E - H I N G E D H . M . D O O R - S E E D O O R S C H E D U L E A U T O S L I D I N G D O O R - S E E D O O R S C H E D U L E S E C T I O N A L O V E R H E A D D O O R - S E E D O O R S C H E D U L E R O L L - U P D O O R - S E E D O O R S C H E D U L E W A L L M O U N T E D L I G H T F I X T U R E ( B O T . @ 8 ' - 0 " A . F . F . ) , T Y P . - S E E E L E C T R I C A L E X H A U S T F A N L O U V E R - S E E M E C H A N I C A L 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 L I G H T S A N D B L A S T A G G R E G A T E C O N C R E T E C O L O R : S W " E G G S H E L L B L A C K " 7 - 8 - C O L O R : S W 6 7 6 7 " A Q U A R I U M " 1 / 1 6 " = 1 ' - 0 " S C A L E S O U T H B U I L D I N G E L E V A T I O N 1 1 / 1 6 " = 1 ' - 0 " S C A L E N O R T H B U I L D I N G E L E V A T I O N 2 1 / 1 6 " = 1 ' - 0 " S C A L E W E S T B U I L D I N G E L E V A T I O N 3 1/ 1 6 " = 1 ' - 0 " S C A L E EAST BUILDING ELEVATION 4 G 7 A 1 6 A 16 E 5 5 5 4 4 5 6 6 6 6 8 H 8 8 66 4441 1 1 C O L O R : A T A S " S A N D S T O N E " C O L O R : A T A S " W A L N U T " C O L O R : A T A S " G A L V A L U M E " C O L O R : R E G A L O A K 9 - 1 0 - C O L O R : S W 6 4 5 1 " N U R T U R E G R E E N " A T A S R I G I D W A L L I I M F N 1 6 0 & M F N 1 2 1 H O R I Z O N T A L P A N E L I N G A T A S I S O L E R E N M L S T U C C O E M B O S S E D V E R T I C A L P A N E L I N G C O N C R E T E T I L T W A L L 2 ' H x 5 6 ' W x 1 0 ' D M E T A L C A N O P Y A T A S R I G I D W A L L M F N I I 1 2 2 H O R I Z O N T A L P A N E L I N G I - J - N O T U S E D M E T A L T R I M 1 2 " H I G H R O L L - U P D O O R - S E E D O O R S C H E D U L E K - I 1 I 1 - 2 3 3 4 4 62 1 1 - C O L O R : S I E R R A S U N S E T A 2 A 1 A 2 H 8 H 8G7 G 7 L 8 L 8 F 6 L - 6 " H x 3 " D A R C H I T E C T U R A L D E T A I L S F 6 C 3 D 15 C 3 B 4 A 10A10 A 2 D 1 5 B 4 A 10D15 L 8 L 8 F 6 K 1 1 K 1 1 K 1 1 K 1 1 K 1 1 K 1 1 C 3 D 4 A 16A16K11K11K11K11K11K11K11 A 1 F 6 F 6 A 10A8A14A1042'-3"TOP OF PARAPET(BEYOND)0'-0"1st FLOOR F.F.E.12'-6"2nd FLOORF.F.E.23'-2"3rd FLOOR F.F.E.39'-3"TOP OF PARAPET35'-10"T.O. PURLIN LOW SIDE 1 3 1 95 1 310'-0"1st FLOOR F.F.E.12'-6"2nd FLOOR F.F.E.23'-2"3rd FLOOR F.F.E.39'-3"TOP OF PARAPET 4 2 ' - 3 " T O P O F P A R A P E T 22 1 7 1 1 5 0 ' - 0 " 1st F L O O R F . F . E . 1 2 ' - 6 " 2nd F L O O R F . F . E . 2 3 ' - 2 " 3rd F L O O R F . F . E . 3 8 ' - 3 " TOP O F P A R A P E T 4 2 ' - 2 " TOP OF PARAP E T ( B E Y O N D ) 34'-2"T.O. PURLINLOW SIDE ECAD J 10J12 1 2 - C O L O R : S W 6 4 5 0 ' E A S Y G R E E N " 1 3 - C O L O R : S W 6 4 4 4 " T O P I A R Y T I N T " 1 4 - C O L O R : S W 6 4 5 5 " F L E E T I N G G R E E N " 1 5 - C O L O R : A T A S " S I E R R A T A N " 1 6 C O L O R : S W 7 0 7 0 " S I T E W H I T E " - A 16 7 A 1 6 A 8 A 13A12A10A12A10A10A8A10A10I1A12 B 4 A 1 0 A 1 2 A 1 0 A 1 0 A 1 2 1 1 A 1 0 A 1 2 A 8 A 1 0 A 1 2 A 1 0 A 8 A 1 0 A 1 0 A 1 2 A 1 2 A 1 3 A 8 A 1 4 A 16 J 10J10J12J10A2A16 A 1 6 A 1 0 A 2 D 1 5 A 1 0 B 4 C 3 A 1 2 A 8 A 1 0 A 1 2 A 1 0 A 8 A 1 0 A 1 2 A 1 0 A 1 2 A 1 3 A 8 A 1 4 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z B U I L D I N G E L E V A T I O N S B U I L D I N G A A 4 . 1 E L E V A T I O N S S H O W N A R E B A S E D O F F O F T H E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K ( D S D B O O K ) . P R I O R T O O R D E R I N G A N D I N S T A L L A T I O N O F M A T E R I A L , C O O R D I N A T E W I T H T H E L A T E S T D S D B O O K . C O N T A C T F A C I L I T Y I M A G I N G G R O U P , O W N E R S R E P , A N D A R C H I T E C T I F A N Y E X T E R I O R M E C H A N I C A L , E L E C T R I C A L , P L U M B I N G , O R O T H E R C O N F L I C T S E X I S T . 3 3 3 3 123456781011 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 942'-3"TOP OF PARAPET(BEYOND)0'-0"1st FLOOR F.F.E.12'-6"2nd FLOORF.F.E.23'-2"3rd FLOOR F.F.E.39'-3"TOP OF PARAPET35'-10"T.O. PURLIN LOW SIDE E C A B D 0 ' - 0 " 1 s t F L O O R F . F . E . 1 2 ' - 6 " 2 n d F L O O R F . F . E . 2 3 ' - 2 " 3 r d F L O O R F . F . E . 3 8 ' - 3 " T . O . P U R L I N H I G H S I D E 4 2 ' - 2 " T O P O F P A R A P E T 3 9 ' - 3 " T O P O F P A R A P E T 3 4 ' - 2 " T . O . P U R L I N L O W S I D E D Z B U I L D I N G S E C T I O N S A 5 . 1 1 / 1 6 " = 1 ' - 0 " S C A L E B U I L D I N G S E C T I O N 1 1 / 1 6 " = 1 ' - 0 " S C A L E B U I L D I N G S E C T I O N 2 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 1 / 2 " = 1 ' - 0 " S C A L E W A L L S E C T I O N 1 1 / 2 " = 1 ' - 0 " S C A L E W A L L S E C T I O N 2 1 / 2 " = 1 ' - 0 " S C A L E W A L L S E C T I O N 3 1/2" = 1'-0"SCALEWALL SECTION4 S E E E L E V . T . O . P A R A P E T S E E E L E V . F I N . 3 R D F L O O R S E E E L E V . F I N . 1 S T F L O O R S E E E L E V . T . O . P A R A P E T S E E E L E V . T . O . S L A B 3 R D F L O O R S E E E L E V . T . O . S L A B 2 N D F L O O R S E E E L E V . T . O . S L A B 1 S T F L R S E E E L E V . T . O . P A R A P E T S E E E L E V . T . O . S L A B 3 R D F L O O R S E E E L E V . T . O . S L A B 2 N D F L O O R S E E E L E V . T . O . S L A B 1 S T F L R SEE ELEV.T.O.PARAPETSEE ELEV.T.O.SLAB 3RD FLRSEE ELEV.T.O.SLAB 2ND FLRSEE ELEV.T.O.SLAB 1ST FLR +14'-0"BOTTOM OF CANOPY S I N G L E S K I N M E T A L P A N E L O V E R I M P A N D F R A M I N G P E R S T R U C T U R A L , T Y P . S I N G L E S K I N M E T A L P A N E L O V E R I M P A N D F R A M I N G P E R S T R U C T U R A L , T Y P . C O N C R E T E T I L T P A N E L P E R S T R U C T U R A L C O N C R E T E S L A B O V E R C O N T . V A P O R B A R R I E R A N D A B C , T Y P . I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . C O N C R E T E T I L T P A N E L T Y P . W I N D G I R T P E R S T R U C T U R A L , T Y P I C A L S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . W I N D G U R T P E R S T R U C T U R A L , T Y P I C A L S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . C O N C R E T E S L A B O V E R C O N T . V A P O R B A R R I E R A N D A B C , T Y P . I N T E R I O R F I N I S H P E R P L A N S WIND GIRT P E R STRUCTURA L , T Y P I C A L STRUCTURE B E Y O N D , SEE STRUCT U R A L FLOOR S L A B , T Y P . WIND GURT P E R STRUCTURA L , T Y P I C A L STRUCTURE B E Y O N D , SEE STRUCT U R A L FLOOR S L A B , T Y P . CONCRETE S L A B O V E R CONT. VAPO R B A R R I E R A N D ABC, TYP.INTERIOR FI N I S H PER PLANS I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . I M P O V E R C O N C R E T E T I L T P A N E L T Y P . WIND GIRT PERSTRUCTURAL, TYPICALSTRUCTURE BEYOND,SEE STRUCTURALFLOOR SLAB, TYP.WIND GURT PERSTRUCTURAL, TYPICALSTRUCTURE BEYOND,SEE STRUCTURALFLOOR SLAB, TYP.CONCRETE SLAB OVERCONT. VAPOR BARRIER ANDABC, TYP.INTERIOR FINISHPER PLANS SINGLE SKIN METAL PANELOVER IMP AND FRAMING PERSTRUCTURAL, TYP.SINGLE SKIN METAL PANELOVER IMP AND FRAMING PERSTRUCTURAL, TYP.SINGLE SKIN METAL PANELOVER IMP AND FRAMING PERSTRUCTURAL, TYP.CONCRETE TILT PANELTYP. S E E E L E V . T . O . S L A B 2 N D F L O O R 10'-0" S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z W A L L S E C T I O N S A 5 . 2 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S 1 11 1 1 1 S E E E L E V . T . O . P A R A P E T S E E E L E V . T . O . S L A B 3 R D F L O O R S E E E L E V . T . O . S L A B 1 S T F L R + 8 ' - 6 " B O T T O M O F C A N O P Y 3 ' - 0 " S E E E L E V . T . O . S L A B 2 N D F L O O R S E E E L E V . T . O . P U R L I N L O W S I D E S E E E L E V . T . O . S L A B 3 R D F L O O R S E E E L E V . T . O . S L A B 1 S T F L R S E E E L E V . T . O . S L A B 2 N D F L O O R S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . W I N D G U R T P E R S T R U C T U R A L , T Y P I C A L S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . C O N C R E T E S L A B O V E R C O N T . V A P O R B A R R I E R A N D A B C , T Y P . S I N G L E S K I N M E T A L P A N E L O V E R I M P A N D F R A M I N G P E R S T R U C T U R A L , T Y P . S I N G L E S K I N M E T A L P A N E L O V E R I M P A N D F R A M I N G P E R S T R U C T U R A L , T Y P . C O N C R E T E S L A B O V E R C O N T . V A P O R B A R R I E R A N D A B C , T Y P . G L A Z I N G S Y S T E M T Y P . C O N C R E T E T I L T P A N E L T Y P . C A N O P Y I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . I M P O V E R F R A M I N G P E R S T R U C T U R A L , T Y P . C O N C R E T E T I L T P A N E L , T Y P . W I N D G I R T P E R S T R U C T U R A L , T Y P I C A L S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . W I N D G U R T P E R S T R U C T U R A L , T Y P I C A L S T R U C T U R E B E Y O N D , S E E S T R U C T U R A L F L O O R S L A B , T Y P . W I N D G I R T P E R S T R U C T U R A L , T Y P I C A L I N T E R I O R F I N I S H , P E R P L A N S 1 / 2 " = 1 ' - 0 " S C A L E W A L L S E C T I O N 5 1 / 2 " = 1 ' - 0 " S C A L E W A L L S E C T I O N 6 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z W A L L S E C T I O N S A 5 . 3 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S 1 1 1 1 N N S I M . T Y P . T Y P . S I M . S I M . T Y P . S I M . 1 2 3 4 5 6 7 8 9 1 0 ABC 9 ' - 0 " 9 ' - 0 " 9 ' - 0 " 9 ' - 0 " 9 ' - 0 " 8 ' - 0 " 5 3 ' - 0 " 4'-6" 7'-1"12'-1" 7 ' - 6 " 1 2 ' - 6 " 4 3 ' - 0 " 9 ' - 4 " 50'-0" 15'-6"40'-0" 2'-5" 4 4 ' - 6 " 3 0 ' - 0 " 2'-6" 2'-5"3'-8"4'-8" 2 ' - 0 " 6'-6" 2 ' - 5 " 5 ' - 7 " A 4 . 1 3 A 8 . 3 2 A 8 . 3 2 A 8 . 3 2 A 8 . 3 2 A 8 . 3 9 A 8 . 3 9 A 8 . 3 9 1A5. 2 1 A 5 . 1 S H O W R O O M 1 0 0 B R E A K R O O M 1 0 2 R E S T R O O M 1 0 3 O F F I C E 1 0 1 R & D A R E A 1 0 4 T Y P I C A L W A L L T Y P E L I S T 1 E N L A R G E D S H O W R O O M P L A N S C A L E 1 / 8 " = 1 ' - 0 " C C 3 C C 1 6 " M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S T O R A G E S I D E A N D 5 8 " G . W . B . O T H E R S I D E ; U N F A C E D R - 1 9 B A T T I N S U L A T I O N T O S T R U C T U R E A B O V E ; G . W . B . P E R N O T E 1 6 " M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S E L F - S T O R A G E S I D E A N D D - P A N E L O T H E R S I D E ; U N F A C E D R - 1 9 B A T T I N S U L A T I O N T O S T R U C T U R E A B O V E . C C 2 6 " M E T A L S T U D S A T 2 4 " O . C . ( U N O ) W I T H M B C I D - P A N E L S T O R A G E S I D E A N D 5 8 " G . W . B . O T H E R S I D E ; U N F A C E D R - 1 9 B A T T I N S U L A T I O N T O S T R U C T U R E A B V O E ; G . W . B P E R N O T E 1 . J 1 3 - 5 / 8 " M E T A L S T U D S A T 2 4 " O . C . W I T H S I N G L E L A Y E R 5 8 " G . W . B . I N T E R I O R S I D E A N D M B C I U - P A N E L O R D - P A N E L A N D K I C K P L A T E S T O R A G E S I D E ; U N F A C E D R - 1 3 B A T T I N S U L A T I O N A T A L L R E S T R O O M W A L L S T O S T R U C T U R E A B O V E - P R O V I D E M O I S T U R E R E S I S T A N T G . W . B . P E R N O T E 1 . R 6 " M E T A L S T U D S A T 2 4 " O . C . W I T H 5 8 " M O I S T U R E R E S I S T A N C E ( M . R . ) G . W . B . E A C H S I D E P E R N O T E 1 T O S T R U C T U R E A B O V E . C O L O R L E G E N D K E Y N O T E S 1 . 4 " S T R I P I N G - S E E C I V I L F O R L A Y O U T 2 . C U S T O M E R L O A D I N G A R E A 3 . P R E C A S T C O N C R E T E C U R B S T O P X C O L O R : S H E R W I N - W I L L I A M S " T R A F F I C Y E L L O W " 7'-6" T R U E N O R T H P R O J E C T N O R T H S E R V I C E S I N K F . R . P . P A N E L A P P L I E D T O W A L L B E H I N D S I N K F I X T U R E S 5 0 G A L . E L E C . W A T E R H E A T E R 1 8 " H I G H P L A T F O R M F O R H V A C E Q U I P M E N T ( I F R E Q ' D ) M O P S I N K A I R C O M P R E S S ( B Y O T H E R S ) C O U N T E R P L A C E M E N T A N D O R I E N T A T I O N P E R R E T A I L G R O U P C C 1 C C 3 C C 3 C C 2 J 1 J 1 J 1 J 1 R C O U N T E R P O W E R P O L E , C O O R D I N A T E W I T H U - H A U L R E T A I L G R O U P . F I E L D L O C A T E . 1 2 ' - 8 " D O N O T P O L I S H C O N C R E T E 16'-8" 3'-0" 5'-0" 1 0 ' - 6 " 1 0 4 A 1 0 4 B 1 0 4 C 1 0 0 B 1 0 0 A 1 0 3 1 0 2 1 0 1 1 1 2 3 4 5 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z E N L A R G E D S H O W R O O M A 6 . 1 S E E A 9 . # S E R I E S S H E E T S F O R S T O R A G E C O N S T R U C T I O N D E T A I L S . C O N T R A C T O R S H A L L C O N F I R M S T O R A G E L A Y O U T P R I O R T O C O N S T R U C T I O N . N O T I F Y O W N E R / A R C H I T E C T O F A N Y D I S C R E P A N C I E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R D I M E N S I O N I S T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L ( U H I ) F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . 1 1 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 F I R S T F L O O R 2 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 S E C O N D F L O O R 4 3/8" = 1'-0"SCALEINTERIOR STAIR 1 THIRD FLOOR6 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 S E C T I O N 1 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 S E C T I O N 3 3/8" = 1'-0"SCALEINTERIOR STAIR 1 SECTION5 4 A 6 . 6 V E R T I C A L C L E A R A N C E B A R R I E R S E E T 1 . 2 , 1 1 2 " D I A , R A I L S 1 2 0 A 1 2 0 B 2 2 0 3 2 0 2 A 6 . 6 6 A 6 . 6 6 A 6 . 6 3A6.60'-0"T.O. SLAB +6'-3"T.O. LANDING +12'-6"T.O. LANDING +17'-10"T.O. LANDING +23'-2"T.O. LANDING5'-4"(10 RISERS AT 6.40")5'-4"(10 RISERS AT 6.40")6'-3"(11 RISERS AT 6.81")6'-3"(11 RISERS AT 6.81") 0 ' - 0 " T . O . S L A B + 6 ' - 3 " T . O . L A N D I N G + 1 2 ' - 6 " T . O . L A N D I N G + 1 7 ' - 1 0 " T . O . L A N D I N G + 2 3 ' - 2 " T . O . L A N D I N G 5'-4" (10 RISERS AT 6.40") 5'-4" (10 RISERS AT 6.40") 6'-3" (11 RISERS AT 6.81") 6'-3" (11 RISERS AT 6.81") 0 ' - 0 " T . O . S L A B + 6 ' - 3 " T . O . L A N D I N G + 1 2 ' - 6 " T . O . L A N D I N G + 1 7 ' - 1 0 " T . O . L A N D I N G + 2 3 ' - 2 " T . O . L A N D I N G 5'-4" (10 RISERS AT 6.40") 5'-4" (10 RISERS AT 6.40") 6'-3" (11 RISERS AT 6.81") 6'-3" (11 RISERS AT 6.81") 120B 220 320 2 A 6 . 6 5A6.6 1 A 6 . 6 7 ' - 0 " 3 ' - 0 " 2 ' - 4 " 8 ' - 3 " ( 9 T R E A D S @ 1 1 " ) 6 ' - 2 " L A N D I N G 4 ' - 3 " L A N D I N G 8 " 1 8 ' - 8 " 4'-0"10"4'-0"3"3" G G A 6 . 7 7 C T 9'-4" 1 2 1 1 1 3 1 2 0 A 2 0 ' - 0 " 1 2 0 B S I M . 8 " G A 6 . 7 1 S I M . 3 A 6 . 4 5 A 6 . 4 1 A 6 . 4 S T A I R 1 1 2 0 7 ' - 0 " 3 ' - 0 " 2 ' - 4 " 8 ' - 3 " ( 9 T R E A D S @ 1 1 " ) 6 ' - 2 " L A N D I N G 4 ' - 3 " L A N D I N G 8 " 1 8 ' - 8 " 4'-0"10"4'-0"3"3" G G A 6 . 7 7 S T A I R 1 2 2 0 M 2 9'-4" 1 2 1 1 1 3 2 2 0 2 0 ' - 0 " S I M . 8 " G A 6 . 7 1 S I M . 3 A 6 . 4 5 A 6 . 4 1 A 6 . 4 7'-0"3'-0"2'-4"8'-3" (9 TREADS @ 11")6'-2" LANDING4'-3" LANDING 8"18'-8"4'-0"10"4'-0"3"3"GGA6.7 7STAIR 1 320 M29'-4"121113 20'-0"320 SIM.8"GA6.7 1SIM.3A6.4 5A6.4 1A6.4 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . A L L E X T E R I O R M E T A L F A B R I C A T I O N S E X P O S E D T O W E A T H E R S H A L L B E G A L V A N I Z E D . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S B G D Z E N L A R G E D S T A I R P L A N S A N D S E C T I O N S A 6 . 4 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1111 1 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 F I R S T F L O O R 2 3 / 8 " = 1 ' - 0 " S C A L E I N T E R I O R S T A I R 1 S E C O N D F L O O R 4 3/8" = 1'-0"SCALEINTERIOR STAIR 1 THIRD FLOOR6 3 / 8 " = 1 ' - 0 " S C A L E E X T E R I O R S T A I R E L E V A T I O N 1 3 / 8 " = 1 ' - 0 " S C A L E E X T E R I O R S T A I R E L E V A T I O N 3 3/8" = 1'-0"SCALEINTERIOR STAIR 1 SECTION5A6.6 4SIM. A 6 . 7 6 S I M . A 6 . 7 6 S I M . 4'-6" LANDING 1'-0"4'-6" LANDING 10'-0" 3 " 4 ' - 5 " 9 ' - 2 " ( 1 0 T R E A D S @ 1 1 " ) 6 ' - 4 " 3 " 320A3"4'-5"9'-2"(10 TREADS @ 11")6'-4"3" 2 ' - 6 " 1 ' - 3 " 8 ' - 3 " ( 9 T R E A D S @ 1 1 " ) 2 2 0 A 1 2 0 A 5 ' - 5 " 1 9 ' - 1 1 " 2 ' - 6 " 1 2 A 6 . 5 1 A 6 . 5 3 3 1 U P D O W N 4 ' - 9 " 9 ' - 2 " ( 1 0 T R E A D S @ 1 1 " ) 6 ' - 1 0 " 2 0 ' - 1 1 " 1 2 A 6 . 5 1 A 6 . 5 3 U P A 6 . 7 7 S I M . 3"4'-0" CLEAR 3"3"4'-0" CLEAR 3" 4 " 2 ' - 8 " 2 ' - 6 " 9 " 1 0 ' - 4 " 4 ' - 0 " 4 " 10'-1014" 214" 10'-4" 214" 4'-6"LANDING1'-0"4'-6"LANDING 10'-0"2'-6"1'-3"8'-3"(9 TREADS @ 11")5'-5"19'-11"2'-6"12A6.53 31UPDOWN3"4'-0"CLEAR 3"3"4'-0"CLEAR 3"A6.5 1 6'-3" (11 RISERS @ 6 13 16") 6'-3" (11 RISERS @ 6 13 16") 5'-73 8" (10 RISERS @ 6 3 4") 5'-05 8" (9 RISERS @ 6 3 4") H S S C O L U M N ( T Y P ) S T A I R S T R I N G E R ( T Y P ) 1 1 / 2 " S T E E L H A N D R A I L S T Y P I C A L 1 / 2 " S Q . S T E E L B A R P I C K E T S A T 4 " O . C . M A X T Y P I C A L 6'-3" (11 RISERS @ 6 13 16") 6'-3" (11 RISERS @ 6 13 16") 5'-73 8" (10 RISERS @ 6 3 4") 5'-05 8" (9 RISERS @ 6 3 4") G U A R D R A I L S T R I N G E R S E E S T R U C T U R A L E D G E O F B U I L D I N G 1 2 3 1 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . A L L E X T E R I O R M E T A L F A B R I C A T I O N S E X P O S E D T O W E A T H E R S H A L L B E G A L V A N I Z E D . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S B G D Z E N L A R G E D E X T E R I O R S T A I R P L A N S A N D S E C T I O N S A 6 . 5 1 1 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 0' - 3" 1 ' - 0 " 0' - 1 1/2" 0 ' - 1 1 / 2 " 1 ' - 0 " 0 ' - 5 " 0 ' - 1 1 / 2 " 1 ' - 0 " 1 - 1 / 2 " S T E E L G U A R D R A I L A S S E M B L Y 1 - 1 / 2 " Ø S T E E L H A N D R A I L A S S E M B L Y 0 ' - 1 1 / 2 " 0 ' - 1 1 / 2 " 0 ' - 6 " 0 ' - 1 1 " 3' - 0"3' - 6"0' - 1 1/2"0' - 3"3' - 0"3' - 6" 2' - 0"1' - 0" 0' - 1 1/2"0' - 3" 2' - 0"1' - 0" 3' - 6" 3' - 0" 0' - 1 1/2"0' - 3" 3' - 0" 3' - 6" 3' - 6" 3' - 0" 3' - 6" 3' - 0" 2' - 0"1' - 0 1/8" 0' - 1 1/2" 3' - 0" 1 1/2".0' - 3" 0' - 1 1 / 2 " 0' - 3 " 0' - 1 1 / 2 " 0 ' - 3 " E . Q E . Q 0 ' - 1 1 / 2 " 1 / 2 " S Q B A R P I C K E T S A T 4 " O C M A X 1 - 1 / 2 " S T E E L G U A R D R A I L A S S E M B L Y 5 / 8 " B E N T S T E E L R O D S U P P O R T 1 - 1 / 2 " S T E E L H A N D R A I L A S S E M B L Y S T E E L S T A I R A S S E M B L Y S E E S T R U C T U R A L C O N T I N U O U S 1 6 G A S H E E T M E T A L B L O C K I N G S E C U R E D T O S T U D S A T F R A M E D W A L L A S S E M L I E S I N T E R M E D I A T E H A N D R A I L W A L L B R A C K E T S M A X I M U M S P A C I N G 4 ' - 0 " O . C . 1 - 1 / 2 " Ø S T E E L H A N D R A I L R E T U R N E A C H E N D O F H A N D R A I L T O W A L L P E R D E T A I L 4 / A 6 . 7 T E R M I N A T E B L O C K I N G A T A S T U D S T E E L D E C K L A N D I N G S E E S T R U C T U R A L S T E E L C H A N N E L H E A D E R S E E S T R U C T U R A L S T E E L S T A I R A S S E M B L Y S E E S T R U C T U R A L 1 / 2 " S Q . B A R P I C K E T S A T 4 " O C M A X 1 / 2 " S Q B A R P I C K E T S A T 4 " O C M A X 1 - 1 / 2 " S T E E L G U A R D R A I L A S S E M B L Y 5 / 8 " B E N T S T E E L R O D S U P P O R T 1 - 1 / 2 " S T E E L H A N D R A I L A S S E M B L Y S T E E L S T A I R A S S E M B L Y S E E S T R U C T U R A L S T E E L S T A I R A S S E M B L Y S E E S T R U C T U R A L 1-1/2" STEEL HANDRAILASSEMBLY5/8" BENT STEELROD SUPPORT 1/2" SQ BAR PICKETSAT 4" OC MAXSTEEL STAIRASSEMBLY SEESTRUCTURALSTEEL DECKLANDING SEESTRUCTURALSTEEL CHANNEL HEADERSEE STRUCTURAL 1 - 1/2" STEELGUARDRAIL ASSEMBLY 1 " = 1 ' - 0 " S C A L E T Y P I C A L W A L L M O U N T E D H A N D R A I L 2 1 " = 1 ' - 0 " S C A L E T Y P I C A L S T A I R A T S L A B 1 1 " = 1 ' - 0 " S C A L E T Y P I C A L S T A I R A T L A N D I N G 3 1 " = 1 ' - 0 " S C A L E T Y P I C A L S T A I R W I T H G U A R D R A I L 4 1" = 1'-0"SCALETYPICAL STAIR AT INTERMEDIATE LANDING53" = 1'-0"SCALETYPICAL STAIR TREAD AND RISER DETAIL6 0' - 1"PER PLAN PER PLAN 12GA STEELPLATE RISERSTEEL CHECKERPLATE TREADS TYP.STEEL STRINGERSEE STRUCTURALTREAD SUPPORTSEE STRUCTURAL11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . A L L E X T E R I O R M E T A L F A B R I C A T I O N S E X P O S E D T O W E A T H E R S H A L L B E G A L V A N I Z E D . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S K Z B G / D Z S T A I R D E T A I L S A N D S E C T I O N S A 6 . 6 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 1 1 3 " = 1 ' - 0 " S C A L E H A N D R A I L C L R D I M S 1 F A C E O F S T R I N G E R 0 ' - 0 3 / 4 " 0 ' - 3 " 3 A 6 . 7 0 ' - 1 1 " 0 ' - 5 1 / 4 " E Q E Q F A C E O F W A L L 1 A 6 . 7 0 ' - 1 0 1 / 4 " 0 ' - 8 " 0 ' - 5 " 0 ' - 3 " 0 ' - 2 1 / 4 " 0 ' - 1 1 / 2 " 0 ' - 1 1 / 2 " 1 A 6 . 7 0' - 1 1/2"0' - 6" 0' - 3 3/16" 0' - 5" 0' - 0 3/4" 0' - 1 1/2" 0' - 10" 0' - 11 1/2" 1' - 2 1/2" 0' - 0 3/4" 0' - 1 1/2" 0' - 11"0' - 11" 1 . S T A I R S S H A L L F O L L O W T H E N A T I O N A L A R C H I T E C T U R A L A S S O C I A T I O N O F M E T A L M A N U F A C T U R E R S ( N A A M M ) M E T A L S T A I R S M A N U E L F O R S T R A I G H T S T A I R S . 2 . S E E A R C H I T E C T U R A L A N D S T R U C T U R A L D R A W I N G S . S E R V I C E C L A S S F O R A L L S T A I R S , H A N D R A I L S , G U A R D R A I L S , L A D D E R S , A N D I N T E R M E D I A T E R A I L I N G 3 . C O N T R A C T O R S H A L L P E R F O R M A S I T E V I S I T R E Q U I R E D T O C O N F I R M F I N A L L O C A T I O N S A N D S I Z E S O F M A T E R I A L S . N O T I F Y O W N E R O F A N Y D I S C R E P A N C I E S . 4 . S H O P D R A W I N G S S H A L L B E P R O V I D E D A N D A P P R O V E D I N W R I T I N G P R I O R T O A N Y F A B R I C A T I O N . 5 . E X T E R I O R S T A I R S T O B E G A L V A N I Z E D A N D I N T E R I O R S T A I R P A I N T E D S T E E L S T A I R S S E E F I N I S H S C H E D U L E . 6 . S E E S H E E T S A 6 . 4 T O A 6 . 5 F O R A D D I T I O N A L I N F O R M A T I O N . 1 - 1 / 2 " S T E E L H A N D R A I L A S S E M B L Y 5 / 8 " B E N T S T E E L R O D S U P P O R T I N T E R M E D I A T E G U A R D R A I L 1 - 1 / 2 S T E E L G U A R D R A I L A S S E M B L Y 5 / 8 " B E N T S T E E L R O D S U P P O R T 1 - 1 / 2 S T E E L H A N D R A I L A S S E M B L Y R E T U R N H A N D R A I L T O G U A R D R A I L 5 / 8 " B E N T S T E E L R O D S U P P O R T E D G E O F S T A I R T R E A D 1 - 1 / 2 S T E E L H A N D R A I L A S S E M B L Y 1 - 1 / 2 S T E E L G U A R D R A I L A S S E M B L Y 1 - 1 / 2 S T E E L G U A R D R A I L A S S E M B L Y E D G E O F S T A I R T R E A D H S S S T E E L C O L U M N T E R M I N A T E S A T S T R I N G E R B E L O W 5 / 8 " B E N T S T E E L R O D S U P P O R T 1 - 1 / 2 S T E E L H A N D R A I L A S S E M B L Y 3 " = 1 ' - 0 " S C A L E H A N D R A I L A T H S S C O L 2 3 " = 1 ' - 0 " S C A L E H A N D R A I L A T W A L L 3 1 1 / 2 " = 1 ' - 0 " S C A L E S T A I R D E T A I L 7 1 1 / 2 " = 1 ' - 0 " S C A L E S T A I R D E T A I L 6 1 1 / 2 " = 1 ' - 0 " S C A L E S T A I R D E T A I L 5 1 1 / 2 " = 1 ' - 0 " S C A L E H A N D R A I L D E T A I L 4 T Y P I C A L S T A I R N O T E S 0 ' - 1 1 1 / 3 2 " W E L D E D C O N N E C T I O N W E L D E D C O N N E C T I O N 1 - 1 / 2 " S T E E L H A N D R A I L W E L D E D C O N N E C T I O N W E L D E D C O N N E C T I O N 0 ' - 1 1 1 / 3 2 " H S S S T E E L C O L U M N S 1 - 1 / 2 " S T E E L H A N D R A I L 0 ' - 1 3 / 4 " M I N . F A C E O F W A L L 0 ' - 0 1 / 4 " 0' - 1 1/2" MIN 0' - 1 15/32" 0' - 1 15/32" 0' - 4" 0' - 4" 1 - 1 / 2 S T E E L G U A R D R A I L P O S T 1 - 1 / 2 S T E E L H A N D R A I L 5 / 8 " B E N T S T E E L R O D S U P P O R T 5 / 8 " B E N T S T E E L R O D S U P P O R T S T E E L O R I R O N A D A W A L L B R A C K E T ( W A G N E R # 3 4 1 9 O R E G U A L ) F I N I S H T O M A T C H H A N D R A I L F A S T E N E R - B O L T W I T H S L E E V E A N C H O R A T T I L T P A N E L O R M A S O N R Y B O L D W I T H B U T T E R F L Y A N C H O R A T S T U D W A L L A S S E M B L Y . S E E S T A I R S E C T I O N F O R B L O C K I N G I N F O R M A T I O N T Y P I C A L H A N D R A I L R E T U R N 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . A L L E X T E R I O R M E T A L F A B R I C A T I O N S E X P O S E D T O W E A T H E R S H A L L B E G A L V A N I Z E D . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S K Z B G / D Z S T A I R D E T A I L S A 6 . 7 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 1415PIT LADDER 1 4 1 5 P I T L A D D E R 4A6.5 4 A 6 . 5 NOTE: COORDINA T E E L E V A T O R J A C K , S U M P P I T , P I T L A D D E R , E T C W I T H E L E V A T O R M A N U F A C T U R E R 1415 D E T A I L N O T E S : ROOFING ASSEMBLY1' - 4" P A N E L ( 5 0 0 0 L B C A B ) P A N E L C A B L E S W I R E S T O B E I N S T A T E D B.O. PIT P A N E L CLEAR OVERHEAD12' - 9" MAX3' - 0"9' - 1" MAX.3' - 8"1' - 10"1' - 10" 4' - 3"6' - 11"4' - 0"FINISHED OPENING8' - 0"FINISHED OPENING8' - 0"FINISHED OPENING8' - 0" BUFFER BUFFER 7 , 5 0 0 P O U N D R A T E D H Y D R A U L I C P A S S E N G E R / S E R V I C E E L E V A T O R I N C O N F O R M A N C E W I T H I B C A R T I C L E S 3 0 0 1 . 2 R E F E R E N C E D S T A N D A R D S A N D 3 0 0 1 . 3 A C C E S S I B I L I T Y . F A B R I C A T E D A N D I N S T A L L E D B Y U - H A U L A P P R O V E D E L E V A T O R M A N U F A C T U R E R C U S T O M C O N F I G U R E D P E R O W N E R S P E C I F I C A T I O N S . P L A T F O R M : 8 ' - 4 " x 9 ' - 4 " C A B H E I G H T : 8 ' - 6 " M A X D O O R S : 5 ' - 0 " x 8 ' - 0 " ; M I N I M U M 1 8 G A U G E M E T A L ; F L U S H P A N E L D E S I G N ; 2 - S P E E D ; S I D E S L I D E ; R I G H T O R L E F T O P E N ; B A K E D E N A M E L F I N I S H , B L A C K H O I S T W A Y D O O R A N D F R A M E A S S E M B L Y T O B E M I N I M U M 1 H O U R F I R E R E S I S T A N C E R A T E D , T E S T E D P E R N F P A - 2 5 2 ; I N S T A L L E D I N A C C O R D A N C E W I T H N F P A - 8 0 ; I D E N T I F I E D B Y L A B E L I N G I N A C C O R D A N C E W I T H I B C A R T I C L E 7 1 5 . 4 . 6 D O O R F R A M E : 1 4 G A U G E H O L L O W M E T A L ; F I R E R E S I S T A N C E R A T E D A S A C O M P O N E N T O F A N O P E N I N G P R O T E C T I V E A S S E M B L Y . C A B I N T E R I O R : 3 / 1 6 " C H E C K E R E D P L A T E A L U M I N U M F L O O R I N G O N T O P O F P L A I N S T E E L ; S T E E L W A L L S , B A K E D E N A M E L W H I T E ; S T E E L C A R T O P , B A K E D E N A M E L W H I T E ; 2 R O W S O F 2 " X 6 " O A K R A I L I N G S O N T H R E E S I D E S , C E N T E R L I N E S A T 9 " A N D 3 8 " A B O V E F I N I S H E D F L O O R ; 2 4 - L A M P F L U O R E S C E N T F I X T U R E S ; A D A C O M P L I A N T H A N D S - F R E E T E L E P H O N E ; A D D I T I O N A L W I R I N G F O R O W N E R V I D E O E Q U I P M E N T A N D A C C E S S R E A D E R S ; A C C E S S H A T C H P O S I T I O N E D I N C E N T E R / R E A R O F C A B C E I L I N G E Q U I P M E N T : S U B S T I T U T E B I O D E G R A D A B L E H Y D R A U L I C F L U I D F O R S T A N D A R D H Y D R A U L I C F L U I D 4 . 1 0 . 2 A U T O M A T I C O P E R A T I O N - E L E V A T O R O P E R A T I O N S H A L L B E A U T O M A T I C - E A C H C A R S H A L L H A V E A S E L F - L E V E L I N G F E A T U R E T H A T W I L L A U T O M A T I C A L L Y B R I N G T H E C A R T O F L O O R L A N D I N G W I T H I N A T O L E R A N C E O F 1 / 2 " ( 1 3 m m ) U N D E R R A T E D L O A D I N G A N D Z E R O L O A D I N G C O N D I T I O N S . T H I S S E L F - L E V E L I N G F E A T U R E S H A L L B E A U T O M A T I C A N D I N D E P E N D E N T O F T H E O P E R A T I N G D E V I C E A N D S H A L L C O R R E C T F O R U N D E R T R A V E L A N D O V E R T R A V E L . 4 . 1 0 . 3 H A L L C A L L B U T T O N S - S H A L L B E C E N T E R E D A T 4 2 " ( 1 0 6 7 m m ) A B O V E F L O O R : S H A L L H A V E V I S U A L S I G N A L S T O I N D I C A T E W H E N C A L L I S R E G I S T E R E D A N D A N S W E R E D . - M I N I M U M S I Z E : 3 / 4 " ( 1 9 m m ) I N S M A L L E S T D I M E N S I O N . " U P " B U T T O N S H A L L B E A B O V E " D O W N " B U T T O N . - B U T T O N S S H A L L B E R A I S E D O R F L U S H . - O B J E C T S M O U N T E D B E N E A T H B U T T O N S S H A L L N O T P R O J E C T M O R E T H A N 4 " ( 1 0 2 m m ) F R O M T H E W A L L . 4 . 1 0 . 4 H A L L L A N T E R N S A N D C A R R I D I N G L A N T E R N S - A V I S I B L E A N D A U D I B L E S I G N A L S H A L L B E P R O V I D E D A T E A C H H O I S T W A Y E N T R A N C E T O I N D I C A T E W H I C H C A R I S A N S W E R I N G A C A L L . - A U D I B L E S I G N A L S S H A L L S O U N D O N C E F O R U P , T W I C E F O R D O W N , O R S H A L L H A V E V E R B A L A N N U N C I A T O R S T H A T S A Y " U P " O R " D O W N " . - V I S I B L E F I X T U R E S S H A L L B E M O U N T E D W I T H C E N T E R L I N E A T L E A S T 7 2 " ( 1 8 2 9 m m ) A B O V E T H E L O B B Y F L O O R . - V I S U A L E L E M E N T S S H A L L B E A T L E A S T 2 1 / 2 " ( 6 4 m m ) I N T H E S M A L L E S T D I M E N S I O N . - S I G N A L S S H A L L B E V I S I B L E F R O M T H E V I C I N I T Y O F T H E H A L L C A L L B U T T O N - I N - C A R L A N T E R N S C O N F O R M I N G W I T H T H E A B O V E R E Q U I R E M E N T S S H A L L B E A C C E P T A B L E . 4 . 1 0 . 5 C H A R A C T E R S O N H O I S T W A Y E N T R A N C E S - A L L E L E V A T O R H O I S T W A Y E N T R A N C E S S H A L L H A V E R A I S E D A N D B R A I L L E F L O O R D E S I G N A T I O N S P R O V I D E D O N B O T H J A M B S . - C H A R A C T E R S S H A L L B E C E N T E R E D 6 0 " ( 1 5 2 4 m m ) A B O V E F I N I S H F L O O R . - C H A R A C T E R S S H A L L B E 2 " ( 5 1 m m ) H I G H , R A I S E D 1 / 3 2 " ( 0 8 m m ) , U P P E R C A S E , S A N S S E R I F O R S I M P L E S E R I F T Y P E , A N D S H A L L B E A C C O M P A N I E D B Y G R A D E 2 B R A I L L E . 4 . 1 0 . 6 D O O R P R O T E C T I V E A N D R E O P E N I N G D E V I C E - E L E V A T O R D O O R S S H A L L O P E N A N D C L O S E A U T O M A T I C A L L Y . - D O O R S S H A L L H A V E A R E O P E N I N G D E V I C E T H A T W I L L S T O P A N D R E O P E N A C A R D O O R I F T H E D O O R B E C O M E S O B S T R U C T E D B Y A N O B J E C T O R P E R S O N . - T H E D E V I C E S H A L L B E C A P A B L E O F C O M P L E T I N G T H E S E O P E R A T I O N S W I T H O U T R E Q U I R I N G C O N T A C T F O R A N O B S T R U C T I O N P A S S I N G T H R O U G H T H E O P E N I N G A T H E I G H T S O F 5 " ( 1 2 7 m m ) A N D 2 9 " ( 7 3 7 m m ) A B O V E F I N I S H F L O O R . - D O O R R E O P E N I N G D E V I C E S H A L L R E M A I N E F F E C T I V E F O R A T L E A S T 2 0 S E C O N D S . A F T E R S U C H I N T E R V A L , D O O R S M A Y C L O S E I N A C C O R D A N C E W I T H A S M E A 1 7 1 . 1 - 1 9 9 0 . - I F S A F E T Y D O O R E D G E S A R E P R O V I D E D I N E X I S T I N G A U T O M A T I C E L E V A T O R S , A U T O M A T I C D O O R R E O P E N I N G D E V I C E S M A Y B E O M I T T E D . 4 . 1 0 . 7 , 8 D O O R A N D S I G N A L T I M I N G F O R H A L L C A L L S A N D C A R C A L L S - T H E M I N I M U M A C C E P T A B L E T I M E F R O M N O T I F I C A T I O N T H A T A C A R I S A N S W E R I N G A C A L L U N T I L D O O R S B E G I N T O C L O S E S H A L L B E C A L C U L A T E D A S F O L L O W S : T = D / ( 1 . 5 f t / s ) O R T = D / ( 4 4 5 m m / s ) T = T I M E I N S E C O N D S D = D I S T A N C E F R O M P O I N T 6 0 " ( 1 5 2 4 m m ) D I R E C T L Y I N F R O N T O F F A R T H E S T C A L L B U T T O N T O C E N T E R L I N E O F H O I S T W A Y D O O R . - T H E M I N I M U M A C C E P T A B L E N O T I F I C A T I O N T I M E S H A L L B E F I V E S E C O N D S F O R H A L L C A L L S . - T H E M I N I M U M T I M E F O R E L E V A T O R D O O R S T O R E M A I N F U L L Y O P E N I N R E S P O N S E T O A C A R S H A L L B E T H R E E S E C O N D S . 4 . 1 0 . 9 F L O O R P L A N O F E L E V A T O R C A R S - S H A L L P R O V I D E S P A C E F O R W H E E L C H A I R U S E R S T O E N T E R T H E C A R , M A N E U V E R W I T H I N R E A C H O F C O N T R O L S , A N D E X I T T H E C A R . - D O O R S S H A L L P R O V I D E 3 6 " ( 9 1 4 m m ) C L E A R M I N I M U M . - C A B D E P T H : 5 1 " ( 1 2 9 5 m m ) M I N I M U M , W I T H 5 4 " ( 1 3 7 2 m m ) M I N I M U M F R O M R E A R O F C A B T O I N S I D E F A C E O F D O O R . - C A B W I D T H : S I D E O P E N I N G D O O R - 6 8 " ( 1 7 2 7 m m ) M I N I M U M : C E N T E R O P E N I N G D O O R - 8 0 " ( 2 0 3 2 m m ) M I N I M U M . - C L E A R A N C E B E T W E E N C A R P L A T F O R M S I L L A N D E D G E O F H O I S T W A Y L A N D I N G S H A L L B E 1 1 / 4 " ( 3 2 m m ) M A X I M U M . 4 . 1 0 . 1 0 F L O O R S U R F A C E S - S H A L L B E F I R M , S T A B L E , A N D S L I P R E S I S T A N T - I F C A R P E T I S U S E D , I T S H A L L H A V E T H E F O L L O W I N G F E A T U R E S : S H A L L B E S E C U R E L Y A T T A C H E D A F I R M C U S H I O N , P A D , O R B A C K I N G ( O R N O N E ) . A L E V E L L O O P , T E X T U R E D L O O P , L E V E L C U T P I L E , O R L E V E L C U T / U N C U T P I L E T E X T U R E . M A X I M U M P I L E T H I C K N E S S : 1 / 2 " ( 1 3 M M ) E X P O S E D E D G E S F A S T E N E D T O F L O O R S U R F A C E S W I T H C A R P E T E D G E T R I M 4 . 1 0 . 1 1 I L L U M I N A T I O N L E V E L S I L L U M I N A T I O N L E V E L A T C O N T R O L S , P L A T F O R M , T H R E S H O L D A N D L A N D I N G S H A L L B E M I N I M U M 5 F O O T C A N D L E S 4 . 1 0 . 1 2 , 1 3 C A R C O N T R O L S A N D C A R P O S I T I O N I N D I C A T O R S B U T T O N S - S I Z E : 3 / 4 " ( 1 9 m m ) M I N I M U M I N L E A S T D I M E N S I O N . - B U T T O N S S H A L L B E R A I S E D O R F L U S H . C O N T R O L I N D I C A T O R S - A L L C O N T R O L B U T T O N S S H A L L B E D E S I G N A T E D B Y B R A I L L E A N D B Y R A I S E D S T A N D A R D A L P H A B E T C H A R A C T E R S F O R L E T T E R S , A R A B I C S Y M B O L S F O R N U M E R A L S , O R S T A N D A R D S Y M B O L S A S R E Q U I R E D I N A S M E A 1 7 1 1 - 1 9 9 0 . - C H A R A C T E R S S H A L L B E 5 / 8 " ( 1 6 m m ) T O 2 " ( 5 1 m m ) H I G H , R A I S E D 1 / 3 2 " ( 0 8 m m ) , U P P E R C A S E , S A N S S E R I F O R S I M P L E S E R I F T Y P E , A N D S H A L L B E A C C O M P A N I E D B Y G R A D E 2 B R A I L L E . - A L L R A I S E D D E S I G N A T I O N S S H A L L B E I M M E D I A T E L Y L E F T O F T H E B U T T O N T O W H I C H T H E Y A P P L Y . - F L O O R B U T T O N S S H A L L B E P R O V I D E D W I T H V I S U A L S I G N A L S W H I C H L I G H T W H E N E A C H C A L L I S R E G I S T E R E D A N D E X T I N G U I S H W H E N E A C H C A L L I S A N S W E R E D . H E I G H T - A L L F L O O R B U T T O N S S H A L L B E M A X I M U M 5 4 " ( 1 3 7 2 m m ) A B O V E F L O O R W H E R E S I D E A P P R O A C H I S P R O V I D E D , 4 8 " ( 1 2 1 9 m m ) M A X I M U M W H E R E F O R W A R D A P P R O A C H I S R E Q U I R E D . - E M E R G E N C Y C O N T R O L S , I N C L U D I N G A L A R M A N D S T O P , S H A L L B E G R O U P E D A T B O T T O M O F P A N E L , W I T H C E N T E R L I N E S 3 5 " ( 8 8 9 m m ) M I N I M U M A B O V E F L O O R . L O C A T I O N - C O N T R O L S S H A L L B E L O C A T E D O N A F R O N T W A L L I F C A R S H A V E C E N T E R O P E N I N G D O O R S , A N D A T E I T H E R A S I D E W A L L O R T H E F R O N T W A L L I F C A R S H A V E S I D E O P E N I N G D O O R S . C A R P O S I T I O N I N D I C A T O R S - A V I S U A L C A R P O S I T I O N I N D I C A T O R S H A L L B E P R O V I D E D A B O V E T H E C A R C O N T R O L P A N E L O R A B O V E T H E D O O R . - A S T H E C A R P A S S E S O R S T O P S A T A F L O O R , T H E C O R R E S P O N D I N G N U M B E R S S H A L L I L L U M I N A T E A N D A N A U D I B L E S I G N A L S H A L L S O U N D . - N U M E R A L S S H A L L B E A M I N I M U M 1 / 2 " ( 1 3 m m ) H I G H . - A U D I B L E S I G N A L S H A L L B E N O L E S S T H A N 2 0 D E C I B E L S W I T H F R E Q U E N C Y N O H I G H E R T H A N 1 5 0 0 H z . - A N A U T O M A T I C V E R B A L A N N O U N C E M E N T O F T H E F L O O R N U M B E R M A Y B E S U B S T I T U T E D F O R T H E A U D I B L E S I G N A L . 4 . 1 0 . 1 4 E M E R G E N C Y C O M M U N I C A T I O N S - I F P R O V I D E D , E M E R G E N C Y T W O - W A Y C O M M U N I C A T I O N S Y S T E M S B E T W E E N T H E E L E V A T O R A N D A P O I N T O U T S I D E T H E H O I S T W A Y S H A L L C O M P L Y W I T H A S M E A 1 7 1 . 1 . - H I G H E S T O P E R A B L E P A R T O F S Y S T E M S H A L L B E M A X I M U M 4 8 " ( 1 2 1 9 m m ) F R O M F L O O R . - S Y S T E M S H A L L B E I D E N T I F I E D B Y R A I S E D S Y M B O L A N D L E T T E R I N G L O C A T E D A D J A C E N T T O T H E D E V I C E C H A R A C T E R S S H A L L B E 5 / 8 " ( 1 6 m m ) T O 2 " ( 5 1 m m ) H I G H , R A I S E D 1 / 3 2 " ( 0 . 8 m m ) , U P P E R C A S E , S A N S S E R I F O R S I M P L E S E R I F T Y P E , A N D S H A L L B E A C C O M P A N I E D B Y G R A D E 2 B R A I L L E . - I F S Y S T E M U S E S H A N D S E T , M I N I M U M C O R D L E N G T H S H A L L B E 2 9 " ( 7 3 7 m m ) . - I F L O C A T E D I N A C L O S E D C O M P A R T M E N T , D O O R S H A L L B E O P E R A B L E W I T H O N E H A N D , S H A L L N O T R E Q U I R E T I G H T G R A S P I N G , P I N C H I N G , O R T W I S T I N G O F T H E W R I S T , A N D S H A L L R E Q U I R E A M A X I M U M F O R C E O F 5 I b s . - T H E E M E R G E N C Y C O M M U N I C A T I O N S Y S T E M S H A L L N O T R E Q U I R E V O I C E C O M M U N I C A T I O N ( V O I C E - O N L Y S Y S T E M I S I N A C C E S S I B L E T O P E R S O N S W I T H S P E E C H O R H E A R I N G I M P A I R M E N T S . ) ( 7 5 0 0 L B C A B ) E L E V A T O R O P T I O N S F O R R I G H T O R L E F T C A B . E L E V A T O R T R A V E L C A B L E S / W I R E S 2 - R G - 5 9 B R A I D E D F O R V I D E O , 2 - C A M E R A P O W E R ( 2 - 1 8 A W G S T R A N D E D ) . 1 2 - 1 8 A W G S T R A N D E D W I R E S F O R A C C E S S R E A D E R . P H O N E I N C A B & L I N E T O M E C H R O O M . C A B L E S T O C A M E R A L O C A T I O N N E E D T O B E P U N C H E D T H R O U G H C O R R E C T C O R N E R O F C A B ( 7 5 0 0 L B ) I N C E N T E R F O R ( 5 0 0 0 L B ) C A B L E S F O R A C C E S S R E A D E R I N S I D E M A I N P A N E L N E E D T O B E L A B E L E D . ( F U T U R E U S E ) H A N D S F R E E P H O N E W I T H V O I C E O P T I O N P R O G R A M E L E V A T O R P H O N E # T O : 1 - 8 0 0 - 2 3 8 - 4 3 6 4 S U M P P I T E L E V A T O R J A C K B.O. ROOFT.O. PURLINSSEE ELEV.FIN. FLOOR3RD FLOORSEE ELEV.FIN. FLOOR2ND FLOORSEE ELEV.FIN. FLOOR1ST FLOOR SEAL TOP OF HOISTWAY WITHCONTINUOUS 1-HOURFIRE-RESISTANCE RATED JOINTSYSTEM TESTED IN ACCORDANCEWITH ASTM E1966 OR UL 2079 HOIST BEAM BYCONTRACTORELEVATORASSEMBLYMINIMUMREFUGESPACEOVERTRAVEL WITH 7'- 11"TOP OF CAB IN FULL TOP OVERALL CAB HEIGHTWALL TYPE PERPLANS ONSHEET A2.1WATERPROOFELEVATOR PIT,SEE SPECS.6A8.9 SIM6A8.9 SIM6A8.9 SIM6A8.9 SIM6A8.9 SIM 1 / 2 " = 1 ' - 0 " S C A L E E N L A R G E D E L E V A T O R P L A N - P I T 1 1/2" = 1'-0"SCALEELEVATOR PLAN - 2ND AND 3RD FLOORS33/16" = 1'-0"SCALEELEVATOR SECTION4 1 / 2 " = 1 ' - 0 " S C A L E E N L A R G E D E L E V A T O R P L A N - F I R S T F L O O R 2 M I N I M U M E L E V A T O R S E C U R I T Y R E Q U I R E M E N T S E L E V A T O R A D A C O M P L I A N C E G E N E R A L S P E C I F I C A T I O N S E L E V A T O R A D A C O M P L I A N C E C O N T I N U E D 1 4 P I T L A D D E R 4 A 6 . 8 1 5 11' - 4" 128 E L E V / E Q U I P R M 1 2 8 6'-5"3'-7"11'-4"11'-4" 1 1 ' - 8 " 1 ' - 8 " 11'-8"1'-8"G GG G G G G H H H 1 G 1 0 ' - 0 " 1 ' - 8 " 9 ' - 3 " 1 1 ' - 8 " 9 " 8'-8116"3'-7" 10'-0" 6'-5" S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 11/29/2021 7:04:34 PM R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S B G D Z E N L A R G E D E L E V A T O R P L A N S A N D D E T A I L S A 6 . 8 3 1 / 4 " = 1 ' - 0 " S C A L E L O A D I N G D O C K E L E V A T I O N 2 1 / 4 " = 1 ' - 0 " S C A L E L O A D I N G D O C K P L A N 1 0 1 10111213 1 4 1 5 1 6 1 7 1 8 1' - 0 1/2"9' - 0"12' - 0"12' - 0" 5 6 ' - 0 " 9 ' - 0 " 9 ' - 0 " 9 ' - 0 " 5 ' - 0 " 9 ' - 1 1 1 / 2 " 0 ' - 6 " 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0 A 6 . 1 1 2 C U S T O M E R L O A D I N G A R E A W A L L M O U N T E D L I G H T F I X T U R E - S E E E L E C T R I C A L N O T U S E D N O T U S E D D O W N S P O U T C O N C R E T E T I L T P A N E L , L I G H T B R O O M F I N I S H A T E X T E R I O R S I D E , 3 / 4 " C H A M F E R A T E X T E R I O R E D G E S C A N O P Y F R A M I N G - B Y C O N T R A C T O R E X P A N S I O N J O I N T - S E E S T R U C T U R A L D R A W I N G S F O R L O C A T I O N S L I N E O F C A N O P Y A B O V E 01 O T Y P . O 0 1 1 : 4 8 M A X I M U M S L O P E I N A L L D I R E C T I O N S A T A C C E S S I B L E P A R K I N G S P A C E A N D A C C E S S A I S L E 1 1 P R E C A S T C O N C R E T E C U R B S T O P 1 2 C A R T R A I L I M B E D P L A T E 1 3 S I D E - H I N G E D H M D O O R - S E E D O O R S C H E D U L E 1 4 A U T O S L I D I N G D O O R - S E E D O O R S C H E D U L E 1 5 S E C T I O N A L O V E R H E A D D O O R - S E E D O O R S C H E D U L E 4 " S T R I P I N G - P R O V I D E C O N T I N U O U S 4 " S T R I P A T P E R I M E T E R O F C U S T O M E R L O A D I N G A R E A S L A B F O R P A R K I N G S T A L L , S E E P L A N O R C I V I L P L A N S W H E R E P R O V I D E D O 0 1 K E Y N O T E S 3' - 6 5/8" T Y P . 1 1 01 O TYP.FACE OF DOCK FACE OF CANOPY ABOVE10 0 ' - 0 1 / 2 " A E M O N A T U R A L G R A Y C O N C R E T E C O L O R : P R E - F I N I S H E D " U - H A U L G R E E N " C O L O R : S H E R W I N - W I L L I A M S " T R A F F I C Y E L L O W " C O L O R : S H E R W I N - W I L L I A M S " C H R O M E Y E L L O W " 1 2 M T Y P . TYP. 11 0 2 O 0 1 TYP EAUP7' - 0"3' - 0" 2 ' - 1 0 " 6 ' - 5 1 / 2 " 0 ' - 6 1 / 2 " 2 A 6 . 1 2 18171615 1 4 1 3 1 2 1 1 1 0 0 ' - 6 " 06 0 9 T Y P 0 6 E T Y P S T L . C L E V I S A S S E M B L Y T Y P . 0 8 E B . O . C A N O P Y 1 4 ' - 0 " 2nd FLOOR F.F.E.06TYP.15 T Y P . 0 9 TTTTTT 0 7 A 1 3 T1st FLOOR F.F.E. 1 1 T Y P . T 0 6 T Y P . SEE ELEVATION 14 SEE ELEVATION 0 4 8' - 0"2' - 0"10' - 0"33' - 0" 5' - 0"15' - 0" S L O P E 1 : 4 8 AT FACE OF BUILDING 14' - 0" CLEAR S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z E N L A R G E D L O A D / U N L O A D P L A N A N D E L E V A T I O N A 6 . 1 1 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S F / F L O O R E L E V A S P E R P L A N S K E Y N O T E S A E N A T U R A L G R A Y C O N C R E T E C O L O R : P R E - F I N I S H E D " U - H A U L G R E E N " F O R R E I N F O R C E M E N T S E E S T R U C T U R A L C O N C S L A B A S P E R P L A N S A N D D E T A I L S 0 1 C U S T O M E R L O A D I N G A R E A 0 2 B U T L E R V S R I I R O O F 0 3 B U T L E R M O D U L E Z E I I F A S C I A P A N E L , 2 4 G A 0 4 B U T L E R B O X G U T T E R 0 5 D O W N S P O U T C O N C R E T E T I L T P A N E L , L I G H T B R O O M F I N I S H A T E X T E R I O R S I D E , 3 / 4 " C H A M F E R A T E X T E R I O R E D G E S 0 7 P R E C A S T C O N C R E T E C U R B S T O P 0 8 W A L L M O U N T E D L I G H T F I X T U R E - S E E E L E C T R I C A L 0 9 C A N O P Y F R A M I N G - S E E S T R U C T U R A L 1 0 C A N O P Y L I G H T I N G - S E E E L E C T R I C A L 0 6 1 / 4 " x 4 x 0 ' 4 " S T E E L E M B E D P L . A S S E M B L Y . M A X I M U M P M . S P A C I N G 3 2 " O . C . ( S E E S T R U C T U R A L ) 1 1 / 2 " = 1 ' - 0 " S C A L E C A R T R A I L I M B E D P L A T E A T G R A D E L E V E L D O C K 1 1 / 2 " = 1 ' - 0 " S C A L E WALL SE C T I O N A T G R A D E 2 C O L O R L E G E N D AA8.4 53rd FLOOR F.F.E.A8.6 5SIM.SEE ELEVATION sim0203E S E E L O A D I N G D O C K E L E V A T I O N T O P C A N O P Y 04A8.3 52nd FLOOR F.F.E.05 TYP.06 A SEE ELEVATION simTYP.1009 S E E L O A D I N G D O C K E L E V A T I O N S O F F I T / C A N O P Y A8.3 10 simSLOPE SEE PLAN011st FLOOR F.F.E.SEE ELEVATION 0707A8.2 8sim STL. CLEVISASSEMBLY TYP.NOTE :SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 7 8 0 4 / 1 5 / 2 0 2 2 --- -- -- -- -- -- -- -- 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 U - H A U L M O V I N G & S T O R A G E O F W E S T M E R I D I A N 1 0 3 0 W . F R A N K L I N R D . M E R I D I A N , I D 8 3 6 4 2 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:39 PM 11/29/2021 7:04:40 PM 11/29/2021 7:04:41 PM K Z B G / D Z E N L A R G E D L O A D / U N L O A D W A L L S E C T I O N A 6 . 1 2 SEE SCHEDULE3' - 4"SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE 0' - 10" SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE3' - 6"0' - 8"TT T 0' - 4" T T0' - 4"SEE SCHEDULESEE SCHE D U L E SEESCHEDULE SEE SCHEDUL E SEE SCHEDULE S E E S C H E D U L E SEESCHEDULE S E E S C H E D U L E D O O R T Y P E S SEE SCHEDU L E T T T T T S E E S C H E D U L E D O O R N O T E S 1 . A L L D O O R G L A Z I N G S H A L L B E T E M P E R E D S A F E T Y G L A S S A N D P E R M A N E N T L Y I D E N T I F I E D B Y T H E M A N U F A C T U R E R 2 . L O C K & L A T C H S E T S S H A L L H A V E L E V E R D E V I C E S F O R U S E B Y T H O S E W I T H D I S A B I L I T I E S 3 . H A N D A C T I V A T E D D O O R O P E N I N G H A R D W A R E T O B E C E N T E R E D @ 3 0 " T O 4 4 " A F F & B E O P E N E D W I T H A S I N G L E E F F O R T B Y L E V E R T Y P E H A R D W A R E 4 . M A X I M U M E F F O R T T O O P E R A T E S H A L L N O T E X C E E D 8 5 P O U N D S F O R E X T E R I O R D O O R S A N D 5 P O U N D S F O R I N T E R I O R D O O R S 5 . T H E B O T T O M 1 0 " O F A L L D O O R S S H A L L H A V E A S M O O T H U N I N T E R R U P T E D S U R F A C E 6 . A L L R E Q U I R E D E X I T D O O R W A Y S S H A L L H A V E A M I N I M U M O F 3 2 " C L E A R O P E N I N G W I T H T H E D O O R @ 9 0 ° T O T H E C L O S E D P O S I T I O N 7 . T H E M A X I M U M H E I G H T O F T H R E S H O L D T O B E 1 / 2 " M A X , V E R T I C A L C H A N G E @ E D G E I S 1 / 4 " W I T H A M A X I M U M B E V E L O F 4 5 ° I F A D O O R H A S A C L O S E R , T H E N T H E S W E E P 8 . P E R I O D O F T H E C L O S E R S H A L L B E A D J U S T E D S O T H A T F R O M A N O P E N P O S I T I O N O F 7 0 ° , T H E D O O R W I L L T A K E A T L E A S T 3 S E C O N D S T O M O V E T O A P O I N T 3 " ( 7 5 M M ) F R O M T H E L A T C H , M E A S U R E D T O T H E L E A D I N G E D G E O F T H E D O O R 9 . V E R I F Y A L L D O O R O P E N I N G S B E F O R E F A B R I C A T I O N 1 0 . E X I S T I N G E G R E S S D O O R S S H A L L R E C E I V E N E W P A N I C H A R D W A R E A S R E Q U I R E D 1 1 . A L L D O O R S U S E D F O R E G R E S S P U R P O S E S M U S T B E O P E N - A B L E F R O M T H E I N S I D E W I T H O U T T H E U S E O F S P E C I A L K N O W L E D G E O R E F F O R T TYPE 3•GLAZED SWING DOOR•FLUSH METAL•18 GA. WITH RIGID POLYSTYRENE CORE•16 GA. H M FRAME•"T" DENOTES TEMPERED SAFETY GLASS; VISION LITE•FACTORY PRIMED; FIELD PAINT PER SCHEDULE TYPE 1A•POWER SINGLE-SLIDE ENTRANCE DOOR AT STORAGE•DURA-GLIDE 2000 SERIES BY STANLEY ACCESS TECHNOLOGIES•WITH A NOMINAL 5'-0" OPENING•BLACK ANODIZED ALUMINUM FRAME•"T" DENOTES TEMPERED SAFETY GLASS•SIGN ADJACENT TO DOOR STATING "THIS DOOR MUST REMAIN UNLOCKEDDURING BUSINESS HOURS "•BREAK AWAY PANEL IN ACCORDANCE WITH IBC SECTION 1008 1 4 2•10" BOTTOM RAIL AUTO LOCKING PER SCHEDULE•NO THRESHOLD•SEE PLANS FOR DOOR OPENING DIRECTION PRIOR TO ORDERINGTYPE 4A•GENERAL PURPOSE EXTERIOR DOOR•FLUSH METAL•18 GA. WITH RIGID POLYSTYRENE CORE•16 GA. H.M. FRAME•FACTORY PRIMED; FIELD PAINT PER SCHEDULE TYPE 4•GENERAL PURPOSE EXTERIOR DOOR•FLUSH METAL•18 GA. WITH RIGID POLYSTYRENE CORE•16 GA . H.M. FRAME•FACTORY PRIMED; FIELD PAINT PER SCHEDULETYPE 5•GENERAL PURPOSE INTERIOR DOOR•FLUSH METAL•18 GA. WITH RIGID POLYSTYRENE CORE•20 GA . H.M. FRAME•FACTORY PRIMED; FIELD PAINT PER SCHEDULETYPE 6A / 6B•INTERIOR STORAGE LOCKER DOOR (UH-04)•MODEL 650 ROLL UP DOOR BY JANUS•ALUMINUM BOTTOM BAR•U-HAUL PUNCHED GUIDES AND HARDWARE•PRE-FINISHED AISLE SIDE; U-HAUL ORANGE, HIGHGLOSSTYPE 7A•INTERIOR STORAGE LOCKER DOOR (UH-16)•FLUSH METAL SWING DOOR WITH DIAGONAL BRACING•MANUFACTURED BY JANUS•SPECIAL 18 GA. FRAME•PRE-FINISHED HIGH GLOSS U-HAUL ORANGE AISLE SIDE T Y P E 9 B O V E R H E A D D O O R • S T A N D A R D - M O U N T F I X E D D O O R P A N E L B Y J A N U S • A L U M I N U M B O T T O M B A R - P E R - F I N I S H E D O N E S I D E ; U - H A U L • O R A N G E , H I G H G L O S S - Z E E - T Y P E M O U N T I N G S T R I P S / T R I M A T S T A N D A R D - M O U N T D I S P L A Y D O O R S • J - T Y P E M O U N T I N G S T R I P S / T R I M A T S U R F A C E • M O U N T D I S P L A Y D O O R S • M O U N T T Y P I C A L D O O R H A R D W A R E • A T F A C E O F D O O R P A N E L T Y P E 1 0 A I N T E R I O R L O A D / U N L O A D O V E R H E A D D O O R • M A N U F A C T U R E R : C L O P A Y • M O D E L : G D 2 L U W 1 ( V E R I F Y W R A T I N G W I T H L O C A L R E Q U I R E M E N T S ) • L O W - H E A D R O O M R E A R M O U N T E D 2 " T R A C K - F I E L D V E R I F Y • F A C T O R Y F I N I S H - C A N Y O N R I D G E U L T R A - G R A I N W A L N U T • " T " D E N O T E S T E M P E R E D S A F E T Y G L A S S P L A I N L O N G W I T H S Q U A R E G R I L L E S W I N D O W 3 R D & 4 T H S E C T I O N F R O M F I N I S H E D F L O O R ( P R O V I D E I N 3 R D P A N E L O N L Y I F H E I G H T I S 8 ' L E S S ) • M O T O R I Z E D , I N S U L A T E D S E C T I O N A L O V E R H E A D D O O R • S T R U C T U R A L F R A M E ( J A M B A N D H E A D ) • F U L L W E A T H E R S T R I P • F O L L O W I N G F E A T U R E S S H A L L B E C O O R D I N A T E D W I T H U H I C O N S T R U C T I O N P R O J E C T M A N A G E R / O W N E R S R E P R E S E N T A T I V E A N D O V E R H E A D D O O R I N S T A L L E R : 1 . M A N U A L O P E N / C L O S E / S T O P B U T T O N S 2 . E L E C T R I C O P E R A T O R C O N T R O L S 3 . M I L L E R E D G E S A F E T Y E D G E P N : M E - 1 2 3 - T 2 - U . A L S O I N C L U D E S : M I L L E R E D G E A L U M I N U M R E T A I N E R P N : M E - 1 2 3 - C A 3 A L W A Y S O R D E R T H E M I L L E R E D G E C U T L E N G H T T H E S A M E W I D T H O F D O O R S E C T I O N 4 . M I L L E R E D G E W I R E L E S S R E C E I V E R K I T P N : R B - P - 1 0 K ( T R A N S M I T T E R & R E C E I V E R K I T ) 5 . L I F T M A S T E R M O N I T O R E D L I G H T C U R T A I N P N : L C - 3 6 M I N S T A L L E D A T W A R E H O U S E D O O R S O N L Y 6 . L I F T M A S T E R A D D I T I O N A L I N T E R F A C E C A R D P N : C P S 3 C A R D 7 . A D D I T I O N A L L I M I T S W I T C H K I T P N : K 7 2 0 1 2 5 1 5 - 1 8 . S A F E T Y M O T I O N / T R I G G E R B E A M ( 1 ) B E A 1 2 4 0 M O T I O N L O W V O L T A G E ( D O O R S A F E T Y / T R I G G E R B E A M ) I N S I D E & O U T · F O L L O W I N G F E A T U R E S H A L L B E C O O R D I N A T E D W I T H S E C U R I T Y V E N D O R P E R S E C U R I T Y L A Y O U T P L A N ( Q - D R A W I N G ) : A N D S H A L L B E I N S T A L L E D A T W A R E H O U S E D O O R S O N L Y 1 . S E C U R I T Y A C C E S S T R I G G E R O N E A C H D O O R ( W I E G A N D & D O O R K I N G ) I N S T A L L E D B Y S E C U R I T Y V E N D E R . T Y P E 1 1 • R E F U S E D O O R • I N S U L A T E D S E C T I O N A L O V E R H E A D D O O R • M O D E L 5 2 4 S ; M A N U F A C T U R E D B Y C L O P A Y • J A M B / W A L L M O U N T E D R A I L S • F A C T O R Y P R I M E D ; P A I N T E R E X T E R I O R O F D O O R P E R S C H E D U L E T T T T T T T T T T T T T T T T T T T T T T T T T T T T Y P E 1 0 O V E R H E A D D O O R • M A N U F A C T U R E R : C L O P A Y • M O D E L : 3 7 2 4 W 1 ( V E R I F Y W R A T I N G W I T H L O C A L R E Q U I R E M E N T S ) • " T " D E N O T E S T E M P E R E D S A F E T Y G L A S S F U L L V I E W 3 R D S E C T I O N F R O M F I N I S H E D F L O O R . • M O T O R I Z E D , I N S U L A T E D S E C T I O N A L O V E R H E A D D O O R • S T R U C T U R A L F R A M E ( J A M B A N D H E A D ) • V E R T I C A L R A I L S U N L E S S N O T E D O T H E R W I S E . F I E L D V E R I F Y • F U L L W E A T H E R S T R I P • F O L L O W I N G F E A T U R E S S H A L L B E C O O R D I N A T E D W I T H U H I C O N S T R U C T I O N P R O J E C T M A N A G E R / O W N E R S R E P R E S E N T A T I V E A N D O V E R H E A D D O O R I N S T A L L E R : 1 . M A N U A L O P E N / C L O S E / S T O P B U T T O N S 2 . E L E C T R I C O P E R A T O R C O N T R O L S 3 . M I L L E R E D G E S A F E T Y E D G E P N : M E - 1 2 3 - T 2 - U . A L S O I N C L U D E D S : M I L L E R E D G E A L U M I N U M R E T A I N E R P N : M E - 1 2 3 - C A 3 A L W A Y S O R D E R T H E M I L L E R E D G E C U T L E N G H T T H E S A M E W I D T H O F D O O R S E C T I O N 4 . M I L L E R E D G E W I R E L E S S R E C E I V E R K I T P N : R B - P - 1 0 K ( T R A N S M I T T E R & R E C E I V E R K I T ) 5 . L I F T M A S T E R M O N I T O R E D L I G H T C U R T A I N P N : L C - 3 6 M I N S T A L L E D A T W A R E H O U S E D O O R S O N L Y 6 . L I F T M A S T E R A D D I T I O N A L I N T E R F A C E C A R D P N : C P S 3 C A R D 7 . S A F E T Y M O T I O N / T R I G G E R B E A M ) I N S I D E & O U T · F O L L O W I N G F E A T U R E S H A L L B E C O O R D I N A T E D W I T H S E C U R I T Y V E N D O R P E R S E C U R I T Y L A Y O U T P L A N ( Q - D R A W I N G ) : A N D S H A L L B E I N S T A L L E D A T 1 . T R I G G E R N E O - D S C W I R E L E S S T R A N S C E I V E R W / K E Y P H O B . I N S T A L L E D B Y S E C U R I T Y V E N D O R S E E S C H E D U L E SEE SCHEDULE T Y P E 2 1 A • P O W E R S I N G L E - S L I D E S U R F A C E M O U T N E D E N T R A N C E D O O R A T S T O R A G E . • D U R A - G L I D E 2 0 0 0 S E R I E S B Y S T A N L E Y A C C E S S T E C H N O L O G I E S . • B L A C K A N O D I Z E D A L U M I N U M F R A M E . • " T " D E N O T E S T E M P E R E D S A F E T Y G L A S S . • S I G N A D J A C E N T T O D O O R S T A T I N G " T H I S D O O R M U S T R E M A I N U N L O C K E D D U R I N G B U S I N E S S H O U R S . " • B R E A K A W A Y P A N E L I N A C C O R D N A C E W I T H I B C S E C T I O N 1 0 1 0 . 1 . 4 . 2 . • U - F A C T O R : 0 . 2 1 0 . • 1 0 " B O T T O M R A I L . • A U T O L O C K I N G P E R S C H E D U L E . • N O T H R E S H O L D . • S E E P L A N S F O R D O O R O P E N I N G D I R E C T I O N P R I O R T O O R D E R I N G . 0' - 10" SEE SCHEDULE S E E S C H E D U L E S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:39 PM A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S K Z B G / D Z D O O R T Y P E S A 7 . 0 3 3 J A M B A N C H O R S S E A L A N T O N A L L E D G E S D O O R A S S C H E D U L E D F R A M E A S S C H E D U L E D S C H E D . O P E N I N G M E T A L S T U D S M E T A L R U N N E R M E T A L R U N N E R M E T A L C H A N N E L S S C H E D U L E D W A L L T Y P E SCHEDULED WALL TYPE SCHEDULED OPENING C R C H A N N E L @ 2 4 " O . C . A B O V E O P E N I N G S 6 ' - 0 " O R L A R G E R R E F E R T O W A L L T Y P E S C H E D U L E F O R M A T E R I A L S E A L A N T O N A L L E D G E S F R A M E A S S C H E D U L E D D O O R A S S C H E D U L E D R E F E R T O W A L L T Y P E S C H E D U L E F O R M A T E R I A L 1 2 " = 1 ' - 0 " S C A L E T Y P I N T E R I O R D O O R J A M B D T L 1 3 " = 1 ' - 0 " S C A L E E X T E R I O R D O O R T H R E S H O L D 3 1 2 " = 1 ' - 0 " S C A L E T Y P I N T E R I O R D O O R H E A D D T L 2 1 / 2 " = 1 ' - 0 " S C A L E T Y P I C A L I N T E R I O R S T O R A G E U N I T E L E V A T I O N 4 3/4" = 1'-0"SCALEBURGLAR BAR DETAIL5DOOR HARDWARE NOTES: 1 1 3 8 ' - 0 " 3 ' - 0 " 2 3 B 1 0 A 5 6 B 5 5 4 5 4 1 1 ' - 0 " 3 ' - 0 " 3 ' - 4 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 3 ' - 0 " 8 ' - 0 " 7 ' - 0 " M E T A L H M / G L S 9 ' - 0 " 1 0 ' - 6 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " M E T A L H M M E T A L H M H M H M H M H M 4 A N O D I Z E D B L A C K H M S T E E L H M A L U M S T E E L H M 1 8 G A H M H M H M H M H M L N B A N E G C C L E J _ _ _ _ _ _ _ E X T E R I O R D O O R ( * * / * * * ) _ E X T E R I O R D O O R ( * * / * * * ) F A I L - S A F E A U T O L O C K ; S U R F A C E M O U N T E D ( * * * ) T I L E - E D G E T H R E S H O L D ; A D A C O M P L I A N T I D S I G N " R E S T R O O M " ( * * * ) T I L E - E D G E T H R E S H O L D ; A D A C O M P L I A N T I D S I G N " R E S T R O O M S " E X T E R I O R D O O R ( * * / * * * ) A) AUTOMATIC SLIDING ENTRANCE DOORB) SHOWROOM TO D&R BAYSC) OFFICE/BREAKROOM DOORD) CUSTOMER ENTRANCE DOOR / 24 HOUR DOORE) RESTROOM DOOR - INTERIOR H ) S T O R A G E L O C K E R S W I N G D O O R J ) S W I N G D O O R - E X T E R I O R K ) S W I N G D O O R - I N T E R I O R L ) S W I N G D O O R - I N T E R I O R / E X T E R I O R D O O R S C H E D U L E D O O R H A R D W A R E G R O U P S - FULL WEATHERSTRIP(1) 1" SINGLE CYLINDER DEAD BOLT, KEYED BOTH S I D E S (1) KEY SWITCH AND KEYED LOCK(1) AUTOLOCK PER SCHEDULE - NO THRESHOLD(3) HINGES(1) LEVER HANDLE LOCK SET(1) TRILOGY T2 CODED LOCK @ STORAGE SIDE(COORDINATE W/UHI SECURITY)(1) SELF CLOSER(3) SILENCERS(1) WALL BUMPER(1) ALUMINUM THRESHOLD 1/2" MAX(3) HINGES(1) LEVER HANDLE LOCK SET (3) SILENCERS(1) WALL BUMPER- FULL WEATHERSTRIP(3) HINGES(1) LEVER HANDLE LOCK SET WITH KEY LOCK; EXT E R I O R (1) VP KEYPAD ACCESS @ EXTERIOR SIDE; (CARDS W I P E & DOOR STRIKE, COORDINATE W/ UHI SECURITY)(1) PANIC HARDWARE; INTERIOR(1) SELF CLOSER(1) CRASH CHAIN(1) WALL BUMPER(1) ALUMINUM THRESHOLD 1/2" MAX(3) HINGES(1) LEVER HANDLE LOCK SET(1) SCHLAGE OCCUPANCY INDICATOR DEADBOLT(1) ALUM. TILE EDGE/ THRESHOLD 1/2" MAX(1) SELF CLOSER(1) KEYPAD(3) SILENCERS ( 3 ) H I N G E S A T D O O R T Y P E S 7 A , 7 B ( 2 ) H I N G E S A T D O O R T Y P E 7 C ( 1 ) C - 5 0 1 D O O R M O U N T E D G R A S P A B L E L A T C H ( 3 ) H I N G E S ( 1 ) P A N I C H A R D W A R E - I N T E R I O R S I D E ( 1 ) S E L F C L O S E R ( 3 ) S I L E N C E R S ( 1 ) A L U M I N U M T H R E S H O L D 1 / 2 " M A X ( 3 ) H I N G E S ( 1 ) L E V E R H A N D L E L O C K S E T W I T H K E Y L O C K S ( 1 ) S E L F C L O S E R ( 3 ) S I L E N C E R S ( 1 ) W A L L B U M P E R P E R S C H E D U L E ( 3 ) H I N G E S ( 1 ) L E V E R H A N D L E L O C K S E T W I T H K E Y L O C K S ( 1 ) S E L F C L O S E R ( 3 ) S I L E N C E R S ( 1 ) W A L L B U M P E R P E R S C H E D U L E HARDWARE GROUPS ARE INTENDED ONLY AS A GUIDE. CONTRACTOR SHALLPREPARE A COMPLETE HARDWARE SCHEDULE PER OWNER-PROVIDEDINFORMATION AND SUBMIT FOR REVIEW. 1 0 4 C 1 0 0 B 1 0 1 1 0 2 1 0 3 1 0 7 1 0 4 A 1 0 4 B 1 0 5 1 1 0 B 1 1 0 A 1 1 2 1 1 1 A 1 2 1 2 2 1 3 2 1 1 1 1 D 1 0 6 1 0 9 1 2 0 B 1 2 0 A 1 1 1 B 1 1 1 C 3 0 6 3 0 8 1 0 8 2 0 8 2 2 0 3 2 0 _ _ 1 A 8 ' - 6 " A N O D I Z E D B L A C K A L U M A _ F A I L - S A F E A U T O L O C K ; S U R F A C E M O U N T E D 2 1 A 8 ' - 6 " A N O D I Z E D B L A C K A L U M A _ F A I L - S A F E A U T O L O C K ; S U R F A C E M O U N T E D 3 3 ' - 0 " 7 ' - 0 " H M / G L H M D _ E X T E R I O R D O O R ( * * / * * * ) D O O R B Y C L O P A Y . O V E R H E A D D O O R S . L O W - H E A D R O O M R E A R M O U N T E D 2 " T R A C K F I E L D V E R I F Y P R I O R T O O R D E R I N G D O O R F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T U - H A U L B L A C K ( P 1 0 1 ) F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y F I N I S H E D C A N Y O N R I D G E U L T R A G R A I N W A L N U T F A C T O R Y F I N I S H E D U - H A U L O R A N G E 1 0 F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S _ _ D O O R B Y C L O P A Y . L O W - H E A D R O O M R E A R M O U N T E D 2 " T R A C K F I E L D V E R I F Y P R I O R T O O R D E R I N G D O O R F I R E D O O R P E R I B C 7 1 6 . 5 E X T E R I O R D O O R ( * * / * * * ) F I R E D O O R P E R I B C 7 1 6 . 5 M A N U A L R O L L - U P D O O R B Y J A N U S F I R E D O O R P E R I B C 7 1 6 . 5 1 H R 1 H R 1 H R _ _ _ _ _ N S T E E L F A C T O R Y F I N I S H - B L A C K F A C T O R Y P R I M E D - F I E L D P A I N T U - H A U L B L A C K ( P 1 0 1 ) F A C T O R Y P R I M E D - F I E L D P A I N T U - H A U L B L A C K ( P 1 0 1 ) M E T A L A L U M / G L A L U M / G L A L U M / G L H M 1 2 ' - 0 " 1 0 ' - 6 " 8 ' - 6 " 1 1 ' - 3 " 3 ' - 0 " 7 ' - 0 " 1 1 ' - 3 " F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T T O M A T C H A D J A C E N T W A L L S F A C T O R Y P R I M E D - F I E L D P A I N T U - H A U L B L A C K ( P 1 0 1 ) H M H M H M H M 3 ' - 0 " 7 ' - 0 " 3 ' - 0 " 7 ' - 0 " 3 ' - 0 " 7 ' - 0 " 3 ' - 0 " 7 ' - 0 " 5 5 5 4 H M H M H M H M L M J M 2 1 1 ' - 3 " 8 ' - 6 " A L U M / G L D O O R / R O O M # T Y P E 6 A 6 B 7 A 9 B W I D T H H E I G H T M A T E R I A L 8 ' - 0 " 3 ' - 4 " 3 ' - 4 " 8 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " 7 ' - 0 " M E T A L M E T A L M E T A L M E T A L F I N I S H A N O D I Z E D B L A C K F R A M E 1 8 G A 1 8 G A 1 8 G A 1 8 G A A L U M G R O U P R A T I N G N O T E G G H G A _ _ _ _ _ M A N U A L R O L L - U P D O O R B Y J A N U S M A N U A L R O L L - U P D O O R B Y J A N U S M A N U A L S W I N G D O O R B Y J A N U S F I X E D D O O R P A N E L B Y J A N U S . D O O R A P P L I E D A T E X T E R I O R F A C A D E A T A C C E S S I B L E L O C K E R U N I T S F A I L - S A F E A U T O L O C K 6 A 6 B 7 A 9 B 1 0 0 A F A C T O R Y F I N I S H E D U - H A U L O R A N G E F A C T O R Y F I N I S H E D U - H A U L O R A N G E F A C T O R Y F I N I S H E D U - H A U L O R A N G E F A C T O R Y F I N I S H E D U - H A U L O R A N G E ** = PROVIDE 1/2" CONDUIT INSIDE DOOR FRAMES (LATCH SIDE) FORSECURITY DEVICES*** =LATCH SIDE OF DOOR: CENTER LINE OF SIGN AT +60 INCHESABOVE FINISHED FLOOR IN ACCORDANCE WITH IBC ARTICLES 1110. 1,2902.4 M ) E X I T S T A I R D O O R - I N T E R I O R N ) S E C T I O N O V E R H E A D D O O R - F U L L W E A T H E R S T R I P ( 3 ) H I N G E S ( 1 ) P A N I C H A R D W A R E - I N T E R I O R ( 1 ) L E V E R H A N D L E L O C K S E T A T S T A I R S I D E ( 1 ) S E L F C L O S E R ( 3 ) S I L E N C E R S ( 1 ) P R O V I D E P O W E R O P E R A T O R ( 1 ) S A F E T Y E D G E A T B O T T O M G ) S T O R A G E L O C K E R R O L L - U P D O O R ( 1 ) S T A I N L E S S S T E E L P A D L O C K S L I D E B O L T ( 2 ) C O I L I N G S P R I N G S W I T H D O O R F ) R E S T R O O M D O O R - I N T E R I O R ( 3 ) H I N G E S ( 1 ) L E V E R H A N D L E L O C K S E T ( 1 ) S C H L A G E O C C U P A N C Y I N D I C A T O R D E A D B O L T ( 1 ) A L U M I N U M T I L E E D G E / T H R E S H O L D 1 2 " M A X . ( 1 ) S E L F C L O S E R ( 1 ) W A L L B U M B E R P E R S C H E D U L E DOOR NOTES 1.ALL DOOR GLAZING SHALL BE TEMPERED SAFETYGLASS AND PERMANENTLY IDENTIFIED BY THEMANUFACTURER.2.LOCK & LATCH SETS SHALL HAVE LEVER DEVICESFOR USE BY THOSE WITH DISABILITIES.3.HAND ACTIVATED DOOR OPENGIN HARDWARE TOBE CENTERED @ 30" TO 44" A.F.F. & BE OPENEDWIHT A SINGLE EFFORT BY LEVER TYPE HARDWARE.4.MAXIMIUM EFFORT TO OPERATE SHALL NOTEXCEED 8.5 OUNDS FOR EXTERIOR DOORS AND 5POUNDS FOR INTERIOR DOORS.5.THE BOTTOM 10" OF ALL DOORS SHALL HAVE ASMOOTH UNINTERRUPTED SURFACE.6.ALL REQUIRED EXIT DOORSWAYS SHALL HAVE AMINIMU OF 32" CLEAR OPENING WITH THE DOOR @90° TO THE CLOSED POSITION.7.THE MAXIMUM HEIGHT OF THRESHOLD TO BE 12"MAX. VERTICAL CHANGE @ EDGE IS 14" WITH AMAXIMUM BEVEL OF 45°.8.IF A DOOR HAS A CLOSER, THEN THE SWEEPPERIOD OF THE CLOSER SHALL BE ADJUSTED SOTTHAT FROM AN OPEN POSITION OF 70°, THE DOORWILL TAKE AT LEAST 3 SECONDS TO MOVE TO APOINT 3" (75 MM) FROM THE LATCH, MEASURED TOTHE LEADING EDGE OF THE DOOR.9.VERIFY ALL DOOR OPENINGS BEFORE FABRICATION.10.EXISTING EGRESS DOORS SHALL RECEIVE J-TYPEHARDWARE AS REQUIRED.11.ALL DOORS USED FOR EGRESS PURPOSES MUST BEOPEN-ABLE FROM THE INSIDE WITHOUT USE OFSPECIAL KNOWLEDGE OR EFFORT. I N T E R I O R E X T E R I O R S C H E D U L E D D O O R 1 / 2 " M A X . F L O O R F I N I S H P E R S C H E D U L E T O P O F C O N C R E T E S L A B D O O R B O T T O M D R I P W I T H S E A L S E T I N S E A L A N T . R E : H A R D W A R E S C H E D U L E H A N D I C A P C O M P L I A N T " P A N I C " T Y P E T H R E S H O L D . S E T I N F U L L B E D O F S E A L A N T . A P P L Y S E A L A N T A T E A C H E N D S L O P E 1 / 8 " - 1 / 4 " P E R 1 ' - 0 " ( M I N . F I R S T 5 ' - 0 " F R O M D O O R ) R E : F O U N D A T I O N & C I V I L D R A W I N G S T O P O F E X T E R I O R W A L K I N G S U R F A C E T O P T R I M A N G L E B O T T O M T R I M A N G L E O P E N L I N E O F D E C K P U R L I N / H E A D E R S P U R L I N P O S T / S T U D 8'-4" MIN, HEIGHT (VRIFY SITE SPECIFIC CONDTIONS) 7'-0" MIN. DOOR HEIGHT F L U S H H E A D E R P A N E L ; C O L O R : G L O S S Y W H I T E F L U S H P E I R P A N E L ; C O L O R : G L O S S Y W H I T E E X T E N D E D P U L L D O W N R O P E W I T H L O O P A T E N D F O R A C C E S S I B L E U N I T S W I T H R O L L I N G D O O R S . R O P E T O B E M A X . 4 8 " A . F . F . W H E N D O O R I S C O M P L E T E L Y O P E N S T A I N L E S S S T E E L S L I D I N G D O O R L A T C H B Y " C H A T E A U P R O D U C T S " O R O W N E R A P P R O V E D E Q U A L S E M I - R E C E S S E D F I R E E X T I N G U I S H E R C A B I N E T B Y J A N U S W I T H M A X I M U M P R O J E C T I O N O F 4 " ; C O L O R : P S O R A N G E U N I T R U L L - U P D O O R W I T H V I N Y L B U L B - T Y P E W E A T H E R S T R I P A T B O T T O M O F D O O R . S E E D O O R S C H E D U L E F O R S I Z E ; C O L O R : G L O S S Y P S O R A N G E . 6" MAXIMUM OPENING0' - 0 3/16"HALLWAY CHANNELTYPICAL PARTITIONHALLWAY SYSTEM 2' - 0" OR GREATER 0' - 10"0' - 8"0' - 8"0' - 8"0' - 8"0' - 8"BURGLAR BAR HAT CHANNELS 8" ON CENTER OVER HALLWAY SYSTEM ASSHOWN WHEN GAP SPACING TO ROOF DECK OR FLOOR IS GREATER THAN 24.WHERE GAP IS LESS THAN 24" NO BURGLAR BAR HAT CHANNELS ARE REQUIREDCEILING FINISH ORBOTTOM OFSTRUCTURE ABOVEVERTICAL UPRIGHTS ORCOLUMNS 10'-0" ON CENTERMAXIMUM S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:39 PM 11/29/2021 7:04:40 PM K Z B G / D Z D O O R S C H E D U L E & D O O R D E T A I L S A 7 . 1 1 1 1 1 3 3 3 3 3 3 3 A B B R E V I A T I O N A C T C O N C F R P G W B G W B - W R G W B - X K P U H - 0 1 U H - 0 2 U H - 0 5 P E G P L Y P T D T I L E - F T I L E - W T I L T V C B C M U P R E - F M A T E R I A L M A N U F A C T U R E R A C O U S T I C C E I L I N G T I L E C O N C R E T E F I B E R G L A S S R E I N F O R C E D P A N E L S 5 / 8 " G Y P S U M W A L L B O A R D 5 / 8 " G Y P S U M W A L L B O A R D ; T Y P E X 1 8 G A M E T A L K I C K P L A T E 2 6 G A U G E 2 9 G A U G E G A L V A N I S M P L U S 1 8 G A U G E K I C K P L A T E 1 / 4 " P E G B O A R D P A I N T F L O O R T I L E W A L L T I L E C O N C R E T E V I N Y L C O V E B A S E C O N C R E T E M A S O N R Y U N I T P R E - F I N I S H E D A R M S T R O N G - E M P L O Y K A I S E R O R E Q U A L K A I S E R O R E Q U A L N O T E : 3 - M B C I M B C I M B C I - - S H E R W I N - W I L L I A M S C E R A M I C T I L E C E R A M I C T I L E - A R M S T R O N G - - T Y P E O M N I F I S S U R E - - S T A N D A R D W A T E R R E S I S T A N T H E A T / F I R E R E S I S T A N T G A L V C O I L - S T O C K " D " P A N E L " U " P A N E L - - - S H E R - C R Y L - - - - - - - - - G A L V A N I Z E D P R E - F I N I S H E D H I G H G L O S S W H I T E G A L V A N I Z E D G A L V A N I Z E D P A I N T E D U L T R A W H I T E N A T U R A L S E E C O L O R L E G E N D B E I G E B E I G E N A T U R A L B L A C K - S E E C O L O R L E G E N D C O L O R W H I T E - W H I T E - - M A X A L L O W A B L E M A X A L L O W A B L E M A X A L L O W A B L E 1 2 " H I G H , 1 " A . F . F . 3 2 " W X 5 / 8 " 3 6 " W X 3 / 4 " 1 2 " H I G H - - - 1 2 " X 1 2 " 1 2 " X 1 2 " - 4 " X 4 ' - 0 " - - S I Z E 2 4 " x 4 8 " F I N I S H - S T A I N E D F I N I S H , O R N A T U R A L C O N C R E T E W I T H E X T R U D E D A N O D I Z E D A L U M I N I U M T R I M - - - M O U N T E D W I T H R I V E T S S E E S H E E T A 9 . 7 M O U N T E D V E R T I C A L L Y M O U N T E D H O R I Z O N T A L L Y - - S H E R - C R Y L H I G H G L O S S F I N I S H A D D I T I O N A L I N F O R M A T I O N O N R E S T R O O M S H E E T L I G H T B R O O M F I N I S H A T E X T E R I O R S I D E S T A N D A R D T E X T U R E - P R E - F I N I S H E D F R O M M A N U F A C T U R E R / R E M A R K S M A T E R I A L S L E G E N D ROOM #105110112 / 212 / 312111109106 / 306108 / 208 / 308120 / 220 / 320 RO O M N A M E REFUSESELF STORA G E L O B B Y SELF STORA G E STORAGEELEVATOR E Q U I P M E N T R O O M MOP / COMM R O O M STAIR 1 C O N C C O N C C O N C C O N C C O N C C O N C C O N C C O N C E X P O S E D E X P O S E D E X P O S E D E X P O S E D E X P O S E D T I L E - F E X P O S E D E X P O S E D N O T E S - - - T I L E - F V C B - - W A L L ' A ' F I N I S H W A L L ' B ' F I N I S H W A L L ' C ' F I N I S H W A L L ' D ' F I N I S H W A I N S C O T C E I L I N G T Y P E C E I L I N G H E I G H T N O T E S ( S E E S H E E T N O T E S F O R A D D I T I O N A L I N F O R M A T I O N ) E X P O S E D V A R I E S V A R I E S P R E - F P T D P P T D R P R E - F E X P O S E D P T D P V A R I E S V A R I E S P R E - F P T D P P T D R P R E - F E X P O S E D P T D P V A R I E S V A R I E S P R E - F P T D P P T D R P R E - F E X P O S E D P T D P V A R I E S V A R I E S P R E - F P T D P P T D R P R E - F E X P O S E D - - - - - T I L E - W N O T E S - E X P O S E D E X P O S E D E X P O S E D E X P O S E D - G W B / P T D P - - - 9 ' - 0 " - - - - F O R A D D I T I O N A L I N F O R M A T I O N S E E F L O O R P L A N P R O V I D E ( U H - 0 5 ) K I C K P L A T E I N C A R T S T O R A G E A R E A - P R O V I D E ( U H - 0 5 ) K I C K P L A T E - F O R A D D I T I O N A L I N F O R M A T I O N S E E R E S T R O O M S H E E T F O R A D D I T I O N A L I N F O R M A T I O N S E E R E S T R O O M S H E E T F O R A D D I T I O N A L I N F O R M A T I O N S E E F L O O R P L A N A NATURAL GRAY CONCRETEB PAINT TO MATCH CONCRETE TILT - UP PANELC COLOR: PRE-FINISHED "HIGH GLOSS WHITE "D COLOR: PRE-FINISHED "U-HAUL ORANGE "E COLOR: PRE-FINISHED "U-HAUL GREEN "F COLOR: PRE-FINISHED BLACK ANODIZED ALUMINUMG COLOR: GALVANIZED FINISHEDH COLOR: RUSTOLEUM "FOREST GREEN"J COLOR: "SIERRA SUNSET" (12" STRIPE)K COLOR: SHERWIN - WILLIAMS "BLACK" (DOOR & FRAME)LMNOPQRCOLOR: SHERWIN - WILLIAMS " LIGHT GRAY "COLOR: SHERWIN - WILLIAMS " MEDIUM GRAY "COLOR: SHERWIN - WILLIAMS " CHROME YELLOW "COLOR: SHERWIN - WILLIAMS " TRAFFIC YELLOW "COLOR: SHERWIN - WILLIAMS " ULTRA WHITE "COLOR: SHERWIN - WILLIAMS " ACCESSIBLE BEIGE "COLOR: SHERWIN - WILLIAMS " PENNYWHISTLE " F I N I S H S C H E D U L E COLOR LEGEND 5 / 8 " G Y P S U M W A L L B O A R D ; W A T E R R E S I S T A N T P L Y W O O D - B B G R A D E 3 / 4 " T H I C K W I T H 3 / 4 " R O U N D M O U N T A T 1 2 " A . F . F T O 9 ' - 0 " A . F . F . S E E P L A N F O R L O C A T I O N W A L L T I L E U S E D A S A 4 8 " W A I N S C O T , B R I C K P A T T E R N ; S E E R E S T R O O M S H E E T SINGLE OCCUP A N C Y R E S T R O O M ( S ) : INSIDE F L O O R M A T E R I A L F L O O R F I N I S H B A S E M A T E R I A L 121 / 221 / 321STAIR 2 C O N C E X P O S E D E X P O S E D E X P O S E D E X P O S E D E X P O S E D - - - F O R A D D I T I O N A L I N F O R M A T I O N S E E F L O O R P L A N 100101SHOWROOMOFFICE102104BREAKROOMR&D AREA C O N C S T A I N E D P T D Q P T D Q P T D Q P T D Q E X P O S E D S T A I N C O N C R E T E F L O O R C O H I L L S " A G E D B R O N Z E " , P R O V I D E I N S U L A T I O N , P E G B O A R D P T D " P - C L A S S ' C ' P E R T A B L E 8 0 3 . 1 1 V C B 9 ' - 0 " 9 ' - 0 " 9 ' - 0 " V A R I E S - C O N C S T A I N E D P T D Q P T D Q P T D Q P T D Q S T A I N C O N C R E T E F L O O R C O H I L L S " A G E D B R O N Z E " , P R O V I D E I N S U L A T I O N - C L A S S ' C ' P E R T A B L E 8 0 3 . 1 1 V C B G W B / P T D P C O N C T I L E - F T I L E - W T I L E - W / P T D R T I L E - W G W B / P T D P 9 ' - 0 " F O R A D D I T I O N A L I N F O R M A T I O N S E E R E S T R O O M S H E E T SINGLE OCCUP A N C Y R E S T R O O M ( S ) : 103 T I L E - W / P T D R T I L E - W / P T D R T I L E - W / P T D R - C O N C S T A I N E D P T D Q P T D Q P T D Q P T D Q S T A I N C O N C R E T E F L O O R C O H I L L S " A G E D B R O N Z E " , P R O V I D E I N S U L A T I O N - C L A S S ' C ' P E R T A B L E 8 0 3 . 1 1 V C B G W B / P T D P TTTT WINDOW SCHEDULE AND NOTE S WINDOW #DIMENSIONS/REMARKSBOTTOM OF FRAME AT 12" ABOVE FINISH FLOOR ATSHOWROOM. (1 FRAME TOTAL)'T' DENOTES TEMPERED SAFETY GLASS.BOTTOM OF FRAME AT 38" ABOVE FINISH FLOOR ATSHOWROOM/D&R WALL (1 FRAME TOTAL)'T' DENOTES TEMPERED SAFETY GLASS.METAL FRAME WITH THERMAL BREAK: FIXED, PERF. SPECS.:PRODUCT ID BASIS OF DESIGN: TRU LIGHT OR OLD CASTLE,SHGC AND U-FACTOR PER IECC. SEE BUILDING ELEVATIONS WINDOW NOTES:1.ALL WINDOWS SHALL HAVE A MINIMUM VISIBLE LIGHTTRANSMITTANCE (VLT) OF 84% AT DUAL PANE WINDO W S AND 89% AT SINGLE PANE WINDOWS.2.CONTRACTOR TO DETERMINE REQUIRED GLAZINGTHICKNESS BASED ON WINDOW SIZE, ELEVATION AN D LOCAL REQUIREMENTS.3.ALL GLAZING SHALL BE TEMPERED SAFETY GLASS WI T H NO TINT. 'T' DENOTES TEMPERED SAFETY GLASS.4.ALL FRAMES SHALL BE 4" DEEP OR MATCH EXISTING,CENTER-GLAZED, BLACK ANODIZED STOREFRONTFRAME.5.VERIFY ALL WINDOW OPENINGS BEFORE FABRICATIO N . T Y P E 5 - A L U M I N U M S T O R E F R O N T W I N D O W W I T H F I X E D G L A Z I N G - S E E E L E V A T I O N S F O R B O T T O M O F W I N D O W E L E V A T I O N . TYPE 4-ALUMINUM STOREFRONT W I N D O W W I T H FIXED GLAZING-BOTTOM OF WINDOW AT 38" A . F . F . TYPE 3 @ SHOWROOM-ALUMINUM STOREFRONT WINDOW WITHFIXED GLAZING-BOTTOM OF WINDOW AT 12" A.F.F. 2 5 ' - 0 " ( 5 E Q U A L P A N E L S ) 2 " 2 " 2 " T Y P 2"2" 8'-0" T . O . S L A B M U L L I O N ( T Y P . ) 2"2"4'-0" 2" 4'-0" 2" 3'-2" T . O . S L A B TOP OF WINDOW TOBE EVEN WITH TOPOF ADJACENT DOOR1'-0"MIN 2"2"16'-0" (3 EQUAL PANELS)2"2"7'-6"12"TT 2" (TYP.)MULLION (TYP.)SHOWROOMENTRANCE DOORT.O. SLAB 107FIRE RISER R O O M C O N C E X P O S E D P T D P P T D P P T D P P T D P E X P O S E D F O R A D D I T I O N A L I N F O R M A T I O N S E E F L O O R P L A N T Y P E 6 - A L U M I N U M S T O R E F R O N T W I N D O W W I T H F I X E D G L A Z I N G - S E E E L E V A T I O N S F O R B O T T O M O F W I N D O W E L E V A T I O N . 3 0 ' - 0 " ( 6 E Q U A L P A N E L S ) 2 " 2 " 2 " T Y P 2"2" 8'-0" T . O . S L A B M U L L I O N ( T Y P . ) 5 4 36METAL FRAME WITH THERMAL BREAK: FIXED, PERF. SPECS.:PRODUCT ID BASIS OF DESIGN: TRU LIGHT OR OLD CASTLE,SHGC AND U-FACTOR PER IECC. SEE BUILDING ELEVATIONS S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:39 PM 11/29/2021 7:04:40 PM A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S 11/29/2021 7:04:41 PM B G D Z F I N I S H S C H E D U L E S A 7 . 2 2 2 2 3 132' - 7"5' - 9" C L 3 6 " 108208308TYP G 1 ' - 9 " A8.9 8 SIM108208308KBK8' - 4"9' - 7"2' - 6"0' - 2"0' - 10"0' - 2"EQ A EQEQEQEQ(TYP.)2' - 0"EQ 2 1 ' - 6 " 4 1 0 6 3 0 6 (TYP.)1' - 0" 1 ' - 8 " 5 ' - 4 " R J 1 3 A 7 . 5 1 R E S T R O O M 1 0 6 3 0 6 J 1 A 3' - 2"1' - 0"1' - 9"L 1 6 " - 1 8 " 7 " - 9 " 1 8 " M I N . 1 8 " M I N . 1 1 " M I N . 6 " M A X . 1 2 " 2 4 " C L 4 2 " 1 2 " C L 8 " M I N . 10' - 0"7' - 0"T.O. INTERCOM5' - 3 1/8"CONDUIT C.L.T.O. INTERCOM BUTTOM4' - 0"CONDUIT C.L.6' - 2"1' - 0"7' - 0"5' - 9" 7' - 7 3/16" 1' - 3" 1 ' - 6 " 1 7 " - 1 9 " 3 3 " - 3 6 " 5 0 " M A X 4' - 0" 3 3 " - 3 6 " 5 0 " M A X 2 4 " 4' - 0" 0' - 3" 5' - 7" 4 2 " 7 4 " M I N . 3 4 " M A X . 4 0 " M A X 7' - 0" 4 4 " M A X . 9 " M I N . 2 7 " M I N . 3 4 " M A X . 4' - 0" N O T E S : W A T E R C L O S E T ( T O I L E T ) : W C - 1 T A N K T Y P E W A T E R C L O S E T ( H A N D I C A P ) : A M E R I C A N S T A N D A R D F L O W I S E ® D U A L F L U S H R I G H T - H E I G H T E L O N G A T E D T O I L E T M O D E L # 2 4 8 0 . 2 1 6 . 1 7 - 3 / 4 " R I M H E I G H T , V I T R E O U S C H I N A , 0 8 / 1 6 G A L P E R F L U S H H I G H E F F I C I E N C Y T O I L E T ( H E T ) W H I T E I N C O L O R C H R O M E - P L A T E D T O P M O U N I E D P U S H B U T T O N A C T U A T O R . L A V A T O R Y ( S I N K ) : L - 1 W A L L H U N G L A V A T O R Y ( H A N D I C A P ) : A M E R I C A N S T A N D A R D C O M R A D E ™ W A L L H U G E L A V A T O R Y 2 0 " X 1 8 - 1 / 4 " V I T R E O U S C H I N A , R E A R O V E R F L O W . W H I T E I N C O L O R . P R O V I D E S - 9 W A L L H A N G E R B O L T E D T O W A L L , A M E R I C A N S T A N D A R D M O D E L # 0 1 2 4 . 0 2 4 . S U P P L Y F I T T I N G : D E L T A ® M O D E L 5 2 3 - H D F - D S T , 1 . 5 G A L P E R M I N U T E , 4 " C E N T E R S E T L A V A T O R Y F A U C E T , W I T H S I N G L E L E V E R H A N D L E A N D M E T A L G R I D S T R A I N E R . 3 / 8 " O . D . S T R A I G H T , S T A G G E R E D P E X S U P P L Y T U B E S - 3 5 " A N D 3 6 " . P R O V I D E O F F S E T P - T R A P F O R H A N D I C A P U S E . A N D H O T W A T E R P I P I N G W I T H T R U E B R O ® M O D E L # 1 0 2 E - Z , L A V G U A R D 2 B E L O W L A V A T O R Y . S O A P D I S P E N S E R : B O B R I C K B - 5 0 9 0 M A T R I X S E R I E S S O A P D I S P E N S E R . M O U N T S O T H A T D I S P E N S E R B U T T O N I S N O M O R E T H A N 4 4 " A B O V E F I N I S H E D F L O O R . M A N U F A C T U R E R ' S R E C O M M E N D E D I N S T A L L A T I O N H E I G H T T O T O P O F U N I T I S 5 0 - 7 / 8 " A F . F . A D A G R A B B A R S : B O B R I C K B - 6 8 0 6 . 9 9 S E R I E S , S T A I N L E S S S T E E L , 1 - 1 / 2 " D I A M E T E R , C O N C E A L E D M O U N T I N G , P E E N E D N O N - S L I P F I N I S H , I N S I Z E S A N D L O C A T I O N S A S S H O W N O N D R A W I N G S . G R A B B A R S S H A L L S U P P O R T A T L E A S T 9 0 0 L B S ( 4 0 8 K G ) . F U R N I S H W I T H C O N C E A L E D A N C H O R S A N D A N C H O R P L A T E S S U I T E D T O G R A B B A R L O C A T I O N . P A P E R T O W E L D I S P E N S E R : B O B R I C K B - 5 2 8 6 0 M A T R I X S E R I E S S U R F A C E - M O U N T E D R O L L - P A P E R - T O W E L D I S P E N S E R . P R O V I D E P A P E R T O W E L D I S P E N S E R A T E A C H L A V A T O R Y L O C A T I O N M O U N T S O P A P E R T O W E L D I S P E N S E R A N D L E V E R I S N O M O R E T H A N 4 8 " A . F . F . M A N U F A C T U R E R ' S R E C O M M E N D E D I N S T A L L A T I O N H E I G H T T O T O P O F U N I T , I S 5 1 " A . F . F . T O I L E T T I S S U E D I S P E N S E R : B O B R I C K B - 5 2 8 8 M A T R I X S E R I E S S U R F A C E - M O U N T E D M U L T I - R O L L T O I L E T T I S S U E D I S P E N S E R . M A N U F A C T U R E R ' S R E C O M M E N D E D I N S T A L L A T I O N H E I G H T T O T O P O F U N I T I S 2 8 " A . F . F . T O I L E T S E A T C O V E R D I S P E N S E R : B O B R I C K B - 5 2 2 1 S U R F A C E - M O U N T E D T O I L E T - S E A T - C O V E R D I S P E N S E R . P R O V I D E 4 " M I N I M U M C L E A R A N C E F R O M B O T T O M O F D I S P E N S E R T O T O P O F A N Y H O R I Z O N T A L P R O J E C T I O N T O P R O V I D E R O O M F O R F I L L I N G D I S P E N S E R F R O M B O T T O M . M A N U F A C T U R E R ' S R E C O M M E N D E D I N S T A L L A T I O N H E I G H T T O T O P O F U N I T I S 3 0 " - 4 5 " A . F . F . M I R R O R : 2 4 " X 4 0 " U N F R A M E D G L A S S M I R R O R T O B E P U R C H A S E D L O C A L L Y . B O T T O M R E F L E C T I V E S U R F A C E T O B E M O U N T E D A T 4 0 " A B O V E F I N I S H E D F L O O R , M A X I M U M , P E R A D A R E Q U I R E M E N T . M I R R O R S H A L L B E F R A M E D W I T H 1 " X 3 " W O O D M O L D I N G ( O R A L T E R N A T E , D E C O R A T I V E P R E - R O U T E D W O O D M O L D I N G - L I K E C H A I R R A I L ) , P A I N T E D B L A C K . P R O P E R B A C K I N G M U S T B E A P P L I E D T O T H E W A L L T O A L L O W M I R R O R T O M O U N T F L U S H W H E N M O U N T I N G O V E R U N E V E N S U R F A C E S S U C H A S W A L L T I L E A N D D R Y W A L L . F L O O R A N D W A L L T I L E I N R E S T R O O M : 1 . 1 2 " X 1 2 " C E R A M I C T I L E , T A N / B E I G E I N C O L O R , T O R E S E M B L E T R A V E R T I N E . I N S T A L L 1 2 " X 1 2 " W A L L T I L E T O 4 8 " A . F . F . T I L E M U S T B E R A T E D F O R L I G H T C O M M E R C I A L U S E A N D S U I T A B L E F O R F L O O R A N D W A L L A P P L I C A T I O N . F L O O R : I N S T A L L T I L E I N S T A N D A R D " T I L E " P A T T E R N W A L L : I N S T A L L T I L E I N " B R I C K " ( S T A G G E R E D ) P A T T E R N , T O 4 8 " A B O V E F I N I S H E D F L O O R T I L E G R O U T : 1 . G R O U T T O M A T C H T I L E A S N O T E D A B O V E . P O L Y B L E N D ® S A N D E D G R O U T O R S I M I L A R P R O V I D E 1 / 4 " G R O U T W I D T H . T H R E S H O L D / T R A N S I T I O N : F O R T R A N S I T I O N F R O M R E S T R O O M T I L E T O O T H E R F L O O R I N G S U R F A C E , U S E 1 . 2 S C H L U T E R ® - R E N O - U F O R 5 / 1 6 " F L O O R T I L E , I N A L U M I N U M , S A T I N A N O D I Z E D ( A E ) F I N I S H . T H I S M A Y B E O R D E R E D T H R O U G H D A L T I L E . O R M A Y P U R C H A S E S I M I L A R T R A N S I T I O N P I E C E F R O M L O C A L T I L E S U P P L I E R . C H A I R R A I L : T O F I N I S H T O P E D G E O F W A L L T I L E , I N S T A L L 1 " X 3 " W O O D S A N D E D S M O O T H A B O V E T I L E , P A I N T B L A C K . U S E S A M E 1 " X 3 " W O O D T O " F R A M E " O U T M I R R O R , P A I N T B L A C K . A L T E R N A T E L Y , C A N U S E D E C O R A T I V E , P R E - R O U T E D W O O D M O L D I N G F O R C H A I R R A I L A N D M I R R O R " F R A M E " . D O O R H A R D W A R E : I N A D D I T I O N T O T H E L E V E R H A N D L E , I N S T A L L O C C U P A N C Y I N D I C A T O R D E A D B O L T . S C H L A G E B 5 7 1 - 6 2 6 . E X H A U S T F A N : I N S T A L L " A I R K I N G " A S 7 0 E X H A U S T F A N I N R E S T R O O M S , O R A P P R O V E D E Q U A L . 7 0 C F M / 4 . 0 S O N E S @ 0 . 1 0 " S P . C O N N E C T E X H A U S T F A N A N D L I G H T S T O O C C U P A N C Y S E N S O R S W I T C H . N O T E : S E A L A L L A C C E S S O R Y F A S T E N E R P E N E T R A T I O N S T O P R E V E N T M O I S T U R E F R O M E N T E R I N G T H E P A R T I T I O N . S T A I N L E S S S T E E L S H E L F S T A I N L E S S S T E E L S H E L F A C C E S S I B L E T O I L E T / G R A B B A R L O C A T I O N & S H E L F A C C E S S I B L E U R I N A L , P A R T I T I O N & S H E L F S T A N D A R D M O U N T I N G H E I G H T L A V A T O R Y & M I R R O R ( I N S U L A T E A L L E X P O S E D D R A I N A N D H O T W A T E R P I P E S , T Y P . ) F I N I S H E D C E I L I N G T O B E P A I N T E D S H E R W I N - W I L L I A M S , S H E R - C R Y L H P A G L O S S " U L T R A W H I T E " - B 6 6 W 3 0 0 1 " x 3 " W O O D T O M A T C H T H A T O F C H A I R R A I L , T O F R A M E M I R R O R P A I N T B L A C K T O M A T C H C H A I R R A I L , D O O R A N D D O O R T R I M S O A P D I S P E N S E R M O U N T S O D I S P E N S I N G B U T T O N I S A T 4 8 " M A X . A . F . F . 2 4 " X 4 0 " M I R R O R M O U N T S O T H A T B O T T O M R E F L E C T I V E S U R F A C E I S @ 4 0 " A . F . F . M A X . P A P E R T O W E L D I S P E N S E R M O U N T S O D I S P E N S I N G B U T T O N / M E C H A N I S M I S A T 4 8 " M A X . A . F . F . 1 " x 3 " W O O D T O M A T C H T H A T O F C H A I R R A I L , T O F R A M E M I R R O R P A I N T B L A C K T O M A T C H C H A I R R A I L , D O O R A N D D O O R T R I M 3RD FLOOR ROOFACCESS SEEARCHITECTURALROOF DETAILS 4'-0" x 8'-0" x 3/4" PLYWOODPANEL 4'-0" FROM FINISH GRADEFOR MOUNTING SECURITYSYSTEM EQUIPMENT48"W X 48"T F.R.P.PANEL APPLIEDOVER WALL FINISHCONTRACTOR TO INSTALL "MAXV SIGN" 10"WX1'-0"H 2" FROMSMALL RULES BOARD, 2" FROMDIRECTORY "B" SIGN, AND 7'-0"A.F.F. TO BOTTOM OF SIGNMCP TO INSTALL THE "DIRECTORY"B" SIGN" 2'-6"WX3'-0"H, 2" FROM VSIGN, 7'-0" FROM FINISHED FLOORTO TOP OF SIGN MATCH THEDIRECTORY NUMBER (LOCATEDON THE BACK OF THEDIRECTORY) WITH STATIONNUMBER ON THE MAX V-SIGN CONTRACTOR TO I N S T A L L "SMALL RULES BOA R D " S I G N (3'-2"WX2'-0"H) 2" FR O M M A X V-SIGN, AND 6'-2" A. F . F T O THE TOP OF THE SI G N . CONTRACTOR TOINSTALL CLIMATECONTROLLED SIGNWITH THERMOMET E R (1'-9")WX1'-2 1/4"H) 5 " FROM SMALL RULE S SIGN, 5'-9" A.F.F TO T O P OF SIGN.NOTES:1.OWNER TO FURNISH SIGNS.2.DIRECTORY SIGN TO INCLUDE DIRECTIONS TO ACCESSIBLE EXITS AND RESTROOMS.3.REFER TO IMAGING BOOK PROVIDED BY AMERCO CONSTRUCTION DEPARTMENT."RETURN CARTS HE R E " SIGN (5'-0" W x 1'-6" H ) CENTERED LEFT TO R I G H T ON SIDE WALL, ABO V E L E F T SIDE CART STOP (9' - 8 " ) , 7 ' - 0 " FROM FINISHED FL O O R T O TOP OF THE SIGN.KICK PLATE PROVID E (UH-05) KICK PLATE I N C A R T STORAGE AREA 1" A F F CART STOP 2"X12" F L A T A N D TIGHT AGAINST BA S E B O A R D OF WALLS SURROU N D I N G CART STORAGE AR E A A N D PAINT CHROME YEL L O W 1 GAL: PN 62604, 5 G A L : P N 62624 FASTEN TO F L O O R WITH 1/2" DIA x 3 3/4 " W E D G E ANCHOR BOLTS AT 2 ' - 0 " O . C . AND 6" FROM ENDS T Y P I C A L (COUNTERSINK AN C H O R BOLTS TO BE FLUS H W I T H TOP OF BOARD)YELLOW CERAMIC MARKERS 4" YELL O W CERAMIC MARKERS 1'-0" O.C. (TYP), P N : 8 7 6 0 0 2 BEGIN PLACEMENT OF MARKERS 1'- 0 " F R O M END OF BACK CART STOP CONTINUI N G O U T PERPENDICULAR TO WALL THE DEP T H O F T H E CART STORAGE AREA (Y) TO THE CO R N E R O F RECTANGLE PLACE MARKERS 1'-0" O C F R O M CORNER, PARALLEL TO CART STOP, E N D I N G APPROX 1'-0" O C FROM RIGHT CART S T O P MARKERS TO BE ORDERED AND SHI P P E D FROM BREWER COTE CO BY UHICONSTRUCTION DEPT SEE INSTALL A T I O N INSTRUCTIONS INSTALL MARKERS P R I O R T O INSTALLATION OF CONCRETE FLOO R S E A L E R NOTE:REFER TO IMAGING BOOK PROVIDED BY AMERCO CONSTRUCTION DEPARTMENTMATERIALS NEEDED:1.2"X12" STUD - 1 AT WIDTH AND DEPTH OF CART STORAGE.2.1/2" DIA x 3 3/4" ANCHOR BOLTS (COUNTERSINK FLUSH WITH TOP OF BOARD).3.YELLOW CERAMIC MARKERS.4.RETURN CARTS HERE SIGN. 3 ' x 7 ' S T E E L D O O R A N D T R I M T O B E P A I N T E D S H E R W I N - W I L L I A M S " E G G S H E L L B L A C K " MOP/COMM RM N . T . S . S C A L E E L E V A T I O N A 1 N . T . S . S C A L E E L E V A T I O N B 2 N . T . S . S C A L E E L E V A T I O N C 3 N . T . S . S C A L E R E S T R O O M F I X T U R E S & A C C E S S O R I E S M O U N T I N G H E I G H T S 4 N . T . S . S C A L E E L E V A T I O N D 5 1 / 2 " = 1 ' - 0 " S C A L E E N L A R G E D R E S T R O O M P L A N 6 1/2" = 1 ' - 0 " SCA L E ENLARGED MOP/COMM ROOM 9 1/2" = 1 ' - 0 " SCA L E CLIMATE CONTROL SIGNS 8 3/8" = 1 ' - 0 " SCA L E CART STORAGE 7 T O I L E T A C C E S O R I E S 1 0 6 3 0 6 R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 0 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . R E F E R T O S H E E T A 7 . 2 F O R W I N D O W T Y P E S , F I N I S H S C H E D U L E A N D R E L A T E D N O T E S . A L L D O O R A N D W I N D O W D I M E N S I O N S A R E T O C E N T E R L I N E O F R O U G H O P E N I N G . R E F E R T O U - H A U L I N T E R N A T I O N A L S T A N D A R D S P E C I F I C A T I O N S F O R M A T E R I A L A N D I N S T A L L R E Q U I R E M E N T S . S E E U H I F A C I L I T Y I M A G I N G A N D D I R E C T I O N A L S I G N A G E I M A G I N G B O O K F O R A D D I T I O N A L I N F O R M A T I O N / R E Q U I R E M E N T S , A N D F I N A L C O L O R S E L E C T I O N . A L L S E L E C T I O N S A R E S U B J E C T T O A P P R O V A L B Y O W N E R - N O S U B S T I T U T I O N S . K Z B G / D Z E N L A R G E D R E S T O O M P L A N A N D M O P / C O M M R O O M A 7 . 5 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 5 ' - 0 " W I D E A I S L E BEAM F A B R I C D U C T 5 ' - 0 " W I D E A I S L E DUCTBELT AND BUCKLEINTET ZIPPERINLET ATTACHMENT DETAILDURATEX TYPE WITH ZIPPER AND OVERLAPCABLESUSPENSION DETAIL1 ROW HORIZONTAL CABLE SUSPENSION 5 ' - 0 " W I D E A I S L E DURATEX FABRICCLIP ATTACHMENTCABLETURNBUCKLEEYEBOLTSUSPENSION DETAIL1 ROW CABLE SUSPENSION AT 12 O'CLOCK F A B R I C D U C T D U C T S O X 5' - 0" WIDE AISLE 5' - 0" WIDE AISLE 5' - 0" WIDE AISLE S C E N A R I O 2 S C E N A R I O 1 F A B R I C D U C T N O T E S : 1 . F A B R I C D U C T S S H A L L B E D U C T S O X B R A N D / 3 0 0 D E N I E R F A B R I C D U R A T E X U - H A U L G R E E N . 2 . U T I L I Z E S I N G L E R O W C A B L E O N L Y T O S U S P E N D F A B R I C D U C T - S O X . 3 . D O N O T U T I L I Z E D O U B L E R O W C A B L E S Y S T E M . 4 . N O M E T A L D U C T S I N H A L L W A Y S . 5 . H O L E S I N F A B R I C D U C T S S H A L L B E A T " 9 " A N D " 3 " . 6 . I N S U R E F A B R I C D U C T S C L E A R S T A C K E D L O C K E R S W I N G D O O R W H E N D E F A T T E D . 7 . W H E R E S T R U C T U R A L B E A M O R P I P I N G O B S T R U C T D U C T L I N E . W R A P F A B R I C D U C T C L O S E T O B E A M . C R I M P I N G O F D U C T S I S A C C E P T A B L E . 8 . A L L D U C T S A N D S P R I N K L E R P I P I N G T O F O L L O W S L O P E O F R O O F . L I G H T I N G N O T E S : 1 . A L L L I G H T F I X T U R E S A R E T O B E M O U N T E D A S H I G H A S P O S S I B I L E F R O M T H E F I N I S H E D F L O O R . T H E D I M E N S I O N S H O W N I S T H E A B S O L U T E M I N I M U M A N D I S T O B E U S E D O N L Y I F N E C E S S A R Y . 2 . L I G H T A T S T A C K E D L O C K E R S M O U N T A T 1 2 ' - 0 " A . F . F . M I N I M U M . B R E A K T Y P I C A L L I G H T R U N B Y R E M O V I N G F I X T U R E T O A L L O W D U C T T O C R O S S A I S L E M E C H . R O O M B R E A K T Y P I C A L L I G H T R U N B Y R E M O V I N G F I X T U R E T O A L L O W D U C T T O C R O S S A I S L E M E C H . R O O M B R E A K T Y P I C A L L I G H T R U N B Y R E M O V I N G F I X T U R E T O A L L O W D U C T T O C R O S S A I S L E M E C H . R O O M B R E A K T Y P I C A L L I G H T R U N B Y R E M O V I N G F I X T U R E T O A L L O W D U C T T O C R O S S A I S L E M E C H . R O O M A T M I D D L E U N I T O P T . 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E W / T U B E G U A R D C E N T E R E D O N A I S L E , T Y P HORIZONTAL FABRICDUCT SUPPORT CABLELAPPED OVER BEAM METAL DECKINGUPPER FLUTEANCHOR PATCH, 4-6PER INLETINCLUDED, SEWN TO FABRICSECURE SELF-TAP SCREWEDGE- GUARD FORMETAL EDGE (INCLUDED)STANDARD CABLE CLIPEXTENDED WEBBINGW/CABLE CLIPSTANDARD CABLE CLIPINTERMEDIATECABLE SUPPORTCABLE CLAMPSAIR DISTRIBUTION AS SPECIFIEDINLET COLLAR, DUCTBELT,ANCHOR PATCHES AND ZIPPERFOR EASY DETACHMENT 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E W / T U B E G U A R D C E N T E R E D O N A I S L E , T Y P 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E W / T U B E G U A R D C E N T E R E D O N A I S L E , T Y P 3 / 8 " = 1 ' - 0 " S C A L E A I S L E S E C T I O N - A T F L O O R 1 3 / 8 " = 1 ' - 0 " S C A L E A I S L E S E C T I O N - A T R O O F 2 3 / 8 " = 1 ' - 0 " S C A L E A I S L E S E C T I O N - A T R O O F 3 1 / 8 " = 1 ' - 0 " S C A L E G E N E R A L A I S L E L A Y O U T P L A N 4 1 / 8 " = 1 ' - 0 " S C A L E C R O S S I N G A I S L E L A Y O U T P L A N 5 1 / 8 " = 1 ' - 0 " S C A L E ' T ' F A B R I C D U C T C R O S S I N G A I S L E 6 1 1 / 2 " = 1 ' - 0 " S C A L E FABRIC DUCT MOUNTING A T B E A M 7 3 / 8 " = 1 ' - 0 " S C A L E FABRIC DUCT AT BEAM OBSTR U C T I O N 9 1 / 2 " = 1 ' - 0 " S C A L E FABRIC DUCT INLET ATTAC H M E N T 1 0 N. T. S. SCALEFABRIC DUCT MOUNTING DETAILS11 G E N E R A L N O T E S F I N . F L R . A I S L E F I N . F L R . M E T A L R O O F I N G F A S T E N E R D E T A I L A I S L E W H E R E P U R L I N S R U N P A R A L L E L T O A I S L E M E T A L R O O F I N G W H E R E P U R L I N S R U N P A R A L L E L T O A I S L E F I N . F L R . F A S T E N E R D E T A I L A I S L E T . O F P U R L I N V A R I E S FLOOR TO FLOOR -TYPICALLY 10' - 8" FIELD VERIFY SEE LIGHTING NOTES 9' - 0" SEE LIGHTING NOTES 9' - 0" C O N C R E T E S L A B O N M E T A L D E C K F I R E S P R I N K L E R L I N E 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E W / T U B E G U A R D M O U N T D I R E C T L Y T O T H E U N D E R S I D E O F F L O O R S L A B A B O V E S T O R A G E R O O M G A S L I N E S E E P L U M B I N G D R A W I N G S F A B R I C D U C T T O B E M O U N T E D A S H I G H A S P O S S I B L E F R O M T H E F I N . F L O O R A N D A S C L O S E T O A D J . P A R T I T I O N W E R E I N F I L E D S T O R A G E R O O M R O O F P U R L I N S E E P L A N S C O L D F O R M E D / S T E E L B E A M S E E P L A N S F I R E S P R I N K L E R L I N E 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E S T O R A G E R O O M S T O R A G E R O O M F A B R I C D U C T T O B E M O U N T E D A S H I G H A S P O S S I B L E F R O M T H E F I N . F L O O R U N I S T R U T A T T A C H E D T O Z - P U R L I N S G A S L I N E S E E P L U M B I N G D R A W I N G S C O L D F O R M E D / S T E E L B E A M S E E P L A N S R O O F P U R L I N S E E P L A N S G A S L I N E S E E P L U M B I N G D R A W I N G S F A B R I C D U C T T O B E M O U N T E D A S H I G H A S P O S S I B L E F R O M T H E F I N . F L O O R 1 / 2 " M T L . C O N D U I T A T T A C H E D T O Z - P U R L I N S S T O R A G E R O O M S T O R A G E R O O M 8 ' - 0 " L O N G ( T Y P . ) F L U O R E S C E N T L I G H T F I X T U R E F I R E S P R I N K L E R L I N E BEAM OBSTRUCTIONFABRIC DUCTDUCTBELT AND BUCKLE I N L E T Z I P P E R D R A I N P A N / S T A N D ANCHOR PATCH, 4-6 PER INLETINCLUDED, SEWN TO FABRICSECURE WITH SELF-TAP SCREW E D G E - G U A R D F O R M E T A L E D G E ( I N C L U D E D ) I N L E T O V E R L A P , F O L D E D B A C K 13"x13" RETURNAIR FILTER BOX11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:32 PM 11/29/2021 7:04:39 PM 11/29/2021 7:04:40 PM 11/29/2021 7:04:41 PM 11/29/2021 7:04:43 PM K Z B G / D Z T Y P I C A L A I S L E L A Y O U T A 8 . 1 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 E X T E R I O R I N T E R I O R EXTERIORINTERIORT.O. SLABPER PLANS T . O . S L A B P E R P L A N S 0 ' - 9 1 / 4 " T . O . S L A B P E R P L A N S E X T E R I O R I N T E R I O R N O T E : EXTERIOR0' - 5 1/2"INTERIOR G E O T E X T I L E F A C I N G S O I L T.O. SLABPER PLANS 0 ' - 9 1 / 4 " T . O . S L A B P E R P L A N S R O L L U P D O O R E X T E R I O R I N T E R I O R E X T E R I O R I N T E R I O R B A S E A N G L E W I T H A N C H O R E X T R U D E D T R I M T . O . S L A B P E R P L A N S 0 ' - 9 1 / 4 " 1 / 8 " S L O P E P E R F T F I N I S H F L O O R S E E E L E V A T I O N S O I L S E E C I V I L D W G S 4" MAX0' - 0 1/4" 4" MAX 0' - 1 1/2" 0' - 4" MAX. 3/4" 4" MAX 4" MAX 0' - 0 3/4" 0' - 0 3/4" C O N C R E T E T I L T . P A N E L P E R P L A N S S T E E L E M B E B P L A T E S P E R S T R U C T U R A L P L A N S C O N C R E T E S L A B S E E S T R U C T U R A L V A P O R R E T A R D E R S E E S P E C S . C O N C R E T E S L A B - O N - G R O U N D P E R S T R U C T U A L P L A N S F I N I S H E D G R A D E V A P O R R E T A R D E R S E E S P E C S . C O A R S E G R A V E L S E E C I V I L C O N C R E T E S L A B - O N - G R O U N D P E R S T R U C T U R A L P L A N S F I N I S H E D G R A D E C O N C R E T E T I L T P A N E L P E R P L A N S I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S C O N C R E T E T I L T P A N E L P E R P L A N S S T E E L P L A T E E M B E D S E E S T R U C T U R A L C O N C R E T E S L A B - O N - G R A D E S E E S T R U C T U R A L V A P O R R E T A R D E R S E E S P E C S . C O A R S E G R A V E L S E E C I V I L F I N . G R A D E S E E C I V I L D W G S . C O N C R E T E S L A B - O N - G R A D E S E E S T R U C T U R A L S T R U C T U R A L F O O T I N G 1 / 2 " C O M P R E S S I B L E J O I N T F I L L E R I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S I N T E R I O R F U R R I N G P E R P L A N S V A P O R R E T A R D E R S E E S P E C S . C O A R S E G R A V E L S E E C I V I L C O N C R E T E S L A B - O N - G R O U N D P E R S T R U C T U R A L P L A N S F I N I S H E D G R A D E S T E E L E M B E D P L A T E S P E R S T R U C T U R A L P L A N S C O N C R E T E T I L T P A N E L P E R P L A N S F I N . G R A D E S E E C I V I L D W G S . D I S T U R B E D S O I L S E E C I V I L D W G S . F O O T I N G B A R R I E R R E F E R T O M A N U F A C T U R E R ' S S P E C I F I C A T I O N S A N D P R O D U C T R E C O M M E N D A T I O N P R E - C A S T C O N C R E T E P A N E L P E R P L A N S S E L F - A D H R I N G W A T E R P R O O F I N G M E M B R A N E G E O T E X T I L F P E R M A N U F A C T U R E R R E C O M M E N D A T I O N C O A R S E G R A V E L S E E C I V I L U N D I S T U R B E D S O I L S E E C I V I L D W G S . S T R U C T U R A L F O O T I N G I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S E X T E R I O R F R A M E D W A L L P E R P L A N S C O N T . B O T T O M T R A C K P E R P L A N S C O N C R E T E S L A B - O N - G R O U N D P E R S T R U C T U R A L P L A N S F I N I S H E D G R A D E M B C I P A N E L P E R P L A N S CONCRETETILT. PANELPER PLANSSTEEL EMBEB PLATESPER STRUCTURAL PLANSCONCRETE SLAB SEESTRUCTURALVAPOR RETARDERSEE SPECS.CONCRETESLAB-ON-GROUNDPER STRUCTUALPLANS FINISHEDGRADECONCRETETILT PANELPER PLANSCONCRETE SLABSEE STRUCTURALVAPORRETARDERSEE SPECS.COARSEGRAVELSEE CIVILCONCRETE SLAB - ON- GROUND PERSTRUCTURAL PLANS FINISHEDGRADE SLOPE FLOOR ATSLIDER / SWING DOOR1/4" OVER THICKNESSOF CONC TILT-UPWALL 1 1 / 2 " = 1 ' - 0 " S C A L E F L R S L A B A T T I L T W A L L C O N C P N L 1 1 1 / 2 " = 1 ' - 0 " S C A L E F L O O R S L A B D T L A T R O L L U P D O O R 2 1 1 / 2 " = 1 ' - 0 " S C A L E L O A D I N G D O C K A N D F O O T I N G D E T A I L 3 1 1 / 2 " = 1 ' - 0 " S C A L E F L R S L A B D T L A T C F S T L W A L L A T E X T A C C E S S S T O R 6 1 1 / 2 " = 1 ' - 0 " S C A L E F O O T I N G D E T A I L 5 1 1 / 2 " = 1 ' - 0 " S C A L E F L R S L A B D T L A T T I L T W A L L C O N C P N L W / I N T . F U R R 4 1 1/2" = 1'-0"SCALEFLOOR SLAB DTL AT TILT UP CONCRETE PANEL71 1/2" = 1'-0"SCALEFLOOR SLAB DTL AT DOOR OPENING81" = 1'-0"SCALENOT USED9 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 K Z B G / D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 2 2 0' - 1" 0' - 0 1/2" I N T E R I O R E X T E R I O R 0' - 1 11/32" MIN. 0' - 1 1/2" MIN. 0' - 1 11/32" 0' - 1 3/8" MIN E X T E R I O R I N T E R I O R INTERIOREXTERIOR FRAMED WALL PER PLANSCONT. BOTTOM TRACKT.O. SLABPER PLANSBASE TRIM I N T E R I O R S L A B E D G E EXTERIOR 0 ' - 0 1 / 2 " CONT. SEALANT E X T E R I O R 0 ' - 0 1 / 2 " I N T E R I O R I N T E R I O R W A R E H O U S E J A M B T R I M E X T E R I O R 0 ' - 0 1 / 2 " C O N C R E T E T I L T P A N E L S P E R P L A N S I N T E R I O R E X T E R I O R C O N T I N U O U S B A C K E R R O D A N D S E A L A N T C O N C R E T E T I L T P A N E L S P E R P L A N S C O N T I N U O U S B A C K E R R O D A N D S E A L A N T N O T E - J O I N T B E T W E E N T I L T P A N E L A N D C . I . P . C O N C R E T E F O U N D A T I O N W A L L S I M I L A R C O N T I N U O U S B A C K E R R O D A N D S E A L A N T C O N T I N U O U S B A C K E R R O D A N D S E A L A N T C O N C R E T E T I L T P A N E L S P E R P L A N S N O T E - J O I N T B E T W E E N T I L T P A N E L A N D C . I . P . C O N C R E T E F O U N D A T I O N W A L L S I M I L A R C O N T I N U O U S B A C K E R R O D S A N D S E A L A N T S T E E L P L A T E S E E S T R U C T U R A L N O T E - J O I N T B E T W E E N T I L T P A N E L A N D C . I . P . C O N C R E T E F O U N D A T I O N W A L L S I M I L A R C O N C R E T E T I L T P A N E L P E R P L A N S I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S E X T E R I O R M E T A L F R A M E D W A L L P E R P L A N S E D G E T R I M A S S E M B L Y A N D C O N N E C T I O N B Y P A N E L M A N U F A C T U R E R E X T E R I O R M E T A L W A L L P E R P L A N S C O N T I N U O U S S E A L A N T B E A D M B C I P A N E L P E R P L A N S S E A L A N T A N D B A C K E R R O D C O N T I N U O U S B A C K E R R O D A N D S E A L A N T C O N C R E T E T I L T P A N E L S P E R P L A N S EXTERIOR METALWALL PANEL PERPLANSCONT. INSULATIONPER PLANSINTERIOR FURRING PERPLANS INTERIOR METAL WALLPANEL PER PLANS CONCRETESLAB-ON-DECK PERSTRUCTURAL PLANS INTERIOR METAL WALL PANEL PERPLANSFINISH, SEEPLANMULLION CLOSURETRIM PRECAST CONCRETEPANELDBL. SEALANT AND BACKERROD 3 " = 1 ' - 0 " S C A L E C O N C R E T E T I L T P A N E L J O I N T D E T A I L 1 3 " = 1 ' - 0 " S C A L E C O N C T I L T P A N E L J O I N T D T L A T T C O R N E R 2 3 " = 1 ' - 0 " S C A L E C O N C R E T E T I L T P A N E L J O I N T D E T A I L 3 3 " = 1 ' - 0 " S C A L E T I L T P A N E L J O I N T D T L P E R P . T O M E T A L P A N E L 6 1 1 / 2 " = 1 ' - 0 " S C A L E E L E V F L R S L A B D T L A T M T L P A N E L 5 3 " = 1 ' - 0 " S C A L E E X T W A L L P A N E L A T C O N C . T I L T P A N E L C O R N E R 4 3" = 1' - 0 " SCAL E FLR SLAB AT MTL PANEL W/ CONT INSUL 8 3" = 1' - 0 " SCAL E WINDOW JAMB AT TILT UP PANEL 7 1 1/2" = 1 ' - 0 " SCAL E JAMB DTL AT HM DR IN PRECAST WALL 9 1 1/2" = 1 ' - 0 " SCAL E HEAD DTL AT HM DR IN PRECAST WALL 1 0 1' - 0" T . O . S L A B P E R P L A N S B A S E T R I M I N T E R I O R E X T E R I O R M B C I P A N E L P E R P L A N S S U P P O R T A N G L E T O M A T C H B A S E T R I M I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S E X T E R I O R M E T A L F R A M E D W A L L P E R P L A N S C O N T . B O T T O M T R A C K P E R P L A N S C O N C R E T E S L A B - O N - D E C K P E R S T R U C T U R A L P L A N S I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S I N T E R I O R F U R R I N G P E R P L A N S MO0' - 0 3/4"0' - 2"TILT UP CONCRETEPANELSEALANT WITHBACK RODSEALANT WITHBACK ROD3/4" MO0' - 2"SEALANT ANDBACK RODHOLLOWMETAL FRAME TILT UP CONCRETEPANELSEALANT WITHBACK RODRAIN DRIPIF SCHED11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM K Z B G / D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 3 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 0 ' - 9 1 5 / 3 2 " I N T E R I O R J O I N T T R I M 0 ' - 6 " 0 ' - 0 1 5 / 3 2 " C L I P F A S T E N E R S V E R T I C A L J O I N T G A S K E T F R A M I N G M E M B E R 0 ' - 3 " 6 " S T U D S B U I L D I N G F I N I S H F A C E O F M E T A L P A N E L S Y S T E M COPING CAP 6 " M I N I M U M C L I P F A S T E N E R S C L I P F A S T E N E R S U R E T H A N E S E A L A N T C O N T . V E R T I C A L J O I N T G A S K E T 7 . 2 I N S U L - R I B ™ W A L L P A N E L I N S I D E C O R N E R T R I M ( F 3 2 1 0 ) Z E E S P A C I N G T R I M O U T S I D E C O R N E R T R I M S H E E T I N G A N G L E A S R E Q U I R E D 1 / 8 " x 3 / 8 " P O P R I V E T W A L L G I R T F R A M I N G M E M B E R I N T E R I O R J O I N T T R I M C O L D F O R M F R A M I N G F A S T E N E R ( N O T B Y M B C I ) D B L . 6 " S T U D D E L . 6 " S T U D 2 " ' Z ' F U R R I N G M B C I P A N E L P E R E L E V A T I O N S C O R N E R T R I M D B L . S E A L A N T A N D B A C K E R R O D C O R N E R T R I M M B C I P A N E L P E R E L E V A T I O N S F I N I S H P E R P L A N S 6" MINIMUM VARIES 0' - 2 1/32" 1 " x 1 / 8 " T A P E S E A L E R ( 7 3 0 0 ) T O P & B O T T O M O F Z E E S P A C E R T R I M T H R U - P A N E L F A S T E N E R W / W A S H E R @ E A C H S U P P O R T F I E L D I N S T A L L E D F O A M O R B L A N K E T I N S U L A T I O N ( N O T B Y M B C I ) 1 / 8 x 3 / 1 6 P O P R I V E T ( F A S T E R # 1 4 ) @ 1 2 " O . C . B E T W E E N W A L L M E M B E R S @ E A C H W A L L M E M B E R N O N - S K I N I N G B U T Y L S E A L A N T ( 7 1 0 0 ) 3 / 8 " B E A D 1 " x 1 / 8 " T A P E S E A L E R ( 7 3 0 0 ) C O N T I N U O U S 7 . 2 I N S U L - R I B ™ W A L L P A N E L T H R U - P A N E L F A S T E N E R W / W A S H E R @ E A C H S U P P O R T 1 / 4 - 1 4 x 7 / 8 L A P T E K W / W A S H E R ( F A S T E N E R # 4 A ) @ 8 " O . C . B E T W E E N S U P P O R T S U R E T H A N E J O I N T S E A L A N T 3 / 8 " D I A M E T E R B E A D C O N T I N U O U S T O O L E D T O F O R M A F I L L E T 1 / 8 x 3 / 8 P O P R I V E T @ 1 2 " O . C . W A L L P A N E L C L I P ( 4 6 3 3 ) H O R I Z O N T A L I N S U L A T E D C F M E T A L W A L L P A N E L W / E N D F O L D H O R I Z O N T A L I N S U L A T E D C F M E T A L W A L L P A N E L W / E N D F O L D U R E T H A N E S E A L A N T I N S T A L L E D B E H I N D P A N E L D U R I N G I N S T A L L A T I O N R I V E T P O P 3 / 8 x 1 / 8 @ 1 2 " O . C . 1 / 8 x 3 / 8 P O P R I V E T @ 1 2 " O . C . U R E T H A N E J O I N T S E A L A N T 3 / 8 " D I A M E T E R B E A D C O N T I N U O U S T O O L E D T O F O R M A F I L L E T W A L L P A N E L C L I P ( 4 6 3 3 ) H O R I Z O N T A L I N S U L A T E D C F M E T A L W A L L P A N E L W / E N D F O L D U R E T H A N E S E A L A N T I N S T A L L E D B E H I N D P A N E L D U R I N G I N S T A L L A T I O N THROUGH PANELFASTENER @7.2" O.C.INTO LOW RIBS1/8 x 3/8 POP RIVET@12" O.C.BUTYL SEALANTTAPE (7300)7.2 FOAM OUTSIDECLOSURE (7609)7.2 INSUL-RIB™ WALLPANEL N O N - S K I N N I N G B U T Y L S E A L A N T ( 7 1 0 0 ) 3 / 8 " B E A D E X I S T I N G P A R A P E T W A L L ( N O T B Y M B C I ) C L I P F A S T E N E R M I N . ( 2 ) R E G U I R E D W A L L P A N E L C L I P ( 4 6 3 3 ) @ P A N E L S I D E J O I N T 1 / 4 - 1 4 x 7 / 8 L A P T E K W / W A S H E R @ 8 " O . C . ( F A S T E N E R # 4 A ) E N D D A M U R E T H A N E S E A L A N T 3 " = 1 ' - 0 " S C A L E T Y P I C A L O U T S I D E C O R N E R A T M E T A L P A N E L 3 3 " = 1 ' - 0 " S C A L E F A C A D E O F F S E T 2 3 " = 1 ' - 0 " S C A L E T Y P . S Y S T E M D I M E N S I O N S 1 3 " = 1 ' - 0 " S C A L E H O R I Z O N T A L J O I N T 4 1 1 / 2 " = 1 ' - 0 " S C A L E D E F L E C T I O N J O I N T 5 3 " = 1 ' - 0 " S C A L E V E R T I C A L J O I N T 6 1 1 / 2 " = 1 ' - 0 " S C A L E T R A N S I T I O N A T M E T A L P A N E L S E C T I O N 7 1 1 / 2 " = 1 ' - 0 " S C A L E T R A N S I T I O N A T M E T A L P A N E L P L A N 1 1 1 1 / 2 " = 1 ' - 0 " S C A L E TYPICAL O U T S I D E C O R N E R A T M E T A L P A N E L 1 0 3 " = 1 ' - 0 " S C A L E TYPICAL O U T S I D E C O R N E R A T M E T A L P A N E L 9 1 1 / 2 " = 1 ' - 0 " S C A L E TRAN S I T I O N A T M E T A L P A N E L S E C T I O N 8 1 1/2" = 1'-0"SCALEINSIDE CORNER AT STOR. AND WAREHOSE12 WALL GIRTINSIDE CORNER TRIMINSULATIONFLAT INSIDE CORNER TRIMWALL GIRTCORNER FRAMING @ SEALANT AT INSIDE CORNER TRIM INTERIOR OF BUILDINGEXTERIOR OF BUILDING BUTYL SEALANT(CONTINUOUSEACH LEG)METAL ROOFPER PLANSBUTYL SEALANT(CONTINUOUSEACH LEG)OUTSIDE CORNERTRIM1/8 x 3/8 POP RIVET(FASTENER #12a) @EACH WALL MEMBER 6" STUDS, TYPFINISH PER PLANSINSIDE CORNER TRIM3/8" SEALANT BEAD P A N E L W I D T H + / - 0 ' - 1 0 " P O P R I V E T A T 8 " O . C . C O N C R E T E T I L T P A N E L P A N E L T H I C K N E S S PANEL THICKNESS PANEL LENGTH I N S U L A T E D M E T A L W A L L P A N E L 3 5/8" STUDBLOCKING, TYP 6 " M I N I M U M F R A M I N G M E M B E R 6" MINIMUM MBCI PANEL PER PLANS,WITH PANEL FOLD TOCREATE CORNERFACTORY INSTALLED16 GA.ANGLE F I N I S H P E R P L A N S 6" STUDS, TYPDBL. 6" STUDSPOP RIVET AT 8" O.C.6" STUDS, TYP B U T Y L S E A L A N T T A P E I N S I D E C O R N E R T R I M P O P R I V E T A T 8 " O . C . PANE L W I D T H INSULATED METAL WALL P A N E L T H I C K N S S M O D U L E MODULE PANEL THICKNSS PANEL WIDTH +/- 1' - 0" T H R U - P A N E L F A S T E N E R W / W A S H E R @ T O P M I D D L E , & B O T . ( N O T T O E X C E E D 5 ' - 0 " O . C . ) 1 / 4 - 1 4 x 7 / 8 L A P T E K W / W A S H E R @ 8 " O . C . B E T W E E N T H R U F A S T E N E R S I N S U L M E T A L W A L L P A N E L NON-SKINNING BUTYL3/8" SEALANT BEADINSIDE CORNER TRIM NON-SKINNING BUTYL3/8" SEALANT BEADCLIP FASTENERMIN. (2) REGUIREDWALL PANEL CLIP @PANEL SIDE JOINT 1 4 G A . G A L V . S U P P O R T A N G L E D E F L E C T I O N J O I N T , T Y P . U R E T H A N E T U B E S E A L A N T H E M M E D F L A S H I N G , T Y P . S E A L A N T A N D B A C K E R R O D D E E P L E G D E F L E C T I O N T R A C K 3 " M B C I I N S U L A T E D M E T A L P A N E L S Y S T E M 6 " S T U D S , T Y P 3 5 / 8 " S T U D S B L O C K I N G , T Y P F I N I S H P E R P L A N S I N S I D E C O R N E R T R I M B U T Y L S E A L A N T T A P E P O P R I V E T A T 8 " O . C . P A N E L W I D T H + / - 1 ' - 0 " P A N E L T H I C K N E S S P A N E L T H I C K N E S S PANEL LENGTH N O N - S K I N N I N G B U T Y L 3 / 8 " S E A L A N T B E A D T H R U - P A N E L F A S T E N E R W / W A S H E R @ T O P , M I D D L E , & B O L . ( N O T T O E X C E E D 5 ' - 0 " O . C . ) 1 / 4 - 1 4 x 7 / 8 L A P T E K W / W A S H E R @ 8 " O . C . B E T W E E N T H R U F A S T E N E R S I N S U L A T E D M E T A L W A L L P A N E L I N S U L A T E D M E T A L W A L L P A N E L 11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM K Z B G / D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 4 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 0 ' - 1 2 1 / 3 2 " LOUVERLOUVER SILLFINISH PER PLANS6" STUD JAMB TRIM F L A T T R I M M B C I P A N E L P E R P L A N S B A S E T R I M C O N C R E T E S L A B F I N I S H P E R P L A N S S H I M R O FIELD CUT AS REQ'D L O U V E R M B C I P A N E L P E R P L A N S H E A D T R A C K F L A T T R I M POP RIVETSFIELD CUT AS REQ'D F I N I S H P E R P L A N S 6 " S T U D S H I M L O U V E R J A M B T R I M R O M B C I P A N E L P E R P L A N S 0 ' - 2 " F L A T T R I M S I L L 0' - 0 3/4" 0' - 0 3/4" 1' - 0" H E A D C L O S U R E T R I M T O M A T C H I N T E R I O R P A N E L S Y S T E M S E A L A N T A N D B A C K E R R O D M B C I P A N E L P E R P L A N S B A R R I E R F L A S H I N G T A P E D O U B L E S E A L A N T A N D B A C K E R R O D S E A L A N T A N D B A C K E R R O D J A M B C L O S U R E T R I M T O M A T C H I N T E R I O R P A N E L S Y S T E M I N T E R I O R F I N I S H P A N E L S Y S T E M B A R R I E R F L A S H I N G T A P E D O U B L E S E A L A N T A N D B A C K E R R O D A L U M S I L L E X T E N S I O N W I T H G Y P B D R E C E I V E R A L U M S I L L P A N F I N I S H E D T O M A T C H G L A Z E D A L U M W A L L S Y S T E M S I L L P A N E N D D A M B E Y O N D M U L L I O N C L O S U R E T R I M A L U M S I L L P A N F I N I S H E D T O M A T C H G L A Z E D A L U M W A L L S Y S T E M B A R R I E R F L A S H I N G T A P E D O U B L E S E A L A N T A N D B A C K E R R O D S U P P O R T A N G L E T O M A T C H B A S E T R I M M B C I P A N E L Y P E R P L A N S 6 " S T L H E A D E R F I L L E D W I T H M I N E R A L W O O L I N S U L A T I O N 2 1 / 2 " x 2 1 / 2 " x 1 2 G A G A L V A N I Z E D A N G L E S E A L A N T O V E R B O N D B R E A K E R T A P E M U L L I O N C L O S U R E T R I M M B C I P A N E L Y P E R P L A N S 2 " X 2 0 G A C O N T I N U O U S M E T A L S T R A P 2 1 / 2 " x 2 1 / 2 " x 1 2 G A G A L V A N I Z E D A N G L E S E A L A N T O V E R B O N D B R E A K E R T A P E M U L L I O N C L O S U R E T R I M END DAM OF LOUVER SILLBEYOND JAMB2 1/2" x 2 1/2" x 12 GAGALVANIZED ANGLEMBCI PANELYPER PLANSNOTE: DO NOT FASTENTHROUGH SILL PAN.SEALANT WITH BONDBREAKER TAPEUSE CLEAN ANDCONCEAL FASTENERUNDER FLASHINGCONTINUOUS BUTYLSEALANTFRAMED OPENINGTYPICALMBCI PANELPER PLANSEXPOSED SEALANTTYPICALDOOR/WINDOWFRAME TYPICALTYPICAL CONTINUOUSBUTYL SEALANT 1/4" - 14 HEX HEAD FASTENERSWITH WASHER FRAMED OPENINGTYPICALDOOR/WINDOWFRAME TYPICALFACTORY INSTALLED EPS FOAMEND DAM FOR PAPER CORE ONLYEXPOSED SEALANTTYPICALCONTINUOUS BUTYL SEALANTW/ MARRIAGE BEAD TOVERTICAL PANEL GASKET D O U B L E S E A L A N T A N D B A C K E R R O D B A R R I E R F L A S H I N G T A P E 3 " = 1 ' - 0 " S C A L E W I N D O W H E A D A T M E T A L P A N E L 1 3 " = 1 ' - 0 " S C A L E W I N D O W J A M B A T M E T A L P A N E L 2 3 " = 1 ' - 0 " S C A L E W I N D O W S I L L A T M E T A L P A N E L 3 3 " = 1 ' - 0 " S C A L E L O U V E R J A M B D E T A I L 6 3 " = 1 ' - 0 " S C A L E L O U V E R H E A D D E T A I L 5 3 " = 1 ' - 0 " S C A L E W I N D O W S I L L A T S L A B W / M T L O N T I L P A N E L 4 3" = 1'-0"SCALELOUVER SILL DETAIL73" = 1'-0"SCALEDOOR HEAD WITH DRIP83" = 1'-0"SCALEDOOR JAMB (2 PIECE FLASHING)8 K Z D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 5 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 INTERIOR WALL PER PLANSFINISH FLOORSEE ELEVATIONINTERIOR WALL PER PLANS MULTI-PLY STRIPPINGCONT CLEATSEALANTINTERIORELEVATOR PIT S E E E L E V A T I O N M B C I P A N E L P E R P L A N S S U P P O R T A N G L E A S R E Q U I R E D D O U B L E S E A L A N T A N D B A C K E R R O D S T E E L T U B E A N D C H A N N E L P E R S T R U C T U R A L G L 3 ' - 1 0 1 3 / 1 6 " S U P P O R T A N G L E A S R E Q U I R E D D O U B L E S E A L A N T A N D B A C K E R R O D S T E E L T U B E A N D C H A N N E L P E R S T R U C T U R A L G R A V E L S T O P F L A S H I N G M B C I P A N E L P E R P L A N S D O U B L E S E A L A N T A N D B A C K E R R O D W I D T H P E R W A L L S E C T I O N M E T A L V E N T E D S O F F I T H E M M E D F L A S H I N G . T Y P . S E A L A N T A N D B A C K E R R O D P A N E L E N D F O L D D O U B L E S E A L A N T A N D B A C K E R R O D W I D T H P E R W A L L S E C T I O N M B C I P A N E L P E R P L A N S S E E W A L L S E C T I O N W A L L T Y P E P E R P L A N S H E M M E D F L A S H I N G . T Y P . S E A L A N T A N D B A C K E R R O D P A N E L E N D F O L D M E T A L V E N T E D S O F F I T G R A V E L S T O P F L A S H I N G T U B E S T E E L C A N O P Y S E E E L E V A T I O N T O S T E E L N O T U S E D 2' - 0" 0' - 6" 0' - 6 1/2" 0' - 6 1/2" S T E E L T U B E F R A M E D L O U V E R S Y S T E M S T E E L T U B E F R A M E D L O U V E R S Y S T E M C L O S U R E T R I M / F L A S H I N G T O M A T C H P A N E L S Y S T E M 1 8 G A M T L R O O F I N G / C O P I N G T O M A T C H F A C E O F C A N O P Y W / S E A L E D J O I N T S U S I N G S L O C K C L I P S C O N T I N U O U S S T R I P O F S E L F H E A L I N G U N D E R L A Y M E N T A T J O I N T S S M O O T H M E T A L P A N E L O V E R A I R & W A T E R B A R R I E R A N D E X T E R I O R S H E A T H I N G P R O V I D E I N W A L L S T R U C T U R A L S U P P O R T A T E A . B R A C K E T SHEET METAL GRAVEL ST O P -NOTCHED TO PERMIT DR A I N A G E SHEET METAL GRAVELSTOP SCUPPER 1 8 G A M T L R O O F I N G / C O P I N G T O M A T C H F A C E O F C A N O P Y W / S E A L E D J O I N T S U S I N G S L O C K C L I P S C O N T I N U O U S S T R I P O F S E L F H E A L I N G U N D E R L A Y M E N T A T J O I N T S S M O O T H M E T A L P A N E L O V E R A I R & W A T E R B A R R I E R A N D E X T E R I O R S H E A T H I N G C O N T R A C T O R T O P R O V I D E F R A M I N G D E S I G N A N D C A L C U L A T I O N F O R O W N E R R E V I E W T R E A T E D W O O D N A I L E R R O O F I N G S Y S T E M NOTES: FIRE RATED FLOORS ANDWALL; FILL CAVITY WITH MINERALWOOL AND SEAL WITH FIRE-RESISTANCE RATED PER PLANSSTEEL ANGLE COORDINATEWITH ELEVATOR MANUF. SIZEAND LOCATIONSILL ASSEMBLY BYELEVATORMANUFACTURERSTEEL ANGLE COORDINATEWITH ELEVATOR MANUF.SIZE AND LOCATION GROUTED SOLID BOND BEAM.WITH CONT. REINF. AS PERPLANS, SEE STRUCTURALFOR ADDITIONALINFORMATION.CONCRETE OVER STEELDECK WITH CONT. ANGLESEE STRUCTURAL. E S S E N T A L O V E R H A N G F L A S H I N G T Y P I C A L I N S U L A T E D M E T A L P A N E L P E R P L A N S I N T E R I O R F I N I S H P E R P L A N S I N S U L A T E D M E T A L P A N E L P E R P L A N S E S S E N T A L O V E R H A N G F L A S H I N G T Y P I C A L COVER NAILER WITH CON T STRIP OF SELF HEALINGUNDERLAYMENT N O T U S E D N O T U S E D 1 1 / 2 " = 1 ' - 0 " S C A L E C A N O P Y / E Y E B R O W D E T A I L A T W I N D O W H E A D 1 1 1 / 2 " = 1 ' - 0 " S C A L E C A N O P Y / E Y E B R O W D E T A I L 2 1 1 / 2 " = 1 ' - 0 " S C A L E M E T A L C A N O P Y 3 1 1 / 2 " = 1 ' - 0 " S C A L E C O R N I C E D E T A I L 4 3 / 4 " = 1 ' - 0 " S C A L E C A N O P Y D E T A I L 5 1 1/2" = 1'-0"SCALEELEVATOR DOOR SILL63" = 1'-0"SCALEWINDOW FLASHING73" = 1'-0"SCALEPIECE JAMB FLASHING8 D I M P E R W A L L S E C T I O N M E T A L B O X G U T T E R PROVIDE IN WA L L S T R U C T U R A L SUPPORT AT E A . B R A C K E T CUT PANEL AN D F O L D E N D S I N TO ALLOW FOR P E N E T R A T I O N THEN SEAL WIT H S E A L A N T A N D BACKER RODMBCI WALL PAN E L PER PLANSWALL - TO - RO O F F L A S H I N G LAP BEHIND MB C I W A L L PANEL SYSTEM P E R P L A N S B U T L E R M O D U L E Z E I I F A S C I A P A N E L W I T H I N T E R G A L C O P I N G ( " U - H A U L G R E E N " ) G Y P S U M B O A R D C L O S U R E A N D D R I P E D G E T O M A T C H F A S C I A 1 6 G A M E T A L S T U D S A T 1 6 " O . C . T Y P I C A L 1 ' x 8 ' L I G H T F I X T U R E , S E C U R E L I G H T T O G R I D A T A L L F O U R C O R N E R S VINYL BACKED G Y P S U M BOARD PANELS . P R O V I D E HOLD-DOWN C L I P S BARRIER FLASHING TAPEBARRIER FLASHING TAPEX.050 MIN ALUMINUMSHEET METALWINDOW FLASHINGSYNTHETIC SHEETAIR/WATER BARRIER WINDOW NOT SHOWNFOR CLARITYFILLET BEAD OFSEALANT AT INSIDECORNERS OFFLASHING11/29/2021 7:04:47 PM 11/29/2021 7:04:45 PM 11/29/2021 1:07:33 AM 11/29/2021 1:07:36 AM 11/29/2021 7:04:45 PM 11/29/2021 7:04:47 PM K Z / B G D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 6 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 0' - 3"0' - 3" MIN 12". EXTERIORINTERIOR_T.O. WALLPER PLANST.O. DOOR OPENINGCOILING DOOR 0' - 1 1/2" I N S U L A T I O N S E E R O O F P L A N M B C I P A N E L P E R P L A N S T . O . W A L L H I G H S I D E S E E E L E V A T I O N M E T A L R O O F P E R P L A N S V A R I E S S H I M ( C O N T ) T . O . P A R A P E T P E R P L A N S P B R P A N E L T . O . R O O F ( H . P . ) P E R P L A N S _ _ E X T E R I O R M E T A L R O O F P E R P L A N S F I R E S E A L A N T / F I R E S M O K E 0 ' - 8 1 / 2 " T . O . W A L L H I G H S I D E S E E E L E V A T I O N I N T E R I O R T . O . W A L L P E R P L A N S I N S U L A T I O N S E E R O O F P L A N T A P E P A N L A S T I C EXTERIOR_INTERIOR E X T E R I O R _ T . O . P A R A P E T S E E E L E V A T I O N C O U N T E R F L A S H I N G F L A S H I N G S U P P O R T C L I P T.O. WALLPER PLANS0' - 1 1/2"T.O. DOOR OPENING T . O . W A L L P E R P L A N S C O N T . C L E A T I N T E R I O R - S H I M & T R A C K ( C O N T ) C O N T . C L E A T I N T E R I O R E X T E R I O R W A T E R D I V E R T E R O U T S I D E C A P C E L L M R - 2 4 U R E T H A N E S E A L A N T B A C K - U P P L A T E M T L . R O O F P A N E L R O O F C U R B C I N C H S T R A P , F O R M E D C I N C H S T R A P , F L A T O U T S I D E C A P C E L L 1 8 4 A 8 . 9 R O O F C U R B I N S I D E C A P C E L L U R E T H A N E S E A L A N T S L O P E P R E F I N I S H E D S C U L P T U R E D P A R A P E T C A P B U T Y L T A P E A N D R I B F I L L E R A S R E G U I R E D C O N T . C L E A T E X T E R I O R F R A M E D W A L L P E R P L A N S P A R A P E T R A K E F L A S H I N G M E T A L R O O F P E R P L A N S 1 1 / 4 " E A V E S T A R T E R B Y M E T A L R O O F M A N U F A C T U R E R M E T A L R O O F P E R P L A N S R O O F P U R L I N S P E R P L A N S C O N T I N U O U S C O L D - F O R M E D S T E E L T O P T R A C K P E R S T R U C T U R A L P L A N S I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S E X T E R I O R F R A M E D W A L L P E R P L A N S C O R R U G A T I O N C L O S U R E B Y M E T A L R O O F M A N U F A C T U R E R 6 " H I G H P R E - F I N I S H E D M E T A L E A V E C L O S U R E T R I M E X T E R I O R M E T A L W A L L P A N E L P E R P L A N S P R E - F I N I S H E D P A R A P E T C A P R I G I D I N S U L A T I O N P E R P L A N S F I L L C A V I T Y W I T H M I N E R A L W O O L B A T T ; S E A L W I T H F I R E - R E T A R D E N T C A U L K E X T E R I O R M E T A L W A L L P A N E L P E R P L A N S R O O F P U R L I N S , S T L . P L A T E S & A N G L E S E E S T R U C T U R A L C O N T I N S U L A T I O N P E R P L A N S ( T Y P . ) C O N T I N U O U S C O L D - F O R M E D S T E E L T O P T R A C K P E R S T R U C T U R A L P L A N S R E T A I N E R W / R I V E T & S E A L C O N T . T R I M A T H I G H S I D E O F R O O F M E T A L R O O F P E R P L A N S T R I P L E B E A D T A P E S E A L E R 1 2 X 1 " Z E C S E L F - D R I L L I N G F A S T E N E R D I R E C T I O N O F P A N E L I N S T A L L A T I O N W A T E R D I V E R T E R M R - 2 4 B U T L E R R O O F P A N E L T R I P L E B E A D T A P E S E A L E R F I R E S E A L A N T / F I R E S M O K E S T E E L B E A M , R O O F P U R L I N S , S T L . P L A T E S & A N G L E S E E S T R U C T U R A L I N T E R I O R M E T A L W A L L P E R P L A N S R O O F P U R L I N S & C O N T . S T L . A N G L E S S E E S T R U C T U R A L F I R E S T O P W I T H U 9 1 4 O R W . H . I . A P P R O V E D J O I N T F I R E S T O P S Y S T E M M A T C H I N G W A L L R A T I N G C O N T I N U O U S 4 1 / 4 x 3 3 / 4 x 1 6 G A C O L D - F O R M E D B E N T P L A T E ( L L V ) E A C H S I D E S E E S T R U C T U R A L F I R E S T O P W I T H U 9 1 4 O R W . H . I . A P P R O V E D J O I N T F I R E S T O P S Y S T E M M A T C H I N G W A L L R A T I N G R O O F P U R L I N S & C O N T . S T L . A N G L E S S E E S T R U C T U R A L C M U W / H O R I Z O N T A L R E I N F . @ 1 6 " O . C . V E R T I C A L L Y ; R E F E R T O S T R U C T . F O R V E R T . R E I N F M E T A L R O O F P E R P L A N S C O N T I N U O U S L E D G E R A N G L E P E R P L A N S C O N T I N U O U S C O L D - F O R M E D S T E E L T O P T R A C K P E R S T R U C T U R A L P L A N S I N T E R I O R M E T A L W A L L P A N E L P E R P L A N S E X T E R I O R F R A M E D W A L L P E R P L A N S M B C I P A N E L P E R P L A N B U T Y L T A P E A N D R I B F I L L E R A S R E Q U I R E D P R E F I N I S H E D S C U L P T U R E D H I G H R A K E T R I M T R I M C L I P B Y M E T A L R O O F M A N U F A C T U R E R 1 1/4" EAVE STARTER BYMETAL ROOFMANUFACTURERMETAL ROOF PERPLANSCONTINUOUS COLD-FORMED STEELTOP TRACK PER STRUCTURAL PLANSMETAL STUDS PERSTRUCTURAL PLANSPEFINISHED METALHEADER TRIM - COLORTO MATCH HEADERPANEL EXTERIOR HEADERPANEL PER PLANS PREFINISHED SCULPTUREDHIGH EAVE TRIM CORRUGATION CLOSURE BYMETAL ROOFMANUFACTURER1 1/4" EAVE STARTER BYMETAL ROOFMANUFACTURERMETAL ROOF PERPLANSCONTINUOUS COLD-FORMED STEELTOP TRACK PER STRUCTURAL PLANSMETAL STUDS PERSTRUCTURAL PLANS PREFINISHED METALHEADER TRIM - COLOR TOMATCH HEADER PANEL EXTERIOR HEADERPANEL PER PLANS PREFINISHEDSCULPTURED HIGHEAVE TRIM CORRUGATION CLOSURE BYMETAL ROOFMANUFACTURER 3 " = 1 ' - 0 " S C A L E P A R A P E T D T L R O O F P E R P . T O W A L L 1 3 " = 1 ' - 0 " S C A L E L O W E A V E D T L A T C F S T E E L F R A M E D W A L L 2 3 " = 1 ' - 0 " S C A L E P A R A P E T D T L A T R O O F F R A M I N G H I G H W A L L 3 1 / 4 " = 1 ' - 0 " S C A L E R O O F H A T C H P L A N 4 3 " = 1 ' - 0 " S C A L E M E T A L S T U D F I R E B A R R I E R D E T A I L A T R O O F 5 3 " = 1 ' - 0 " S C A L E C M U F I R E B A R R I E R D E T A I L A T R O O F 6 3 " = 1 ' - 0 " S C A L E R A K E D T L A T C F S T E E L F R A M E D W A L L 7 1 / 2 " = 1 ' - 0 " S C A L E R O O F H A T C H 8 3" = 1'-0"SCALEEAVE DETAIL AT CF STEEL HEADER PANEL91/2" = 1'-0"SCALEROOF ACCESS LADDER103" = 1'-0"SCALEEAVE DETAIL AT CF STEEL PANEL11 1' - 9" 0 ' - 7 " 3 ' - 0 " 0 ' - 7 " 8 " C . M . U S E C T I O N P L A N R O O F S C U T T L E - 2 ' - 6 " x 3 ' - 0 " T Y P E " S " W I T H " L A D D E R - U P " S A F T Y P O S T E A C H S I D E M O D E L 2 B Y B I L C O C O M P A N Y . S E C U R E T O R O O F S T R U C T U R A L S T E E L W I T H T H R U B O L T S A C C O R D I N G T O M A N U F A C T U R E R ' S D I R E C T I O N S . H I N G E P I N S A R E T O B E W E L D E D N O N - R E M O V A B L E . C U R B S U P P O R T F R A M E - S E E S T R U C T U R A L 2 - 1 / 2 " x 3 / 8 " F L A T S T E E L B A R B R A C K E T S A T 4 ' - 0 " C E N T E R S . W E L D T O S I D E R A I L S . W E L D T O P T O S T E E L A N G L E F R A M E . P R O V I D E 2 - 1 / 2 " x 2 - 1 / 2 " x 3 / 1 6 " W E L D E D C L I P A N G L E S S E C U R E D T O C O N C R E T E F L O O R W I T H 1 / 2 " x 2 - 3 / 4 " W E D G E " R E D H E A D " A N C H O R B O L T S 1 - 1 / 2 " C . R . S T E E L R E I N F O R C I N G C H A N N E L S W I T H W E L D E D 3 / 8 " T H R U B O L T S T O R E C E I V E B R A C K E T S . C U T S T U D F L A N G E S T O R E C E I V E R E I N F O R C I N G C H A N N E L 2 - 1 / 2 " x 3 / 8 " F L A T S T E E L B A R S I D E R A I L S , A N D 1 " D I A . S T E E L R I N G S P U N C H E D I N T O R A I L S 1 2 " C E N T E R S A N D W E L D E D 1' - 6"EQUAL EQUAL1' - 4"1' - 0"WELD TO RAILSWALL ASSEMBLY PERPLANSCLEAR1' - 6"0' - 7"2 1/2" x 3/8" BARRAIL - EACH SIDE1" Ø BAR STOCK RINGS.PLUG11/29/2021 7:04:47 PM K Z / B G D Z A R C H I T E C T U R A L B U I L D I N G D E T A I L S A 8 . 7 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 1 / 4 " = 1 ' - 0 " S C A L E F L O O R P L A N A N D N O T E S 1 1 / 4 " = 1 ' - 0 " S C A L E A I S L E P A N E L E L E V A T I O N 4 1 / 4 " = 1 ' - 0 " S C A L E P A N E L L A Y O U T E L E V A T I O N 2 1 / 4 " = 1 ' - 0 " S C A L E I N T E R I O R A I S L E P A N E L E L E V A T I O N 5 1/4" = 1'-0"SCALEAISLE DOOR ELEVATION31/4" = 1'-0"SCALEINTERIOR DIVIDING PANEL ELEVATION6 N O T E : C O O R D I N A T E P A N E L H E I G H T W I T H F L O O R T O F L O O R C L E A R H E I G H T , A N D S P R I N K L E R D E S G I N NOTE:COORDINATE PANEL HEIGHT WITH FLOOR TO FLOOR CLEAR HEIGHT, AND SPRINKLER DESGIN NOTE:COORDINATE PANEL HEIGHT WITH FLOOR TO FLOOR CLEAR HEIGHT, AND SPRINKLER DESGIN F O R G A P S O V E R 1 0 " S E E B U R G L A R B A R D E T A I L 4 / A 9 . 8 F O R G A P S O V E R 1 0 " S E E B U R G L A R B A R D E T A I L 4 / A 9 . 8 FOR GAPS OVER 10" SEEBURGLAR BAR DETAIL 4/A9.8 FOR GAPS OVER 10" SEEBURGLAR BAR DETAIL 4/A9.8BOTTOM OFSTRUCTURE ABOVEBOTTOMS OFSTRUCTURE ABOVE ( 1 ) P A N E L A B O V E 3 ' - 4 " W I D E R O L L U P D O O R B O T T O M O F S T R U C T U R E A B O V E SWING DOOR ANDHARDWARE UH-16 ANGLE HEAD TRIMUH-12H'J' MOLDUH-06ANGLE TRIMUH-03'D' PANELUH-01ANGLE JAMB TRIMUH-12ROLL UP DOORUH-04KICK PLATEUH-05 A L T E R N A T E : F I E L D C U T 4 " N O T C H E S A S S H O W N ( 1 ) P A N E L A B O V E 3 ' - 4 " W I D E R O L L U P D O O R F I E L D C U T 8 " N O T C H A S S H O W N ( 3 ) P A N E L S A B O V E 8 ' - 0 " W I D E R O L L U P D O O R ( 3 ) P A N E L S A B O V E 8 ' - 0 " W I D E R O L L U P D O O R A L T E R N A T E P A N E L L A Y O U T A L T E R N A T E P A N E L L A Y O U T 4 " 4 " 8 " 10" 1 2 3 1 1 2 3 1 5 ' - 0 " 5 ' - 0 " 1 0 ' - 0 " C L C L C L 8'-4" MIN. TO 10'-0" MAX(SEE NOTE)8'-4" MIN. TO 10'-0" MAX(SEE NOTE)'J' MOLDUH-06TOP ANGLEUH-07'U' PANELUH-022-1/2" CEEUH-12KICK PLATEUH-05BOT. ANGLEUH-07 'U' PANELUH-02 10" 10" 10" SEE ELEVATIONS 1 0 ' - 0 " C L 1 0 ' - 0 " C L 10'-0116"10'-0" F . O . S . F . O . S . F.O.S.F.O.S. A I S L E AISLE CL 5 x 1 0 5 x 1 0 1 0 x 1 0 1 0 x 1 0 1 0 x 1 0 6 B 6 B 6 A 6 A A 9 . 8 1 S I M . A 9 . 8 9 A I S L E A 9 . 8 4 A 9 . 8 6 A 9 . 8 7 A T B A S E 4 A 9 . 1 3 A 9 . 1 6 A 9 . 1 T Y P . 6 A 9 . 1 T Y P . 6 A 9 . 1 T Y P . 5 A 9 . 1 T Y P . 8 A 9 . 1 9 A 9 . 1 7 A 9 . 1 K T Y P . L T Y P . K T Y P . L T Y P . L T Y P . 7 A K T Y P . A 9 . 1 0 3 7 T.O. FLOOR/T.O. ROOFT.O. FIN. FLOORSEE ELEVATION T . O . F L O O R / T . O . R O O F T . O . F I N . F L O O R S E E E L E V A T I O N T . O . F I N F L O O R S E E E L E V A T I O N T . O . F L O O R / T . O . R O O F T.O. FLOOR/T.O. ROOFT.O. FIN. FLOORSEE ELEVATION T O P A N G L E U H - 0 7 ' D ' P A N E L U H - 0 1 ' U ' P A N E L U H - 0 2 2 - 1 / 2 " C E E U H - 0 8 K I C K P L A T E U H - 0 5 B O T . A N G L E U H - 1 8 A 9 . 1 0 4 2 A 9 . 1 0 4 1 A N G L E C L I P U H - 3 3 8'-4" MIN. TO 10'-0" MAX (SEE NOTE) 8'-4" MIN. TO 10'-0" MAX (SEE NOTE) SEE ELEVATIONS B O T T O M O F S T R U C T U R E A B O V E ' J ' M O L D U H - 0 6 A N G L E T R I M U H - 0 3 ' D ' P A N E L U H - 0 1 K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T O P & B O T . AISLESTORAGE UNIT 'J' MOLDUH-06'D' PANEL UH-01 W/#8 SCREW UH-38W@ BOT. ANGLE, MID-SPAN CEE & TOPANGLE @ 18" O.C. ON 2-1/2" CEE UH-08VERT. @ 60" O.C. (MAX.)TOP ANGLEUH-07JAMB STUDUH-102-1/2" CEE UH-08 HORIZ. W/ANGLE CLIP UH-33 (BOTH ENDS)ANGLE JAMB TRIM UH-12HATTACH W/#8 SCREWSUH-38W NO FASTENERS INFACE OF TRIM (TYP.)ROLL UP DOORUH-04 CEILING FINISH OR BOTTOMOF STRUCTURE ABOVEFINISHED FLOOR A9.10 43A9.10 34 10" 7 W A L L S E C T I O N S C A L E 3 / 4 " = 1 ' - 0 " A I S L E S T O R A G E U N I T A I S L E S T O R A G E U N I T C E I L I N G F I N I S H O R B O T T O M O F S T R U C T U R E A B O V E 2 - 1 / 2 " C E E U H - O H H O R I Z . @ M I D - S P A N O R 6 0 " O . C . ( M A X . ) W / A N G L E C L I P U H - 3 3 ( B O T H E N D S ) ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N C E E & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T . 6 0 " O . C . ( M A X ) K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T O P & B O T . B O T . A N G L E U H - 1 8 W / 3 / 4 " H I L T P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) 0 ' - 0 " F I N . F L R 10" C E I L I N G F I N I S H O R B O T T O M O F S T R U C T U R E A B O V E ' J ' M O L D U H - 0 6 T O P A N G L E U H - 0 7 J A M B S T U D U H - 1 0 D O O R U H - 1 6 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 @ B O T . A N G L E & 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T . @ 6 0 " O . C . ( M A X ) 2 - 1 / 2 " C E E U H - 0 8 H O R I Z . W / A N G L E C L I P U H - 3 3 B O T H E N D S A N G L E J A M B T R I M U H - 1 1 A T T A C H W / # 8 S C R E W S U H - 3 8 W N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) C O N C . F L R . 0 ' - 0 " F I N . F L R 10" A 9 . 1 0 4 3 A 9 . 1 0 4 3 0'-0"FIN. FLR 8 S E C T I O N A T S W I N G D O O R S C A L E 3 / 4 " = 1 ' - 0 " 9SECTION AT ROLL UP DOORSCALE3/4" = 1' - 0" R E F E R T O S H E E T A 7 . 1 F O R D O O R T Y P E S A N D R E L A T E D N O T E S . S E E L O C K E R P A R T S L I S T O N S E E D O O R M A N U F A C T U R E R ' S I N S T A L L A T I O N I N S T R U C T I O N S F O R A D D I T I O N A L I N F O R M A T I O N . R E F E R T O S H E E T A 2 . 1 F O R W A L L T Y P E S A N D R E L A T E D I N F O R M A T I O N . T H I S F L O O R P L A N I S F O R I L L U S T R A T I O N P U R P O S E S O N L Y . R E F E R T O A R C H I T E C T U R A L P L A N S F O R A C T U A L F L O O R P L A N & W E L L T Y P E S . K Z D Z S I N G L E L E V E L L O A D B E A R I N G S T O R A G E A S S E M B L Y A 9 . 1 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 3 P A R T S L I S T P A R T U H - 0 1 U H - 0 2 U H - 0 3 U H - 0 4 U H - 0 4 a U H - 0 5 U H - 0 6 U H - 0 7 U H - 0 8 U H - 0 9 U H - 1 0 U H - 1 1 U H - 1 1 M U H - 1 2 U H - 1 2 H U H - 1 2 M U H - 1 3 U H - 1 4 U H - 1 4 M U H - 1 5 U H - 1 6 U H - 1 7 U H - 1 8 U H - 1 9 U H - 2 0 U H - 2 1 U H - 2 2 U H - 2 3 U H - 2 3 a U H - 2 4 U H - 2 5 U H - 2 6 U H - 2 7 U H - 2 8 U H - 2 9 U H - 3 0 U H - 3 1 U H - 3 2 U H - 3 3 U H - 3 4 U H - 3 5 U H - 3 6 U H - 3 7 U H - 3 8 G U H - 3 9 U H - 3 9 a U H - 4 0 U H - 4 1 U H - 4 2 U H - 4 3 U H - 4 4 U H - 4 5 U H - 4 6 U H - 4 8 U H - 4 9 U H - 5 0 U H - 5 1 U H - 5 2 U H - 5 3 N O T E : N O T A L L P A R T S A R E S H O W N . S E E P A R T S L I S T F O R A L L P A R T I N F O R M A T I O N # D E S C R I P T I O N 3 2 " W I D E x 2 6 G A . D - P A N E L ( V E R T I C A L H A L L W A Y P A N E L ) 3 6 " W I D E x 2 9 G A . U - P A N E L ( H O R I Z O N T A L P A N E L ) 3 " x 3 " x 1 8 G A . A N G L E T R I M ( O U T S I D E C O R N E R ) ( # 6 5 0 ) R O L L U P D O O R , A L U M . B O T . B A R , U - H A U L P U N C H E D G U I D E S & H D W R . - S I Z E P E R P L A N ( N O T S H O W N ) ( # 5 0 1 ) R O L L U P D O O R , A L U M . B O T . B A R , U - H A U L P U N C H E D G U I D E S & H D W R . - S I Z E P E R P L A N ( N O T S H O W N ) 1 2 " H I G H x 1 8 G A . K I C K P L A T E 3 " x 3 / 4 " x 1 " x 2 0 G A . J - M O L D T R I M 2 " x 2 " x 2 0 G A . A N G L E L F - 2 1 / 2 " x 1 5 / 8 " x 5 / 1 6 " x 2 0 G A . C E E L F - 1 5 / 8 " x 1 1 / 2 " x 1 / 4 " x 1 8 G A . C H A N N E L S E C T I O N ( C S - 1 ) L F - 4 " x 1 1 / 2 " x 1 " x 1 6 G A . P R E S S B R E A K C E E ( D O O R J A M B S T U D ) ( N O T C H J A M B S T U D , S T R I K E S I D E O N L Y O F S W I N G D O O R 3 " x 2 " x 2 0 G A . A N G L E T R I M w / D O O R S T O P A N G L E ( L E F T J A M B , R I G H T J A M B , H E A D w / E D G E G U A R D ) 2 1 / 2 " x 2 " x 2 0 G A . A N G L E T R I M w / D O O R S T O P A N G L E ( L E F T J A M B , R I G H T J A M B , H E A D w / E D G E G U A R D ) 3 " x 2 1 / 4 " x 2 0 G A . A N G L E J A M B T R I M ( L E F T J A M B A N D R I G H T J A M B T R I M A T R O L L - U P ) 3 " x 2 " x 2 0 G A . A N G L E H E A D T R I M ( H E A D E R T R I M ) 3 ' - 4 " W I D E x 6 1 / 8 " T A L L x 2 0 G A . H O R I Z . M U L L I O N T R I M w / P L A S T I C E D G E G U A R D ( S T A C K E D L O C K E R S ) 3 " x 3 " x 2 0 G A . A N G L E T R I M ( I N S I D E C O R N E R ) L F - 6 " x 4 " x 3 / 4 " x 1 6 G A . C E E ( F L O O R D E C K @ S C 1 0 & S T A C K E D L O C K E R ) L F - 8 " x 4 " x 3 / 4 " x 1 6 G A . M O D C E E ( M O D I F I E D F L O O R D E C K @ S C 1 0 & S T A C K E D L O C K E R ) L F - 4 " x 2 1 / 2 " x 5 / 8 " x 1 6 G A . C E E ( L O A D B E A R I N G S T U D ) D M D S S W I N G D O O R w / 5 0 1 & 5 0 2 L A T C H E S , D I A G . B R A C I N G & H D W R . ( S C 1 0 , S T A C K E D L O C K E R ) - S I Z E P E R P L A N L F - 3 " x 4 1 / 4 " I D x 3 " x 1 6 G A . L O A D B E A R I N G O P E N F A C E D C H A N N E L ( S E I S M I C R E G I O N S ) L F - 4 1 / 4 " x 3 3 / 4 " x 1 6 G A . L O A D B E A R I N G B O T T O M A N G L E - L L H 3 1 / 2 " W I D E x 1 6 G A . F L A T S T O C K ( C R O S S B R A C I N G ) 8 C S 2 . 5 x 0 5 9 C E E O R A P P R O V E D E Q U A L - S T A I R H E A D E R ( S C 1 0 ) L F x 1 1 / 4 " x 2 1 / 2 " x 1 1 / 4 " x 2 0 G A . O P E N F A C E D C H A N N E L ( P O N Y W A L L @ S C 1 0 ) 2 " x 4 1 / 4 " I D x 2 " x 1 2 0 " x 2 4 G A . O P E N E D F A C E D C H A N N E L C A P T R I M ( P O N Y W A L L C A P T R I M @ S C 1 0 D I S P L A Y D O O R , S T A N D A R D M O U N T , F I X E D , A L U M . B O T . B A R , L A T C H E S ( M A T C H S T O R A G E D O O R S ) , U H - 1 2 T R I M S A N D H D W R . - S I Z E P E R P L A N D I S P L A Y D O O R , S U R F A C E M O U N T , F I X E D , A L U M . B O T . B A R , L A T C H E S ( M A T C H S T O R A G E D O O R S ) , C O L O R M A T C H E D T R I M S & H D W R . - S I Z E P E R P L A N E X T E R I O R F I L L E R / H E A D E R P A N E L w / T R I M S A N D H A R D W A R E - S I Z E P E R P L A N E X T E R I O R F I L L E R / H E A D E R P A N E L ( W I D E R A T E D ) w / T R I M S , H D W R . & S T E E L F O R H E A D E R - S I Z E P E R P L A N ( # 7 5 0 ) C O M M E R C I A L R O L L U P D O O R , C H A I N F A L L O P E R A T I O N , A L U M . B O T . B A R , U - H A U L P U N C H E D G U I D E S & H D W R . - S I Z E P E R P L A N ( # 7 5 0 ) C O M M E R C I A L R O L L U P D O O R , ( E X T . W I N D R A T E D ) , W I N D S O C K S , A L U M . B O T . B A R , U - H A U L P U N C H E D G U I D E S & H D W R . - S I Z E P E R P L A N - N O T S H O W N N O T U S E D P R E F A B R I C A T E D S T E E L S T A I R S w / D I A M O N D P L A T E T R E A D S & R I S E R S . w / H A N D R A I L S ( S C 1 0 ) ( N O T S H O W N ) 1 3 / 4 " x 1 " x 2 0 G A . A N G L E - V E R T I C A L S W I N G D O O R S T O P w / H E M M E D E D G E & R I V E T S . ( C S 1 0 & S T A C K E D L O C K E R S ) P L A S T I C E D G E G U A R D ( C S 1 0 , S T A C K E D L O C K E R S ) S C R E W T I P C O V E R S ( I N T E R I O R S T O R A G E ) - N O T S H O W N 2 " x 1 1 / 2 " x 1 3 / 8 " A N G L E C L I P ( S I M P S O N A 2 1 O R E Q U A L ) N O T U S E D 1 / 8 " D I A . R I V E T S ( 3 / 8 " T O 1 / 2 " L O N G ) 1 / 8 " D I A . R I V E T S ( 3 / 8 " T O 1 / 2 " L O N G ) # 1 2 x 3 / 4 " S D S # 8 x 3 / 4 " S D S ( F O R U S E A T U - P A N E L ) 0 . 1 4 5 D I A . P O W E R - D R I V E N P I N S ( 3 / 4 M I N I M U M E M B E D ) O R A P P R O V E D E Q U A L X - G N 2 7 M X C O M B O ; 1 / 8 " x 1 1 / 1 6 " ( 3 m m x 2 7 m m ) H I L T I P I N S ( O R E Q U A L ) & S H O T S ( S E I S M I C L O C A T I O N S ) 0 . 1 4 5 D I A . x 4 " P O W E R - D R I V E N P I N S ( 1 1 / 2 " M I N I M U M E M B E D ) O R A P P R O V E D E Q U A L 3 / 8 " D I A . x 4 " L O N G A N C H O R S ( S I M P S O N T I T A N O R E Q U A L , S E I S M I C L O C A T I O N S ) 3 " x 4 " x 1 / 4 " P L A T E W A S H E R W I T H ( 1 ) 1 / 2 " D I A . H O L E P U N C H E D I N C E N T E R ( S E I S M I C L O C A T I O N S ) 1 / 2 " x 1 " B O L T S ( S C 1 0 S T A I R S ) 1 / 2 " N U T ( S C 1 0 S T A I R S ) 1 / 2 " W A S H E R ( S C 1 0 S T A I R S ) R A T C H E T T E N S I O N D E V I C E ( R O L L U P D O O R S ) - N O T S H O W N C A D M I U M P L A T E D R . U . D . L A T C H - P A R T S O R D E R O N L Y - F I E L D I N S T A L L - N O T S H O W N S T A I N L E S S S T E E L R . U . D . L A T C H - P A R T S O R D E R O N L Y - F I E L D I N S T A L L - N O T S H O W N S T A I N L E S S S T E E L R . U . D . L A T C H - F A C T O R Y I N S T A L L - N E W C O N S T R U C T I O N - S H O W N O N U H - 0 4 N O T U S E D 7 ' T A L L , # 6 5 0 U N I V E R S A L R . U . D . G U I D E S x P A I R , P R E - P U N C H E D F O R D O O R C O N T A C T S - N O T S H O W N 7 ' T A L L , # 6 5 0 U N I V E R S A L R . U . D . G U I D E S x P A I R , P R E - P U N C H E D F O R D O O R C O N T A C T S - N O T S H O W N F I N I S H H I G H G L O S S W H I T E G A L V A L U M E G A L V A N I Z E D U R G E N T O R A N G E / S I E R R A S U N S E T U R G E N T O R A N G E / S I E R R A S U N S E T G A L V A N I Z E D H I G H G L O S S W H I T E G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D H I G H G L O S S W H I T E H I G H G L O S S W H I T E H I G H G L O S S W H I T E H I G H G L O S S W H I T E H I G H G L O S S W H I T E G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D U R G E N T O R A N G E / S I E R R A S U N S E T G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D G A L V A N I Z E D H I G H G L O S S W H I T E U R G E N T O R A N G E / S I E R R A S U N S E T U R G E N T O R A N G E / S I E R R A S U N S E T U R G E N T O R A N G E / S I E R R A S U N S E T U R G E N T O R A N G E / S I E R R A S U N S E T U R G E N T O R A N G E / S I E R R A S U N S E T G A L V A N I Z E D G R A Y G R A Y ( P 3 ) G R A Y G R A Y W H I T E O R G R A Y G A L V A N I Z E D G A L V A N I Z E D Z I N C C O A T E D H I G H G L O S S W H I T E H I G H G L O S S W H I T E G A L V A N I Z E D Z I N C C O A T E D Z I N C C O A T E D Z I N C C O A T E D Z I N C C O A T E D P R I M E D Z I N C C O A T E D Z I N C C O A T E D Z I N C C O A T E D S T E E L C A D M I U M S T A I N L E S S S T E E L S T A I N L E S S S T E E L G A L V A N I Z E D G A L V A N I Z E D S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z S T O R A G E L O C K E R C O M P O N E N T S A 9 . 7 U H - 3 8 W # 8 x 3 / 4 " S D S ( F O R U S E A T D - P A N E L ) H I G H G L O S S W H I T E U H - 0 1 S C A L E : 1 1 2 " = 1 ' - 0 " UH-09 SCALE:6"=1'-0"UH-08 SCALE:6"=1'-0"UH-07 SCALE:6"=1'-0"UH-06 SCALE:6"=1'-0" U H - 0 5 S C A L E : 3 " = 1 ' - 0 " U H - 0 3 S C A L E : 6 " = 1 ' - 0 " U H - 0 2 S C A L E : 1 1 2 " = 1 ' - 0 " UH-13 SCALE:6"=1'-0"SCALE:6"=1'-0"UH-12M SCALE:6"=1'-0"UH-12HUH-12 SCALE:6"=1'-0" U H - 1 1 S C A L E : 6 " = 1 ' - 0 " U H - 1 1 M S C A L E : 6 " = 1 ' - 0 " U H - 1 0 S C A L E : 6 " = 1 ' - 0 " SHOWN w / U H - 1 2 T R I M UH-20 SCALE:3"=1'-0"UH-19 SCALE:3"=1'-0"UH-18 SCALE:6"=1'-0"UH-17 SCALE:6"=1'-0"U H - 1 6 S C A L E : 1/ 4 " = 1 ' - 0 " U H - 1 5 S C A L E : 6 " = 1 ' - 0 " U H - 1 4 M S C A L E : 3 " = 1 ' - 0 " U H - 1 4 S C A L E : 3 " = 1 ' - 0 " UH-37 SCALE:1'-0"=1'-0"UH-36 SCALE:1'-0"=1'-0"UH-35 SCALE:1'-0"=1'-0"UH-33 SCALE:6"=1'-0" U H - 3 1 S C A L E : 6 " = 1 ' - 0 " U H - 3 0 S C A L E : 6 " = 1 ' - 0 " U H - 2 2 S C A L E : 6 " = 1 ' - 0 " U H - 2 1 S C A L E : 6 " = 1 ' - 0 " UH-45 SCALE:6"=1'-0"UH-44 SCALE:6"=1'-0"UH-43 SCALE:6"=1'-0"UH-42 SCALE:6"=1'-0"UH - 4 1 SC A L E : 6"= 1 ' - 0 " U H - 4 0 S C A L E : 1 ' - 0 " = 1 ' - 0 " U H - 3 9 a S C A L E : 1 ' - 0 " = 1 ' - 0 " U H - 3 9 S C A L E : 1 ' - 0 " = 1 ' - 0 " U H - 3 8 G S C A L E : 1 ' - 0 " = 1 ' - 0 " U H - 3 8 W S C A L E : 1 ' - 0 " = 1 ' - 0 " 3 3 " = 1 ' - 0 " S C A L E L B P A R I T I T O N A T O U T S I D E 1 3 " = 1 ' - 0 " S C A L E N L B D I V I D I N G W A L L 5 3 " = 1 ' - 0 " S C A L E SC-10 UPPER LOCKER FLO O R A T E N D W A L L 9 O U T S I D E C O R N E R A N G L E T R I M U H - 0 3 A T T A C H T O D - P A N E L W / ( 2 ) 1 / 8 " D I A . R I V E T S U H - 3 6 A T B O T ( T O P A N D B O T T O M O F K I C K P L A T E ) M I D - H E I G H T A N D T O P A T 6 0 " O . C . ± E A C H L E G K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T & B 4 " C E E U H - 1 5 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N & ' J ' M O L D O N 4 " C E E U H - 1 5 V E R T . B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . B O T . A N G L E U H - - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) 2 - 1 / 2 " C E E U H - 0 8 @ 6 0 " O . C . ( M A X . ) W / ( 2 ) # 1 2 S C R E W U H - 3 7 @ T O P & B O T . A N G L E ' U ' P A N E L U H - 0 2 W / # 1 2 S C R E W U H - 3 7 @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . 2 - 1 / 2 " C E E U H - 0 8 V E R T . @ 6 0 " O . C . ( M A X . ) ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E & ' J ' M O L D O N 4 " C E E U H - 1 5 @ 3 0 " " O . C . ( M A X ) U H - 1 8 L 4 x 4 x 1 2 G A x 4 ' - 0 " L O N G A B O V E O P E N I N G S O N L Y . S E E P L A N F O R A D D I T I O N A L I N F O R M A T I O N T O P C H A N N E L U H - 1 7 W / ( 2 ) # 1 2 S C R E W U H - 3 7 ( O N E E A . F A C E E A S T U D M I N . ) TOP ANGLEUH-076" FLOOR CEEUH-14 3 " = 1 ' - 0 " S C A L E L B P A R I T I T O N A T A I S L E 4 3 " = 1 ' - 0 " S C A L E L B P A R T I T I O N A T A I S L E A T D I V P A N E L 6 3 " = 1 ' - 0 " S C A L E L B P A R I T I T O N A T I N T W A L L A T I N S I D E C O R N E R 2 3 " = 1 ' - 0 " S C A L E L B P A R I T I T O N A T I N S I D E C O R N E R A T A I S L E 3 3 " = 1 ' - 0 " S C A L E L B P A R T I T I O N A T E X I S T I N G 8 3 " = 1 ' - 0 " S C A L E L B P A R T I T I O N A T I N T W A L L A T D I V P A N E L 7 B O T . A N G L E U H - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) 4 " C E E U H - 1 5 ( 2 ) # 1 2 S C R E W U H - 3 7 ' U ' P A N E L ' U H - 0 2 W / # 8 U H - 3 8 G @ B O T . A N G L E , V E R T . C E E & T O P C H A N N E L P E R S T R U C . ' U ' P A N E L U H - 0 2 W / # 8 S C R E W U H - 3 8 G @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . & V E R T . C E E @ 2 4 " O . C . 2 - 1 / 2 " C E E U H - 0 8 @ 6 0 " O . C . ( M A X . ) B O T . A N G L E U H - 1 8 W / 3 / 4 " H I L T I P I N S U H - 3 9 A N G L E T R I M U H - 1 3 W / 1 / 8 " Ø R I V E T S U H - 3 6 @ 2 4 " O . C . E A . F A C E ( T Y P . ) B O T . A N G L E U H - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) ' D ' P A N E L U H - 0 1 # 8 S C R E W U H - 3 8 W @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . 4 " C E E U H - 1 5 ( 2 ) # 1 2 S C R E W U H - 3 7 2 - 1 / 2 " C E E U H - 0 8 @ 6 0 " O . C . ( M A X . ) ' U ' P A N E L U H - 2 0 W / # 8 S C R E W U H - 3 8 G @ B O T . A N G L E , V E R T . C E E & T O P C H A N N E L . ' U ' P A N E L U H - 0 2 W / # 8 S C R E W U H - 3 8 G @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . & V E R T . C E E @ 2 4 " O . C . A N G L E T R I M U H - 1 3 W / 1 / 8 " Ø R I V E T S U H - 3 6 @ 2 4 " O . C . E A . F A C E ( T Y P . ) K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T O P & B O T . B O T . A N G L E U H - 1 8 W / 3 / 4 " H I L T I P I N S U H - 3 9 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N C E E & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T . @ 6 0 " O . C . ( M A X . ) 4 " C E E U H - 1 5 ( 2 ) # 1 2 S C R E W U H - 3 7 K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T O P & B O T . B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N C E E & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T @ 6 0 " O . C . ( M A X . ) K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T O P @ B O T 4 " C E E U H - 1 5 B O T . A N G L E U H - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 ' U ' P A N E L U H - 0 2 W / # 8 S C R E W U H - 3 8 G @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C 4 " C E E U H - 1 5 ( 2 ) # 1 2 S C R E W U H - 1 5 2 - 1 / 2 " C E E U H - 0 8 @ 6 0 " O . C . ( M A X . ) B O T . A N G L E U H - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N & ' J ' M O L D . K I C K P L A T E U H - 0 5 1 " A . F . F . W / 1 / 8 " Ø R I V E T S U H - 3 5 @ 2 4 " O . C . T & B ' J ' M O L D U H - 0 6 - V E R T . 4 " C E E U H - 1 5 A T T A C H T O E X I S T . W A L L P E R W A L L C O N D I T I O N S B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 E X I S T I N G W A L L A N G L E J A M B T R I M U H - 1 2 W / ( 4 ) # 8 S C R E W S U H - 3 8 W - N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) R O L L U P D O O R U H - 0 4 J A M B S T U D U H - 1 0 W / ( 2 ) # 1 2 S C R E W S U H - 3 7 @ B O T . A N G L E & T O P A N G L E B O T . A N G L E U H - 0 7 W / P O W D E R D R I V E N P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 1 0 LB PARTITION AT INT WALL AT O H D O O R J A M B S C A L E 1 1 / 2 " = 1 ' - 0 " 'D' PANEL UH-01 W/ #8 SCREWUH-38W - NO FASTENERS INFACE OF TRIM (TYP.)4" CEE UH-15@ CORR.'U' PANEL UH-02 W/ #8 SCREWUH-38G @ BOT. ANGLE & TOPANGLE @ 18" O.C.A9.10 35 1 1 LB PARTITION AT INT WALL AT SWI N G D O O R J A M B S C A L E 1 1 / 2 " = 1 ' - 0 " S W I N G D O O R U H - 0 4 J A M B S T U D U H - 1 0 W / P O W D E R D R I V E N P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 0 7 W / P O W D E R D R I V E N P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 A N G L E J A M B T R I M U H - 1 2 W / ( 4 ) # 8 S C R E W S U H - 3 8 W - N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) 'D' PANEL UH-01 W/ #8 SCREWUH-38W @ BOT. ANGLE & TOPANGLE @ 18" O.C.BOT. ANGLE UH-07 W/POWDER DRIVEN PINSUH-39 @ 15" O.C. (MAX.) &6" FROM END (MAX.)4" CEE UH-15 @ CORR'U' PANEL UH-02 W/#8 SCREW UH-38G @BOT. ANGLE, VERT.CEE &TOP CHANNEL S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 B G D Z T Y P I C A L L O A D B E A R I N G P A R T I T I O N L O C K E R D E T A I L S A 9 . 8 3 N . T . S . S C A L E R O L L - U P A N D S W I N G D O O R A T D I V I D I N G W A L L 3 7 3 " = 1 ' - 0 " S C A L E E N L A R G E D S W I N G D O O R J A M B D E T A I L S 3 9 3 " = 1 ' - 0 " S C A L E E N L A R G E D S W I N G D O O R H E A D E R D E T A I L 3 8 3 " = 1 ' - 0 " S C A L E J A M B S T U D A S S E M B L Y T O P C O N N E C T I O N 4 1 3 " = 1 ' - 0 " S C A L E J A M B S T U D A S S E M B L Y T O P C O N N E C T I O N 4 2 3" = 1'-0"SCALEANGLE CLIP AT PARTITION WALL AT AISLE 4 3 3" = 1'-0"SCALETOP ANGLE CONN AT AISLE SIDE45 R O L L U P D O O R U H - 0 4 A N G L E J A M B T R I M U H - 1 2 H A T T A C H W / U H - 3 5 R I V E T S N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) 2 - 1 / 2 " C E E U H - 0 8 H O R I Z A N G L E C L I P U H - 3 3 ( B O T H E N D S ) J A M B S T U D U H - 1 0 B E Y O N D ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N C E E & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T . @ 6 0 " O C . ( M A X . ) U H - 3 5 R I V E T S ' D ' - P A N E L U H - 0 1 J A M B S T U D U H - 1 0 W / ( 2 ) # 1 2 S C R E W S @ T O P & B O T . A N G L E S D O O R G U I D E 1 8 G A . G A L V . S T E E L R O L L - U P D O O R ( R . U . D . ) G U I D E A N G L E J A M B T R I M U H - 1 2 W / ( 4 ) # 8 S C R E W S U H - 3 8 W N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) R . U . D . U H - 0 4 S E E P L A N F O R D O O R N U M B E R & S 7 . 1 F O R D O O R I N F O R M A T I O N 1 2 " T Y P . 9 6 " C L E A R O P E N I N G ( 8 ' - 0 " D O O R ) 4 0 " C L E A R O P E N I N G ( 3 ' - 4 " D O O R ) N O T E : · S E E J A N U S I N T . M O D E L I N S T A L L A T I O N V I D E O A N D I N S T R U C T I O N S F O R D O O R I N S T A L L A T I O N · O U T T O O U T O F D O O R G U I D E R A I L S H A L L B E 1 " L A R G E R T H A N C U R T A I N W I D T H 3 " = 1 ' - 0 " S C A L E E N L A R G E D R O L L - U P D O O R H E A D E R D E T A I L 3 4 3 " = 1 ' - 0 " S C A L E E N L A R G E D R O L L - U P D O O R J A M B D E T A I L 3 5 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E , M I D - S P A N C E E & T O P A N G L E @ 1 8 " O . C . O N 2 - 1 / 2 " C E E U H - 0 8 V E R T . @ 6 0 " O . C . ( M A X . ) A N G L E J A M B T R I M U H - 1 2 H A T T A C H W / U H - 3 5 R I V E T S N O F A S T E N E R S I N F A C E O F T R I M ( T Y P . ) S W I N G D O O R U H - 1 6 J A M B S T U D U H - 1 0 B E Y O N D A N G L E C L I P U H - 3 3 B O T H E N D S D O O R S T O O P T R I M U H - 3 0 W / R I V E T S U H - 1 0 0 J A M B S T U D 2 - 1 / 2 " C E E U H - 0 8 H O R I Z O N T A L U H - 0 1 D - P A N E L B E Y O N D U H - 1 4 L F - 6 " x 4 " x 3 / 4 " x 1 6 G A . C E E ( 4 ) # 1 2 S C R E W S U H - 3 7 A T S I M P S O N L 3 0 C L I P A N G L E 6 x 6 x 2 0 G A . G A L V C F S P L A T E A T T A C H M E N T T O U N D E R S I D E O F U H - 1 4 W / ( 4 ) # 1 2 S C R E W S ( 1 ) A T E A C H C O R N E R P L A T E 2 " D O O R A S S E M B L Y U H - 1 6 ' D ' P A N E L U H - 0 1 W / # 8 S C R E W U H - 3 8 W @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . B O T . A N G L E U H - 0 7 J A M B S T U D U H - 1 0 W / ( 2 ) # 1 2 S C R E W S U H - 3 7 A T T O P A N G L E & B O T . U H - 0 7 ( T Y P . ) A N G L E T R I M L & R S I D E S U H - 1 1 N O T C H E D U H - 1 0 J A M B S T U D , S T R I K E S I D E O N L Y K I C K P L A T E U H - 0 5 ' D ' P A N E L U H - 0 1 B O T . A N G L E U H - 0 7 B O U . W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) N O T E : · S E E J A M B S T U D A N D H E A D E R S T U D S S H A L L B E I N S T A L L E D L E V E L A N D P L U M . 3 ' - 4 " R O U G H O P E N I N G W I T H S P A C E R 25 8" 2-1/2" CEE UH-08 #12 SCREW UH-37 ANGLE CLIP UH-33'D' PANEL UH-01 W/#8SCREW UH-38W @ BOT.ANGLE, MID-SPAN CEE &TOP ANGLE @ 18" O.C.#12 SCREW UH-37 ANGLE CLIP UH-332-1/2" CEE UH-082-1/2" CEE UH-08D-PANEL BEYONDUH-01 'J' MOLD UH-06'D' PANEL UH-01 TOP ANGLE UH-07UH-01 D-PANEL (BEYOND)JAMB STUD UH-10 J A M B S T U D U H - 1 0 4 2 A 9 . 1 0 ( 4 ) # 1 2 S C R E W S U H - 3 7 A T S I M P S O N L 3 0 C L I P A N G L E 6 x 6 x 2 0 G A . G A L V C F S P L A T E A T T A C H M E N T T O U N D E R S I D E O F U H - 1 4 W / ( 4 ) # 1 2 S C R E W S ( 1 ) A T E A C H C O R N E R O F P L A T E T Y P . U H - 1 4 L F - 6 " x 4 " x 3 / 4 " x 1 6 G A . C E E R O L L U P D O O R U H - 0 4 B O T . A N G L E U H - 0 7 W / 3 / 4 " H I L T I P I N S U H - 3 9 @ 1 5 " O . C . ( M A X . ) & 6 " F R O M E N D ( M A X . ) B O T . A N G L E U H - 0 7 O R U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 ' D ' P A N E L U H - 0 1 ' U ' P A N E L U H - 0 2 W / # 1 2 S C R E W U H - 3 7 @ B O T . A N G L E & T O P A N G L E @ 1 8 " O . C . 2 - 1 / 2 " C E E U H - 0 8 @ 6 0 " O . C . ( M A X . ) S W I N G D O O R A S S E M B L Y U H - 1 6 ' U ' P A N E L U H - 0 2 B O T . A N G L E U H - 0 7 O R U H - 1 8 W / P O W D E R D R I V E N P I N S U H - 3 9 S W I N G D O O R M A X I M U M O F F S E T W H E N C L O S E D D E T A I L A 9 . 1 0 3 5 A 9 . 1 0 3 9 3" = 1'-0"SCALEANGLE CLIP AT PARTITION WALL 4 4 2" B G D Z T Y P I C A L L O C K E R D E T A I L S A 9 . 1 0 S I T E A D D R E S S : A R C H I T E C T L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- 1 2 4 0 9 S . 8 T H S T , S T E 2 0 1 B O I S E , I D 8 3 7 0 2 P : 2 0 8 - 8 1 0 - 7 7 4 5 3 U - H A U L M O V I N G A N D S T O R A G E O F R E X B U R G 3 2 8 N 2 N D E . R E X B U R G , I D 8 3 4 4 0 3 STRUCTURAL NOTES GENERAL 1. SPECIFICATIONS: FOR MORE COMPLETE INFORMATION SEE SPECIFICATIONS. WHERE CONFLICTS BETWEEN THESE NOTES AND SPECIFICATIONS OCCUR, THE MORE STRINGENT OF THESE SHALL TAKE PRECEDENCE. 2. THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF ALL ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL AND PLUMBING WORK. IMMEDIATELY NOTIFY THE STRUCTURAL ENGINEER OF ANY DISCREPANCIES OR CONFLICTS WITH OTHER TRADES. 3. DIMENSIONS: THE STRUCTURAL DRAWINGS SHALL BE CONSIDERED AS A PART OF THE COMPLETE SET OF CONTRACT DRAWINGS, INCLUDING THE DRAWINGS OF ALL DISCIPLINES. IT IS INTENDED THAT THE STRUCTURAL DRAWINGS WILL PROVIDE SUFFICIENT DIMENSIONS TO LOCATE THE PRIMARY STRUCTURAL ELEMENTS AND MEMBERS. LOCATION OF SECONDARY MEMBERS WHICH ARE AFFECTED BY SYSTEMS DETAILED BY OTHERS MAY REQUIRE REFERENCE TO THE DRAWINGS OF OTHER DISCIPLINES AND LAYOUT AND COORDINATION BY THE CONTRACTOR. IF DIRECT CONFLICT BETWEEN DIMENSIONS OF TWO OR MORE DISCIPLINES IS ENCOUNTERED, SUCH CONFLICTS SHALL BE RESOLVED BY THE ARCHITECT. DO NOT USE SCALED DIMENSIONS. USE WRITTEN DIMENSIONS OR WHERE DIMENSIONS ARE NOT PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATIONS BEFORE PROCEEDING WITH THE WORK IN QUESTION. 4. TYPICAL AND SIMILAR CONDITIONS: ALL CONCRETE IS REINFORCED, AND ALL STEEL MEMBERS ARE CONNECTED TO IMMEDIATELY ADJACENT MEMBERS SHOWN ON THE PLANS UNLESS SPECIFICALLY NOTED OTHERWISE. WHERE SPECIFIC DETAILS ARE NOT CALLED OUT, TYPICAL DETAILS OR DETAILS SHOWN FOR SIMILAR CONDITIONS SHALL APPLY, SUBJECT TO THE STRUCTURAL ENGINEERS APPROVAL. 5. SPECIAL CONDITIONS: REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR LOCATION AND SIZE OF BLOCKOUTS, INSERTS, OPENINGS, CURBS, HOUSEKEEPING PADS, DEPRESSIONS AND SLOPES NOT SHOWN ON THE STRUCTURAL DRAWINGS. 6. OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, SPECIFICATIONS, NOTES, AND DETAILS SHALL BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER AND RESOLVED BEFORE PROCEEDING WITH THE WORK. 7. THE CONTRACTOR MUST SUBMIT IN WRITING ANY REQUESTS FOR MODIFICATIONS TO THE PLANS AND SPECIFICATIONS. SHOP DRAWINGS SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW DO NOT CONSTITUTE "IN WRITING" UNLESS IT IS CLEARLY NOTED THAT SPECIFIC CHANGES ARE BEING REQUESTED. 8. LOADS FROM CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOFS. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT LISTED IN THE DESIGN CRITERIA. CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. 9. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT AND MATERIALS. 10. DEFERRED SUBMITTALS: WHERE STRUCTURAL COMPONENTS ARE FULLY OR PARTIALLY DESIGNED AND DETAILED BY THE SUPPLIER OR FABRICATOR, COMPLETE SHOP DRAWINGS AND CALCULATIONS, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED, SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW. IN ADDITION, A COPY OF THESE DOCUMENTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FOR APPROVAL IN ACCORDANCE WITH LOCAL CODE BEFORE INSTALLATION. GOVERNING CODES IBC 2018 CODE REGULATION / REQUIREMENT BUILDING CODE CODE REFERENCE ASCE 7-16MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ACI 318-14BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE TMS 402-16BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES AISC 360-16 & AISC 341-16SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AISI S240-15NORTH AMERICAN STANDARD FOR COLD-FORMED STEEL FRAMING - GENERAL PROVISIONS NDS-2018NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION STRUCTURAL DESIGN CRITERIA FLOOR DEAD LOAD (psf) LIVE LOAD (psf) CONCENTRATED LOAD (lbs) PER EQUIPMENT, 1000 MIN 300 125 100 50 50 SUSP. SLAB (LIGHT STORAGE) STAIRS DESIGN LOADS CONSTRUCTION TYPE = V-B RISK CATEGORY = II ROOF DEAD LOAD (psf) LIVE LOAD (psf) FLAT ROOF 15 20 (SEE SNOW CRITERIA) CONCENTRATED LOAD (lbs) (SEE PLAN) SNOW WIND GROUND SNOW LOAD FLAT-ROOF SNOW LOAD SNOW EXPOSURE FACTOR SNOW LOAD IMPORTANCE FACTOR THERMAL FACTOR Pg = 50 psf Pf = 35 psf Ce = 1.0 I = 1.0 Ct = 1.0 105 mph (3 SEC. GUST) C 24.6 psf (END) 16.3 psf (INTERIOR) -34.7 psf (ROOF, ZONE 1) -46.1 psf (ROOF, ZONE 2) -54.9 psf (ROOF, ZONE 3) BASIC WIND SPEED WIND EXPOSURE MWFRS PRESSURE COMPONENT AND CLADDING DESIGN WIND PRESSURE -26.0 psf (WALL, ZONE 4) -39.0 psf (WALL, ZONE 5) SEISMIC Ie = 1.0 Ss = 0.370 S1 = 0.143 D SDS = 0.371 SD1 = .221 D FLAT STRAP X-BRACED WALLS & WOOD/METAL SHEATHED SHEARWALLS CS = 0.114 (ULTIMATE) R = 3.25 EQUIVALENT LATERAL FORCE SEISMIC IMPORTANCE FACTOR MAPPED SPECTRAL RESPONSE ACCELERATIONS SITE CLASS SPECTRAL RESPONSE COEFFICIENTS SEISMIC DESIGN CATEGORY BASIC SEISMIC LOAD RESISTING SYSTEM (SLRS) SEISMIC RESPONSE COEFFICENT RESPONSE MODIFICATION FACTOR ANALYSIS PROCEDURE USED ASTM A615DEFORMED BARS 60 WELDED WIRE FABRIC (WWF) ICC REPORT #2495 LAP / COUPLER SPLICE CONCRETE REINFORCEMENT REINFORCING STEEL STANDARDLOCATION / USE OR TYPE GRADE (ksi) ASTM A185 65 WELDABLE REINFORCING STEEL ASTM A706 60 PLAIN / SMOOTH BARS ASTM A615 60 DESCRIPTIONSPLICE TYPE DS BAR-LOCK COUPLER BY 'DAYTON SUPERIOR' REFERENCE TYPICAL LAP SPLICE COUPLER SPLICE DETAIL, .LAP REINFORCING IN PLACE NOTES: 1. COMPACTION REQUIREMENTS SHALL BE AS INDICATED IN THE GEOTECHNICAL REPORT. 2. FOR PIPING OR OTHER UTILITIES ALONGSIDE OR PENETRATING THROUGH FOUNDATION WALLS, RE: . 3. CONCRETE FOUNDATIONS AND SLABS ON GROUND SHALL BEAR ON DRY NATIVE SOIL OR ENGINEERED FILL, BOTH WITH VERIFIED COMPACTION OF 98% PER STANDARD PROCTOR U.N.O. IN THE GEOTECHNICAL REPORT. GEOTECHNICAL STRUCTURAL DESIGN BASED ON: OWNER ACCEPTED RECOMMENDATIONS CONTAINED IN THE GEOTECHNICAL REPORT FROM: MAXIMUM FOUNDATION SOIL BEARING PRESSURE USED EXTERIOR FOOTINGS SHALL BE FOUNDED BELOW THE ADJACENT FINISHED GROUND, (MEASURED FROM BOTTOM OF FOOTING), A MINIMUM OF: REPORT # / BY 1500 psf 36" DATE No. E212541g ATLAS NOV 8, 2021 FOUNDATION AND SLAB BASE REQUIREMENTS: FOOTINGS: BEAR ON ENGINEERED FILL OR UNDISTURBED NATIVE SOILS. SLABS: PLACE OVER 4" OF 3/4" MINUS CRUSHED BASE, OVER ENGINEERED FILL OR UNDISTURBED NATIVE SOILS. CONCRETE MIX DESIGN MIN CEMENT & W/C RATIO (PER CUBIC YARD) MIX DESIGN SHALL BE ESTABLISHED IN ACCORDANCE TO CHAPTER 5 OF ACI 318. LOCATION / USE OR TYPE 28 DAY STRENGTH ENTRAINED AIR (3% MAX. IN NON- AIR ENTRAINED CONCRETE) MAXIMUM SLUMP * 2" to 4" SLUMP BEFORE ADDITION OF PLASTICIZER WITH PLASTICIZER CEMENT TYPE - - -500 lbs. / 0.50 W/C 8" MAX.* WALLS & FDN WALLS 8" MAX.* 8" MAX.* FOOTINGS FOUNDATIONS SITE ELEMENTS NO PLASTICIZER 6% (± 11/2%) 4" (± 1") 4" (± 1") 4" (± 1") f´c = 3500 psi f´c = 3500 psi f´c = 3500 psi 6% (± 11/2%) 500 lbs. / 0.45 W/C 500 lbs. / 0.50 W/C I/II I/II I/II INT. SLABS 6" MAX.f´c = 4000 psi- - -- - - EXT. SLABS 6" MAX. SLABS 8" MAX.*f´c = 4000 psi6% (± 11/2%) 520 lbs. / 0.53 W/C 520 lbs. / 0.50 W/C I/II I/II REINFORCING CONCRETE COVER NOTES: 1. PROVIDE SPECIAL INSPECTION TO MEET LOCAL CODE REQUIREMENTS. GENERAL CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOURS NOTICE TO THE SPECIAL INSPECTOR PRIOR TO POURING CONCRETE. 2. EMBEDDED ITEMS ARE TO BE CAST IN PLACE, TYPICAL. DO NOT WET SET ANY EMBEDDED ITEMS, U.N.O. 3. SECURE ALL REINFORCING IN POSITION WITH CHAIRS BEFORE CONCRETE PLACEMENT EXCEPT THAT CONCRETE DOBIES MAY BE USED TO POSITION SLAB-ON-GRADE REINFORCEMENT. DOWELS SHALL BE TIED IN PLACE PRIOR TO PLACING CONCRETE. DO NOT STAB OR "WET-SET" DOWELS. INSTALL AND SECURE ANCHOR BOLTS, EMBED PLATES, ETC. WITHIN SPECIFIED TOLERANCES PRIOR CONCRETE PLACEMENT. 4. MECHANICALLY VIBRATE ALL CONCRETE PLACEMENTS, EXCEPT SLABS, GREATER THAN 5" THICK. 5. AT SLAB RE-ENTRANT CORNERS AND FLOOR PENETRATIONS, RE: . 6. ALL REBAR IN CONCRETE EXPOSED TO EARTH SHALL BE GALVANIZED. REBAR IN SLABS ON GROUND THAT ARE PROTECTED BY A VAPOR BARRIER AND/OR INSULATION DO NOT REQUIRE GALVANIZED REBAR. MINIMUM CONCRETE COVER OVER REINFORCEMENTLOCATION / USE OR TYPE 1 1/2" CONCRETE CAST AGAINST EARTH CONCRETE EXPOSED TO EARTH OR WEATHER 3" CONCRETE NOT EXPOSED TO EARTH OR WEATHER BEAMS AND COLUMNS: 3/4" 1 1/2" SLABS AND WALLS: #6 AND LARGER: #5 AND SMALLER: 2" MASONRY MATERIALS & STANDARD REQUIREMENTS USE RUNNING BOND EXCEPT AS NOTED. 2000 psiASTM C90CONCRETE MASONRY UNITS GROUT STANDARDMATERIAL ASTM C1019 MORTAR ASTM C270 - - - OR SPECIFIED COMPRESSIVE STRENGTHTYPE 2000 psi DENSITY SPECIFICATION TYPE S NORMAL WEIGHT > 125 pcf LIGHTWEIGHT < 105 pcf - - - - - - - - - - - - MASONRY REINFORCING STEEL LOCATION / USE OR TYPE GRADE (ksi)STANDARD ASTM A615 60 WELDABLE REINFORCING STEEL ASTM A706 60 PLAIN / SMOOTH BARS ASTM A615 60 ASTM A951 65 LADDER OR TRUSS WITH PRE-FABRICATED CORNER & TEE INTERSECTION UNITS SIDE CROSS .1483"Ø .1483"Ø TYPICAL MASONRY REINFORCING STEEL SIZEROD WIRE VERT. SPACING 16" O.C. LOCATION / TYPE JOINT REINFORCING STEEL GRADE (ksi)STANDARD f´m = 2000 psiASTM C1314MASONRY PRISM/ASSEMBLY - - - - - - NOTES: 1. SPECIAL INSPECTION IS REQUIRED. PROVIDE SPECIAL INSPECTION TO MEET LOCAL CODE REQUIREMENTS. GENERAL CONTRACTOR SHALL NOTIFY SPECIAL INSPECTOR A MINIMUM OF 48 HOURS PRIOR TO GROUTING OPERATIONS. 2. THERE SHALL BE A MINIMUM OF (1) #5 ON ALL SIDES OF EVERY OPENING IN MASONRY WALLS, UNO. BARS SHALL EXTEND NOT LESS THAN 24" BEYOND THE CORNER OF THE OPENING, TYPICAL. 3. ALL CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. GROUT SHALL BE A WORKABLE MIXTURE SUITABLE FOR PUMPING WITHOUT SEGREGATION AND SHALL BE THOROUGHLY MIXED. GROUT SHALL BE CONSOLIDATED BY MECHANICAL VIBRATION DURING PLACING AND RECONSOLIDATED AFTER EXCESS MOISTURE HAS BEEN ABSORBED, BUT BEFORE WORKABILITY IS LOST. THE GROUTING OF A WALL SHALL BE COMPLETED IN ONE DAY WITH NO INTERRUPTIONS GREATER THAN ONE HOUR. 4. ALL REINFORCING SHALL BE PLACED PRIOR TO GROUTING. VERTICAL REINFORCING BARS SHALL BE HELD IN POSITION AT THE TOP AND BOTTOM AND AT INTERVALS NOT FARTHER APART THAN 200 BAR DIAMETERS. 5. THERE SHALL BE A MINIMUM OF 1" OF GROUT ALL THE WAY AROUND ALL ANCHOR BOLTS. 6. ALL BEAM/JOIST/GIRDER POCKETS SHALL BE FILLED WITH GROUT AFTER ALL DEAD LOADS ARE IN PLACE. 7. SOLID GROUT BOTTOM 4'-0" OF CMU WALLS ABOVE FINISH FLOOR, TYP. 8. ALL CMU BELOW F.G. TO BE SOLID GROUTED. ICC REPORT #2495 LAP / COUPLER SPLICE DESCRIPTIONSPLICE TYPE DS BAR-LOCK COUPLER BY 'DAYTON SUPERIOR' REFERENCE TYPICAL LAP SPLICE COUPLER SPLICE DETAIL, .LAP REINFORCING IN PLACE JOINT REINFORCEMENT LAP - - -LAP JOINT REINFORCING 12" MIN. ALL STEEL WORK SHALL CONFORM WITH AISC SPECIFICATIONS. CONNECTIONS ASTM A992WIDE FLANGE SHAPES OTHER ROLLED SHAPES NOTES: 1. SPECIAL INSPECTION IS REQUIRED. PROVIDE SPECIAL INSPECTION TO MEET LOCAL CODE REQUIREMENTS. GENERAL CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOUR NOTICE TO SPECIAL INSPECTOR PRIOR TO ANY FIELD WELDING OPERATIONS OR INSTALLATION OF HIGH STRENGTH BOLTS. 2. NON-SHRINK GROUT: ASTM C 1107, MINIMUM COMPRESSIVE STRENGTH OF 7,000 psi AT 28 DAYS. DAMP CURE OR CHEMICAL CURE ALL NON-SHRINK GROUT PLACEMENTS PER MANUFACTURER'S RECOMMENDATIONS. STEEL DECKING STRUCTURAL AND MISCELLANEOUS STEEL STEEL MEMBERS STANDARD (U.N.O.)LOCATION / USE OR TYPE GRADE ASTM A36 STRUCTURAL HSS TUBING ASTM A500 B STEEL JOISTS* - - - TYPELOCATION / USE FINISH ROOF DECK PAINTED1-1/2" DGB-36 DECK OPENING REINFORCEMENT - - - - - - - - - DESIGN REQUIREMENT / REFERENCE UNIFORM AND CONCENTRATED LOADS / INDICATED ON ROOF FRAMING PLAN AND ROOF NOTES - - - - - - - - - *JOIST DEPTH SHALL NOT EXCEED DEPTH INDICATED ON ROOF FRAMING PLAN. MANUFACTURER ASC PROFILES, INC. GAUGE 20GA. • ROOF DECK TO BE CONTINUOUS FOR 2 OR MORE SPANS. • PROVIDE COPY OF ICC EVALUATION REPORT WITH ROOF DECK SHOP DRAWINGS. • (EQUIVALENT ALTERNATES WILL BE ALLOWED UPON REQUEST WITH VALID ICC REPORT) CONNECTION REFERENCE DIAPHRAGM NOTES, RE: S3 • REINFORCE OPENINGS WITH ADDITIONAL METAL REINFORCEMENT AND CLOSURE PIECES AS REQUIRED FOR STRENGTH, CONTINUITY OF DECKING AND SUPPORT OF OTHER WORK SHOWN. RE: DETAILS , & . LOCATION / USE STANDARD OR MFR.TYPE 1 ALL BOLT CONNECTIONS TO BE SNUG TIGHT EXCEPT BOLTS NOTED AS S.C. TO BE FULLY TIGHTENED PROVIDE LOAD INDICATOR WASHERS AT ALL S.C. BOLTS. 2 AUTOMATICALLY END WELDED. OPTION STEEL TO STEEL ASTM A325BOLTS 1 E70 ELECTRODESWELDS - - - E60 ELECTRODES (ROOF DECK ATTACHMENT ONLY) STEEL TO CONCRETE ASTM A307BOLTS 1 - - - HEADED SHEAR STUDS 2 'NELSON' DIVISION OF TRW HEADED CONCRETE ANCHORS (HCA) 2 DEFORMED BAR ANCHORS (DBA) 2 OR APPROVED EQUIVALENT OR APPROVED EQUIVALENT OR APPROVED EQUIVALENT 'NELSON' DIVISION OF TRW 'NELSON' DIVISION OF TRW STUD WALL BLOCKING / BRIDGING SHEATHING ATTACHMENT LOCATION TYPE COLD FORMED STEEL ALL INSTALLATION AND CONNECTIONS SHALL FOLLOW THE LATEST EDITION OF THE AISI GUIDELINE RECOMMENDATIONS. 800T150-54 TOP & BOT. TRACK CONTINUOUS METAL TRACKS 800S162-54 STUDSSTRUCTURAL & EXTERIOR STUD WALLS 1/8" FLARE WELD #8 'TEK' SCREWSALL METAL WALLS 6" O.C. #8 'TEK' SCREWSALL METAL ROOFS 6" O.C. STRUCTURAL MEMBERS DOUBLE STUDS AND HEADERS SIZE (U.N.O.) USE OR TYPE - - - 24" O.C. STUD SPACING (U.N.O.) (2) ROWS @ 24" O.C. CONT. L2x2 x 16GA. AT EXPOSED SOFFIT EDGES STITCH WELDED FULL LENGTH #10 SCREWSSCREWED BACK TO BACK 2" @ 12" O.C. MATCH STUD GAUGE MID WALL HEIGHT OR 8'-0" O.C. MAX. 4' - 0" O.C.LOAD BEARING & EXTERIOR WALLS NON LOAD BEARING WALLS ATTACHMENT TYPE ATTACHMENT SPACING STUD WALLS LOCATION REQUIREMENT ATTACHMENT OPTION FASTENER TYPE (U.N.O.) PANEL EDGE SPACING (U.N.O.) 12" O.C. 12" O.C. FIELD SPACING (U.N.O.) VERTICAL SPACINGGAUGE MATCH STUD GAUGE • FOR FASTENER LAYOUT AND TYPICAL NOTES, RE: • ALL EXTERIOR CFS WALLS ARE SHEARWALLS. BLOCK ALL PANEL EDGES AND PROVIDE PANEL EDGE ATTACHMENT. CONT. L2x2 x 16GA. AT EXPOSED SOFFIT EDGES • BRIDGING IS NOT REQUIRED IF BOTH SIDES OF THE WALLS ARE SHEATHED FULL HEIGHT. YIELD STRENGTH (MIN. / U.N.O.) TYPICAL C.F.S. STRUCTURAL MEMBERS Fy = 50 (ksi) LOCATION / USE OR TYPE CONNECTION TYPE CONNECTIONS LOCATION / USE OR TYPE WELD SIZE (MIN.) WELD TYPE (U.N.O.) STANDARD OR MFR. FOLLOW MFR. RECOMMENDATIONS- - - E60 ELECTRODESC.F.S. TO C.F.S.FILLET FLARE BEVEL HARDWARE WELDED (U.N.O.)1/16" 1/8" 'SIMPSON' OR EQUIVALENT- - -C.F.S. TO NON-C.F.S. STITCH WELDS: 2" @ 12" O.C. U.N.O. REMARKS CONNECTIONS DF#2STUDS, JOISTS, ETC.2x4 OR LARGER SHEATHING GRADE (U.N.O.)LOCATION / USE SIZE PANEL IDENTIFICATIONLOCATION / USE TYPEFASTENER COMMON NAILS LUMBER APA RATED PLYWOOD OR OSB EXP. 1ROOF SHEATHING WALL SHEATHING SAWN LUMBER NAILS • FOR CONNECTIONS OF 'SIMPSON' HARDWARE OR EQUIVALENT FOLLOW MANUFACTURERS RECOMMENDATIONS. PANEL TYPE CDX PLYWOOD OR OSB NOTES: 1. PROVIDE NOMIMAL PANEL THICKNESSES AS CALLED ON THE PLANS. 2. THE SMOOTH FACE OF PANELS SHALL BE EXPOSED AT ALL EXPOSED INTERIOR CONDITIONS. 3. THE SAME PANEL TYPES MUST BE USED AT ALL EXPOSED INTERIOR CONDITIONS. APA RATED PLYWOOD OR OSB EXP. 1CDX PLYWOOD OR OSB REINFORCING CONCRETE COVER ASTM A615DEFORMED BARS 60 WELDED WIRE FABRIC (WWF) ICC REPORT #2495 NOTES: 1. SPECIAL INSPECTION IS REQUIRED. PROVIDE SPECIAL INSPECTION TO MEET REQUIREMENTS OF LOCAL CODE. GENERAL CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOURS NOTICE TO THE SPECIAL INSPECTOR PRIOR TO POURING CONCRETE. 2. INSTALL AND SECURE ANCHOR BOLTS, EMBED PLATES, ETC. WITHIN SPECIFIED TOLERANCES PRIOR TO CONCRETE PLACEMENT. LAP / COUPLER SPLICE CONCRETE TILT-UP PANELS REINFORCING STEEL STANDARDTYPE GRADE (ksi) ASTM A185 65 WELDABLE REINFORCING STEEL ASTM A706 60 PLAIN / SMOOTH BARS ASTM A615 60 DESCRIPTIONSPLICE TYPE DS BAR-LOCK COUPLER BY 'DAYTON SUPERIOR' REFERENCE TYPICAL LAP SPLICE COUPLER SPLICE DETAIL .LAP REINFORCING IN PLACE MINIMUM CONCRETE COVER OVER REINFORCEMENTLOCATION / USE OR TYPE 1 1/2" CONCRETE CAST AGAINST EARTH CONCRETE EXPOSED TO EARTH OR WEATHER 3" CONCRETE NOT EXPOSED TO EARTH OR WEATHER BEAMS AND COLUMNS: 3/4" 1 1/2" #5 AND SMALLER: #6 AND LARGER: 2" SLABS & WALLS: ALL CONCRETE TILT-UP WORK SHALL BE ESTABLISHED IN ACCORDANCE WITH ACI 301-99 CONTRACTOR'S RESPONSIBILITY DESCRIPTIONREQUIREMENT ADDITIONAL REINFORCEMENT DETAILED INDIVIDUAL PANEL PIECE DRAWINGS TEMPORARY BRACING OF PANELS UNTIL SECURED PERMANENTLY IS THE CONTRACTOR'S RESPONSIBILITY. • PLACE MECHANICAL CONNECTORS WHERE SHOWN. • REINFORCE OPENINGS THROUGH PANELS AS DETAILED. • SECURE ALL REINFORCING IN POSITION WITH CHAIRS BEFORE CONCRETE PLACEMENT. • APPLY AT LEAST TWO UNIFORM COATS OF BOND BREAKER ON THE CASTING SLAB. • MECHANICALLY VIBRATE THE STRUCTURAL PANEL WYTHE DURING CONCRETE PLACEMENT. • PROTECT AND CURE ALL CONCRETE SURFACES. • BEGIN CURING IMMEDIATELY AFTER FINISHING. PANELS ARE DESIGNED FOR SERVICE CONDITIONS. REINFORCEMENT FOR LIFTING STRESSES, HOIST POINTS, ETC OR STRONGBACKS, IF REQUIRED ARE THE CONTRACTOR'S RESPONSIBILITY. DRAWINGS INCLUDING ALL EMBEDMENT TYPES AND LOCATIONS, LIFTING INSERT TYPE AND LOCATIONS, BRACING INSERT TYPE AND LOCATIONS, ETC ARE THE CONTRACTOR'S RESPONSIBILITY AND MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL. TEMPORARY BRACING PRE-PANEL ERECTION REQUIREMENTCONDITION CONCRETE COMPRESSIVE STRENGTH LENGTH OF TIME PANEL CONCRETE CURED 3000 PSI (MIN.) (7) DAYS (MIN.) TWO CONDITIONS MUST BE SATISFIED BEFORE PANELS MAY BE ERECTED PANEL CONSTRUCTION ALL ANCHORS INTO CONCRETE MUST BE DESIGNED IN ACCORDANCE WITH ACI 318 APPENDIX D CRITERIA FOR CRACKED CONCRETE. LOCATION / USE - - -HILTI KWIK CON II* HILTI HY200*EPOXY ANCHORS ICC-ES REPORT ESR-3187 HILTI KWIK BOLT TZ*EXPANSION ANCHORS ICC-ES REPORT ESR-1917 HILTI HY270* ICC REPORT #4143 UNGROUTED CMU CELLS HILTI HY270 W/ HIT-IC INSERT ICC REPORT #4143 CONCRETE OR GROUTED CMU CELLS HILTI KWIK/HUS-EZ*ICC ESR-3027 AND ESR-3056 CONCRETE GROUTED CMU CELLS ANCHORS NOTES: 1. INSTALL ANCHORS PER MANUFACTURER'S INSTRUCTIONS. 2. ALTERNATE ANCHORS MAY BE SUBMITTED FOR APPROVAL. SUBMITTAL MUST INCLUDE APPLICABLE ICC REPORTS. TYPE ANCHOR (U.N.O.)REFERENCE * ALTERNATES ALLOWED PER NOTE #2 CONCRETE OR GROUTED CMU CELLS EPOXY ANCHORS EPOXY ANCHORS SCREW ANCHORS SCREW (USE ONLY WHERE SPECIFICALLY NOTED ON DETAILS) /5 S5.0 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S0 GENERAL STRUCTURAL NOTES DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 SHEET NUMBER SHEET S0 GENERAL STRUCTURAL NOTES S0.1 SPECIAL INSPECTION S1 FOUNDATION PLAN S1.1 FIRST FLOOR SHEARWALL PLAN S2 SECOND FLOOR FRAMING PLAN S2.1 SECOND FLOOR SHEARWALL PLAN S3.0 THIRD FLOOR FRAMING PLAN S3.1 THIRD FLOOR SHEARWALL PLAN S4.0 ROOF FRAMING PLAN S5.0 FOUNDATION DETAILS S5.1 FOUNDATION DETAILS S5.2 FOUNDATION DETAILS S6.0 FLOOR FRAMING DETAILS S6.1 FLOOR FRAMING DETAILS S6.2 FLOOR FRAMING DETAILS S7.0 ROOF FRAMING DETAILS S7.1 ROOF FRAMING DETAILS S8.0 STAIR FRAMING PLANS S8.1 STAIR FRAMING & DETAILS S9.0 CANOPY FRAMING S10.0 COMPOSITE TILT-UP PANEL WALL ELEVATIONS S10.1 TILT-UP PANEL DETAILS N o . D e s c r i p t i o n D a t e 3 U H I C O M M E N T S / C I T Y R E S U B M I T T A L 0 9 .1 5 .2 0 2 2 3 3 09/27/2022 SPECIAL INSPECTION SPECIAL INSPECTION, MATERIAL TESTING & STRUCTURAL OBSERVATION ITEMS REQUIRED BY CHAPTER 17 OF THE IBC FOR ITEMS REQUIRING CONTINUOUS INSPECTION, A SPECIAL INSPECTOR MUST BE PRESENT ONSITE DURING THE PERFORMANCE OF THAT TASK. IN “PERIODIC” INSPECTIONS/TESTS SHALL BE PERFORMED PRIOR TO COMMENCING THE TASK, INTERMITTENTLY DURING THE TASK, AND AT THE COMPLETION OF THE TASK, UNLESS NOTED OTHERWISE. THE “DETAILED INSTRUCTIONS & FREQUENCY” PROVIDES A DESCRIPTION OF THE PRESUMED REQUIREMENTS FOR TASKS REQUIRING “PERIODIC” INSPECTIONS. SPECIAL INSPECTORS SHALL: • BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO PERFORMING ANY DUTIES. • PROVIDE PROOF OF LICENSURE AS A SPECIAL INSPECTOR IN THE PROJECT’S STATE FOR EACH TYPE OF INSPECTION. • INSPECTION REPORTS ARE TO MEET THE REQUIREMENTS OF THE BUILDING CODE AND LOCAL AHJ STANDARDS. • INSPECTION REPORTS ARE TO BE SUBMITTED TO THE ARCHITECT, ENGINEER, OWNER/PROJECT MANAGER, AHJ PROJECT MANAGER, AND THE STATE BUILDING OFFICIAL WITHIN 48 HOURS OF PERFORMING INSPECTIONS. • A FINAL INSPECTION REPORT SHALL BE SUBMITTED FOLLOWING COMPLETION OF THE PROJECT DOCUMENTING THE TYPES OF SPECIAL INSPECTIONS PERFORMED AND A STATEMENT INDICATING THAT THE STRUCTURE IS IN COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND APPLICABLE CODES. ASSUMED MANPOWER FOR SPECIAL INSPECTION ITEMS, TO BE DISCUSSED AND VERIFIED WITH OWNER: • THE SAME INDIVIDUAL INSPECTORS SHALL BE USED FOR THE PROJECT TO MAINTAIN CONTINUITY WITHIN THE PROJECT. ○ SPECIAL INSPECTION AGENCY SHALL BE RESPONSIBLE FOR PROVIDING THE COORDINATION OF PERSONNEL ACCEPTABLE TO OWNER • FOR REMOTE SITES, THE SPECIAL INSPECTORS SHOULD BE LICENSED IN MULTIPLE DISCIPLINES FOR SPECIAL INSPECTION IN ORDER TO LIMIT THE NUMBER IN INDIVIDUALS TRAVELING TO THE PROJECT SITE. FABRICATORS YES NO APPROVED FABRICATOR UNAPPROVED FABRICATOR X REQUIRED IN-PLANT INSPECTIONS YES NO STEEL CONSTRUCTION CONCRETE CONSTRUCTION COLD-FORMED CONSTRUCTION WOOD CONSTRUCTION STRUCTURAL STEEL ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES PRIOR TO WELDING: VERIFY WELDING PROCEDURES (WPS) AND CONSUMABLE CERTIFICATES X MATERIAL IDENTIFICATION X VERIFY TYPE AND GRADE OF MATERIAL. WELDER IDENTIFICATION X A SYSTEM SHALL BE MAINTAINED BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. FIT-UP GROOVE WELDS X VERIFY JOINT PREPARATION, DIMENSIONS, CLEANLINESS, TACKING, AND BACKING. ACCESS HOLES X VERIFY CONFIGURATION AND FINISH. FIT-UP OF FILLET WELDS X VERIFY ALIGNMENT, GAPS AT ROOT, CLEANLINESS OF STEEL SURFACES, AND TACK WELD QUALITY AND LOCATION. DURING WELDING: USE OF QUALIFIED WELDERS X VERIFY THAT WELDERS ARE APPROPRIATELY QUALIFIED. CONTROL AND HANDLING OF WELDING CONSUMABLES X VERIFY PACKAGING AND EXPOSURE CONTROL. CRACKED TACK WELDS X VERIFY THAT WELDING DOES NOT OCCUR OVER CRACKED TACK WELDS. ENVIRONMENTAL CONDITIONS X VERIFY WIN SPEED IS WITHIN LIMITS AS WELL AS PRECIPITATION AND TEMPERATURE. WPS FOLLOWED X VERIFY ITEMS SUCH AS SETTINGS ON WELDING EQUIPMENT, TRAVEL SPEED, WELDING MATERIALS, SHIELDING GAS TYPE/FLOW RATE, PREHEAT APPLIED, INTERPASS TEMPERATURE MAINTAINED, AND PROPER POSITION. WELDING TECHNIQUES X VERIFY INTERPASS AND FINAL CLEANING, EACH PASS IS WITHIN PROFILE LIMITATIONS, AND QUALITY OF EACH PASS. AFTER WELDING: WELDS CLEANED X VERIFY THAT WELDS HAVE BEEN PROPERLY CLEANED. SIZE, LENGTH, AND LOCATION OF WELDS X WELDS MEET VISUAL ACCEPTANCE CRITERIA X ARC STRIKES X K-AREA X BACKING & WELD TABS REMOVED X REPAIR ACTIVITIES X DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT/MEMBER X NONDESTRUCTIVE TESTING: CJP WELDS (RISK CAT. II)X ULTRASONIC TESTING SHALL BE PERFORMED ON 10% OF CJP GROOVE WELDS IN BUTT, T- AND CORNER JOINTS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN MATERIALS 5/16-INCH THICK OR GREATER. TESTING RATE MUST BE INCREASED IF > 5% OF WELDS TESTED HAVE UNACCEPTABLE DEFECTS. CJP WELDS (RISK CAT. III OR IV)X A REDUCTION IN THE RATE OF ULTRASONIC TESTING IS ALLOWED PER SECTION N5.5E. ACCESS HOLES (FLANGE > 2”)X WELDED JOINTS SUBJECT TO FATIGUE X PRIOR TO BOLTING (AISC 360): ►NOT REQUIRED IF ONLY SNUG-TIGHT JOINTS ARE SPECIFIED. CERTIFICATIONS OF FASTENERS X FASTENERS MARKED X VERIFY THAT FASTENERS HAVE BEEN MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS. PROPER FASTENERS FOR JOINT X VERIFY GRADE, TYPE, AND BOLT LENGTH IF THREADS ARE EXCLUDED FROM THE SHEAR PLANE. PROPER BOLTING PROCEDURE X VERIFY PROPER PROCEDURE IS USED FOR THE JOINT DETAIL. CONNECTING ELEMENTS X VERIFY APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET REQUIREMENTS. PRE-INSTALLATION VERIFICATION TESTING X OBSERVE AND DOCUMENT VERIFICATION TESTING BY INSTALLATION PERSONNEL FOR FASTENER ASSEMBLIES AND METHODS USED. PROPER STORAGE X VERIFY PROPER STORAGE OF BOLTS, NUTS, WASHERS, AND OTHER FASTENER COMPONENTS. DURING BOLTING: ►NOT REQUIRED IF ONLY SNUG-TIGHT JOINTS ARE SPECIFIED. ►NOT REQUIRED FOR PRETENSIONED JOINTS USING TURN-OF-THE-NUT METHOD WITH MATCH-MARKING, DIRECT-TENSION-INDICATORS, OR TWIST-OFF TYPE TENSION CONTROL METHOD. FASTENER ASSEMBLIES X VERIFY THAT FASTENER ASSEMBLIES ARE OF SUITABLE CONDITION, PACED IN ALL HOLES, AND WASHERS ARE POSITIONED AS REQUIRED. SNUG-TIGHT PRIOR TO PRETENSIONING X VERIFY THAT JOINTS ARE BROUGHT TO SNUG-TIGHT CONDITION PRIOR TO PRETENSIONING OPERATION. FASTENER COMPONENT X VERIFY THAT FASTENER COMPONENT IS NOT TURNED BY WRENCH PREVENTED FROM ROTATING. PRETENSIONED FASTENERS X VERIFY THAT FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES. AFTER BOLTING: DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS X STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL CONCRETE CONSTRUCTION POST-INSTALLED ANCHORS OR DOWELS X ALL POST-INSTALLED ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS REQUIRED BY THE APPROVED ICC-ES REPORT. MASONRY CONSTRUCTION PRIOR TO CONSTRUCTION: REVIEW MATERIAL CERTIFICATES, MIX DESIGNS, TEST RESULTS AND CONSTRUCTION PROCEDURES X VERIFY THAT MATERIALS CONFORM TO THE REQUIREMENTS OF THE APPROVED CONSTRUCTION DOCUMENTS. MIX DESIGN, TEST RESULTS, MATERIAL CERTIFICATES, AND CONSTRUCTION PROCEDURES SHOULD BE SUBMITTED FOR REVIEW. MORTAR MIX DESIGNS SHALL CONFORM TO ASTM C 270 WHILE GROUT SHALL CONFORM TO ASTM C 476. MATERIAL CERTIFICATES SHALL BE PROVIDED FOR THE FOLLOWING: REINFORCEMENT; ANCHORS, TIES, FASTENERS, AND METAL ACCESSORIES; MASONRY UNITS; MORTAR AND GROUT MATERIALS. CONSTRUCTION PROCEDURES FOR COLD-WEATHER OR HOT-WEATHER CONSTRUCTION SHALL BE REVIEWED. AS CONSTRUCTION BEGINS: PROPORTIONS OF SITE-PREPARED MORTAR X VERIFY THAT MORTAR IS OF THE TYPE AND COLOR SPECIFIED ON THE CONSTRUCTION DOCUMENTS, THAT IT CONFORMS TO ASTM C 270, AND THAT IT IS MIXED IN ACCORDANCE WITH TMS-402. CONSTRUCTION OF MORTAR JOINTS X VERIFY THAT MORTAR JOINTS COMPLY WITH TMS-402. GRADE AND SIZE OF PRESTRESSING TENDONS AND ANCHORAGES X VERIFY THAT PRESTRESSING TENDONS, ANCHORAGES, COUPLERS, AND END BLOCKS COMPLY WITH COMPLY WITH TMS-402. LOCATION OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND ANCHORAGES X VERIFY THAT REINFORCEMENT AND PRESTRESSING TENDONS ARE PLACED IN ACCORDANCE WITH TMS-402. PRESTRESSING TECHNIQUE X VERIFY THAT PRESTRESSING TECHNIQUE COMPLIES WITH TMS-402. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY X VERIFY THAT MORTAR COMPLIES WITH TMS-402. SOILS CONSTRUCTION VERIFY SUBGRADE IS ADEQUATE TO ACHIEVE DESIGN BEARING CAPACITY X PRIOR TO PLACEMENT OF CONCRETE. VERIFY EXCAVATIONS EXTEND TO PROPER DEPTH AND MATERIAL PRIOR TO PLACEMENT OF COMPACTED FILL OR CONCRETE. VERIFY THAT SUBGRADE HAS BEEN APPROPRIATELY PREPARED PRIOR TO PLACING COMPACTED FILL PRIOR TO PLACEMENT OF COMPACTED FILL. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS ALL MATERIALS SHALL BE CHECKED AT EACH LIFT FOR PROPER CLASSIFICATIONS AND GRADATIONS NOT LESS THAN ONCE FOR EACH 10,000FT² OF SURFACE AREA. VERIFY PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION X ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES X X X X X YES NO X YES NO X X PERIODIC INSPECTION FOR: SINGLE PASS FILLET WELDS <= 5/16" 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED AGENCY RETAINED BY THE OWNER OR THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE ACTING AS THE OWNER'S AGENT. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE REGISTERED DESIGN PROFESSIONAL APPRAISED OF WORK PROGRESS AS IT PERTAINS TO SPECIAL INSPECTIONS AND ENSURING THAT NO WORK REQUIRING SPECIAL INSPECTION IS CONCEALED BEFORE SPECIAL INSPECTIONS WITH ACCEPTABLE RESULTS OCCUR. 2. SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL (WHEN REQUIRED), AND TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. REPORTS SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THEY ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK. SPECIAL INSPECTIONS WELDING OF REINFORCING STEEL: VERIFICATION OF WELDABILITY X VERIFY WELDABILITY OF REINFORCING STEEL BASED UPON CARBON EQUIVALENT AND IN ACCORDANCE WITH AWS D1.4. REINFORCING STEEL IN INTERMEDIATE OR SPECIAL MOMENT FAMES, AND BOUNDARY ELEMENTS OF SPECIAL STRUCTURAL WALLS X SHEAR REINFORCEMENT X OTHER REINFORCING STEEL X VISUALLY INSPECT ALL WELDS IN ACCORDANCE WITH AWS D1.4. COLD-FORMED STEEL CONSTRUCTION: WIND-FORCE-RESISTING SYSTEMS OR SEISMIC-FORCE-RESISTING SYSTEMS X PERIODIC INSPECTIONS OF WELDING OPERATIONS. IF FASTENER SPACING IS < 4” O.C.: VERIFY THAT PROPER SCREW ATTACHMENT, BOLTING, ANCHORING AND OTHER FASTENING OF SHEAR WALLS, DIAPHRAGMS, DRAG STRUTS, BRACES, SHEAR PANELS AND HOLDOWNS HAS OCCURRED. PERFORMED BY CODE INSPECTION FIRM. OTHER STEEL INSPECTIONS: STRUCTURAL STEEL DETAILS X ALL FABRICATED STEEL OR STEEL FRAMES SHALL BE INSPECTED TO VERIFY COMPLIANCE WITH THE DETAILS SHOWN IN THE CONSTRUCTION DOCUMENTS, SUCH AS BRACES, STIFFENERS, MEMBER LOCATIONS, AND PROPER APPLICATION OF JOINT DETAILS AT EACH CONNECTION. ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL X SHALL BE ON THE PREMISES DURING THE PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH CONSTRUCTION DOCUMENTS. VERIFY THE DIAMETER, GRADE, TYPE, AND LENGTH OF THE ANCHOR ROD OR EMBEDDED ITEM, AND THE EXTENT OR DEPTH OF EMBEDMENT PRIOR TO PLACEMENT OF CONCRETE. REDUCED BEAM SECTIONS (RBS)X VERIFY CONTOUR AND FINISH AS WELL AS DIMENSIONAL TOLERANCES (AISC 341). PROTECTED ZONES X VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS ARE MADE WITHIN THE PROTECTED ZONE (AISC 341). H-PILES X VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS OCCUR WITHIN THE PROTECTED ZONES OF PILING (AISC 341). STEEL ELEMENTS OF COMPOSITE CONSTRUCTION: PLACEMENT AND INSTALLATION OF STEEL DECK X PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS X DOCUMENT ACCEPTANCE OR REJECTION OF STEEL ELEMENTS X REINFORCING STEEL X VERIFY APPROPRIATE REINFORCEMENT SIZE, SPACING, AND ORIENTATION; THAT IT HAS NOT BEEN RE-BENT IN FIELD; THAT IT IS CORRECTLY TIED AND SUPPORTED; AND THAT REQUIRED STEEL CLEARANCES HAVE BEEN PROVIDED. STEEL ROOF AND FLOOR DECKS: MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK X CONFIRM THAT IDENTIFICATION MARKINGS ARE PROVIDED TO CONFORM TO ASTM STANDARDS SPECIFIED ON CONSTRUCTION DOCUMENTS. FLOOR AND ROOF DECK WELDS X VISUAL INSPECTION IS REQUIRED TO CONFIRM THAT WELD MEETS ACCEPTANCE CRITERIA OF AWS D1.3. WELDER QUALIFICATIONS SHOULD ALSO BE VERIFIED. STRUCTURAL STEEL PRIOR TO GROUTING: GROUT SPACE X VERIFY THAT GROUT SPACE IS FREE OF MORTAR DROPPINGS, DEBRIS, LOOSE AGGREGATE, AND OTHER DELETERIOUS MATERIALS AND THAT CLEANOUTS ARE PROVIDED PER TMS-402. CONTINUOUS INSPECTION IS REQUIRED FOR RISK CATEGORY IV BUILDINGS. GRADE, TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR BOLTS, AND PRESTRESSING TENDONS AND ANCHORAGES X VERIFY THAT REINFORCEMENT, JOINT REINFORCEMENT, WALL TIES, ANCHOR BOLTS AND VENEER ANCHORS COMPLY WITH THE APPROVED CONSTRUCTION DOCUMENTS AND TMS 402. PLACEMENT OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND ANCHORAGES X VERIFY THAT REINFORCEMENT, JOINT REINFORCEMENT, WALL TIES, ANCHOR BOLTS AND VENEER ANCHORS ARE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND TMS 402. CONTINUOUS INSPECTION IS REQUIRED FOR RISK CATEGORY IV BUILDINGS. PROPORTIONS OF SITE-PREPARED GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS X VERIFY THAT GROUT IS PROPORTIONED PER ASTM C 476 AND HAS A SLUMP BETWEEN 8-11 INCHES. SELF-CONSOLIDATED GROUT SHALL NOT BE PROPORTIONED ONSITE (SEE TMS 402). CONTINUOUS INSPECTION IS REQUIRED FOR RISK CATEGORY IV BUILDINGS. CONSTRUCTION OF MORTAR JOINTS X VERIFY THAT MORTAR JOINTS ARE PLACED IN ACCORDANCE WITH TMS 402. DURING MASONRY CONSTRUCTION: SIZE AND LOCATION OF STRUCTURAL ELEMENTS X VERIFY THE LOCATIONS OF STRUCTURAL ELEMENTS WITH RESPECT TO THE APPROVED PLANS AND CONFIRM THAT TOLERANCES MEET THE REQUIREMENTS OF TMS 402. TYPE, SIZE, AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE OF MASONRY TO STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION. X VERIFY THAT CORRECT ANCHORAGES AND CONNECTIONS ARE PROVIDED PER THE APPROVED PLANS AND TMS 402. CONTINUOUS INSPECTION IS REQUIRED FOR RISK CATEGORY IV BUILDINGS. WELDING OF REINFORCEMENT X PREPARATION, CONSTRUCTION, AND PROTECTION OF MASONRY DURING COLD WEATHER (<40°F) OR HOT WEATHER (>90°F). X VERIFY THAT COLD-WEATHER CONSTRUCTION IS PERFORMED IN ACCORDANCE WITH ARTICLE 1.8 C OF TMS 602/ACI 530.1-11 AND HOT WEATHER CONSTRUCTION PER ARTICLE 1.8 D OF TMS 602/ACI 530.1-11. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE X PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS IS IN COMPLIANCE X PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED MORTAR JOINTS X VERIFY THAT MORTAR IS PLACED IN ACCORDANCE WITH TMS-402. OBSERVATION OF GROUT SPECIMENS, MORTAR SPECIMENS, AND/OR PRISMS X CONFIRM THAT SPECIMENS/PRISMS ARE PERFORMED AS REQUIRED BY TMS-402. CONTINUOUS INSPECTION IS REQUIRED FOR RISK CATEGORY IV BUILDINGS. MINIMUM MASONRY TESTING: VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX (VSI) FOR SELF-CONSOLIDATING GROUT X COMPRESSIVE STRENGTH TESTS SHOULD BE PERFORMED IN ACCORDANCE WITH ASTM C 1019 FOR SLUMP FLOW AND ASTM C 1611 FOR VSI. VERIFICATION OF F’M AND F’AAC X DETERMINE THE COMPRESSIVE STRENGTH FOR EACH WYTHE BY THE “UNIT STRENGTH METHOD” OR BY THE “PRISM TEST METHOD” AS SPECIFIED IN TMS 402 PRIOR TO CONSTRUCTION. FOR RISK CATEGORY IV BUILDINGS THIS SHOULD BE VERIFIED AT EVERY 5,000FT² OF CONSTRUCTION. VERIFICATION OF PROPORTIONS OF MATERIALS IN PREMIXED OR PRE-BLENDED MORTAR AND GROUT X VERIFY THAT PROPORTIONS FOR MORTAR MEET ASTM C 270 AND PROPORTIONS FOR GROUT MEET ASTM C 476. THIS APPLIES TO RISK CATEGORY IV BUILDINGS ONLY. CONTINUOUS PERIODIC 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED AGENCY RETAINED BY THE OWNER OR THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE ACTING AS THE OWNER'S AGENT. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE REGISTERED DESIGN PROFESSIONAL APPRAISED OF WORK PROGRESS AS IT PERTAINS TO SPECIAL INSPECTIONS AND ENSURING THAT NO WORK REQUIRING SPECIAL INSPECTION IS CONCEALED BEFORE SPECIAL INSPECTIONS WITH ACCEPTABLE RESULTS OCCUR. 2. SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL (WHEN REQUIRED), AND TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. REPORTS SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THEY ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK. 3. SPECIAL INSPECTOR SHALL BE IDENTIFIED PER IBC SECTION 1704.2.1.SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S0.1 SPECIAL INSPECTION DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 N o . D e s c r i p t i o n D a t e 3 U H I C O M M E N T S / C I T Y R E S U B M I T T A L 0 9 .1 5 .2 0 2 2 3 09/27/2022 7'-0" 8' - 0 " SHOWROOM 100 OFFICE 101 BREAKROOM 102 R&D AREA 104 STAIR 1 120 RESTROOM 106 REFUSE 105 STORAGE 111 STAIR 2 121 LOBBY 110 EQUIPMENT ELEVATOR 109 COMM MOP/ 108 SELF-STORAGE 112 RM FIRE RISER 107 ELEVATORRESTROOM 103 UP SWS. S RE-USE AREA 10 x 1 5 10 x 1 0 5x 5 5x 1 0 AD A d o o r C. S . c o u n t e r p l a c e m e n t a n d o r i e n t a t i o n p e r r e t a i l g r o u p 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 30 ' - 6 " 35 ' - 6 " 0" 0"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 6"0" 218' - 0" 66 ' - 0 " 298' - 0" 13 1 ' - 0 " 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 "HSS8 X8X3/8 35 ' - 6 " 29 ' - 6 " 298' - 0" F12.5 LOAD BEARING WALLS, TYP.H SS4x4x 1 /4 W3 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7HSS4x4x1/4 F5 H SS4x4x 1 /4 F4 H SS6x6x 1 /4 HSS6 x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 26 ' - 9 " 27 ' - 9 " 3 1 / 2 " F11 H SS6x6x 1 /2 F11 H SS6x6x 1 /2 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F7 F11HSS6x6x1/2 F8 F7 F7 S10.0 1 S10.0 2 S10.0 3 S10.0 4 S10.0 5 S10.0 6 80' - 0" 5 1 / 2 " 1' - 11 1/2" W3W3 10' - 4" H SS6x6x 1 /2 F9 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 F8 HSS6 x6x 1 /4 F7 2' - 6" B 9"19' - 9"26' - 9"8' - 0" 10 ' - 9 " 5' - 0 " 33 ' - 9 1 / 2 " 6' - 3 3 / 8 " 10 ' - 2 1 / 4 " B.9B.9 H SS6x6x 1 /4 F7 H SS6x6x 1 /4 F8 10' - 0"H SS6x6x 1 /2 F11 4' - 9"5' - 3" 18 ' - 1 1 1 / 2 " 16 ' - 3 1 / 2 " F6F6 16 ' - 3 1 / 2 " 5 S5.1 2 S5.1 6 S5.1 2 S5.1 2 S5.1 2 S5.1 2 S5.1 8 S5.1 S8.0 6 2 S5.1 6 S5.1S8.0 5 5 S5.1 2 S5.1 6 S5.1 1 S5.2 TYP 3 S5.2 2 S5.2 TYP @ INT. 10 S5.1 TYP 2 S5.1 8 S5.1 TYP TYP W2.5 W2.5 W2.5W2.5 W2.5 W2.5 W2.5 5 S5.1 99' - 0" 98' - 0" T.O.F. TYP H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 F6 F6 7' - 3 1/4"2' - 8 3/4" FOUNDATION NOTES 1. VERIFY/COORDINATE DIMENSIONS WITH ARCHITECTURAL DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR ALL WALL CONSTRUCTION TYPES AND TOP OF WALL ELEVATIONS. 2. COORDINATE EXTERIOR SLABS, GRADES, ETC. WITH ARCHITECTURAL AND CIVIL DRAWINGS. ALL LANDINGS SHALL BE SLOPED IN THE DIRECTION SHOWN AT A SLOPE NO GREATER THAN 1:48 (2%), UNLESS OTHERWISE NOTED. SLOPE FINISH GRADE DOWNWARD AND AWAY FROM STRUCTURE AT A SLOPE NO GREATER THAN 1:48 (2%) FOR A MINIMUM OF FIVE FEET UNLESS OTHERWISE DIRECTED BY A GEOTECHNICAL REPORT OR REQUIRED BY CODE. 3. FOR ALL UTILITIES RUNNING ALONG SIDE OR PENETRATING THROUGH FOUNDATION WALLS, RE: . 4. FOOTING STEP (F.S.) LOCATIONS INDICATED THIS SHEET, RE: . 5. PROVIDE CORNER BARS AT FOUNDATION WALLS AND FOOTINGS AND PROVIDE ADDITIONAL VERTICAL DOWELS AT JAMBS, CORNERS, INTERSECTIONS AND FREE ENDS, RE: , , & 6. PROVIDE STANDARD LAP AT ALL CONCRETE SLAB-ON-GRADE W.W.F. EDGES, RE: . 7. PROVIDE ADDITIONAL CONCRETE SLAB-ON-GRADE REINFORCING AT ALL RE-ENTRANT CORNERS, SLAB PENETRATIONS AND DISCONTINUOUS CONTROL JOINTS, RE: . COORDINATE ALL LOCATIONS OF DISCONTINUOUS CONTROL JOINTS WITH ARCH. 8. INTERIOR CONCRETE SLAB-ON-GRADE CONTROL JOINTS SHALL BE 15'-0" O.C. MAX., U.N.O. FOR CONTROL JOINT LAYOUT, RE: ARCH. & PLAN. 9. ALL MASONRY FLUSH WALL PILASTERS/COLUMNS SHALL BE THE WIDTH OF THE WALL AND 16" LONG MINIMUM (TWO CELL) WITH (2) ADDITIONAL VERTICAL BARS PER CELL, GROUT ALL CELLS WITH REINFORCING SOLID. 10. ANCHOR EQUIPMENT WEIGHING OVER 400 LBS. AGAINST SEISMIC FORCES. ANCHOR STANDBY GENERATOR AND WATER TANKS TO CONCRETE SLAB WITH 1/2" x 3 1/2" EMBED EXPANSION ANCHORS (3 MINIMUM). 11. COORDINATE ALL RETAINING AND SITE WALL DETAILS AND LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. 12. DO NOT BACKFILL BEHIND ANY FOUNDATION WALL UNTIL THE UPPER SLAB, THE LOWER SLAB-ON-GRADE, AND THE FOUNDATION WALL HAS BEEN FULLY POURED AND IN PLACE FOR AT LEAST 7 DAYS. /1 S5.0 /2 S5.0 /8 S5.0 /9 S5.0 /10 S5.0 /4 S5.0 /5 S5.0 TILT-UP PANEL NOTES 1. 5-1/2" THICK (2x6 FORM) WITH REINFORCING PER ASSEMBLY DETAILS, RE: S10 SHEET SERIES FOR TILT PANEL LAYOUT, ELEVATIONS, REINFORCING, DETAILING, ETC. PAD FOOTING SCHEDULE NOTES: 1. ALL FOOTINGS SHALL BE CENTERED WITH COLUMNS IN EACH DIRECTION, U.N.O. 2. TOP OF INTEGRAL PAD & WALL FOOTINGS SHALL MATCH AS APPLICABLE, TYP. WX XX MARK: INDICATES FOOTING TYPE INDICATES FOUNDATION WALL TYPE WALL FOOTING SCHEDULE /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR /6 S5.1 /1 S5.2OR SLAB SCHEDULE MARK THICKNESS REINFORCEMENT SUBBASE A 4" CONC. SLAB #3 REBAR @ 18" O.C. E.W.6 MIL POLY VAPOR BARRIER OVER 4" OF 3/4" MINUS CRUSHED AGGREGATE BASE B 8" CONC. SLAB #4 REBAR @ 12" O.C. E.W. OR #5 REBAR @ 16" O.C. E.W. 6 MIL POLY VAPOR BARRIER OVER 4" OF 3/4" MINUS CRUSHED AGGREGATE BASE INTERIOR LOAD BEARING C.F.S. WALL STUD SCHEDULE 3RD FLOOR WALL LEVEL WALL STUD SIZE & SPC'G 2ND FLOOR 1ST FLOOR BOT. & TOP PL/TRACK (2) 4TH FLOOR 4CS2.5X059 C.F.S. @ 60" O.C. OR 600S162-68 @ 24" O.C. 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) BLOCKING/BRIDGING/BRACING MID-HEIGHT (POSTS SHALL ALIGN W/ PURLINS ABOVE) 4CS2.5X059 C.F.S. @ 30" O.C. OR 600S162-68 @ 24" O.C. 4CS2.5X059 C.F.S. @ 15" O.C. OR 600S162-68 @ 16" O.C. 4CS2.5X059 C.F.S. @ 10" O.C. OR 600S162-68 @ 12" O.C. MID-HEIGHT MID-HEIGHT QUARTER POINTS (3 LOCATIONS) NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO 4X4 BENT PL AT WEB. CONNECT 4X4 TO SLAB W/ (2) GAS DRIVEN PINS PER PLANS. EXTERIOR WALL STUD, HORIZONTAL GIRT & IMP SCHEDULE 3RD FLOOR WALL LEVEL MAX. IMP WALL SHT'G VERTICAL SPAN (5) 2ND FLOOR 1ST FLOOR WALL GIRTS (4,5) (HORIZ) (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. BOT. & TOP PL/TRACK (6) 4TH FLOOR (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. ALL GIRTS SHALL BE PAINTED TO MATCH INSIDE FACE OF IMP. 2. CONTRACTOR TO COORDINATE IMP SHT'G GAGE & FASTNER REQUIREMENTS FOR MAX IMP WALL SHT'G SPAN INDICATED ABOVE. IMP SHT'G SPAN ABOVE IS BASED ON FASTNERS AT SIDE JOINTS & 12" O.C. IN BETWEEN (FP3 PATTERN). 3. WALL GIRTS SPAN FROM HSS TO HSS POST OR C.F.S. TO C.F.S. POST IN EXTERIOR WALLS. 4. WALL GIRT SPACING SHALL MATCH MAX IMP WALL SHT'G SPAN. AT ROOF ABOVE, INSTALL GIRTS AS REQUIRED SO SHT'G SPAN IS EQUAL TO OR LESS THAN TABLE ABOVE WHEN USING "Z" ZEE GIRTS, INSTALL OUTSIDE TOE UP. USE DBL STUD "S" GIRT AT ALL HEADER CONDITIONS. 5. WHEN SHT'G SPAN ABOVE MEETS OR EXCEEDS FL. TO FL. HEIGHT, IMP WALL SHT'G SHALL SPAN FROM FLR. TO FLR. IN THIS CASE, WALL GIRT SHOWN SHALL BE ONLY INSTALLED AT TOP OF DOORS AND WINDOWS WHERE THEY OCCUR. USE TYP. BOT. PL. AT TOP OF FLOOR & UNDERSIDE OF DECK ABOVE. 6. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO BENT PL AT WEB. CONNECT BENT PLATE TO SLAB W/ GAS DRIVEN PINS PER SCHEDULE. 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) (2)600S200-68 @ 10' - 0" O.C. BOXED WALL JAMB POST (VERT)WALL GIRTS TO POST (2)600S200-68 @ 10' - 0" O.C. BOXED (2)600S200-68 @ 10' - 0" O.C. BOXED 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG (2)600S200-68 @ 10' - 0" O.C. BOXED 12' - 8" LOW SIDE 15' - 1" HIGH SIDE 10' - 8" 12' - 6" 12' - 8" LOW SIDE 15' - 1" HIGH SIDE MARK SIZE REINFORCING W2.5 2'-6" x 30" x CONT. (3) #5 CONT. T&B W3 3' - 0" x 12" x CONT. (3) #5 CONT. 3/32" = 1'-0" FOUNDATION PLAN SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S1 FOUNDATION PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 MARK SIZE REINFORCING DETAIL U.N.O. F3 3' -0" x 3' -0" x 12" DP. #5 @ 12" O.C., EA. WAY F4 4' -0" x 4' -0" x 12" DP. #5 @ 12" O.C., EA. WAY F5 5' -0" x 5' -0" x 12" DP. #5 @ 12" O.C., EA. WAY F6 6' -0" x 6' -0" x 14" DP. #5 @ 12" O.C., EA. WAY F7 7' -0" x 7' -0" x 14" DP. #5 @ 10" O.C., EA. WAY F8 8' -0" x 8' -0" x 14" DP. #5 @ 10" O.C., EA. WAY F9 9' -0" x 9' -0" x 16" DP. #5 @ 8" O.C., EA. WAY F11 11' -0" x 11' -0" x 24" DP. #5 @ 6" O.C., EA. WAY F12.5 12' -6" x 12' -6" x 24" DP. #5 @ 6" O.C., EA. WAY No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 1 1 09/27/2022 7'-0" 8' - 0 " SHOWROOM 100 OFFICE 101 BREAKROOM 102 R&D AREA 104 STAIR 1 120 RESTROOM 106 REFUSE 105 STORAGE 111 STAIR 2 121 LOBBY 110 EQUIPMENT ELEVATOR 109 COMM MOP/ 108 SELF-STORAGE RM FIRE RISER 107 ELEVATORRESTROOM 103 UP SWS. S RE-USE AREA 10 x 1 5 10 x 1 0 5x 5 5x 1 0 AD A d o o r C. S . c o u n t e r p l a c e m e n t a n d o r i e n t a t i o n p e r r e t a i l g r o u p 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 0" 0"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 6"0" 298' - 0" 13 1 ' - 0 " 0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 0" 80' - 0"218' - 0" D D D D D A X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 X1 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C C S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 C C S/HDU2 S/HDU2 S/HDU2 X4 S/HDU2 S/HDU2S/HDU2 B.9B.9 SHEARWALL SCHEDULE B MARK C A NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN OF (4) ADD'L GAS DRIVEN PINS AT THE END OF ALL SHEARWALLS U.N.O., WHEN HOLDOWN IS CALLED OUT AT THE END OF A SHEARWALL, NO ADD'L PINS REQUIRED. 3. SIDELAP ATTACHMENT OCCURS OVER PANEL LENGTH W/ ADDITIONAL FASTER AT EA. WALL STUD. SHEATHING 29 GA. P.B.U. SPANNING HORZ. 29 GA. P.B.U. SPANNING HORZ. 24 GA. P.B.U. SPANNING HORZ. END SUPPORTS #12 @ 6" O.C. #12 @ 6" O.C. #12 @ 6" O.C. INTERMEDIATE SUPPORTS #12 @ 12" O.C. #12 @ 12" O.C. #12 @ 12" O.C. SIDELAP #12 @ 20" O.C. WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G X-BRACED WALL SCHEDULE X2 MARK X1 BOT. & TOP PL TO CONCRETE (2) X3 NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN. OF (4) GAS DRIVEN PINS EQUALLY SPACED AT THE END OF ALL SHEARWALLS U.O.N. WHEN HOLDOWN (HD#) IS CALLED OUT AT THE END OF A SHEARWALL, PROVIDE HOLDOWN IN LIEU OF ADDITIONAL PINS. STRAP & PL 1 1/2" WIDE 18 GA STRAP, 18 GA PL STRAP TO PLATE (5) - #12 PLATE TO STUD PLATE TO TRACK WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G FRAMING INFORMATION 6" WIDE 18 GA STRAP, 18 GA PL 8" WIDE 18 GA STRAP, 18 GA PL (20) - #12 (26) - #12 (4) - #12 (14) - #12 (19) - #12 (4) - #12 (14) - #12 (19) - #12 HOLDOWN SCHEDULE NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. ALL HOLDOWNS TO BE SIMPSON STRONG TIE. IF HOLDOWN IS DISCONTINUED, PROVIDE HOLDOWN W/ AN EQUIVALENT CAPACITY. INSTALL ALL HOLDOWNS IN STRICT ACCORDANCE W/ MANUFACTURES INSTRUCTIONS. 3. ALL ANCHORS SHALL BE CAST-IN-PLACE U.N.O. ON PLANS. 4. ALL HOLDOWNS INSTALLED ABOVE A SLAB ON DECK SHALL HAVE THE SAME HOLDOWN INSTALLED AT SLAB UNDERSIDE. TYPE S/HDU2 CS16 STRAP NOTES (SEE SHEARWALL PLAN AND SCHEDULE FOR ADDITIONAL REQUIREMENTS) 1 - POST (18 GA MIN.) AT EACH END OF SHEARWALL. USE 5/8" Ø CAST-IN -PLACE ANCHOR. PROVIDE 5" EMBEDMENT AT SLAB ON GROUND OR FOUNDATION WALL. 1 - POST (18 GA MIN.) AT EACH END OF SHEAR/BRACE WALL. CONNECT TO STUD WALL ABOVE AND BELOW W/ (6) #10 SCREWS EACH. CONTINUE STRAP TO WALL BELOW. AT TILT-UP CONCRETE WALL CONNECT TO WALL W/ GAS DRIVEN PINS. (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 30" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 8" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 6" O.C. STAGGERED W/ 3/4" MIN EMBED BOT. & TOP PL TO CONCRETE (2) WALL T&B ATTACHMENTS #12 @ 12" O.C. #12 @ 12" O.C. D 7/16" PLYWOOD OR OSB #8 @ 6" O.C. (PANEL EDGES) #8 @ 12" O.C.(2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED #8 @ 6" O.C. (PANEL EDGES) SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S1.1 FIRST FLOOR SHEARWALL PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" FIRST FLOOR SHEARWALL PLAN No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 09/27/2022 7'-0" 8' - 0 " SHOWROOM 100 OFFICE 101 BREAKROOM 102 R&D AREA 104 STAIR 1 120 RESTROOM 106 REFUSE 105 STORAGE 111 STAIR 2 121 LOBBY 110 EQUIPMENT ELEVATOR 109 COMM MOP/ 108 SELF-STORAGE 112 RM FIRE RISER 107 ELEVATORRESTROOM 103 UP SWS. S c o u n t e r p l a c e m e n t a n d o r i e n t a t i o n p e r r e t a i l g r o u p 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 34 ' - 8 3 / 8 " 9 5 / 8 " 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"6" 298' - 0" 13 1 ' - 0 " 297' - 6" 6" 35 ' - 0 " 29 ' - 6 " 30 ' - 6 " 35 ' - 0 " 6" 80' - 0"218' - 0" (2) 8CS2x105, TYP ACROSS HALLWAY 13 1 ' - 0 " W2 1 x 4 4 C = 1 / 4 " (6 2 ) 112' - 6" W1 4 X 3 0 C = 0 " (5 0 ) W2 1 x 6 2 C = 3 / 8 " (1 0 0 ) W1 4 X 3 0 C = 0 " (3 2 ) W1 4 X 3 0 C = 0 " (3 2 ) W1 4 X 3 0 C = 0 " (3 2 ) W21x44 C = 0"(32) W14X30 C = 0"(32) W1 4 X 3 0 C = 0 " (3 2 ) W21x55 C = 0"(84)W24x94 C = 0"(116) W21x62 C = 0"(60) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W2 1 x 4 4 C = 1 / 4 " (6 2 ) W18X130 C = 1/4"(120) W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W1 8 X 7 6 C = 3 / 8 " (8 8 ) W1 8 X 7 6 C = 3 / 8 " (8 8 ) W1 8 X 7 6 C = 3 / 8 " (8 8 ) (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY(2) 8CS2x105, TYP ACROSS HALLWAY S8.0 1 S8.0 2 HSS8x6x3/8 C = 0"(32) (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /2 HSS8 X8X3/8 H SS6x6x 1 /2 H SS6x6x 1 /2 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /4 S8.0 5S9.0 1 S9.0 4 1' - 0" 3' - 3" 11 S6.0 12 S6.0 13 S6.0 R E :/1 S6 .1 R E :/1 S6 .1 R E :/9 S6 .0 R E :/9 S6 .0 3 S6.0RE:/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 2 S6.1 3 S6.1 1 S6.0 1 S6.0 2 S6.1 3 S6.1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 1 S6.0 1 S6.0 1 S6.0 B.9 B.9 W18x40 C = 0"(22)W18X71 C = 1/4"(70)H SS6x6x 1 /4 H SS6x6x 1 /4 H SS6x6x 1 /2 HSS6 x6x 1 /4 HSS6 x6x 1 /4 1 S6.0 H SS6x6x 1 /4 11 S6.1 7 S6.1 8 S6.1 L-2 L-1 1 1 1 1 11' -4" CLR 10' -6" CLR 18 ' - 1 1 1 / 2 " 15 ' - 1 0 "HSS6 x6x 1 /4 HSS6 x6x 1 /4 HSS6 x6x 1 /4 HSS6 x6x 1 /4 16 ' - 0 "HSS6 x6x 1 /2 W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W8 X 3 1 C = 1 / 4 " (5 0 ) W1 4 X 3 0 C = 0 " (5 0 ) W1 4 X 3 0 C = 0 " (5 0 ) W1 4 X 3 0 C = 0 " (5 0 ) W1 4 X 3 0 C = 0 " (5 0 ) 3 S6.0 3 S6.0 3 S6.0 11' -4" CLR 10' -6" CLR R E :/1 2 S6 .0 R E :/1 4 S6 .0 R E :/1 4 S6 .0 INTERIOR LOAD BEARING C.F.S. WALL STUD SCHEDULE 3RD FLOOR WALL LEVEL WALL STUD SIZE & SPC'G 2ND FLOOR 1ST FLOOR BOT. & TOP PL/TRACK (2) 4TH FLOOR 4CS2.5X059 C.F.S. @ 60" O.C. OR 600S162-68 @ 24" O.C. 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) BLOCKING/BRIDGING/BRACING MID-HEIGHT (POSTS SHALL ALIGN W/ PURLINS ABOVE) 4CS2.5X059 C.F.S. @ 30" O.C. OR 600S162-68 @ 24" O.C. 4CS2.5X059 C.F.S. @ 15" O.C. OR 600S162-68 @ 16" O.C. 4CS2.5X059 C.F.S. @ 10" O.C. OR 600S162-68 @ 12" O.C. MID-HEIGHT MID-HEIGHT QUARTER POINTS (3 LOCATIONS) NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO 4X4 BENT PL AT WEB. CONNECT 4X4 TO SLAB W/ (2) GAS DRIVEN PINS PER PLANS. EXTERIOR WALL STUD, HORIZONTAL GIRT & IMP SCHEDULE 3RD FLOOR WALL LEVEL MAX. IMP WALL SHT'G VERTICAL SPAN (5) 2ND FLOOR 1ST FLOOR WALL GIRTS (4,5) (HORIZ) (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. BOT. & TOP PL/TRACK (6) 4TH FLOOR (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. ALL GIRTS SHALL BE PAINTED TO MATCH INSIDE FACE OF IMP. 2. CONTRACTOR TO COORDINATE IMP SHT'G GAGE & FASTNER REQUIREMENTS FOR MAX IMP WALL SHT'G SPAN INDICATED ABOVE. IMP SHT'G SPAN ABOVE IS BASED ON FASTNERS AT SIDE JOINTS & 12" O.C. IN BETWEEN (FP3 PATTERN). 3. WALL GIRTS SPAN FROM HSS TO HSS POST OR C.F.S. TO C.F.S. POST IN EXTERIOR WALLS. 4. WALL GIRT SPACING SHALL MATCH MAX IMP WALL SHT'G SPAN. AT ROOF ABOVE, INSTALL GIRTS AS REQUIRED SO SHT'G SPAN IS EQUAL TO OR LESS THAN TABLE ABOVE WHEN USING "Z" ZEE GIRTS, INSTALL OUTSIDE TOE UP. USE DBL STUD "S" GIRT AT ALL HEADER CONDITIONS. 5. WHEN SHT'G SPAN ABOVE MEETS OR EXCEEDS FL. TO FL. HEIGHT, IMP WALL SHT'G SHALL SPAN FROM FLR. TO FLR. IN THIS CASE, WALL GIRT SHOWN SHALL BE ONLY INSTALLED AT TOP OF DOORS AND WINDOWS WHERE THEY OCCUR. USE TYP. BOT. PL. AT TOP OF FLOOR & UNDERSIDE OF DECK ABOVE. 6. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO BENT PL AT WEB. CONNECT BENT PLATE TO SLAB W/ GAS DRIVEN PINS PER SCHEDULE. 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) (2)600S200-68 @ 10' - 0" O.C. BOXED WALL JAMB POST (VERT)WALL GIRTS TO POST (2)600S200-68 @ 10' - 0" O.C. BOXED (2)600S200-68 @ 10' - 0" O.C. BOXED 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG (2)600S200-68 @ 10' - 0" O.C. BOXED 12' - 8" LOW SIDE 15' - 1" HIGH SIDE 10' - 8" 12' - 6" 12' - 8" LOW SIDE 15' - 1" HIGH SIDE KEYED NOTES SHEET NOTES 1. CAMBER AT MID SPAN OF W-BEAMS IS SHOWN AS C = x/x". 2. FRAME MECHANICAL OPENINGS IN FLOOR GREATER THAN 24" IN ANY DIMENSION, RE: . AT OPENINGS LESS THAN 24" RE: & . 3. VERIFY/COORDINATE OPENING SIZE WITH ARCHITECTURAL AND MECHANICAL DRAWINGS. 4. TOTAL NUMBER OF 3/4"x4" LONG "NELSON" SHEAR STUDS REQ'D. FOR BEAMS IS CALLED OUT IN PARENTHESIS AFTER BEAM DESIGNATION AS W_x_ (#) EVENLY SPACED ALONG BEAM LENGTH U.N.O., RE: . 5. PROVIDE THE FOLLOWING FOR SUPPORT AND SIDELAP DECK ATTACHMENTS: A. AT STRUCTRUAL STEEL: (4) 1/2"Ø PUDDLE WELDS AT SUPPORTS (36/4 12" O.C.) AND 12" O.C. ALONG PERIMETER, BUTTON PUNCH SIDELAPS @ 24" O.C. B. AT CFS: (4) #12 SCREWS AT SUPPORTS (36/4 12" O.C.) AND 12" O.C. ALONG PERIMETER, BUTTON PUNCH SIDELAPS @ 24" O.C. 6. CONTRACTOR TO SEAL ALL DECK JOINTS (LAP AND TAPE, BUTT AND TAPE, NEOPRENE OR METAL DECK CLOSURES, ETC) TO PREVENT CONCRETE SEEPAGE. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ALL WALL SHEATHING DEEMED DAMAGED BY UHI REPRESENTATIVE. IN ADDITIONTO SEALING JOINTS, IT IS RECOMMENDED TO COVER ALL WALL SHEATHING BELOW CONCRETE PLACEMENT WITH PLASTIC SHEATHING TO AID INPROTECTION FROM CONCRETE SEEPAGE DAMAGE. 1. 18 GA. 2W COMPOSITE GALVANIZED METAL DECK W/ 4-1/2" TOTAL DEPTH NORMAL WEIGHT CONCRETE (2-1/2" TOPPING OVER 2" METAL DECK) W/ 6 x 6 - W1.4 x W1.4 WWF, OR #3 REBAR @ 16" O.C. DECK TO SPAN 3 SUPPORT LINES MINIMUM. SHORE ALL DECKING PRIOR TO CONCRETE PLACEMENT AT ALL ENTRANCES, SHOWROOM, AND SINGLE SPAN CONDITIONS. COORDINATE WITH OWNER. /7 S6.2 /8 S6.2 /9 S6.2 /6 S6.2 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S2 SECOND FLOOR FRAMING PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" SECOND FLOOR FRAMING PLAN No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 1 09/27/2022 STAIR 1 220 STAIR 2 221 COMM MOP/ 208 SELF-STORAGE 212 ELEVATOR UP S W S . S C . S . E L E V A T O R 7 5 0 0 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"6" 6" 35 ' - 0 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 218' - 0" A S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 B S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 B B B S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B BBB S/HDU2 S/HDU2S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 6"6" 35 ' - 0 " 30 ' - 6 " 29 ' - 6 " 35 ' - 0 " 6" S/HDU2 B S/HDU2 S/HDU2 S/HDU2 B X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 B.9 B.9 4 S6.2 TYP 4 S6.2 TYP 5 S6.2 TYP 5 S6.2TYP X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 X2 S/HDU2 SHEARWALL SCHEDULE B MARK C A NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN OF (4) ADD'L GAS DRIVEN PINS AT THE END OF ALL SHEARWALLS U.N.O., WHEN HOLDOWN IS CALLED OUT AT THE END OF A SHEARWALL, NO ADD'L PINS REQUIRED. 3. SIDELAP ATTACHMENT OCCURS OVER PANEL LENGTH W/ ADDITIONAL FASTER AT EA. WALL STUD. SHEATHING 29 GA. P.B.U. SPANNING HORZ. 29 GA. P.B.U. SPANNING HORZ. 24 GA. P.B.U. SPANNING HORZ. END SUPPORTS #12 @ 6" O.C. #12 @ 6" O.C. #12 @ 6" O.C. INTERMEDIATE SUPPORTS #12 @ 12" O.C. #12 @ 12" O.C. #12 @ 12" O.C. SIDELAP #12 @ 20" O.C. WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G X-BRACED WALL SCHEDULE X2 MARK X1 BOT. & TOP PL TO CONCRETE (2) X3 NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN. OF (4) GAS DRIVEN PINS EQUALLY SPACED AT THE END OF ALL SHEARWALLS U.O.N. WHEN HOLDOWN (HD#) IS CALLED OUT AT THE END OF A SHEARWALL, PROVIDE HOLDOWN IN LIEU OF ADDITIONAL PINS. STRAP & PL 1 1/2" WIDE 18 GA STRAP, 18 GA PL STRAP TO PLATE (5) - #12 PLATE TO STUD PLATE TO TRACK WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G FRAMING INFORMATION 6" WIDE 18 GA STRAP, 18 GA PL 8" WIDE 18 GA STRAP, 18 GA PL (20) - #12 (26) - #12 (4) - #12 (14) - #12 (19) - #12 (4) - #12 (14) - #12 (19) - #12 HOLDOWN SCHEDULE NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. ALL HOLDOWNS TO BE SIMPSON STRONG TIE. IF HOLDOWN IS DISCONTINUED, PROVIDE HOLDOWN W/ AN EQUIVALENT CAPACITY. INSTALL ALL HOLDOWNS IN STRICT ACCORDANCE W/ MANUFACTURES INSTRUCTIONS. 3. ALL ANCHORS SHALL BE CAST-IN-PLACE U.N.O. ON PLANS. 4. ALL HOLDOWNS INSTALLED ABOVE A SLAB ON DECK SHALL HAVE THE SAME HOLDOWN INSTALLED AT SLAB UNDERSIDE. TYPE S/HDU2 CS16 STRAP NOTES (SEE SHEARWALL PLAN AND SCHEDULE FOR ADDITIONAL REQUIREMENTS) 1 - POST (18 GA MIN.) AT EACH END OF SHEARWALL. USE 5/8" Ø CAST-IN -PLACE ANCHOR. PROVIDE 5" EMBEDMENT AT SLAB ON GROUND OR FOUNDATION WALL. 1 - POST (18 GA MIN.) AT EACH END OF SHEAR/BRACE WALL. CONNECT TO STUD WALL ABOVE AND BELOW W/ (6) #10 SCREWS EACH. CONTINUE STRAP TO WALL BELOW. AT TILT-UP CONCRETE WALL CONNECT TO WALL W/ GAS DRIVEN PINS. (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 30" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 8" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 6" O.C. STAGGERED W/ 3/4" MIN EMBED BOT. & TOP PL TO CONCRETE (2) WALL T&B ATTACHMENTS #12 @ 12" O.C. #12 @ 12" O.C. D 7/16" PLYWOOD OR OSB #8 @ 6" O.C. (PANEL EDGES) #8 @ 12" O.C.(2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED #8 @ 6" O.C. (PANEL EDGES) SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S2.1 SECOND FLOOR SHEARWALL PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" SECOND FLOOR SHEARWALL PLAN No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 09/27/2022 STAIR 1 220 STAIR 2 221 COMM MOP/ 208 SELF-STORAGE 212 ELEVATOR UP S W S . S C . S . E L E V A T O R 7 5 0 0 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 0"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 6"0" 298' - 0" 13 1 ' - 0 " 298' - 0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 218' - 0" (2) 8CS2x105, TYP ACROSS HALLWAY S8.0 3 S8.0 4 W16x26HSS4-1/2X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 W1 8 x 3 5 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 W16x26 H SS 4 -1/2X4 -1/2X1 /4 HSS8x6x3/8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 B.9B.9 (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 8CS2x105, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 8CS2x105, TYP ACROSS HALLWAY (2) 8CS2x105, TYP ACROSS HALLWAY 6 S6.0 8 S6.0 7 S6.0 8 S6.0 L-2 L-1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 2 S6.1 3 S6.1 8 S6.0 6 S6.0 6 S6.0 9 S6.0 1 S9.0 2 S9.0 7 S6.0 8 S6.0 14 S6.1 7 S6.0HSS4-1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 1 1 1 INTERIOR LOAD BEARING C.F.S. WALL STUD SCHEDULE 3RD FLOOR WALL LEVEL WALL STUD SIZE & SPC'G 2ND FLOOR 1ST FLOOR BOT. & TOP PL/TRACK (2) 4TH FLOOR 4CS2.5X059 C.F.S. @ 60" O.C. OR 600S162-68 @ 24" O.C. 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) BLOCKING/BRIDGING/BRACING MID-HEIGHT (POSTS SHALL ALIGN W/ PURLINS ABOVE) 4CS2.5X059 C.F.S. @ 30" O.C. OR 600S162-68 @ 24" O.C. 4CS2.5X059 C.F.S. @ 15" O.C. OR 600S162-68 @ 16" O.C. 4CS2.5X059 C.F.S. @ 10" O.C. OR 600S162-68 @ 12" O.C. MID-HEIGHT MID-HEIGHT QUARTER POINTS (3 LOCATIONS) NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO 4X4 BENT PL AT WEB. CONNECT 4X4 TO SLAB W/ (2) GAS DRIVEN PINS PER PLANS. EXTERIOR WALL STUD, HORIZONTAL GIRT & IMP SCHEDULE 3RD FLOOR WALL LEVEL MAX. IMP WALL SHT'G VERTICAL SPAN (5) 2ND FLOOR 1ST FLOOR WALL GIRTS (4,5) (HORIZ) (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. BOT. & TOP PL/TRACK (6) 4TH FLOOR (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. ALL GIRTS SHALL BE PAINTED TO MATCH INSIDE FACE OF IMP. 2. CONTRACTOR TO COORDINATE IMP SHT'G GAGE & FASTNER REQUIREMENTS FOR MAX IMP WALL SHT'G SPAN INDICATED ABOVE. IMP SHT'G SPAN ABOVE IS BASED ON FASTNERS AT SIDE JOINTS & 12" O.C. IN BETWEEN (FP3 PATTERN). 3. WALL GIRTS SPAN FROM HSS TO HSS POST OR C.F.S. TO C.F.S. POST IN EXTERIOR WALLS. 4. WALL GIRT SPACING SHALL MATCH MAX IMP WALL SHT'G SPAN. AT ROOF ABOVE, INSTALL GIRTS AS REQUIRED SO SHT'G SPAN IS EQUAL TO OR LESS THAN TABLE ABOVE WHEN USING "Z" ZEE GIRTS, INSTALL OUTSIDE TOE UP. USE DBL STUD "S" GIRT AT ALL HEADER CONDITIONS. 5. WHEN SHT'G SPAN ABOVE MEETS OR EXCEEDS FL. TO FL. HEIGHT, IMP WALL SHT'G SHALL SPAN FROM FLR. TO FLR. IN THIS CASE, WALL GIRT SHOWN SHALL BE ONLY INSTALLED AT TOP OF DOORS AND WINDOWS WHERE THEY OCCUR. USE TYP. BOT. PL. AT TOP OF FLOOR & UNDERSIDE OF DECK ABOVE. 6. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO BENT PL AT WEB. CONNECT BENT PLATE TO SLAB W/ GAS DRIVEN PINS PER SCHEDULE. 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) (2)600S200-68 @ 10' - 0" O.C. BOXED WALL JAMB POST (VERT)WALL GIRTS TO POST (2)600S200-68 @ 10' - 0" O.C. BOXED (2)600S200-68 @ 10' - 0" O.C. BOXED 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG (2)600S200-68 @ 10' - 0" O.C. BOXED 12' - 8" LOW SIDE 15' - 1" HIGH SIDE 10' - 8" 12' - 6" 12' - 8" LOW SIDE 15' - 1" HIGH SIDE KEYED NOTES SHEET NOTES 1. CAMBER AT MID SPAN OF W-BEAMS IS SHOWN AS C = x/x". 2. FRAME MECHANICAL OPENINGS IN FLOOR GREATER THAN 24" IN ANY DIMENSION, RE: . AT OPENINGS LESS THAN 24" RE: & . 3. VERIFY/COORDINATE OPENING SIZE WITH ARCHITECTURAL AND MECHANICAL DRAWINGS. 4. TOTAL NUMBER OF 3/4"x4" LONG "NELSON" SHEAR STUDS REQ'D. FOR BEAMS IS CALLED OUT IN PARENTHESIS AFTER BEAM DESIGNATION AS W_x_ (#) EVENLY SPACED ALONG BEAM LENGTH U.N.O., RE: . 5. PROVIDE THE FOLLOWING FOR SUPPORT AND SIDELAP DECK ATTACHMENTS: A. AT STRUCTRUAL STEEL: (4) 1/2"Ø PUDDLE WELDS AT SUPPORTS (36/4 12" O.C.) AND 12" O.C. ALONG PERIMETER, BUTTON PUNCH SIDELAPS @ 24" O.C. B. AT CFS: (4) #12 SCREWS AT SUPPORTS (36/4 12" O.C.) AND 12" O.C. ALONG PERIMETER, BUTTON PUNCH SIDELAPS @ 24" O.C. 6. CONTRACTOR TO SEAL ALL DECK JOINTS (LAP AND TAPE, BUTT AND TAPE, NEOPRENE OR METAL DECK CLOSURES, ETC) TO PREVENT CONCRETE SEEPAGE. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ALL WALL SHEATHING DEEMED DAMAGED BY UHI REPRESENTATIVE. IN ADDITIONTO SEALING JOINTS, IT IS RECOMMENDED TO COVER ALL WALL SHEATHING BELOW CONCRETE PLACEMENT WITH PLASTIC SHEATHING TO AID INPROTECTION FROM CONCRETE SEEPAGE DAMAGE. 1. 18 GA. 2W COMPOSITE GALVANIZED METAL DECK W/ 4-1/2" TOTAL DEPTH NORMAL WEIGHT CONCRETE (2-1/2" TOPPING OVER 2" METAL DECK) W/ 6 x 6 - W1.4 x W1.4 WWF, OR #3 REBAR @ 16" O.C. DECK TO SPAN 3 SUPPORT LINES MINIMUM. SHORE ALL DECKING PRIOR TO CONCRETE PLACEMENT AT ALL ENTRANCES, SHOWROOM, AND SINGLE SPAN CONDITIONS. COORDINATE WITH OWNER. /7 S6.2 /8 S6.2 /9 S6.2 /6 S6.2 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S3.0 THIRD FLOOR FRAMING PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" THIRD FLOOR FRAMING PLAN No . D e s c r i p t i o n D a t e 09/27/2022 S W S . S STAIR 1 320 RESTROOM 306 STAIR 2 321 COMM MOP/ 308 SELF-STORAGE 312 ELEVATOR UP C . S . 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 0" 0"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 6"0" 298' - 0" 13 1 ' - 0 " 0" 35 ' - 6 " 29 ' - 6 " 30 ' - 6 " 35 ' - 6 " 0" 218' - 0" S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 AA A X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A A S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A A S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A A A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 S/HDU2 A X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 A A A A A A A A A A S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A S/HDU2 S/HDU2 S/HDU2 S/HDU2 A A B.9B.9 4 S6.2 TYP 4 S6.2 TYP 5 S6.2 TYP 5 S6.2 TYP X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 X3 S/HDU2 SHEARWALL SCHEDULE B MARK C A NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN OF (4) ADD'L GAS DRIVEN PINS AT THE END OF ALL SHEARWALLS U.N.O., WHEN HOLDOWN IS CALLED OUT AT THE END OF A SHEARWALL, NO ADD'L PINS REQUIRED. 3. SIDELAP ATTACHMENT OCCURS OVER PANEL LENGTH W/ ADDITIONAL FASTER AT EA. WALL STUD. SHEATHING 29 GA. P.B.U. SPANNING HORZ. 29 GA. P.B.U. SPANNING HORZ. 24 GA. P.B.U. SPANNING HORZ. END SUPPORTS #12 @ 6" O.C. #12 @ 6" O.C. #12 @ 6" O.C. INTERMEDIATE SUPPORTS #12 @ 12" O.C. #12 @ 12" O.C. #12 @ 12" O.C. SIDELAP #12 @ 20" O.C. WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G X-BRACED WALL SCHEDULE X2 MARK X1 BOT. & TOP PL TO CONCRETE (2) X3 NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. PROVIDE A MIN. OF (4) GAS DRIVEN PINS EQUALLY SPACED AT THE END OF ALL SHEARWALLS U.O.N. WHEN HOLDOWN (HD#) IS CALLED OUT AT THE END OF A SHEARWALL, PROVIDE HOLDOWN IN LIEU OF ADDITIONAL PINS. STRAP & PL 1 1/2" WIDE 18 GA STRAP, 18 GA PL STRAP TO PLATE (5) - #12 PLATE TO STUD PLATE TO TRACK WALL INFORMATION PANEL FASTENER/SCREW SIZE & SPC'G FRAMING INFORMATION 6" WIDE 18 GA STRAP, 18 GA PL 8" WIDE 18 GA STRAP, 18 GA PL (20) - #12 (26) - #12 (4) - #12 (14) - #12 (19) - #12 (4) - #12 (14) - #12 (19) - #12 HOLDOWN SCHEDULE NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. ALL HOLDOWNS TO BE SIMPSON STRONG TIE. IF HOLDOWN IS DISCONTINUED, PROVIDE HOLDOWN W/ AN EQUIVALENT CAPACITY. INSTALL ALL HOLDOWNS IN STRICT ACCORDANCE W/ MANUFACTURES INSTRUCTIONS. 3. ALL ANCHORS SHALL BE CAST-IN-PLACE U.N.O. ON PLANS. 4. ALL HOLDOWNS INSTALLED ABOVE A SLAB ON DECK SHALL HAVE THE SAME HOLDOWN INSTALLED AT SLAB UNDERSIDE. TYPE S/HDU2 CS16 STRAP NOTES (SEE SHEARWALL PLAN AND SCHEDULE FOR ADDITIONAL REQUIREMENTS) 1 - POST (18 GA MIN.) AT EACH END OF SHEARWALL. USE 5/8" Ø CAST-IN -PLACE ANCHOR. PROVIDE 5" EMBEDMENT AT SLAB ON GROUND OR FOUNDATION WALL. 1 - POST (18 GA MIN.) AT EACH END OF SHEAR/BRACE WALL. CONNECT TO STUD WALL ABOVE AND BELOW W/ (6) #10 SCREWS EACH. CONTINUE STRAP TO WALL BELOW. AT TILT-UP CONCRETE WALL CONNECT TO WALL W/ GAS DRIVEN PINS. (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 12" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 30" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 8" O.C. STAGGERED W/ 3/4" MIN EMBED (2) ROWS OF GAS DRIVEN PINS AT 6" O.C. STAGGERED W/ 3/4" MIN EMBED BOT. & TOP PL TO CONCRETE (2) WALL T&B ATTACHMENTS #12 @ 12" O.C. #12 @ 12" O.C. D 7/16" PLYWOOD OR OSB #8 @ 6" O.C. (PANEL EDGES) #8 @ 12" O.C.(2) ROWS OF GAS DRIVEN PINS AT 4" O.C. STAGGERED W/ 3/4" MIN EMBED #8 @ 6" O.C. (PANEL EDGES) SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S3.1 THIRD FLOOR SHEARWALL PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" THIRD FLOOR SHEARWALL PLAN No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 09/27/2022 S W S . S STAIR 1 320 RESTROOM 306 STAIR 2 321 COMM MOP/ 308 SELF-STORAGE 312 ELEVATOR UP C . S . E L E V A T O R 7 5 0 0 3/ 8 " P E R F T . M I N . ROOF NOTES 1. ROOF FRAMING SHALL BE “Z” ROOF PURLINS AS NOTED ON ROOF FRAMING PLAN, UNLESS ENGINEERING IS PROVIDED BY THE PURLIN MANUFACTURER . FINAL PURLIN DEPTH SHALL BE VERIFIED BY THE PURLIN MANUFACTURER. PURLINS SHALL BE CONTINUOUS FOR (2) SPANS MINIMUM. A. NOTE TO PURLIN MANUFACTURER: a. PURLIN MANUFACTURER SHALL CONFORM TO THE PURLIN LAYOUT AS SHOWN ON THE STRUCTURAL DRAWINGS. ALL SUBSTITUTIONS/CHANGES SHALL BE SUBMITTED IN WRITING TO THE E.O.R. FOR APPROVAL PRIOR TO ANY WORK BEING DONE. b. PURLIN MANUFACTURER/INSTALLER SHALL PROVIDE AND DESIGN ALL TEMPORARY AND PERMANENT SHORING AND BRACING. 2. ELEVATOR HOIST BEAM BY CONTRACTOR. COORDINATE SIZE AND LOCATION WITH ELEVATOR MANUFACTURER PRIOR TO FABRICATION. 3. 'LX' LINTEL DETAIL AND SCHEDULE, RE: . 4. NET UPLIFT ON ROOF: A. = -8.4 PSF WIND (ASD) B. = -15.1 PSF WITHIN 10' OF EXTERIOR WALLS (ASD) 1. ROOF DECK SHALL BE A DOUBLE LOCK STANDING SEAM STEEL ROOF DECK AS MANUFACTURERED BY BUTLER MANUFACTURERING. ALL DECK ATTACHMENT AND RELATED ITEMS SHALL BE DESIGNED AND PROVIDED BY DECK MANUFACTURER. SEE GENERAL STRUCTURAL NOTES FOR LOAD REQUIREMENTS, AND FRAMING PLAN FOR DECK SPANS. ROOF DECK / DIAPHRAGM KEYED NOTES 1. ROOF ACCESS HATCH, RE: ARCH. 2. SCUPPER W/ CRICKET IN ROOF INSULATION, RE: ARCH. 3. SNOW DRIFT PROFILES: DRIFTS OCCUR ALONG ENTIRE LENGTH OF WALL SEGMENT. No. Pd No.Pd Wd D1 48 PSF 11' -6" Wd /1 S7.1 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 AA BB CC DD EE 6" 30 ' - 0 " 35 ' - 0 " 6" 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"7' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"6" 298' - 0" 13 1 ' - 0 " 298' - 0" 6" 35 ' - 0 " 29 ' - 6 " 30 ' - 6 " 35 ' - 0 " 6" 218' - 0" 4-1/2" WIDE x 18 GA CROSS BRACING STRAPS, RE: 7Z S 2 . 2 5 x 0 8 5 @ 5 ' -0" O . C . M A X . H SS 4 -1/2X4 -1/2X1 /4 W16x26 W16x26 W1 8 x 3 5 HSS4 -1/2 X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 HSS8x6x3/8 H SS6x6x 3 /8 HSS4 -1/2 X4 -1/2X1 /4 56' - 0" 10 ' - 0 " /2 S7.1 1 S7.0 1B S7.0 1 S7.0 3 S7.0 4-1/2" WIDE x 18 GA CROSS BRACING STRAPS, RE: /2 S7.1 3 S7.0 3 S7.0 11 S7.0 11 S7.0 11 S7.0 2 S7.0 5 S7.0 5 S7.0 5 S7.0 9 S7.0 8 S7.0 8 S7.0 3 S7.1 9 S7.0 4 S7.0 B.9B.9 4-1/2" WIDE x 18 GA CROSS BRACING STRAPS, RE: /2 S7.1 1B S7.0 TYP 1B S7.0 TYP TYP 2 S7.0 8 S7.0 7 S7.0 (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 6CS2x059, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 6CS2x059, TYP ACROSS DOORS IN LOAD BEARING WALL (2) 6CS2x059, TYP ACROSS HALLWAY (2) 6CS2x059, TYP ACROSS HALLWAY L-1 L-1HSS4-1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 HSS4 -1/2 X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 H SS 4 -1/2X4 -1/2X1 /4 W8X15 INTERIOR LOAD BEARING C.F.S. WALL STUD SCHEDULE 3RD FLOOR WALL LEVEL WALL STUD SIZE & SPC'G 2ND FLOOR 1ST FLOOR BOT. & TOP PL/TRACK (2) 4TH FLOOR 4CS2.5X059 C.F.S. @ 60" O.C. OR 600S162-68 @ 24" O.C. 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) BLOCKING/BRIDGING/BRACING MID-HEIGHT (POSTS SHALL ALIGN W/ PURLINS ABOVE) 4CS2.5X059 C.F.S. @ 30" O.C. OR 600S162-68 @ 24" O.C. 4CS2.5X059 C.F.S. @ 15" O.C. OR 600S162-68 @ 16" O.C. 4CS2.5X059 C.F.S. @ 10" O.C. OR 600S162-68 @ 12" O.C. MID-HEIGHT MID-HEIGHT QUARTER POINTS (3 LOCATIONS) NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 2. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO 4X4 BENT PL AT WEB. CONNECT 4X4 TO SLAB W/ (2) GAS DRIVEN PINS PER PLANS. EXTERIOR WALL STUD, HORIZONTAL GIRT & IMP SCHEDULE 3RD FLOOR WALL LEVEL MAX. IMP WALL SHT'G VERTICAL SPAN (5) 2ND FLOOR 1ST FLOOR WALL GIRTS (4,5) (HORIZ) (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. (2) 550S162-54 BOXED OR 6ZS2.25X059 1ST GIRT 8'-0" A.F.F. BOT. & TOP PL/TRACK (6) 4TH FLOOR (2) 550S162-68 BOXED OR 6ZS2.25X085 1ST GIRT 8'-0" A.F.F. NOTES: 1. SEE PLANS, DETAILS, & GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. ALL GIRTS SHALL BE PAINTED TO MATCH INSIDE FACE OF IMP. 2. CONTRACTOR TO COORDINATE IMP SHT'G GAGE & FASTNER REQUIREMENTS FOR MAX IMP WALL SHT'G SPAN INDICATED ABOVE. IMP SHT'G SPAN ABOVE IS BASED ON FASTNERS AT SIDE JOINTS & 12" O.C. IN BETWEEN (FP3 PATTERN). 3. WALL GIRTS SPAN FROM HSS TO HSS POST OR C.F.S. TO C.F.S. POST IN EXTERIOR WALLS. 4. WALL GIRT SPACING SHALL MATCH MAX IMP WALL SHT'G SPAN. AT ROOF ABOVE, INSTALL GIRTS AS REQUIRED SO SHT'G SPAN IS EQUAL TO OR LESS THAN TABLE ABOVE WHEN USING "Z" ZEE GIRTS, INSTALL OUTSIDE TOE UP. USE DBL STUD "S" GIRT AT ALL HEADER CONDITIONS. 5. WHEN SHT'G SPAN ABOVE MEETS OR EXCEEDS FL. TO FL. HEIGHT, IMP WALL SHT'G SHALL SPAN FROM FLR. TO FLR. IN THIS CASE, WALL GIRT SHOWN SHALL BE ONLY INSTALLED AT TOP OF DOORS AND WINDOWS WHERE THEY OCCUR. USE TYP. BOT. PL. AT TOP OF FLOOR & UNDERSIDE OF DECK ABOVE. 6. USE TRACK WHEN INTERIOR METAL PANEL IS INSTALLED. USE BENT PL. IN ALL OTHER CONDITIONS. CONNECT C.F.S. STUD TO BENT PL. W/ (2) #12-14 SCREWS AT EA. STUD FLANGE & W/ (4) #12-14 SCREWS TO BENT PL AT WEB. CONNECT BENT PLATE TO SLAB W/ GAS DRIVEN PINS PER SCHEDULE. 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 6-1/4"X4"X16 GA BENT PLATE (LLH) OR 600T200-54 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) 4-1/4"X4X16 GA BENT PLATE (LLH) OR 400T200-54 (600T200-54 @ 6" WALL) (2)600S200-68 @ 10' - 0" O.C. BOXED WALL JAMB POST (VERT)WALL GIRTS TO POST (2)600S200-68 @ 10' - 0" O.C. BOXED (2)600S200-68 @ 10' - 0" O.C. BOXED 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG 4"X4"X14GA CLIP ANGLE W/ (6) #12 SCREWS EA. LEG (2)600S200-68 @ 10' - 0" O.C. BOXED 12' - 8" LOW SIDE 15' - 1" HIGH SIDE 10' - 8" 12' - 6" 12' - 8" LOW SIDE 15' - 1" HIGH SIDE SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S4.0 ROOF FRAMING PLAN DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/32" = 1'-0" ROOF FRAMING PLAN TYP No . D e s c r i p t i o n D a t e 09/27/2022 2" MIN 8" MIN 15" MIN. OPTION 1: LAP OUTERMOST CROSS BARS OPTION 2: TYPICAL DEFORMED BAR LAP W.W.F. RE: S1 W.W.F. RE: S1 OUTERMOST CROSS BAR LAP OF 2" MIN. TYPICAL LAP SPLICE W/ NO CROSS BARS MINIMUM TOTAL OVERLAP OF 8" TYP. REINF. AT RE-ENTRANT CORNER EDGE OF CONC. SLAB (2) #4 x 36" CENTERED IN SLAB ((2) #4 T&B @ 6" SLAB) C L R . 1 " TYP. REINF. AT DISCONTINUOUS JOINT SAWCUT OR CONSTRUCTION JOINT (2) #4 x 36" CENTERED IN SLAB (2) #4 T&B @ 6" SLAB) CL R . 1" CL R . 1" C L R . 1 " DOOR OPENING CL R . 1" C L R . 1 " 2' - 0 " TYP. REINFORCING AT DOORWAY 1' - 0" EXT. SLAB/ PAVEMENT INTERIOR. SLAB NOTE: STOP ADDITIONAL REINF. AT SAWCUTS & CONTROL JOINTS C L R . 1 " (2) #4 CENTERED IN SLAB (2) # 4 T&B @ 6" SLAB) #4 CENTERED IN SLAB 24" 24" CONTROL JOINT IN FOUNDATION WALL TO ALIGN WITH CONTROL JOINT IN CMU WALL. 3/4" DEEP REVEAL, EA. PREFORMED GASKET RE: ARCHITECTURAL FOR JOINT FINISH VERTICAL WALL REINF. EACH SIDE OF CONTROL JOINT 1/2" HORIZ. BOND BEAM W/ STANDARD HOOK, RE:/10 S5.0 3/ 4 " 3/4" 8" NOTES: 1. CONTROL JOINT SPACING NOT TO EXCEED 26' -0" O.C., UNO. 2. STOP HORIZ. BOND BEAM STEEL AT CONTROL JOINT EXCEPT AT ROOF AND FLOOR DIAPHRAGMS. PROVIDE STANDARD HOOK AT FREE END OF BOND BEAM STEEL AROUND VERTICAL REINFORCEMENT, TYP. 3. LOCATE A MIN OF 2' -8" FROM EDGE OF OPENINGS OR BEAM BEARINGS, UNO. 3 4 REINFORCING LAP SCHEDULE, l d BAR SIZE CONCRETE MASONRY TOP OTHER SINGLE BAR DOUBLE BAR 1' -4" 1' -4" 1' -0"1' -0" 1' -9" 1' -5" 1' -9"1' -1" 5 2' -2" 1' -9" 2' -10"1' -8" 6 2' -8" 2' -1" 5' -4"3' -2" 7 3' -10" 3' -0" 7' -6"4' -4" 8 4' -3" 3' -5" 11' -8"6' -7" 9 4' -11" 3' -10" 15' -3"8' -6" 10 5' -5" 4' -3" 19' -6"10' -9" 11 6' -0" 4' -7" 24' -6"13' -3" 14 7' -7" 5' -11" N/A N/A 18 9' -8" 7' -6" N/A N/A NOTES: f 'c f 'm 1. CONCRETE LAP LENGTHS BASED ON = 3,500 psi. 2. CONCRETE "TOP" LAP LENGTHS SHALL BE USED WHERE HORIZONTAL REINFORCEMENT IS PLACED SUCH THAT MORE THAN 12" OF FRESH CONCRETE IS CAST BELOW. 3. MASONRY LAP LENGTHS BASED ON = 2,000 psi. 4. MASONRY "SINGLE BAR" LAP LENGTHS BASED ON BARS CENTERED WALL. 5. MASONRY "DOUBLE BAR" LAP LENGTHS BASED ON BARS OCCURING AT EACH FACE OF WALL. 6. ALL SPLICES/LAPS CAN BE MADE WITH BAR-LOCK COUPLERS AS AN OPTION TO THE CONTRACTOR FOLLOWING SUBMITTAL TO THE EOR AND APPROVAL. NOTE: MAINTAIN REINFORCING LAP THROUGH INTERFACE BETWEEN CONCRETE AND CMU FOUNDATION WALLS. #5 @ 16" O.C. VERT., CENTERED IN WALL #5 HORIZ. @ 16" O.C. CONCRETE FOUNDATION WALL AT CONCRETE FOUNDATION TEE /7 S5.0 /7 S5 . 0 #5 HORIZ. @ 16" O.C.#5 CORNER BARS @ 16" O.C., ALIGN W/ TYP. HORIZ. REINF. RE: , TYP. LAP RE : , T Y P . LA P CONCRETE FOUNDATION WALL #5 @ 16" O.C. VERT. CENTERED IN WALL #5 CORNER BARS @ 16" O.C., ALIGN W/ TYP. HORIZ. REINF. RE : , T Y P . LA P /7 S5 . 0 AT CONCRETE FOUNDATION CORNER #5 HORIZ. @ 16" O.C.RE: , TYP. LAP /7 S5.0 VERT. JAMB BARS, RE: PLAN SEE STRUCTURAL NOTES FOR TYPICAL HORIZ. & VERT. REINFORCING NOTE: IF CONDUIT IS TO BE PLACED IN CELL ADJACENT TO OPENING, ADD 8" TO OVERALL JAMB WIDTH AND REQ'D. REINF., AND INSTALL (1) #5 VERT. BAR CENTERED IN CELL ADJACENT TO OPENING. RE: PROVIDE SEISMIC HOOK AT FREE END OF ALL HORIZONTAL BOND BEAMS AROUND LAST VERTICAL REBAR /7 S5.0 #5 CORNER BARS, ALIGN W/ TYP. HORIZ. REINF. FOR HORIZ & VERT. REINFORCING, RE: S0 TYP. VERT. REINF. AT (3) CELLS AS SHOWN RE: , TYP. LAP RE : , T Y P . LA P NOTE: AT CMU JOINT REINF., PROVIDE PREFAB CORNER REINFORCING AT CMU CORNER TYP. CMU VERT. REINF. AT (4) CELLS AS SHOWN #5 CORNER BARS, ALIGN W/ TYP. HORIZ. REINF. FOR HORIZ. & VERT. REINFORCING, RE: S0 AT CMU TEE NOTE: AT CMU JOINT REINFORCING, PROVIDE PREFAB TEE JOINT REINFORCING RE: ,TYP. LAP RE : , T Y P . LA P /7 S5.0 /7 S5.0 /7 S5 . 0 /7 S5 . 0 U. N . O . 2' - 8 " M A X . U.N.O. 4' - 0" MIN.,CONCRETE FOUNDATION WALL CONCRETE FOOTING U. N . O . 2' - 8 " M A X . U.N.O. 4' - 0" MIN., CMU FOUNDATION WALL CONCRETE FOOTING CMU FOOTING STEP CONCRETE FOOTING STEP #5 BARS , MATCH AND LAP FOOTING BOT. REINF. #5 BARS , MATCH AND LAP FOOTING BOT. REINF. 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1 2 1 2 STD. LAP STD. LAP2" CLR. 2" CLR. PIPE SLEEVES OR WRAP W/ FOAM TO ALLOW 1" MOVEMENT IN ZONE 1 #5 BAR CENTERED OVER PENETRATION NOTE: PENETRATIONS THRU FOUNDATION WALL SHALL NOT DISRUPT FOUNDATION VERTICAL REINFORCEMENT DO NOT PASS PIPES THRU FOOTING IN ZONE 2 CONC. OR CMU FOUNDATION WALL SLAB 1 2 CRUSHED BASE, RE: S1 d MI N . 2d 1-1/2 SACK SLURRY FILL AT 6" O.D. & LARGER ONLY COMPACTED SELECT FILL SLURRY FILL TO UNDERSIDE OF SLAB WHEN TOP OF PIPE IS LESS THAN 2d FROM UNDERSIDE OF SLAB. OPTION: PROVIDE THICKENED SLAB SECTION IN LIEU OF SLURRY d/ 2 MI N . 4" MI N . 6" M I N .6 5 /8 " MI N . 3" 1' - 4" O.D. PIPE SLEEVE 1' - 4" T. O . W A LL 1' - 0 " M I N . B.O.FOOTING T.O.FOOTING NO ADD'L CONCRETE REQ'D WHEN T.O.PIPE PASSES FREELY A MIN OF 2'-0" BELOW BOTTOM OF FOOTING IN ZONE 4 DE E P P I P E ZO N E 4 BE L O W F T G ZO N E 3 FT G ZO N E 2 ST E M W A L L ZO N E 1 PIPE SLEEVES OR WRAP W/ FOAM TO ALLOW 1" MOVEMENT AND ENCASE IN CONCRETE IN ZONE 3 RE: CIVIL DRAWINGS FOR (E) UTILITIES 1 1 (E) UTILITY PARALLEL TO (N) FOUNDATION EXCAVATION NOT ALLOWED BELOW THIS LINE 2 1 (N) EXCAVATION PARALLEL TO (E) FOUNDATION (E) PIPING OR UTILITY NOT ALLOWED BELOW THIS LINE 10' - 0" 2 1 MIN. 1' - 6" TRENCHING BELOW FLOOR SLAB CONTROL JOINT NEW TO EXISTING SLAB (E) CONC. SLAB ON GROUND (N) CONC. SLAB ON GROUND 1/2"Ø x14" SMOOTH DOWEL @ 12" O.C. W/ HILTI HY200 EPOXY INTO (E) SLAB CONC. SLAB ON GROUND REINFORCING INDUCED CRACK REINFORCING REINFORCING REINF. LOC. 'R' PER TABLE SAWCUT DEPTH 'D' PER TABLE CONSTRUCTION JOINT CONC. SLAB ON GROUND REINFORCING 1/2"Ø x 18" SMOOTH DOWELS @ 12" O.C. OR 1/4"x4-1/2"x4-1/2" DIAMOND DOWELS @ 18" O.C. REINF. LOC. 'R' PER TABLE EQ E Q EQ EQ MATCH SLAB DEPTH 8"TYP. 4 1/4"8" 9"9" EQ EQ 1 2 SLAB TRANSITION CONSTRUCTION JOINT 1/2"Ø x 18" SMOOTH DOWELS @ 12" O.C. OR 1/4"x4-1/2"x4-1/2" DIAMOND DOWELS @ 18" O.C. CONC. SLAB ON GROUND, RE: PLAN CONC. SLAB ON GROUND, RE: PLAN SLAB DEPTH 4" 5" 6" SAWCUT DEPTH "D" 1" 1-1/4" 1-1/2" REINF. LOC. "R" 1-1/2" 1-3/4" 2" *SAWCUT WIDTH 1/8" MIN. & 3/16" MAX. 'D ' 'R ' SAWCUT DEPTH 'D' PER TABLE SAWCUT DEPTH 'D' PER TABLEREINF. LOC. 'R' PER TABLE 'R ' 'D ' SAWCUT DEPTH 'D' PER TABLE REINF. LOC. 'R' PER TABLE 'D ' 'R ' 1 2 3/4" = 1'-0" W.W.F. LAP4 1" = 1'-0" SLAB RE-ENTRANT CORNERS AND PENETRATIONS5 1" = 1'-0" CMU & CONCRETE CONTROL JOINTS6 1" = 1'-0" LAP SPLICE LENGTH SCHEDULE7 1" = 1'-0" CONCRETE CORNER AND TEE8 1" = 1'-0" TYPICAL JAMB OR END101" = 1'-0" CMU CORNER AND TEE9 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S5.0 FOUNDATION DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1/2" = 1'-0" FOOTING STEP2 3/4" = 1'-0" FOUNDATION PENETRATION & TRENCHING1 3/4" = 1'-0" CONTROL AND CONSTRUCTION JOINT3 No . D e s c r i p t i o n D a t e 09/27/2022 #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT OR PROVIDE CONT. PERFORATED KEY JOINT. CONTINUOUS REINFORCING, RE: PLAN CONCRETE SLAB ON GROUND, RE: PLAN #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 1' - 0 " M I N . 6" LONG ROUND BAR DIA. AS REQ'D. 1/4" MIN. MAY BE OMITTED IF GAP < 1/8", TYP.1/4 F.F. RE: PLAN 9 1/4" FIELD VERIFY CLR. 3" CL R . 3" RE: PLAN 18"CONCRETE TILT-UP WALL PANEL, RE: PLAN SEAL JOINT PER U-HAUL REQUIREMENTS EMBED PL.1/4"x6"x8" W/(2) 5/8" DIA x4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES EMBED PL. 1/4"x6"x8" W/(2) 5/8" DIA x4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES 3/ 4 " CONCRETE TILT-UP WALL PANEL, RE: PLAN SEAL JOINT PER U-HAUL REQUIREMENTS #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT OR PROVIDE CONT. PERFORATED KEY JOINT. CONTINUOUS REINFORCING, RE: PLAN 6" LONG ROUND BAR DIA. AS REQ'D. 1/4" MIN. MAY BE OMITTED IF GAP < 1/8", TYP.1/4 CONCRETE SLAB ON GROUND, RE: PLAN 1' - 0 " M I N . F.F. RE: PLAN EMBED PL.1/4"x6"x8" W/(2) 5/8" DIA x4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES EMBED PL. 1/4"x6"x8" W/(2) 5/8" DIA x4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES CLR. 3" CL R . 3" RE: PLAN #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 18" #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT OR PROVIDE CONT. PERFORATED KEY JOINT. CONTINUOUS REINFORCING, RE: PLAN BASE PLATE 3/4"x6"x10" AT 10" O.C. MAX SPACING, RE: PLAN COLD-FORMED STEEL WALL GIRTS PER PLANS AND TOP OF WALL, RE: PLAN HSS POST, RE: PLAN CONTINUOUS BENT PLATE (LLH) PER PLAN. CONNECTED TO SLAB WITH GAS DRIVEN PINS PER WALL STUD/GIRD SCHED., RE: PLAN (2) 3/4" DIA ANCHOR RODS (9" MIN. EMBED) EQ EQ TY P . 1 1 / 2 " TY P . 1 1 / 2 " CONCRETE SLAB ON GROUND, RE: PLAN 1/4 F.F. RE: PLAN RE: PLAN CL R . 3" CLR. 3" 1' - 0 " M I N . #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 18" 6" 10 " HSS POST, RE: PLAN 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT OR PROVIDE CONT. PERFORATED KEY JOINT. CONTINUOUS REINFORCING, RE: PLAN COLD-FORMED STEEL WALL GIRTS PER PLANS AND TOP WALL, RE: PLAN DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING) CONCRETE SLAB ON GROUND, RE: PLAN F.F. RE: PLAN RE: PLAN CL R . 3" CLR. 3" 1' - 0 " M I N . #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 18" CONTINUOUS BENT PLATE (LLH) PER PLAN. CONNECTED TO SLAB WITH GAS DRIVEN PINS PER WALL STUD/GIRD SCHED., RE: PLAN #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT. ROUGHEN JOINT OR PROVIDE CONTINUOUS PREFORMED KEYED JOINT CONTINUOUS REINFORCING, RE: PLAN CONCRETE SLAB ON GROUND, RE: PLAN F.F. RE: PLAN RE: PLAN CL R . 3" CLR. 3" 1' - 0 " M I N . WALL PER PLAN BEYOND #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 18" 9 1/4" FIELD VERIFY 3/ 4 " SLAB RECESS AS OCCURS AT THRESHOLD, COORD. W/ ARCH RE: PLAN CONCRETE TILT-UP WALL PANEL, RE: PLAN STEEL COLUMN AND BASE PLATE, RE: PLAN (2) 3/4" DIA. ANCHOR RODS (9" MIN. EMBED INTO FOOTING) 2" MAX. NON-SHRINK GROUT CONC. FILL AT BLOCKOUT ISOLATION JOINT AT BLOCKOUT CONC. SLAB ON GROUND, RE: PLAN PE R P L A N EXTERIOR TURNDOWN FOOTING BEYOND (NOT SHOWN FOR CLARITY) , RE: PLAN CLR. 4 1/4" CL R . 3" REINF. CONC. SPREAD FOOTING, RE: PLAN 14" SQUARE REINF. CONC. PIER (12" @ 4" SQ. HSS). REINF. W/ (4) #5 DOWELS AND #3 TIES @ 12" O.C. VERT. PROVIDE DBL. TIE AT TOP OF SLAB. TIES TO ENCOMPASS AND BE TIED TO VERT. DOWELS. ANCHOR RODS TO BE INSIDE TIES. F.F. RE: PLAN BASE PLATE 3/4"x6"x12" AT 10" O.C. MAX SPACING, RE: PLAN EQ EQ TY P . 1 1 / 2 " TY P . 1 1 / 2 " 1/4 6" 1' - 0 " HSS POST, RE: PLAN 1' - 2"6" C.F.S. POST, RE: PLAN CONC. SLAB ON GROUND, RE: PLAN PROVIDE CONT. REINFORCING AT BOT. OF THICKENED SLAB PER FOOTING SCHEDULE. F.F. RE: PLAN 3" C L R . P E R P L A N S PER PLANS "PBU" WALL PANEL. RE: PLANS. BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST #4 STIRRUPS @ 18" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. PROVIDE INTERMEDIATE TIES AS REQ'D. EXTERIOR TURNDOWN FOOTING, RE: PLAN OPTIONAL CONSTRUCTION JOINT OR PROVIDE CONT. PERFORATED KEY JOINT. CART GAURADRAIL EMBEDED PL. 1/4"x4x0'-4" STEEL PL. W/ 1/2"Ø x 4" LONG HEADED STUD. MAX. SPACING 32" O.C. (2) #4 CONT. BARS TOP, BOT. AND 18" O.C. IN BETWEEN. CONCRETE SLAB ON GROUND, RE: PLAN #4 DOWEL @ 36" O.C. AND AT ALL CORNERS AND ENDS OF WALLS. 18" 18" F.F. RE: PLAN RE: PLAN CL R . 2 1 / 2 " CLR. 3" ( 1 0 " M A X . D O C K ) SE E P L A N S (1) #4 CONT. BAR. TIE TO OUTSIDE OF STEEL EMBED PL. ANCHOR. COLD-FORMED STEEL WALL GIRTS PER PLANS AND TOP WALL, RE: PLAN 2" 3" 2" 3" PI N S P A C I N G 1-12 1-12 5/8"Ø HILTI KWIK BOLT TZ EXPANSION ANCHOR W/ 3-9/16" EMBED @ 48" O.C. MAX. BOTTOM TRACK TO MATCH STUD GA. MTL. STUD, RE: PLAN CONC. SLAB ON GROUND SHEARWALL SHEATHING, RE: PLAN E.N. CONC. SLAB ON GROUND, RE: PLAN F.F. RE: PLAN CFS POST, RE: PLAN METAL WALL PANEL, RE: PLAN 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S5.1 FOUNDATION DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" TILT-UP PANEL AT SLAB RECESS1 1" = 1'-0" TILT-UP PANEL AT FLUSH CONDITION2 1" = 1'-0" HSS POST AT SLAB4 1" = 1'-0" CFS GIRT WALL AT SLAB3 1" = 1'-0" OPENING AT TURNDOWN FOOTING5 1" = 1'-0" HSS POST AND PEDESTAL6 1" = 1'-0" CFS STUD AT FOOTING9 1" = 1'-0" CART GUARDRAIL FOOTING7 1" = 1'-0" CFS STUD BEARING / SHEARWALL10 1" = 1'-0" CFS WALL AT SLAB8 No . D e s c r i p t i o n D a t eNOT U S E D 09/27/2022 2" NON-SHRINK GROUT HSS COL., RE: PLANS PL 1"x14"x14" @ HSS8x8 PL 1"x14"x12" @ HSS8x6 PL 3/4"x12"x12" @ HSS6x6 PL 3/4"x10"x10" @ HSS4x4 INT. CONC. SLAB ON GROUND, RE: PLAN FOOTING SIZE & REINF., RE: FTG. SCHED. 1/4 GRID F.F. RE: PLAN T.O.F. RE: PLAN (4) 3/4"Ø x 12" A.B. W/ 4" PROJECTION CL R . 3" 1 1 / 2 " TY P . 1 1 / 2 " 1 1/2" TYP. 1 1/2" RE: S1 RE : S 1 CLR. 3" BLOCKOUT 2' - 0" ISOLATION JOINT @ BLOCKOUT CMU WALL, RE: PLAN (2) #5 HORIZ. CONT. AT TOP 8" CONC. FOUNDATION WALL #5 @ 16" O.C. ALTERNATE HOOKS AT BOTTOM 1/2" ISOLATION JOINT INT. CONC. SLAB ON GROUND, RE: PLAN F.F. RE: PLAN T.O.F. RE: PLAN #5 HORIZ. @ 16" O.C. #5 DOWELS (CNTR'D. IN WALL) TO MATCH CMU VERT. REINF. SPACING, EXTEND 23" INTO CMU AND 21" INTO CONC. NOTE: #5 DOWELS MAY BE OMITTED IF #5 REBAR IN CONC. STEM @ 16" O.C. ARE EXTENED 23" INTO CMU. CL R . 3" EQ. 8" EQ. RE: PLAN EXT. CONC. SLAB OR FINISH GROUND, RE: ARCH. SEE FTG. SCHED. RE : P L A N CLR. 3" F.F. RE: PLAN CONC. SLAB ON GROUND, RE: PLAN (2) #5 CONT. AT TOP #5 AT 12" O.C., EA. WAY SUMP PIT BEYOND (COORD. W/ ELEV. MFR.) EL E V A TO R M F R . VE R I F Y W / #4x 16" O.C. 24" 24" 1' - 0 " 1' - 0 " 1 2 CONC. SLAB ON GROUND, RE: PLAN T.O.F. VERIFY W/ ELEV. CLR. 3" CL R . 3" #5 NOSING BAR 6" 6" TYP. 6" 8" CONC. FDN. WALL W/ #5 VERT. @ 16" O.C. (CNTR'D. IN WALL & HOOK INTO FOOTING) & #5 HORIZ. @ 16" O.C. CMU WALL, RE: PLAN #5 DOWELS (CNTR'D. IN WALL) TO MATCH CMU VERT. REINF. SPACING, EXTEND 23" INTO CMU AND 21" INTO CONC. NOTE: #5 DOWELS MAY BE OMITTED IF #5 REBAR IN CONC. STEM @ 16" O.C. ARE EXTENED 23" INTO CMU. CONC. SLAB ON GROUND, RE: PLAN F.F. RE: PLAN VERTICAL DOWELS (CNTR'D. IN WALL) TO MATCH CMU VERT. REINF. SPACING, EXTEND 24" INTO CMU AND ALTERNATE HOOKS AT BOTTOM NOTE: AT CMU FOUNDATION WALLS, PROVIDE TOOLED MORTAR JOINT AT ALL JOINTS ABOVE F.G. CMU WALL, RE: PLAN CL R . 3" C L R .3 " RE: PLAN RE : P L A N TOP & BOT. REINF., RE: PLAN SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S5.2 FOUNDATION DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" INTERIOR HSS COLUMN FOOTING1 1" = 1'-0" CMU AND CONC WALL FOUNDATION4 3/4" = 1'-0" ELEVATOR PIT SECTION2 1" = 1'-0" CMU ON THICKENED SLAB FOOTING3 No . D e s c r i p t i o n D a t e 09/27/2022 CONC. SLAB ON DECK GRID CFS WALL GURTS, RE: PLAN L3x3x1/4x CONT. W/ 1/2"Ø x4" LG. H.C.A. @ 16" O.C. & 6" FROM EA. END DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX. SPACING). CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD-FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO SLAB WITH GAS DRIVEN PINS PER PLAN. #5 CONT. CONC. TILT-UP WALL PANEL, RE: PLAN F.F. RE: PLAN DECK TO WALL PER PLAN 8" MIN. CONT. POUR STOP 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG 3/8" x 8" x 1'-0" EMBEDED PLATE WITH (2) 5/8" DIA. x 3" LONG HEADED STUDS AND (1) #4 x 24" A706 REBAR WELDED TO THE PLATE. CONC. SLAB ON DECK GRID HSS POST, RE: PLAN #5 CONT. CONC. TILT-UP WALL PANEL, RE: PLANS F.F. RE: PLAN 1/4 BASE PLATE CFS WALL GURTS, RE: PLAN L3x3x1/4x CONT. W/ 1/2"Ø x4" LG. H.C.A. @ 16" O.C. & 6" FROM EA. END DECK TO WALL PER PLAN CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD-FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO SLAB WITH GAS DRIVEN PINS PER PLAN. CONT. POUR STOP 8" MIN. 1' - 0 " 8" 1/4 3BAR TO PL. 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG EMBED PLATE, 1"x REQ'D. CONC. TILT-UP WALL PANEL, RE: PLAN W-BEAM, RE: PLAN GRID F.F. RE: PLAN CONC. SLAB ON DECK DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING). CFS WALL GURTS, RE: PLAN DECK TO WALL PER PLAN CONT. POUR STOP MIN. 8" CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD-FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO SLAB WITH GAS DRIVEN PINS PER PLAN. KNIFE PL., RE:/10 S6.2 #5 CONT. 10" 1"8"1" 1" 1' - 0 " 4" 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG 1' - 5 " EMBED PLATE CONC. SLAB ON DECK GRID 3/8" x 12" x 1'-0" EMBEDED PLATE WITH (4) 1/2"Ø x 4" L. H.C.A. @ 36" O.C. & @ EA. END. T/PLATE FLUSH TO T/WALL U.N.O. SEE PLANS & DETAILS FOR ADDITIONAL INFORMATION. DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING). #5 CONT. CONC. TILT-UP WALL PANEL, RE: PLANS F.F. RE: PLAN 1/4 TYP. CONT. L6x6x1/2 W/ 3/8" STIFFENER PL. @ 36" O.C. AND 6" FROM END. CONT. POUR STOP CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD-FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO SLAB WITH GAS DRIVEN PINS PER PLAN. CFS WALL GURTS, RE: PLAN 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG CONC. SLAB ON DECK GRID POST IN EXTERIOR WALL SEE PLANS AND DETAILS FOR ADDITIONAL INFORMATION. CONC. TILT-UP WALL PANEL, RE: PLAN F.F. RE: PLAN HSS POST BEYOND RE: PLAN CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA. 1 1/2"1 1/2" W-BEAM, RE: PLAN 1/4 CONT. POUR STOP #5 CONT. CFS WALL GURTS, RE: PLAN 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG CONC. SLAB ON DECK GRID F.F. RE: PLAN W-BEAM, RE: PLAN, OFFSET AS REQ'D #5 CONT. HSS POST, RE: PLAN CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA.1/4 CONT. POUR STOP CFS WALL GURTS, RE: PLAN 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG CONC. SLAB ON DECK GRID F.F. RE: PLAN (2)10CS2x085 CFS BOX BEAM TYP U.N.O. #5 CONT. L4x4x5/8x6" L. CLIP ANGLE1/4 TYP. CONT. POUR STOP CFS WALL GURTS, RE: PLAN 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG HSS POST PER PLAN HSS POST PER PLAN CONC. SLAB ON DECK GRID DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING). F.F. RE: PLAN #5 CONT. CFS WALL GURTS, RE: PLAN DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING). CFS WALL GIRTS, RE: PLAN CONT. POUR STOP GRID POST IN EXTERIOR WALL. RE: PLANS AND DETAILS FOR ADDITIONAL INFORMATION CONT. 6-1/4"x3-3/4" BENT PLATE (LLH). F.F. RE: PLAN 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. #5 CONT.CONC. SLAB ON DECK W-BEAM, RE: PLAN KNIFE PL., RE: CFS WALL GURTS, RE: PLAN CONT. POUR STOP /10 S6.2 W-BEAM, RE: PLAN 1/4 CONC. SLAB ON DECK GRID POST IN EXTERIOR WALL SEE PLANS AND DETAILS FOR ADDITIONAL INFORMATION. CONC. TILT-UP WALL PANEL, RE: PLAN F.F. RE: PLAN HSS POST, RE: PLAN CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA. 1 1/2"1 1/2" W-BEAM, RE: PLAN CONT. POUR STOP #5 CONT. STIFFENER PL. 3/8"x FULL DEPTH EA. SIDE 1/4 CONC. SLAB ON DECK F.F. RE: PLAN 1 1/2"1 1/2" W-BEAM, RE: PLAN W-BEAM, RE: PLAN KNIFE PL., RE:/10 S6.2 GRID 1' - 0" CAP PL. 3/4"x REQ'D. W/ (4) 3/4"Ø A-325 BOLTS ON 5" GA. FULL DEPTH KNIFE PLATE/STIFFENER PL. EA. SIDE 1/4 1/4 CONC. SLAB ON DECK F.F. RE: PLAN 1 1/2"1 1/2" W-BEAM, RE: PLAN KNIFE PL., RE:/10 S6.2 GRID 3' - 3" CAP PL. 3/4"x REQ'D. W/ (4) 3/4"Ø A-325 BOLTS ON 5" GA. STIFFENER PL. 3/8"x FULL DEPTH EA. SIDE 1/4 CONC. SLAB ON DECK GRID POST IN EXTERIOR WALL SEE PLANS AND DETAILS FOR ADDITIONAL INFORMATION. CONC. TILT-UP WALL PANEL, RE: PLAN F.F. RE: PLAN HSS POST, RE: PLAN CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA.1 1/2"1 1/2" W-BEAM, RE: PLAN CONT. POUR STOP #5 CONT. 1/4 GRID F.F. RE: PLAN HSS POST, RE: PLAN CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA.1 1/2"1 1/2" W-BEAM, RE: PLAN CONC. SLAB ON DECK CFS POST, RE: PLAN METAL WALL PANEL, RE: PLAN 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST STIFFENER PL. 3/8"x FULL DEPTH EA. SIDE SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S6.0 FLOOR FRAMING DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" DECK TO TILT-UP WALL1 1" = 1'-0" DECK TO TILT-UP WALL AT HSS POST2 1" = 1'-0" W-BEAM TO TILT-UP WALL3 1" = 1'-0" STIFFENER PLATE4 1" = 1'-0" W-BEAM TO HSS POST5 1" = 1'-0" DECK TO W-BEAM6 1" = 1'-0" DECK PERP. TO WALL7 1" = 1'-0" DECK PAR. TO WALL8 1" = 1'-0" W-BEAM TO W-BEAM10 1" = 1'-0" W-BEAM TO HSS POST11 1" = 1'-0" BEAM TO BEAM AT COLUMN12 1" = 1'-0" CANTILEVER BEAM13 1" = 1'-0" W-BEAM TO HSS POST9 1" = 1'-0" W-BEAM TO HSS POST14 No . D e s c r i p t i o n D a t e 09/27/2022 CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN METAL WALL PANEL, RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN BENT PL. x CONT. W/ (4) #12 SCREWS AT EA. POST 1" 2" 2A S6.1 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN METAL WALL PANEL, RE: PLAN 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN CFS HEADER/ BEAM, RE: PLAN 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN CFS HEADER/ BEAM, RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST CFS STUDS, RE: PLAN (12) #12 SCREWS EA. SIDE (24 TOTAL) CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN CFS HEADER/ BEAM, RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST CFS STUDS, RE: PLAN (12) #12 SCREWS EA. SIDE (24 TOTAL) (12) #12 SCREWS EA. SIDE (24 TOTAL) CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN METAL WALL PANEL, RE: PLAN W-BEAM, RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN W-BEAM, RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST HSS COL., RE: PLAN W-BEAM, RE: PLAN CAP PL. 1/4"x REQ'D. KNIFE PL., RE:/10 S6.2 KNIFE PL., RE:/10 S6.2 CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN BENT PL.x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST HSS COL., RE: PLAN 1/4 CFS HEADER/ BEAM, RE: PLAN L4x4x1/4x6" W/ PL. 1/4"x FULL AT CFS HEADER (4) #12 SCREWS 1/4 CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA. 1 1/2"1 1/2" W-BEAM, RE: PLAN STIFFENER PL. 3/8"x FULL DEPTH EA. SIDE CONC. SLAB ON DECK F.F. RE: PLAN W-BEAM, RE: PLAN W-BEAM, RE: PLAN W-BEAM ONE SIDE ONLY AS OCCURS 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. KNIFE PL., RE:/10 S6.2 CONC. SLAB ON DECK F.F. RE: PLAN W-BEAM, RE: PLAN W-BEAM ONE SIDE ONLY AS OCCURS 1/4 TYP. 1/4 TYP. CFS HEADER/ BEAM, RE: PLAN L4x4x1/4x6" W/ PL. 1/4"x FULL AT CFS HEADER (4) #12 SCREWS KNIFE PL., RE:/10 S6.2 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. PL. 3/8"x 8"x FULL DEPTH CONC. SLAB ON DECK F.F. RE: PLAN W-BEAM, RE: PLAN W-BEAM, RE: PLAN 1/4 TYP. 1/4 TYP. PL. 3/8"x 8"x FULL DEPTH KNIFE PL., RE:/10 S6.2 CONC. SLAB ON DECK F.F. RE: PLAN W-BEAM, RE: PLAN CONT. L6x6x1/2 W/ 3/8" STIFFENER PL. @ 18" O.C. AND 6" FROM EA. END 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. 1/4 6-12 CONC. SLAB ON DECK F.F. RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST CONC. TILT-UP WALL PANEL, RE: PLAN CONT. POUR STOP #5 CONT. 3/16" SIMPSON "TITEN" SCREWS @ 12" O.C. CFS POST, RE: PLAN WALL SHT'G./ PANEL, RE: PLAN CONC. SLAB ON DECK F.F. RE: PLAN BENT PL. x CONT. PER PLAN W/ (4) #12 SCREWS AT EA. POST CONT. POUR STOP #5 CONT. CFS POST, RE: PLAN WALL SHT'G./ PANEL, RE: PLAN CFS WALL GURTS, RE: PLAN #12 SCREWS @ 12" O.C. 3" 3" 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN (4) #12 SCREWS EA. POST CONC. SLAB ON DECK F.F. RE: PLAN CONT. STEEL PL. 3/16" x 8" WIDE. CONNECT TO DECK ABOVE W/ (2) ROWS #12 SCREWS @ 12" O.C. STAGGERED U.N.O. 3 / 4 " G A P 16GA. DEFLECTION TRACK OR 16GA. TRACK W/ SLIP CLIP AT TOP CFS STUD WALL BELOW W-BEAM CONNECT TO W-BEAM W/ (2) ROWS OF #12 SCREWS OR GAS DRIVEN PINS AT 12" O.C. STAGGERED. CFS WALL/ POST, RE: PLAN 1-5/8"x 1-1/2" 18ga. CHANNEL/ STRUT x CONT. W/ (1) #12 SCREWS AT EA. POST CONC. TILT-UP WALL PANEL, RE: PLAN W-BEAM, RE: PLAN GRID F.F. RE: PLAN CONC. SLAB ON DECK DBL CFS BUILT-UP POST AT EVERY STORAGE LOCKER WALL (10'-0" O.C. MAX SPACING). CFS WALL GURTS, RE: PLAN DECK TO WALL PER PLAN CONT. POUR STOP CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD-FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO SLAB WITH GAS DRIVEN PINS PER PLAN. KNIFE PL., RE:/10 S6.2 #5 CONT. 16ga ANGLE CLIP W/ (6) #12 SCREWS EA. LEG 1/4 CAP PL. 3/4"x REQ'D. W/ (2) 3/4"Ø A-325 BOLTS ON 5" GA. CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN "PBU" WALL PANEL, RE: PLAN VERTICAL COLD JOINT. ROUGHEN FACE PRIOR TO PLACING NEW CONC. ADJACENT TO JOINT. ALL JOINTS SHALL BE PERPINDICULAR TO METAL DECK, OCCUR AT BEARING WALLS AND OCCUR AT METAL DECK LAPS. DO NOT PROVIDE JOINT WITHIN 6'-0" OF STEEL BEAMS.#4 x 24" REBAR @ 18" O.C. CENTERED ON JOINT CL JOINT 0.145 P.D.P. W/ 3/4" MIN. EMBED PER PLAN BENT PL. x CONT. W/ (4) #12 SCREWS AT EA. POST SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S6.1 FLOOR FRAMING DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" CFS WALL TO DECK2 1" = 1'-0" CFS BEAM3 1" = 1'-0" CFS HEADER TO CFS POST4 1" = 1'-0" CONT. CFS HEADER5 1" = 1'-0" NON-BEARING WALL TO BEAM6 1" = 1'-0" W-BEAM TO HSS POST7 1" = 1'-0" CFS & W-BEAM TO HSS POST8 1" = 1'-0" W-BEAM TO W-BEAM9 1" = 1'-0" CFS HEADER TO W-BEAM10 1" = 1'-0" DECK TRANSITION11 1" = 1'-0" DECK TRANSITION12 1" = 1'-0" CFS WALL TO CONC.13 1" = 1'-0" CFS WALL TO CFS WALL14 1" = 1'-0" SECTION AT BASE2A 1" = 1'-0" NON-BEARING WALL TO DECK15 1" = 1'-0" OFFSET W-BEAM TO HSS POST1 1" = 1'-0" ELEVATED SLAB JOINT16 No . D e s c r i p t i o n D a t e 09/27/2022 CONC. SLAB ON DECK F.F. RE: PLAN #5 BOND BM. 1/4 CMU WALL PER PLAN L4x4x1/4 LEDGER ANGLE WITH HY270 (OR SIMILAR) EPOXY ANCHORS W/ 4" EMBED @ 24" O.C. GROUT ALL CELLS SOLID AT ANCHORS. #5 CONT. CONC. SLAB ON DECK F.F. RE: PLAN #5 BOND BM. CMU WALL PER PLAN #5 CONT. CONTINUOUS 1/4" BENT PL W/ 6" HORIZ LEG W/ 3/4" DIA. HEADED STUDS (6" MIN. EMBED) @ 16" O.C. AND 6" FROM EA. END. GROUT TO COURSING. L4x4x1/4 COORDINATE ANGLE SIZE AND LOCATION W/ ELEVATOR MANUF. CMU WALL BEYOND, RE: PLAN CFS BM/HDR. RE: PLANS F.F. RE: PLAN 1/4 1/4 CONC. SLAB ON DECK CMU WALL PER PLAN #5 BOND BM. #5 CONT. L4x4x1/4 LEDGER ANGLE WITH HY270 (OR SIMILAR) EPOXY ANCHORS W/ 4" EMBED @ 24" O.C. GROUT ALL CELLS SOLID AT ANCHORS. L4x4x3/8x12" LG LEDGER ANGLE W/ 1/4" PL CLIP W/ (4) #10 SCREWS TO CFS BM, AND (2) 3/4"x6" HILTI HY 270 EPOXY ANCHORS WALL STUDS PER PLAN PROVIDE (1) ADDITIONAL STUD AT END OF BRACED WALL. TOP TRACK PER PLAN BOTTOM TRACK/ANGLE PER PLAN. CONNECT TO STUD WALL AND TO SLABWITH GAS DRIVEN PINS PER PLAN. X-BRACING STRAPS PER PLAN. PROVIDE TAUT STRAP ATTACHED TO WALL STUDS PER PLAN. CONNECT STRAPS TO EACH STUD AND AT STRAP INTERSECTIONS W/ (1)#10-16 SCREWS @ EACH CONNECTION AND TO GUSSET PLATE PER PLAN. GUSSET PLATE PER PLAN. CONNECT GUSSET PLATE TO TOP TRACK , BOT. ANGLE (OR BOT. TRACK), AND TO END STUD(S) PER PLAN. HOLDOWN TOP AND BOTTOM AS OCCURS PER PLAN. ATTACH TO ADD'L STUD AT EACH END OF BRACED WALL PER THE MFR'S RECOMMENDATIONS. SCREWS FROM "PLATE TO TRACK" SCREWS FROM "PLATE TO STUD" SCREWS FROM "STRAP TO PLATE" PLAN VIEW NOTCH LEG OF ANGLE CONC. SLAB ON DECK W-BEAM, RE: PLAN L5x3x1/4 (LLV) AT EDGES OF OPENINGS, BUTT AT CORNERS 3/16" 2"-"16 3/16" 3/16 3 7A S6.2 C6x8.2 TO FRAME OUT PENETRATION SECTION 'A' 2"-12"7B S6.2 1/4" W-BEAM, RE: PLAN SECTION 'B' KNIFE PL. 1/4"x 4"x 4" CONC. SLAB ON DECK W.W.F. (2) #5 CHORD STEEL, UNO. CONT. L5x3x1/4 W/ 1/2" Ø x 18" DBA'S @ 2'-0" O.C. 1 1 / 2 " SECTION 'C' D 2 D 1 A B L1-1/4x1-1/4x1/4, TYP. NOTES: 1/2" TYP. ADJACENT TO EA. CUT WEB1/8" WEBS OF STEEL DECKING CONSIDERED AS SINGLE OPENING IF HOLES ARE WITHIN 'A' OR 'B' OF EACH OTHER /9 S6.2 /9 S6.21. USE FOR HOLES CUTTING NO MORE THAN 3 ADJACENT WEBS, OTHERWISE RE: . 2. ANGLES SHALL BE PLACED WITH LOWER LEG FLAT ACROSS DECK FLUTES. 3. ANGLES SHALL EXTEND 3 WEBS PAST THE DECK OPENING, TYPICAL. 4. IF DIMENSION A IS >4D OR 32" WHICHEVER IS LARGER, THERE IS NO RESTRICTION ON DIMENSION B. 5. IF DIMENSION B IS >4D OR 32" WHICHEVER IS LARGER, THERE IS NO RESTRICTION ON DIMENSION A. 6. IF DIMENSION A & B ARE <4D OR 32" WHICHEVER IS LARGER, THE OPENING GROUP SHALL BE CONSIDERED AS A SINGLE HOLE, AND SHALL BE REINFORCED AS REQUIRED FOR THE LARGER OPENING, RE: . 7. OPENINGS OR GROUPS OF OPENINGS LESS THAN 6" ACROSS DO NOT REQUIRE REINFORCING. (3 ) F L U T E S 2 4 " M A X . (3 ) F L U T E S NOTES: 1 1/2" TYP. WEBS OF STEEL DECKING 1" AT CENTER OF EACH UPPER FLUTE BEYOND OPENING (TYPICAL)1/8" HSS3x1x3/16- FLAT #3x24"REBAR 1/2" TYP. ADJACENT TO EA. CUT WEB1/8" /7 S6.2 1. HSS SHALL BE PLACED ON TOP OF THE DECK. 2. ADD REBARS AT CORNERS OF OPENINGS ABOVE HSS'. 3. IF THE OPENING OR GROUP OF OPENINGS OCCURS IN ONE DECK UNIT, THE OPENING OR OPENING GROUP MAY BE CUT BEFORE POURING CONCRETE. 4. IF THE OPENING OR GROUP OF OPENINGS CUT THROUGH TWO DECK UNITS, THE DECK SHALL NOT BE CUT UNTIL CONCRETE HAS BEEN PLACED AND CURED. AT THE TIME OF POURING, SUITABLE SLEEVES OR BULKHEADS SHALL BE PLACED AROUND THE OPENING. 5. WHEN THE MAXIMUM DIMENSION OF AN OPENING OR OPENING GROUP EXCEEDS 24", PLACE HEADER BEAMS AROUND OPENING, RE: . GIRDER PER PLAN BEAM PER PLAN SHEAR PL. x FULL PER SCHED. WHEN BEAM FRAMES INTO ONE SIDE OF GIRDER ONLY SHEAR PL. PER SCHED. WHEN BEAM FRAMES INTO BOTH SIDES OF GIRDER BEAM PER PLAN BOLTS, A-325 PER SCHED. PER SCHED. PER SCHED. BEAM PLATE THICKNESS TYP. WELD SIZE (3) 3/4" DIA. (4) 3/4" DIA. (5) 3/4" DIA. (6) 3/4" DIA. (7) 3/4" DIA. A-325 BOLTS # & SIZE (6) 3/4" DIA. (2) 3/4" DIA. (2) 3/4" DIA.W8, C8 (3) 3/4" DIA. NOTES: 1. PROVIDE FIELD WELDS FROM ALL KNIFE PLATES TO ALL BEAMS AS SHOWN AND WHERE CONSTRUCTION REQUIRES. 2. SIZE KNIFE PLATE AS REQ'D PER SKEWED PLATE DETAIL. 3. COPE SUPPORTED BEAM FLANGES AS REQ'D TO AVOID INTERFERENCE WITH CONNECTION PLATE. 4. PROVIDE STANDARD ROUND HOLES. A B A B Θ≤17°17°<Θ≤30° W10, C10 W12, C12 W14, C15 W16 W18 W21 W24 W27 W30 (8) 3/4" DIA. 3/8" 3/8" 3/8" 3/8" 3/8" 1/2" 1/2" 1/2" 1/2" 1/2" 1/4" 1/4" 1/4" 1/4" 1/4" 5/16" 5/16" 5/16" 5/16" 5/16" 1 1/2"2 1/2" TY P . 1 1 / 2 " TY P . 3" O . C . PER SCHED. SKEWED PLATE A B Θ SKEWED CONN. WELD SIZES Θ = 0° 1/4" 1/4" 1/4" 1/4" 1/4" 5/16" 5/16" 5/16" 5/16" 5/16" 3/8" 3/8" 3/8" 3/8" 3/8" 1/2" 1/2" 1/2" 1/2" 1/2" 9/16" 1/4" 1/4" 1/4" 1/4" 1/4" 5/16" 5/16" 5/16" 5/16" 5/16" A B (BEVEL WELD) 30°<Θ≤45° 1/4" 1/4" 1/4" 1/4" 1/4" 5/16" 5/16" 5/16" 5/16" 5/16" 1/2" 1/2" 1/2" 1/2" 1/2" 9/16" 9/16" 9/16" 9/16" BEAM WEB OR F.O.HSS 3 " 3/8" (1/4") 3/8" (1/4") 3/8" (1/4") 3/8" (1/4") 3/8" (1/4") 1/2" (3/8") 1/2" (3/8") 1/2" (3/8") 1/2" (3/8") 1/2" (3/8") 1/2" HSS COLW-BEAMS / CHANNEL 1/2"1 1/2" 2 1/2" PER SCHED. TY P . 1 1 / 2 " TY P . 3" NOTES: 1. WELD ALL SIDES OF ALL KNIFE PLATES TO CONNECTED W-BEAMS AT ALL ATTACHMENTS. KNIFE PLATE BOLTING AND WELDING ARE USED IN UNISON FOR ALL CONNECTIONS. NOTES: MIN. 1' - 0" MIN. 4" DECK PARALLEL TO BEAMDECK PERPENDICULAR OR SKEWED TO BEAM 16" MAX. CL OF GIRDER OR FACE OF COL. 12" MAX. SPACING BTWN. PUDDLE WELDS OR STUD & PUDDLE WELD 1ST STUD 1ST STUD CL SPAN PUDDLE WELD WHERE NO STUD REQ'D. CL OF GIRDER OR FACE OF COL. S6.2 6A /6A S6.2 1. WHEN # OF STUDS REQ'D. EXCEEDS THE # OF FLUTES, PLACE (2) IN EVERY OTHER FLUTE STARTING AT EA. END OF THE BEAM, THE TRANSVERSE SPACE SHALL BE 3" MIN. 2. STUDS SHALL BE 3/4"Ø "NELSON HEADED ANCHOR STUDS" (H.A.S.) OR APPROVED EQUIVALENT. 3. LOCATE STUDS RE: INSIDE OF FLUTES CLOSEST TO NEAREST SUPPORT (AWAY FROM BEAM CENTERLINE). 1 1 / 2 " M I N CO V E R 1/ 2 " M I N CO V E R 1/ 2 " M I N 1 1 / 2 " M I N CORRECT LOCATION INCORRECT LOCATION CL SPAN CONC. SLAB ON DECK F.F. RE: PLAN CFS POST, RE: PLAN "PBU" WALL PANEL, RE: PLAN CONT. BENT PL. (LLH) OR TRACK, RE: PLANS. HOLDOWN PER PLAN CONNECT TO ADDITIONAL STUD AT EACH END OF SHEARWALL OR BRACED WALL PER THE MANUFACTURES RECOMMENDATIONS, RE: PLAN. W-BEAM, RE: PLAN PL. 1/4"x 6"x FULL CONNECT HOLDOWN AT UNDERSIDE OF DECK TO PL. PER THE HOLDOWN MANUFATURES' RECOMMENDATIONS. 1/4 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S6.2 FLOOR FRAMING DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" DECK TO CMU1 1" = 1'-0" DECK TO CMU OPENING2 1" = 1'-0" CFS BEAM TO CMU3 1" = 1'-0" X-BRACED SHEARWALL4 1" = 1'-0" FRAMING AT DECK OPENINGS7 3/4" = 1'-0" DECK PENETRATION8 3/4" = 1'-0" DECK PENETRATION9 1" = 1'-0" BOLTED SHEAR CONNECTION10 1" = 1'-0" TYPICAL COMPOSITE BEAM STUD SPACING6 1" = 1'-0" STUD LOCATION6A 1" = 1'-0" HOLDOWN AT SHEARWALL5 No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 09/27/2022 METAL ROOFING OVER INSULATION W-BEAM, RE: PLAN CFS WALL GIRTS, RE: PLAN CFS "Z" PURLIN, RE: PLAN HSS POST (BEYOND), RE: PLANS 16ga. x 6"x6" PURLIN ATTACHMENT CLIP, W/ (4) #10 SCREWS CONTINUOUS 5x4x14 GAGE (LLH) BENT CFS PL. FOR EXTERIOR PANEL CONNECTION, RE: PLAN T/WALL ELEV. RE: PLAN T.O. STEEL RE: PLAN KNIFE PL., RE:/10 S6.2 L4x4x3/8 x 6" L. W/ 1/4" PL. CLIP. CONN. CFS BEAM TO PL. W/ (4) #10 SCREWS CFS "Z" PURLIN, RE: PLAN HSS POST (BEYOND), RE: PLANS (2) 4CS2x065 C.F.S. BEAM/HEADER @ PURLIN ELEVATION, RE: PLAN T/WALL ELEV. RE: PLAN T.O. STEEL RE: PLAN METAL ROOFING OVER INSULATION 16ga. x 6"x6" PURLIN ATTACHMENT CLIP, W/ (4) #10 SCREWS CFS WALL GIRTS, RE: PLAN CFS "Z" PURLIN, RE: PLAN DBL C.F.S. BUILT-UP POST @ EVERY STORAGE LOCKER, RE: PLANS GUSSET PLATE AT X-BRACE T/WALL ELEV. RE: PLAN METAL ROOFING OVER INSULATION T.O. STEEL RE: PLAN CFS WALL GIRTS, RE: PLAN ROOF DIAPHRAGM X- BRACING, RE: PLAN C.F.S. WALL GIRTS, RE: PLANC.F.S. "Z" PURLIN, RE: PLAN DBL C.F.S. BUILT-UP POST @ EVERY STORAGE LOCKER, RE: PLAN GUSSET PLATE AT X-BRACE METAL ROOFING OVER INSULATION T.O. STEEL RE: PLAN ROOF DIAPHRAGM X- BRACING, RE: PLAN C.F.S. POST, RE: PLAN CONNECT EACH C.F.S. POST TO EACH "Z" PURLIN W/ (6) #10 SCREWS AT EACH CONN. MIN. MIN. TOP/COLLECTOR PL, RE: PLAN MIN. WALL SHT'G, RE: PLAN SIDELAP PANEL FASTENER, RE: PLAN C.F.S. "Z" PURLIN, RE: PLAN METAL ROOFING OVER INSULATION T.O. STEEL RE: PLAN CONNECT EACH C.F.S. POST TO EACH "Z" PURLIN, W/ (6) #10 SCREWS C.F.S. POST, RE: PLAN MAX. SPACING, RE: PLANS METAL ROOFING OVER INSULATION C.F.S. "Z" PURLIN, RE: PLAN T.O. STEEL RE: PLAN CONNECT EACH C.F.S. POST TO EACH "Z" PURLIN W/ (6) #10 SCREWS AT EACH CONN. MIN. C.F.S. "Z" PURLIN, RE: PLAN METAL ROOFING OVER INSULATION C.F.S. STUB POST AT PURLIN/HEADER CONNECTION. STUB POST SHALL MATCH C.F.S. POST PER PLANS. CONNECT EACH STUB POST TO THE HEADER W/ (6) #10 SCREWS MIN. C.F.S. BEAM/HEADER, RE: PLANS T.O. STEEL RE: PLAN CONNECT EACH C.F.S. POST TO EACH "Z" PURLIN, RE: PLANS DBL C.F.S. BUILT UP POST, RE: PLAN MAX. SPACING, RE: PLANS METAL ROOFING OVER INSULATION C.F.S. "Z" PURLIN, RE: PLAN EXTEND ONE POST AND CONNECT TO EACH "Z" PURLIN. RE: PLAN C.F.S. BEAM/HEADER. CONNECT EACH BEAM/HEADER TO THE C.F.S. POST PER PLANS. T.O. STEEL RE: PLAN REINFORCED CMU WALL PER PLANS AND DETAILS. PROVIDE VERTICAL REINF. PER PLANS AND DETAILS AND AT ALL CORNERS AND AT ENDS OF WALLS. GROUT CELLS WITH REINF. SOLID. L4x4x3/16 LEDGER W/ 5/8" HY270 EPOXY ANCHORS @ 24" O.C. GROUT ALL CELLS SOLID AT ANCHORS. STAGGER ANCHORS. RE: PLAN METAL ROOFING OVER INSULATION C.F.S. "Z" PURLIN, RE: PLAN T.O. STEEL RE: PLAN 16ga. x 6"x6" PURLIN ATTACHMENT CLIP, W/ (4) #10 SCREWS #5 BOND. BM. AT TOP TYP. 1/4 REINFORCED CMU WALL PER PLANS AND DETAILS. PROVIDE VERTICAL REINF. PER PLANS AND DETAILS AND AT ALL CORNERS AND AT ENDS OF WALLS. GROUT CELLS WITH REINF. SOLID. L4x4x1/4 X 6" LONG STEEL LEDGER ANGLE W/ 1/4" PL. CLIP. CONN. C.F.S. BM. TO PL. CLIP W/ (4)#10 SCREWS. C.F.S. BM/HDR. CONNECT EACH BM/HDR TO THE C.F.S. POST PER PLANS. RE: PLANS. METAL ROOFING OVER INSULATION C.F.S. "Z" PURLIN, RE: PLAN B/PURLIN ELEV. RE: PLAN GROUTED SOLID BOND BEAM W/ CONT. REINFORCEMENT, RE: PLANS. 3/8x12x1'-8" STEEL PL. W/ (2) ROWS OF (3) 3/4"Ø ANCHORS (5" MIN. EMBED). SPACE ANCHORS 8" O.C. IN BOTH DIRECTIONS. GROUT ALL CELLS SOLID AT ANCHORS. AS ALTERNATE PROVIDE STEEL BEARING PL. PER STEEL BM. BEARING AT CMU PILASTER/WALL DETAIL. #5 BOND. BM. AT TOP TYP. C.F.S. WALL GIRTS, RE: PLAN C.F.S. "Z" PURLIN, RE: PLANS DBL C.F.S. BUILT-UP POST @ EVERY STORAGE LOCKER, RE: PLAN T/WALL ELEV. RE: ARCH. T/WALL ELEV. RE: PLAN C.F.S. WALL GIRTS, RE: PLAN METAL ROOFING OVER INSULATION C.F.S. LOAD-BEARING WALL/POST RE: PLANS MIN. TOP / COLLECTOR PL. PER SHEARWALL SCHEDULE U.N.O. MIN. WALL SHT'G PER SHEARWALL SCHEDULE. END SUPPORT PANEL FASTNER PER SHEARWALL SCHEDULE. INTERMEDIATE PANEL FASTNER PER SHEARWALL SCHEDULE. SIDELAP PANEL FASTNER PER SHEARWALL SCHEDULE #12 SCREWS @ 12" O.C. C.F.S. "Z" PURLIN, RE: PLAN DBL C.F.S. BUILT-UP POST @ EVERY STORAGE LOCKER, RE: PLAN T/WALL ELEV. RE: PLAN C.F.S. WALL GIRTS, RE: PLAN METAL ROOFING OVER INSULATION C.F.S. LOAD-BEARING WALL/POST RE: PLAN MIN. TOP / COLLECTOR PL. PER SHEARWALL SCHEDULE MIN. WALL SHT'G. PER SHEARWALL SCHEDULE. END SUPPORT PANEL FASTNER PER SHEARWALL SCHEDULE. INTERMEDIATE PANEL FASTNER PER SHEARWALL SCHEDULE. SIDELAP PANEL FASTNER PER SHEARWALL SCHEDULE #12 SCREWS @ 12" O.C. SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S7.0 ROOF FRAMING DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" "Z" TO W-BEAM AT EXTERIOR1 1" = 1'-0" "Z" TO CFS HEADER AT EXTERIOR1B 1" = 1'-0" "Z" PURLINS PARALLEL W/ WALL2 1" = 1'-0" "Z" PURLIN AT EAVE3 1" = 1'-0" ROOF PURLIN AT C.F.S. POST4 1" = 1'-0" COORIDOR HEADER AT ROOF PURLIN5 1" = 1'-0" ROOF PURLIN AT C.F.S. BEAM/HEADER6 1" = 1'-0" COORIDOR HEADER AT ROOF PURLIN7 1" = 1'-0" "Z" PURLIN TO CMU8 1" = 1'-0" CFS BEAM TO CMU9 1" = 1'-0" CFS WALL TO EXTERIOR WALL10 1" = 1'-0" CSF WALL TO EXTERIOR EAVE11 No . D e s c r i p t i o n D a t e 09/27/2022 MASONRY LINTEL SCHEDULE MARK MIN. DEPTH DETAILJAMB REINFORCING JAMB WIDTH L-1 L-2 BOT. ELEV. ABOVE F.F. 16" 24" RE: ARCH. RE: ARCH. 16"(1) #6 @ 8" O.C. (1) #6 @ 8" O.C.24" U.N.O. HORIZONTAL REINFORCING (2) #5 TOP & BOTTOM (2) #5 TOP & BOTTOM /1B S7.1 /1B S7.1 1B S7.1 GR O U T S O L I D LI N T E L D E P T H AND THROUGH SOLID GROUTED JAMB 24" MIN BEYOND CORNER OF OPENING TOP REINF. BOTTOM REINF. VERTICAL REINFORCING, RE: SCHEDULE AND DETAILS FOR JAMB CONDITIONS, EXTEND TO FLOOR OR ROOF DIAPHRAGM OPENING ELEVATION NOTES: 1. LOCATED CONTSTRUCTION OPENINGS AS NEEDED, EXTEND #5 HORIZ. AT SIDES OF OPENING TO RECEIVE MECHANICAL COUPLERS AT TIME OF INFILL. B.O. LINTEL RE: ARCH T.O. LINTEL TYP. CMU VERT. REINF. (2) #5 T&B SO L I D GR O U T 1' - 4 " 3" L-1 3" B.O. LINTEL RE: ARCH T.O. LINTEL (2) #5 T&B SO L I D GR O U T 2' - 0 " 3" L-2 3" TYP. CMU VERT. REINF. 1" M I N . 2" 2" 1" M I N . 1" MIN. CL WORK POINT CONT. WALL GIRT/TRACK IN C.F.S. STUD WALL PER PLAN C.F.S. "Z" PURLIN, RE: PLAN X-BRACING STRAP PER PLAN. 16GA x 18" x 18" GUSSET PL. MIN. ALL GUSSET PL. DIM. ARE MIN. FIELD VERIFY ALL DIMS. PRIOR TO FABRICATION. (33) #12 SCREWS FROM PLATE TO GIRT/TRACK (24) #12 SCREWS FROM STRAP TO PLATE (2) #12 SCREWS AT EA. LAP OF STRAPS TO UNDERSIDE OF PURLIN 1 " M I N . SHEARWALL OR X-BRACE WALL, RE: PLAN (8) #12 SCREWS EA. STAP TO GUSSET PLATE OVER SHEARWALL OR X-BRACE WALL TOP TRACK (16) #12 SCREWS FROM GUSSET PLATE TO SHEARWALL OR X-BRACE WALL TOP TRACK (SCREWS FROM STRAPS CAN BE USED FOR THIS ATTACHMENT REQUIREMENT IF THEY PENETRATE ALL THREE LAYERS OF STEEL) STRAP TO EXTERIOR WALL STRAP TO CFS ROOF PURLIN STRAP TO CFS SHEARWALL / X-BRACE B/PURLIN ELEV. RE: PLAN F.F. RE: PLAN T/WALL ELEV. RE: PLAN C.F.S. WALL GIRTS, RE: PLANS. MIN. PROVIDE AT TOP OF PARAPET AND BOT OF PURLIN ELEVATION. RE: PLANS. CONCRETE TILT UP PANEL, RE: PLANS METAL ROOFING OVER INSULATION C.F.S. "Z" PURLIN, RE: PLANS POST IN EXTERIOR WALL. RE: PLANS CONT. BENT PLATE (LLH), PER PLAN. CONNECT TO COLD- FORMED STEEL POST WITH (4) #12 SCREWS AT EA. POST, AND TO HSS WITH (2) ROWS OF #10 SCREWS AT 12" O.C. STAGGERED. HSS BEAM PER PLAN (LONG DIM VERTICAL).WELD TO 3/8x7x1'-1" STEEL PL. CONNECTED TO CMU WALL (4) 3/4"Ø ANCHORS (2 ABOVE AND BELOW) AT BOTH ENDS. USE ADHESIVE SYSTEM PER G.S.N. (6-3/4" MIN. EMBED). PROVIDE AT EACH FLOOR LEVEL. 4"x4"x12 GA BENT PL. AT EACH STUD W/ (3) #10-16 SCREWS INTO EACH STUD AND TO HSS. 4 1 / 2 " F.F. RE: PLAN 4 1 / 2 " 1/4 2 - 12 2 - 12 GRID CONC. TILT-UP WALL PANEL, RE: PLAN F.F. RE: PLAN F.F. RE: PLAN T.O. CMU RE: PLAN 4 1 / 2 " 4 1 / 2 " B/PURLIN ELEV. RE: PLAN HSS BEAM PER PLAN (LONG DIM VERTICAL). PROVIDE HSS BEAM AT EACH FLOOR LEVEL PER PLAN. PL3/8x7x1'-1", ATTACH TO CMU WALL W/ (4) 3/4"Ø ANCHORS AS SHOWN EA. END OF HSS. USE HILTI RE-500 V3, OR SIMILAR, EPOXY W/ 6-3/4" MIN. EMBED INTO SOLID GROUTED CMU. 1/4 TYP. 1" = 1'-0" MASONRY LINTEL SCHEDULE1 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S7.1 ROOF FRAMING DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" ROOF X-BRACE STRAPS AT WALLS AND PURLINS2 1" = 1'-0" HSS BEAMS TO C.F.S. WALL3 1" = 1'-0" HSS BEAMS TO CMU4 No . D e s c r i p t i o n D a t e 09/27/2022 STAIR 1 220 UP STAIR 2 221 STAIR 1 320 UP STAIR 2 321 STAIR 1 120 UP STAIR 2 121 11 12 13 AA HSS8x6x3/8 3"10' - 0"10' - 0"3" 8 S8.1 6 S8.1 6 S8.1 6 S8.1 6 S8.1 6 S8.1 9 S8.1 10 S8.1 C12x20.7 C9 x 1 3 . 4 C12x20.7 C9 x 1 3 . 4 C12x20.7 C12x20.7L3 X 3 X 1 / 4 11 S8.1 10 S8.1 CONT. CONT. 31 31 D 4' - 0 " 10 ' - 4 " 5' - 1 1 " 20 ' - 3 " 10' - 4" C12x20.7 C9x13.4 C9x13.4 C9x13.4 C12x20.7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 5 S8.1 7 S8.1 7 S8.1 4 S8.1 3 S8.1 TYP TYP TYP 6 S8.1 4 S8.1 6 S8.1 11 12 13 AA HSS8x6x3/8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 3"10' - 0"10' - 0"3" 8 S8.1 7 S8.1 6 S8.1 10 S8.1 11 S8.1 31 31 DDHSS4x4x1/4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 C12x20.7 C9x13.4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 C12x20.7 C9x13.4 C9x13.4 4 S8.1 5 S8.1 6 S8.1 7 S8.1 7 S8.1 TYP TYP C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 C1 2 x 2 0 . 7 6 S8.1 11 12 13 AA 10' - 0"10' - 0" 1 S8.1 8 S8.1 9 S8.1 C12x20.7 C9 x 1 3 . 4 C12x20.7 C12x20.7 C12x20.7 C12x20.7 L3 X 3 X 1 / 4 6 S8.1 TYP. 10 S8.1 OPP. 10 S8.1 TYP. CONT. CONT. 31 DDHSS4x4x1/4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 H SS4x4x 1 /4 F3 F3F3 F3 F3 F3 F3 F3 2 S8.1 TYP SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S8.0 STAIR FRAMING PLANS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 3/8" = 1'-0" STAIR #1 @ 2ND FLOOR 3/8" = 1'-0" STAIR #2 @ 2ND FLOOR 3/8" = 1'-0" STAIR #1 @ 3RD FLOOR 3/8" = 1'-0" STAIR #2 @ 3RD FLOOR 3/8" = 1'-0" STAIR #1 FOUNDATION 3/8" = 1'-0" STAIR #2 FOUNDATION PLAN No . D e s c r i p t i o n D a t e 09/27/2022 CONC. SLAB ON GROUND, RE: PLAN C12 STRINGER, RE: PLAN (3) SIDES, TYP. 1/4 L2x2x1/4 x0'- 8" F.F. RE: PLAN L3x3x1/4x0' -3" W/ 5/8"Ø x 3" EMBED HILTI HY200 EPOXY ANCHOR, EA. STRINGER (1) #4 CONT. MI N . 8" 8" 1/4" GALV. BENT CHECKERED TREAD 1/4 1-1/2" NON-SHRINK GROUT FOOTING SIZE & REINF., RE: FTG. SCHED. (4) 3/4"Ø x 13" HEADED A.B. W/ 5" PROJECTION HSS COL., RE: PLANS PL. 1"x10"x10" TYP. 1 1/2" TYP. 1 1/2" TY P . 1 1 / 2 " TY P . 1 1 / 2 " 16" SQ. CONC. PIER (2) #3 TIE IN TOP 5", AND THEN @ 10" O.C. #5 VERT. BARS @ 12" O.C. AROUND PEDESTAL PERIMETER WITH HOOK INTO FTG. RE: PLAN CL R . 3" CLR. 3" 1/4 C12 STRINGER, RE: PLAN L2x2x1/4 x0'- 8" 1/4" GALV. BENT CHECKERED TREAD RE: PLAN EQ EQ F.F. RE: PLAN CJP 1" EA. END 1/4" GALV. BENT CHECKERED PLATE CONT. L3x3x1/4 C-CHANNEL, RE: PLAN1/4TYP. L3x3, RE: PLAN RE: PLAN 1/4 CJP 1" EA. END F.F. RE: PLAN 1/4" GALV. BENT CHECKERED PLATE CONT. L3x3x1/4 C-CHANNEL, RE: PLAN C-CHANNEL, RE: PLAN C12 STRINGER, RE: PLAN L2x2x1/4 x0'- 8" 1/4" GALV. BENT CHECKERED TREAD 1/4" GALV. BENT CHECKERED PLATE C-CHANNEL, RE: PLAN W- BEAM, RE: PLANS KNIFE PL., RE: CONC. SLAB ON DECK L2x2x1/4 x0'- 8" EXPANSION JOINT, RE: PLANS LOWER WALL, RE: PLANS F.F. RE: PLAN /10 S6.2 C-CHANNEL, RE: PLAN 1/4" GALV. BENT CHECKERED PLATE W-BEAM, RE: PLANS F.F. RE: PLAN CONT. L3x3x1/4 AT LANDING PERIMETER CHANNEL NOT SHOWN FOR CLARITY. KNIFE PL., RE:/10 S6.2 F.F. RE: PLAN C-CHANNEL, RE: PLAN 1/4" GALV. BENT CHECKERED PLATE HSS COL., RE: PLANS CONT. L3x3x1/4 AT LANDING PERIMETER CHANNEL NOT SHOWN FOR CLARITY. KNIFE PL., RE:/10 S6.2 1/4 C12 STRINGER, RE: PLAN L2x2x1/4 x0'- 8" 1/4" GALV. BENT CHECKERED TREAD EQ EQ RE: PLAN F.F. RE: PLAN 3/4"Ø HILTI HY270 EPOXY BOLTS W/ 6-3/4" EMBED IN GROUTED CELLS #5 BOND BM. CMU WALL RE: PLANS C-CHANNEL, RE: PLAN 1/4" GALV. BENT CHECKERED PLATE CMU WALL RE: PLANS #5 BOND BM. 3/4"Ø HILTI HY270 EPOXY BOLTS W/ 6-3/4" EMBED IN GROUTED CELLS C-CHANNEL, RE: PLAN 1/4" GALV. BENT CHECKERED TREAD C12 STRINGER, RE: PLAN 1/4" GALV. BENT CHECKERED PLATE L2x2x1/4 x0'- 8" RE: PLAN 1 1/2"9"1 1/2" 2" 8" 2" 1' - 0 " 1' - 0" CMU WALL RE: PLANS 3/4" STRINGER CONTINUOUS AT OUTSDIE WALL, RE: PLAN (4) 3/4"Ø HILTI HY270 EPOXY BOLTS W/ 6-3/4" EMBED IN GROUTED CELLS (OPTION, POCKET BEAM INTO WALL PER ) KNIFE PL., RE:/10 S6.2 KNIFE PL., RE:/10 S6.2 2" 8" 2" /11 S8.1 SOLID GROUT POCKET, OR DRYPACK SOLID AFTER ERECTION RE: PLAN F.F. RE: PLAN STEEL ANGLE LEDGER W/ ADHESIVE ANCHORS NOT SHOWN FOR CLARITY. RE: PLAN STAIR BM PER PLAN 1/4" GAL'V CHECKERED PL W/ L3x3x1/4 STIFFENERS @ 24" O.C. (MAX.) STIFFENER NOT SHOWN FOR CLARITY. PROVIDE (3) COURSES OF SOLID GROUTED MASONARY (16" WIDE) CENTERED UNDER BEAM. BEARING PL. 3/4"x6"x1'-4" W/ (2) 1/2"Ø x8" DBA'S OR #4 A706 REBAR ON 1" NON SHRINK GROUT 1/4 3" (2) #5 BOND BEAM BELOW BEAM W/ STANDARD HOOK AROUND VERT BAR IN LAST CELL 1' - 4" 4"8"4" 6" 1 1 / 2 " SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S8.1 STAIR FRAMING & DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" STRINGER TO SLAB1 1" = 1'-0" CONC. PIER AT HSS COL.2 1" = 1'-0" STAIR LANDING3 1" = 1'-0" STRINGER AT LANDING4 1" = 1'-0" LANDING AT PLATFORM5 1" = 1'-0" STRINGER TO LANDING BEAM6 1" = 1'-0" STRINGER TO HSS COLUMN7 1" = 1'-0" LANDING AT CMU WALL8 1" = 1'-0" LANDING AT CMU WALL9 1" = 1'-0" STRINGER TO CMU WALL10 1" = 1'-0" STRINGER TO CMU WALL11 No . D e s c r i p t i o n D a t e 09/27/2022 RESTROOM 106 REFUSE RM 107 HSS POST IN STUD WALL PER PLAN (10'-0" O.C. MAX.) CONCRETE TILT UP PANEL, RE: PLAN F.F. RE: PLAN 1/4 CONC. SLAB ON DECK STEEL BASE & CAP PL. 3/4x6x1'-0" W/ (2) 1/2" Ø POST INSTALLED ANCHORS AT 9" O.C. (2-5/8" MIN. EMBED). C10x15.3 AT 10'-0" O.C. MAX. W/ (2) HORIZONTAL SLOTTED HOLES TO RECEIVE (2) 3/4" Ø A325 BOLTS AT VERTICAL C6 IN STUD WALL. 3' - 0 " 3/4" (V.I.F.) B/CANOPY ELEV. RE: ARCH C6 TO C10 AFTER ERECTION 6CS2.5x059 PURLINS @ 2'-0" O.C. MAX. PURLINS SHALL BE CONTINUOUS FOR (2) SPANS MIN. METAL ROOF PANELING, RE: PLANS. INSTALL PER MANUFACTURES RECOMMENDATIONS. 10' - 0" MAX. OUTLINE OF FINISH MATERIAL AND SUPPORT FRAMING, RE: ARCH 1' - 9 1 / 2 " 1/4 C10 TO HSS 3/4" Ø ASTM A603 GALVANIZED WIRE ROPE (OR ROD) W/ OPEN SPELTER SOCKET EACH END AND 1/4" STEEL PLATE CONNECTION FOR PIN, TYP. COORDINATE LOCATION W/ EXTERIOR SIGNAGE AND SPACE EQUALLY ACROSS LENGTH OF CANOPY WITH ROD EACH END 10' -0" MAX O.C. SPACING F.F. RE: PLAN CFS POST IN EXTERIOR WALL, RE: PLAN C6x8.2 VERTICAL AT 10'-0" MAX. O.C. IN SAME PLANE AS CFS STUDS W/ (2) 3/4" Ø A325 BOLTS IN VERTICALL SLOTTED HOLES 6CS2.5x059 GIRTS AT TOP AND BOT. OF WALL AND TOP OF C10 FOR ATTACHMENT OF SIDING METAL SIDING, RE: ARCH 3/8 12 1/4 PL TO C6 1/4 PL TO HSS 4 12 6" TY P . 5 1 / 2 " TYP. 11 3/4" STEEL BASE & CAP PL. 3/4x6x1'-0" W/ (2) 1/2" Ø POST INSTALLED ANCHORS AT 9" O.C. (2-5/8" MIN. EMBED). CONCRETE TILT UP PANEL, RE: PLAN F.F. RE: PLAN 1/4 STEEL BASE/CAP PL. 3/4x6x1'-0" C10x15.3 AT 10'-0" O.C. MAX. W/ (2) HORIZONTAL SLOTTED HOLES TO RECEIVE (2) 3/4" Ø A325 BOLTS AT VERTICAL C6 IN STUD WALL. C6x8.2 VERTICAL AT 10'-0" MAX. O.C. IN SAME PLANE AS CFS STUDS W/ (2) 3/4" Ø A325 BOLTS IN VERTICALL SLOTTED HOLES 3' - 0 " 6CS2.5x059 GIRTS AT TOP AND BOT. OF WALL AND TOP OF C10 FOR ATTACHMENT OF SIDING 3/4" (V.I.F.) B/CANOPY ELEV. RE: PLAN TYP. AFTER ERECTION METAL SIDING, RE: ARCH 3/8 126CS2.5x059 PURLINS @ 2'-0" O.C. MAX. PURLINS SHALL BE CONTINUOUS FOR (2) SPANS MIN. METAL ROOF PANELING, RE: PLANS. INSTALL PER MANUFACTURES RECOMMENDATIONS. 10' - 0" MAX. OUTLINE OF FINISH MATERIAL AND SUPPORT FRAMING, RE: ARCH 1' - 9 1 / 2 " 1/4TYP. F.F. RE: PLAN CFS POST IN EXTERIOR WALL, RE: PLAN HSS BEAM ACROSS STAIRWAY, RE: PLAN AND 1/4TYP. 3/4" Ø ASTM A603 GALVANIZED WIRE ROPE (OR ROD) W/ OPEN SPELTER SOCKET EACH END AND 1/4" STEEL PLATE CONNECTION FOR PIN, TYP. COORDINATE LOCATION W/ EXTERIOR SIGNAGE AND SPACE EQUALLY ACROSS LENGTH OF CANOPY WITH ROD EACH END 10' -0" MAX O.C. SPACING 1/4 PL TO C6 1/4 PL TO HSS 6" 4 12 HSS POST IN STUD WALL PER PLAN (10'-0" O.C. MAX.) 4 1 / 2 " 4 1 / 2 " /3 S7.1 HSS BEAM ACROSS STAIRWAY, RE: PLAN AND /3 S7.1 1 2 3 4 A B HSS6 x6x 3 /8 HSS6 x6x 3 /8 HSS6 x6x 3 /8 HSS6 x6x 3 /8 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C 10x 15 .3 C10x15.3 C10x15.3 C10x15.3 C10x15.3 1 S9.0 1 S9.0TYP.HSS6 x6x 3 /8 HSS6 x6x 3 /8 HSS6 x6x 3 /8 11 12 13 14 15 16 17 AA H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 H SS6x6x 3 /8 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 C1 0 x 1 5 . 3 1 S9.0TYP. HSS8x6x3/8 2 S9.0 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S9.0 CANOPY FRAMING DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 1'-0" CANOPY FRAME1 1" = 1'-0" CANOPY CROSS BEAM2 3/16" = 1'-0" CANOPY FRAMING PLAN #1 3/16" = 1'-0" CANOPY FRAMING PLAN #2 No . D e s c r i p t i o n D a t e 09/27/2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 29' - 9"1/2"19' - 5 1/2"1/2"21' - 11 1/2"1/2"15' - 5 1/2"1/2"20' - 11 1/2"1/2"25' - 11 1/2"1/2"25' - 11 1/2"1/2"14' - 11 1/2"1/2"13' - 5 1/2"1/2"19' - 11 1/2"1/2"21' - 11 1/2"1/2"21' - 11 1/2"1/2"21' - 11 1/2"1/2"23' - 8 1/2" 100' - 0" 112' - 1 1/2" T.O.C. F.F. 2ND F.F. 4 1 / 2 " 4' - 9 1 / 2 " 7' - 4 " 112' - 6" CL-3 CL-2 J3 J3 J1 J2 J2 J2 J1 J1 J2 J2 J2 J2 TILT-UP PANEL NOTES 1. 5-1/2" THICK (2x6 FORM) WITH REINFORCING PER ASSEMBLY DETAILS, RE: S10.1 SHEET. CL-1, TYP. U.N.O. CL-2 A B C D E 1/2"26' - 0"1/2"25' - 11 1/2"1/2"25' - 11 1/2"1/2"25' - 11 1/2"1/2" T.O.C. F.F. 2ND F.F. 100' - 0" 112' - 1 1/2" 112' - 6" B.9 26' - 0"1/2" CL-1, TYP. U.N.O. J1 910111213141516171819202122232425262728293031 27' - 6"1/2"27' - 6"1/2"27' - 6"1/2"27' - 6"1/2"27' - 6"1/2"27' - 6"1/2"27' - 6"1/2"25' - 2 1/2" T.O.C. F.F. 2ND F.F. 112' - 6" 112' - 1 1/2" 12 ' - 1 1 / 2 " CDE 1/2"21' - 5 1/2"1/2"21' - 5 1/2"1/2"21' - 5 1/2"1/2" T.O.C. F.F. 2ND F.F. 112' - 6" 112' - 1 1/2" 100' - 0" 123456789 T.O.C. F.F. 2ND F.F. 100' - 0" 112' - 6" 112' - 1 1/2" 1/2"26' - 7 1/2"1/2"26' - 7 1/2"1/2"26' - 7 1/2"5 1/2" ABC T.O.C. F.F. 2ND F.F. 112' - 1 1/2" 112' - 6" 17' - 11 3/4"1/2"17' - 11 1/2"1/2"29' - 5 3/4"1/2" 100' - 0" B.9 CL-3 J1 J3 J3 CL-1 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S10.0 COMPOSITE TILT-UP PANEL WALL ELEVATIONS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1" = 10'-0" COMPOSITE NORTH WALL ELEVATION1 1/8" = 1'-0" COMPOSITE EAST WALL ELEVATION2 1/8" = 1'-0" COMPOSITE SOUTH WALL GRID "E" ELEVATION3 1/8" = 1'-0" COMPOSITE WEST GRID "9" WALL ELEVATION4 1/8" = 1'-0" COMPOSITE SOUTH WALL GRID "C" ELEVATION5 1/8" = 1'-0" COMPOSITE WEST GRID "1" WALL ELEVATION6 No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 1 1 1 1 09/27/2022 1B S10.1 1A S10.1 3 S10.1 /5 S10.1 /2 S10.1 ADDITIONAL VERT. BARS AT JAMB OR UNDER GIRDER, AS OCCURS F.F. RE: PLAN (2) #5 VERT. BARS AT WALL ENDS #3 TIES @ 8" O.C. AT JAMBS EXTEND 2' - 0" ABOVE & BELOW OPENING (2) #5 CONT. BELOW SILL#3 STIRRUPS @ 12" O.C. BELOW OPENINGS (2) #5 BARS W/ 6" 90° HOOKS CONT. AT BOT. OPENING IN PANEL, RE: ARCH. (2) #5 VERT. BARS MIN EACH SIDE OF OPENING #5 x 5' -0" CORNER BAR ALL OPENINGS. TYP. (2) #5 BARS AT HEAD & THRU JAMB, TYP. U.N.O. TYPICAL PANEL REINFORCING: ALL WALLS: #5 VERT. @ 16" O.C. (CENTERED IN WALL), HORIZONTAL BARS: #5 @ 16" O.C. (CENTERED IN WALL), U.N.O. TYPICAL PANEL NOTES: 1. FOR SHIMMING OF PANEL, RE: . 2. PROVIDE CORNER CONN., RE: . 3. FOR TYP WALL LAYOUT/ELEVATION, RE: . 2' - 0 " #3 TIES @ 2' - 0" O.C. AT JAMB ABOVE & BELOW OPENING /6 S10.1 (2) #5 BARS W/ 6" 90° HOOKS CONT. AT TOP MISC. TYP. OPENING, 2' -0" MAX DIM. 2' - 0" #5 x 4' -0" CORNER BAR ALL OPENINGS. TYP. (2) #5 x 4' -0" BARS ALL SIDES TYP. (2) #5 VERT. BARS AT WALL ENDS ADDITIONAL VERT. BARS AT JAMB OR UNDER GIRDER, AS OCCURS EMBED PL.1/4"x6"x8" W/ (2) 5/8" DIA x 4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES, ALIGN W/ FTG EMBEDS. PLACE 24" OFF EA. SIDE EDGE OF TILT-UP. (1) PER LEG, (3) PER PANEL MIN. LINTEL SECTION 'A' VERT. REINF. DIAGONAL CORNER BAR LINTEL REINF. PER SCHD. T.O. OPENING #3 TIES PER SCHD. CONCRETE LINTEL SCHEDULE CL-X DEPTH LONG BARS #3 TIE SPC'G CL-1 16"(4) #5 T&B 6" O.C. CL-2 18"(4) #6 T&B 3" O.C. CL-3 36"(4) #6 T&B 6" O.C. 3' - 0 " CL-3 1' - 6 " CL-2 1' - 4 " CL-1 PE R S C HE D . LI N T E L D E P T H JAMB SECTION 'B' CL R . 1 1 / 2 " TYP. HORIZ. REINF. PERIMETER REINFORCING TYP. VERT. REINF. 2" CLR. L2x2x1/4 x 0' - 6" BENT PL3x3x3/8 x 0' - 8" W/ (2) #5 A706 x 2' - 0" REBAR @ 6" O.C. INSIDE FACE OF PANEL BENT PL3x3x3/8 x 0' - 8" W/ (2) #5 A706 x 2' - 0" REBAR @ 6" O.C. 3/16 EA. LEG MITERED CORNER L2x2x1/4 x 0' - 6" PL3/8"x3"x8" W/ (2) #5 A706 x 2' - 0" REBAR @ 6" O.C. INSIDE FACE OF PANEL 3/16 EA. LEG TYPICAL CORNER/INTERSECTION U.N.O. INSIDE FACE OF PANEL L3x3x3/8 x 8" W/ (2) #5 A706 x 2' - 0" REBAR @ 6" O.C. 1/4"TYP. 1/4"TYP. NOTE: PROVIDE CONNECTION IN (2) MIN LOCATIONS AT THIRD-POINTS BETWEEN THE SLAB AND ROOF, U.N.O. RE: PLAN END PANEL INTERMEDIATE PANEL INTERMEDIATE PANEL S10.1 45 S10.1 RETURN WALL AT CORNER EQ . EQ . EQ . F.F. RE: PLAN EMBED PL.1/4"x6"x8" W/ (2) 5/8" DIA x 4" LONG HEADED STUDS AT 4" O.C. SEE PANEL ELEVATIONS FOR LOCATIONS. ALIGN SLAB & WALL PLATES, ALIGN W/ FTG EMBEDS. PLACE 24" OFF EA. SIDE EDGE OF TILT-UP. (1) PER LEG, (3) PER PANEL MIN. L3x3x1/4x CONT. W/ 1/2"Ø x4" LG. H.C.A. @ 16" O.C. & 6" FROM EA. END L3x3x3/8 x 12" W/ (2) #5 A706 x 2' - 0" REBAR @ 6" O.C. INSIDE FACE OF PANEL 3/16 PLAN 1/4" SPLIT PLATE, RE: . /4A S10.1 NOTE: PROVIDE CONNECTION IN (2) MIN LOCATIONS AT THIRD-POINTS BETWEEN THE SLAB AND FLOOR/ROOF, U.N.O. 1/4"TYP. L3x3x3/8x12" EA. PANEL 1/4" SPLIT PLATE ELEVATION 1 "Ø H O L E 4" 2" 5" 10 " 'A' SPLIT PLATE ISOMETRIC PANEL LENGTH PANEL JOINTS, RE: PANEL SHIMS/ BEARING PADS AS REQ'D CONC. FOOTING, RE: PLAN NOTES: 1. MIN. (3) SHIMS / BEARING PADS EACH PANEL. 2. PROVIDE AN ADDITIONAL SHIM UNDER EACH JAMB LESS THAN 4' - 0" WIDE. 3. FOR TYPICAL PANEL REINFORCING, RE: . 4. DO NOT PLACE SHIMS DIRECTLY UNDER OPENINGS, MOVE SHIM TO NEAREST JAMB /1 S10.1 MAX 4' - 0" EQUAL EQUAL MAX 4' - 0" /7 S10.1 2" MITERED CORNER IN-LINE JOINT BOT. OF FORM & INSIDE FACE OF PANEL 3/4" CHAMFER EXT. FACE OF PANEL EXT. FACE OF PANEL BOT. OF FORM & INSIDE FACE OF PANEL EXT. FACE OF PANEL JOINT, TYP. 3/4" ROLL-UP DOOR JAMB BOT. OF FORM & INSIDE FACE OF PANEL 3/4" CHAMFER, TYP. EXT. FACE OF PANEL SILL BEYOND POST INSTALLED CLOSURE PLATE (NOT SHOWN), RE: ARCH. TYPICAL CORNER EXT. FACE OF PANEL BOT. OF FORM & INSIDE FACE OF PANEL EXT. FACE OF PANEL 3/4" CHAMFER, TYP. 3/4" CHAMFER, TYP. JO I N T , TY P . 3/ 4 " JAMB "J1" (MAN DOOR) CV R . T YP . 1 1 / 2 " CV R . T YP . 1 1 / 2 " 8" 2 1/4" (4) #5 VERT BARS (2 EA. FACE) #3 TIES SPACED PER PLAN JAMB "J3" (25FT OPENING) CV R . T YP . 1 1 / 2 " CV R . T YP . 1 1 / 2 " 6" 6" 6" 2 1/4" (8) #5 VERT BARS (4 EA. FACE) #3 TIES SPACED PER PLAN TYP. WALL REINF. TYP. WALL REINF. JAMB "J2" (DOCK DOOR) CV R . T YP . 1 1 / 2 " CV R . T YP . 1 1 / 2 " 6" 6" 2 1/4" (6) #5 VERT BARS (3 EA. FACE) #3 TIES SPACED PER PLAN TYP. WALL REINF. SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z AM E R C O R E A L E S T A T E C O M P A N Y CONSTRUCTION DEPARTMENT 2727 NORTH CENTRAL AVENUE PHOENIX, ARIZONA 85004 PH: (602) 263-6502 AM E R C O R E A L E S T A T E C O M P A N Y DA V I D N . S A N S O T T A 55 0 9 N . G L E N W O O D S T R E E T GA R D E N C I T Y , I D A H O 8 3 7 1 4 PH O N E : 2 0 8 . 5 0 1 . 2 2 8 9 RE G I S T E R E D P R O F E S S I O N A L E N G I N E E R IN P A R T N E R S H I P W I T H z S10.1 TILT-UP PANEL DETAILS DNS JN/TJN 06-06-22 SE21-437 U-HAUL OF REXBURG 328 N. 2ND E. REXBURG, ID 718081 1/2" = 1'-0" TYPICAL TILT-UP PANEL REINFORCING ELEVATION1 1" = 1'-0" CONCRETE LINTELS1A 1" = 1'-0" PANEL JAMB1B 3/4" = 1'-0" PANEL CORNER CONNECTION5 3/4" = 1'-0" TILT-UP PANEL LAYOUT2 3/4" = 1'-0" IN-LINE PANEL CONNECTION4 1/2" = 1'-0" TILT-UP PANEL SHIMMING6 3/4" = 1'-0" TILT-UP PANEL FORMING7 3/4" = 1'-0" JAMB DETAILS3 No . D e s c r i p t i o n D a t e 1 U P D A T ES / C I T Y S U B M IT T A L 0 8 .1 6 .2 2 1 09/27/2022 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L C O V E R S H E E T 7 1 8 0 8 1 _ M 0 . 1 M 0 . 1 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L S C H E D U L E S 7 1 8 0 8 1 _ M 0 . 2 M 0 . 2 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L S P E C I F I C A T I O N S 7 1 8 0 8 1 _ M 0 . 3 M 0 . 3 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E M E C H A N I C A L P L A N - F I R S T F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S SHOWROOM100OFFICE101BREAKROOM102R&D A R E A 10 4 S T A I R 1 1 2 0 R E S T R O O M 1 0 6 R E F U S E 1 0 5 S T O R A G E 1 1 1 S T A I R 2 1 2 1 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 S E L F - S T O R A G E 1 1 2 R M F I R E R I S E R 1 0 7 E L E V A T O R RESTROOM103 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L P L A N - F I R S T F L O O R 7 1 8 0 8 1 _ M 1 . 1 M 1 . 1 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E M E C H A N I C A L P L A N - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D 9 S T A I R 1 2 2 0 S T A I R 2 2 2 1 S E L F - S T O R A G E 2 1 2 E L E V A T O R C O M M M O P / 2 0 8 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L P L A N - S E C O N D F L O O R 7 1 8 0 8 1 _ M 1 . 2 M 1 . 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E M E C H A N I C A L P L A N - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D S T A I R 1 3 2 0 R E S T R O O M 3 0 6 S T A I R 2 3 2 1 C O M M M O P / 3 0 8 S E L F - S T O R A G E 3 1 2 E L E V A T O R A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L P L A N - T H I R D F L O O R 7 1 8 0 8 1 _ M 1 . 3 M 1 . 3 A B C 1 2 3 4 5 6 7 T R U E N O R T H P R O J E C T N O R T H 1 / 8 " = 1 ' - 0 " S C A L E M E C H A N I C A L E N L A R G E D P L A N - S H O W R O O M 1 N N G E N E R A L N O T E S K E Y N O T E S S H O W R O O M 1 0 0 O F F I C E 1 0 1 B R E A K R O O M 1 0 2 R & D A R E A 1 0 4 R E S T R O O M 1 0 3 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L E N L A R G E D P L A N - S H O W R O O M 7 1 8 0 8 1 _ M 1 . 4 M 1 . 4 M E C H A N I C A L D E T A I L S 7 1 8 0 8 1 _ M 2 . 1 M 2 . 1 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 M E C H A N I C A L D E T A I L S 7 1 8 0 8 1 _ M 2 . 2 M 2 . 2 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 PC OSTVSSPBPP JOSOS P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E E L E C T R I C A L L E G E N D S A N D N O T E S E 0 . 1 XXXXX 0 9 / 1 5 / 2 0 2 2 1 P O L E B A S E D E T A L 2 L I G H T I N G C O N T R O L S C H E M A T I C 3DOCK-LEVELER DETAIL 4 S E R V I C E G R O U N D I N G E L E C T R O D E P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E E L E C T R I C A L S C H E D U L E S A N D D E T A I L S E 0 . 2 XXXXX 0 9 / 1 5 / 2 0 2 2 TRUE NORTH PROJECT NORTH 1" = 30' SCALESITE ELECTRICAL PLAN - BUILDING A 1 NN GENERAL NOTESKEYNOTES J J J J J J J J J J J J J J Project No. 22AP11 Idaho PE #: P-17172 SITE ADDRESS: ENGINEER LOGO: PROFESSIONAL SEAL: NO T E S 3 DA T E NO . 2 IN I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: AM E R C O R E A L E S T A T E C O M P A N Y 8 328 N 2ND E REXBURG, ID 83440 718081 08/16/2022 07 . 1 8 . 2 2 BG BI D S E T 08 . 0 2 . 2 2 BG AD D E N D U M 1 08 . 1 6 . 2 2 BG AR C H I T E C T U R A L U P D A T E S / C I T Y S U B M I T T A L 09 . 1 5 . 2 2 BG UH I C O M M E N T S / C I T Y R E S U B M I I T A L - - - - - - - - U-HAUL MOVING AND STORAGE 1 2 3 LME LME SITE ELECTRICAL PLAN BUILDING A E1.1 XXX XX 09/15/2022 TRUE NORTH PROJECT NORTH 1" = 30' SCALESITE ELECTRICAL PLAN - BUILDING B 1 NN GENERAL NOTESKEYNOTES Project No. 22AP11 Idaho PE #: P-17172 SITE ADDRESS: ENGINEER LOGO: PROFESSIONAL SEAL: NO T E S 3 DA T E NO . 2 IN I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: AM E R C O R E A L E S T A T E C O M P A N Y 8 328 N 2ND E REXBURG, ID 83440 718081 08/16/2022 07 . 1 8 . 2 2 BG BI D S E T 08 . 0 2 . 2 2 BG AD D E N D U M 1 08 . 1 6 . 2 2 BG AR C H I T E C T U R A L U P D A T E S / C I T Y S U B M I T T A L 09 . 1 5 . 2 2 BG UH I C O M M E N T S / C I T Y R E S U B M I I T A L - - - - - - - - U-HAUL MOVING AND STORAGE 1 2 3 LME LME SITE ELECTRICAL PLAN BUILDING B E1.2 XXX XX 09/15/2022 TRUE NORTH PROJECT NORTH 1" = 30' SCALESITE LIGHTING PHOTOMETRIC PLAN - BUILDING A 1 NN GENERAL NOTESKEYNOTES 1.5 1.5 1.4 2.0 2.0 1.7 0.7 0.7 2.8 3.3 3.7 4.1 5.2 6.5 5.7 4.0 3.4 3.2 3.1 3.3 5.2 3.4 2.5 1.9 3.3 3.9 4.2 4.6 5.1 5.7 6.5 6.0 4.6 3.8 3.5 3.4 3.7 4.5 5.7 6.4 5.4 4.0 2.9 2.1 4.2 4.8 5.0 5.4 5.5 5.5 5.6 5.3 4.7 4.0 3.5 3.4 3.9 4.4 5.2 5.3 5.0 4.0 3.1 2.1 5.3 5.8 5.4 5.2 4.9 4.4 4.1 4.0 3.9 3.5 3.1 3.0 3.4 3.8 4.0 4.0 3.9 3.4 2.7 1.9 6.4 6.3 5.3 4.8 4.3 3.4 3.0 3.0 3.0 2.9 2.6 2.5 2.8 3.1 3.1 3.0 3.0 2.9 2.4 1.8 5.8 5.8 4.9 4.3 3.4 2.3 1.8 1.8 1.9 1.9 1.8 1.8 2.0 2.0 2.0 2.0 2.1 2.1 1.9 1.6 4.1 4.7 4.1 3.4 2.5 1.4 0.9 0.8 0.8 0.9 0.9 0.9 0.9 1.0 1.1 1.2 1.4 1.5 1.5 1.4 3.1 3.5 3.1 2.6 1.9 1.0 0.6 0.4 0.4 0.4 0.4 0.5 0.5 0.6 0.8 1.2 1.4 1.6 1.7 1.6 2.8 2.6 2.2 1.8 1.4 0.8 0.5 0.4 0.3 0.3 0.3 0.3 0.3 0.4 0.8 1.4 1.8 2.2 2.4 2.3 5.0 1.9 1.5 1.2 1.0 0.6 2.3 1.3 0.4 0.2 0.2 0.2 0.2 0.4 0.9 1.7 2.4 2.9 3.3 2.9 10.4 2.9 0.4 0.2 0.1 0.2 0.2 0.3 0.9 1.9 2.9 3.7 4.3 3.8 1.6 1.1 0.3 0.2 0.1 0.1 0.2 0.3 0.8 2.0 3.0 4.0 5.2 5.2 2.8 1.5 0.3 0.1 0.1 0.1 0.2 0.3 0.8 2.0 3.0 4.1 5.5 5.7 9.6 2.9 0.4 0.1 0.1 0.1 0.2 0.3 0.9 2.0 3.0 4.0 4.8 4.7 2.5 1.6 0.4 0.2 0.1 0.1 0.2 0.4 1.0 2.0 2.8 3.4 3.8 3.5 2.9 0.4 0.2 0.1 0.2 0.2 0.4 1.0 1.8 2.3 2.7 3.0 2.8 1.9 1.2 0.4 0.2 0.1 0.2 0.2 0.4 0.9 1.4 1.8 2.1 2.2 2.2 2.2 1.4 0.4 0.2 0.2 0.2 0.3 0.4 0.8 1.3 1.6 1.9 1.9 1.9 3.1 0.6 0.3 0.2 0.2 0.3 0.4 0.8 1.3 1.6 1.9 1.9 1.8 2.5 2.0 1.0 0.5 0.3 0.3 0.3 0.4 0.9 1.4 1.8 2.0 2.1 2.1 5.4 4.7 1.9 0.9 0.5 0.3 0.3 0.5 1.0 1.8 2.2 2.6 2.9 2.7 9.6 8.0 3.0 1.2 0.6 0.4 0.3 0.5 1.0 2.0 2.7 3.3 3.6 3.3 8.8 3.4 1.4 0.7 0.4 0.3 0.4 1.0 2.0 3.0 3.9 4.6 4.4 8.8 3.4 1.4 0.7 0.4 0.3 0.4 0.9 2.1 3.1 4.2 5.4 5.7 9.6 8.1 3.0 1.2 0.6 0.4 0.3 0.4 0.9 2.1 3.1 4.2 5.4 5.6 5.5 4.7 1.9 0.9 0.5 0.3 0.3 0.4 1.0 2.1 3.1 3.9 4.5 4.2 1.3 1.2 0.8 0.5 0.3 0.3 0.3 0.5 1.1 2.0 2.7 3.3 3.5 3.2 0.3 0.3 0.3 0.3 0.2 0.2 0.3 0.5 1.0 1.7 2.2 2.6 2.8 2.6 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.5 0.9 1.5 1.8 2.0 2.1 2.1 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.4 0.9 1.4 1.7 1.9 1.9 1.9 1.2 0.8 0.2 0.1 0.1 0.2 0.2 0.4 0.9 1.5 1.7 2.0 2.0 1.9 10.0 2.8 0.3 0.1 0.1 0.1 0.2 0.5 1.0 1.6 2.1 2.3 2.5 2.3 2.1 1.2 0.2 0.1 0.1 0.1 0.2 0.5 1.1 2.0 2.6 3.0 3.2 2.8 0.4 0.4 0.2 0.1 0.1 0.1 0.2 0.4 1.1 2.2 3.1 3.7 4.1 3.8 3.4 1.5 0.3 0.1 0.1 0.1 0.2 0.4 1.1 2.2 3.3 4.4 5.2 5.2 8.2 2.4 0.3 0.1 0.1 0.1 0.2 0.4 1.1 2.2 3.3 4.4 5.8 6.5 0.8 0.6 0.2 0.1 0.1 0.1 0.2 0.4 1.1 2.3 3.3 4.5 5.2 5.3 0.7 0.6 0.2 0.1 0.1 0.1 0.2 0.5 1.2 2.3 3.1 3.7 4.1 3.7 7.8 2.5 0.3 0.1 0.1 0.1 0.2 0.5 1.2 2.0 2.5 3.0 3.1 2.8 3.6 1.7 0.3 0.1 0.1 0.1 0.2 0.5 1.0 1.6 2.0 2.3 2.4 2.3 1.1 0.1 0.1 0.3 0.3 0.1 0.1 0.1 0.1 0.2 0.4 0.8 1.4 1.7 1.9 1.9 1.9 0.7 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.8 1.3 1.6 1.8 1.8 1.8 1.1 1.0 0.4 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.8 1.3 1.7 1.9 2.0 1.9 3.1 2.9 0.9 0.4 0.1 0.1 0.1 0.2 0.4 0.9 1.6 2.0 2.4 2.6 2.5 2.6 1.1 0.2 0.1 0.1 0.1 0.2 0.4 0.9 1.8 2.5 3.0 3.4 3.1 4.1 1.4 0.2 0.1 0.1 0.1 0.2 0.3 0.8 1.9 2.9 3.7 4.4 3.9 0.9 0.6 0.2 0.1 0.1 0.1 0.1 0.3 0.8 1.9 2.9 3.9 5.2 5.4 0.4 0.3 0.1 0.1 0.1 0.1 0.1 0.3 0.7 1.9 2.9 4.0 5.4 5.8 1.7 0.8 0.2 0.1 0.1 0.1 0.1 0.3 0.8 1.9 2.9 3.9 4.5 1.4 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.9 2.0 2.8 3.1 3.4 1.8 0.8 0.3 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.2 0.4 0.8 1.7 3.5 3.3 1.0 0.5 0.5 1.1 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.010.5 10.5 10.5 10.5 0.1 0.2 1.8 0.1 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 1.0 2.3 0.1 0.3 0.9 0.9 0.4 0.2 0.4 0.8 0.8 0.4 0.3 0.5 0.1 0.1 0.1 0.6 3.1 2.8 0.8 0.4 0.7 3.0 2.7 0.8 0.4 0.6 0.5 0.3 0.1 0.2 0.6 0.9 2.1 1.0 0.4 2.2 1.0 0.4 2.9 1.1 0.2 0.2 4.5 1.5 0.5 4.6 1.6 0.5 3.5 1.2 0.2 0.3 1.4 1.6 1.9 1.3 1.5 1.7 0.7 0.4 0.2 0.7 0.8 2.3 5.9 0.6 1.9 5.3 0.2 0.2 0.1 0.3 1.7 1.6 1.7 1.5 1.5 1.6 0.3 0.3 0.1 0.1 4.6 1.6 0.5 4.6 1.5 0.5 1.9 0.9 0.2 0.4 1.8 0.9 0.5 1.9 0.9 0.5 4.3 1.4 0.4 0.7 3.0 2.5 0.7 0.4 0.7 2.9 2.7 0.8 0.5 0.9 1.1 0.7 0.4 0.5 0.8 0.7 0.4 0.4 0.5 0.8 0.7 0.4 0.4 1.0 3.4 3.5 1.0 0.5 0.8 2.9 2.7 0.6 0.4 0.9 2.9 2.2 0.5 0.2 0.2 0.4 0.9 1.4 0.3 0.9 1.5 0.3 0.9 1.6 0.7 1.0 1.6 0.5 0.9 1.8 0.4 0.2 0.3 0.5 1.9 5.5 0.5 2.0 5.8 0.5 2.0 5.6 0.5 1.9 5.5 0.5 2.0 5.6 0.2 0.2 1.4 0.9 1.1 1.9 1.2 1.5 1.9 1.2 1.5 2.1 1.2 1.5 1.9 1.3 1.6 2.0 1.0 0.6 4.7 1.5 0.5 0.3 4.2 1.5 0.5 4.3 1.5 0.5 4.2 1.5 0.5 4.6 1.6 0.5 4.2 1.4 1.6 0.9 0.3 0.2 2.1 1.0 0.3 2.2 1.1 0.4 2.1 1.0 0.4 2.0 1.1 0.4 2.1 1.0 0.3 0.4 0.7 1.0 0.5 0.9 1.0 0.5 0.8 1.0 0.5 0.8 0.9 0.6 0.9 1.1 0.5 0.4 0.2 0.4 1.9 5.1 0.5 2.0 5.3 0.5 1.9 4.9 0.5 1.8 4.6 0.6 2.0 5.1 0.5 0.5 0.9 0.7 1.4 2.6 1.0 1.8 2.9 0.9 1.7 3.0 0.9 1.7 3.1 1.2 2.0 3.3 1.5 1.3 4.1 1.4 0.5 0.4 3.8 1.5 0.6 3.6 1.5 0.6 3.6 1.6 0.7 4.1 2.0 1.2 5.0 3.1 2.2 1.0 0.3 0.3 2.8 1.2 0.4 2.9 1.2 0.4 3.0 1.3 0.5 3.1 1.7 1.2 5.1 3.8 0.5 0.6 0.4 0.9 4.0 2.9 1.2 0.7 1.0 4.4 2.9 1.1 0.7 0.9 3.6 2.9 1.2 0.8 1.0 3.8 3.2 1.4 1.3 1.7 4.4 5.1 3.7 3.8 1.0 1.9 1.0 0.7 1.5 1.9 2.4 1.4 0.8 1.7 1.7 1.9 1.6 0.9 1.3 1.4 1.8 1.9 1.1 1.5 1.5 1.7 2.5 2.0 2.6 3.2 3.4 4.1 1.6 5.6 1.6 0.4 0.4 1.4 5.9 2.3 0.5 0.4 0.9 4.1 3.5 0.7 0.3 0.6 3.1 4.7 1.0 0.5 0.6 2.3 5.9 2.2 1.6 2.2 2.8 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.6 5.2 4.5 4.5 3.9 3.3 3.8 3.9 3.7 3.0 1.4 1.9 2.4 2.9 3.3 3.4 3.2 0.3 0.7 1.1 1.5 1.9 2.2 2.6 2.7 3.0 0.3 0.5 0.9 1.2 1.4 1.7 2.0 2.2 2.5 0.3 0.4 0.6 0.9 1.0 1.2 1.5 1.6 1.9 0.2 0.3 0.4 0.6 0.6 0.8 0.9 0.9 1.0 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.1 0.8 0.6 0.6 0.7 0.6 0.5 0.4 0.3 0.2 0.2 1.9 1.7 1.6 1.6 1.4 1.0 0.7 0.5 0.4 0.3 2.9 2.8 2.7 2.5 1.9 1.3 0.9 0.7 0.5 0.3 3.9 3.8 3.6 3.1 2.3 1.6 1.1 0.8 0.5 0.3 5.1 5.2 4.6 3.6 2.7 1.8 1.2 0.8 0.5 0.3 5.5 5.9 4.6 3.4 2.6 1.7 1.1 0.8 0.5 0.3 2.9 2.3 1.6 1.0 0.7 0.4 0.2 HB F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1F1F1 F1 F1 F1F1 B B B B B HB HB HB HB HB HB HB F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1F1 F1 F1 F1 F1 F1 F1 F1 Project No. 22AP11 Idaho PE #: P-17172 SITE ADDRESS: ENGINEER LOGO: PROFESSIONAL SEAL: NO T E S 3 DA T E NO . 2 IN I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: AM E R C O R E A L E S T A T E C O M P A N Y 8 328 N 2ND E REXBURG, ID 83440 718081 08/16/2022 07 . 1 8 . 2 2 BG BI D S E T 08 . 0 2 . 2 2 BG AD D E N D U M 1 08 . 1 6 . 2 2 BG AR C H I T E C T U R A L U P D A T E S / C I T Y S U B M I T T A L 09 . 1 5 . 2 2 BG UH I C O M M E N T S / C I T Y R E S U B M I I T A L - - - - - - - - U-HAUL MOVING AND STORAGE 1 2 3 LME LME SITE LIGHTING PHOTOMETRIC BUILDING A E1.3 XXX XX 09/15/2022 TRUE NORTH PROJECT NORTH 1" = 30' SCALESITE LIGHTING PHOTOMETRIC PLAN - BUILDING B 1 NN GENERAL NOTESKEYNOTES 3.9 5.6 4.9 3.3 2.5 1.8 1.2 0.8 0.5 0.3 0.1 0.1 0.1 4.2 5.4 5.8 5.0 3.7 2.8 1.8 1.2 0.8 0.5 0.3 0.2 0.1 0.1 0.1 3.9 4.5 4.5 4.4 3.5 2.7 1.8 1.2 0.8 0.6 0.4 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.1 3.1 3.3 3.3 3.3 2.9 2.2 1.5 1.1 0.8 0.8 0.8 1.3 1.8 0.9 0.5 0.4 0.4 0.4 0.2 0.1 2.2 2.2 2.2 2.3 2.2 1.7 1.2 0.9 0.8 1.3 2.6 3.2 5.3 2.2 2.2 1.2 1.7 2.1 0.6 0.1 1.1 1.1 1.1 1.1 1.2 1.1 0.8 0.6 0.6 1.6 6.3 2.6 1.9 5.9 1.9 3.3 5.4 0.9 0.1 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.2 0.4 1.1 1.5 0.2 0.6 2.8 0.2 0.4 1.4 2.0 0.2 0.2 0.3 0.3 0.2 0.1 0.1 0.1 0.2 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.06.5 6.5 F1 F1 F1 F1 HB F1 F1 Project No. 22AP11 Idaho PE #: P-17172 SITE ADDRESS: ENGINEER LOGO: PROFESSIONAL SEAL: NO T E S 3 DA T E NO . 2 IN I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: AM E R C O R E A L E S T A T E C O M P A N Y 8 328 N 2ND E REXBURG, ID 83440 718081 08/16/2022 07 . 1 8 . 2 2 BG BI D S E T 08 . 0 2 . 2 2 BG AD D E N D U M 1 08 . 1 6 . 2 2 BG AR C H I T E C T U R A L U P D A T E S / C I T Y S U B M I T T A L 09 . 1 5 . 2 2 BG UH I C O M M E N T S / C I T Y R E S U B M I I T A L - - - - - - - - U-HAUL MOVING AND STORAGE 1 2 3 LME LME SITE LIGHTING PHOTOMETRIC BUILDING B E1.4 XXX XX 09/15/2022 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P O W E R P L A N - F I R S T F L O O R 1 N N G E N E R A L N O T E S SHOWROOM100OFFICE101BREAKROOM102 R&D AREA104RESTROOM103 J J K E Y N O T E S P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E P O W E R P L A N F I R S T F L O O R E 2 . 1 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P O W E R P L A N - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D S T A I R 1 2 2 0 S T A I R 2 2 2 1 C O M M M O P / 2 0 8 S E L F - S T O R A G E 2 1 2 E L E V A T O R P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E P O W E R P L A N S E C O N D F L O O R E 2 . 2 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P O W E R P L A N - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D S T A I R 1 3 2 0 R E S T R O O M 3 0 6 S T A I R 2 3 2 1 C O M M M O P / 3 0 8 S E L F - S T O R A G E 3 1 2 E L E V A T O R P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E P O W E R P L A N T H I R D F L O O R E 2 . 3 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 8 " = 1 ' - 0 " S C A L E P O W E R P L A N - E N L A R G E D A R E A S 1 N N G E N E R A L N O T E S KEYNOTES · · · S H O W R O O M 1 0 0 O F F I C E 1 0 1 B R E A K R O O M 1 0 2 R & D A R E A 1 0 4 R E S T R O O M 1 0 3 J J J J J J J P P J S J J J J J J J J J SJJJ P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E P O W E R P L A N E N L A R G E D A R E A S E 2 . 4 XXXXX 0 9 / 1 5 / 2 0 2 2 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E H V A C A N D P L U M B I N G P O W E R P L A N - F I R S T F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E H V A C A N D P L U M B I N G P O W E R P L A N F I R S T F L O O R E 3 . 1 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E H V A C A N D P L U M B I N G P O W E R P L A N - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E H V A C A N D P L U M B I N G P O W E R P L A N S E C O N D F L O O R E 3 . 2 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E H V A C A N D P L U M B I N G P O W E R P L A N - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E H V A C A N D P L U M B I N G P O W E R P L A N T H I R D F L O O R E 3 . 3 XXXXX 0 9 / 1 5 / 2 0 2 2 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 E D T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E L I G H T I N G P L A N - F I R S T F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S SHOWROOM100OFFICE101BREAKROOM102 R& D A R E A 1 0 4 S T A I R 1 1 2 0 R E S T R O O M 1 0 6 R E F U S E 1 0 5 S T O R A G E 1 1 1 S T A I R 2 1 2 1 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 S E L F - S T O R A G E 1 1 2 R M F I R E R I S E R 1 0 7 E L E V A T O R RESTROOM103OS O S O S O S O S O S O S O S O S O S O S O S O S O S O S OS OS OS OS O S O S OS O S O S OS O S O S O S O S OSOS L M E L M E L I G H T I N G P L A N F I R S T F L O O R E 4 . 1 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E L I G H T I N G P L A N - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D S T A I R 1 2 2 0 S T A I R 2 2 2 1 C O M M M O P / 2 0 8 S E L F - S T O R A G E 2 1 2 E L E V A T O R O S O S O S O S O S O S O S O S OS OS OS OS OS OS O S O S O S O S OS OSOS O S O S O S O S O S OS O S O S J J J L M E L M E L I G H T I N G P L A N S E C O N D F L O O R E 4 . 2 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E L I G H T I N G P L A N - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D S T A I R 1 3 2 0 R E S T R O O M 3 0 6 S T A I R 2 3 2 1 C O M M M O P / 3 0 8 S E L F - S T O R A G E 3 1 2 E L E V A T O R O S O S O S O S O S O S O S O S OS OS OS OS OS OS O S O S O S O S OS OSOS O S O S O S O S O S OS O S O S J J J L M E L M E L I G H T I N G P L A N T H I R D F L O O R E 4 . 3 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E E M L I G H T I N G P H O T O M E T R I C - F I R S T F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S 0.3 0.3 0.30.4 0.4 0.40.6 0.6 0.60.8 0.9 0.81.1 1.2 1.11.4 1.5 1.41.6 1.7 1.61.6 1.7 1.61.4 1.5 1.41.2 1.2 1.20.9 0.9 0.90.6 0.6 0.60.5 0.5 0.50.4 0.3 0.40.3 0.3 0.30.3 0.3 0.30.4 0.4 0.40.5 0.5 0.50.6 0.7 0.70.9 0.9 0.91.2 1.2 1.21.5 1.5 1.51.6 1.7 1.61.6 1.7 1.61.5 1.5 1.51.2 1.3 1.20.9 1.0 0.90.7 0.7 0.70.5 0.5 0.50.5 0.4 0.50.4 0.4 0.40.5 0.4 0.50.5 0.5 0.50.7 0.7 0.70.9 0.9 0.91.2 1.2 1.21 . 5 1 . 6 1 . 6 1 . 9 2 . 0 1 . 9 2 . 1 2 . 3 2 . 2 2 . 2 2 . 4 2 . 4 2 . 2 2 . 3 2 . 4 2 . 0 2 . 2 2 . 3 1 . 7 1 . 9 2 . 2 2 . 3 2 . 4 2 . 3 2 . 0 1 . 6 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 5 0 . 4 0 . 5 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 9 2 . 0 2 . 0 1 . 8 1 . 6 1 . 4 1 . 3 1 . 4 1 . 5 1 . 7 2 . 0 2 . 2 2 . 3 2 . 2 2 . 0 1 . 6 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 6 0 . 7 0 . 9 1 . 2 1 . 6 1 . 8 1 . 9 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 6 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 9 1 . 9 1 . 7 1 . 5 1 . 3 1 . 2 1 . 2 1 . 3 1 . 5 1 . 8 2 . 0 2 . 1 2 . 1 1 . 9 1 . 5 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 6 0 . 8 1 . 0 1 . 3 1 . 6 1 . 8 1 . 9 1 . 8 1 . 6 1 . 3 1 . 0 0 . 8 0 . 8 1 . 0 0 . 5 0 . 5 0 . 6 1 . 2 1 . 3 1 . 6 0 . 5 0 . 6 1 . 1 0 . 9 0 . 8 1 . 0 0 . 5 0 . 6 0 . 6 1 . 1 1 . 2 1 . 4 0 . 6 0 . 6 1 . 2 1 . 1 0 . 7 0 . 9 0 . 6 0 . 6 0 . 7 1 . 0 1 . 1 1 . 2 0 . 6 0 . 7 1 . 4 1 . 3 0 . 7 0 . 8 0 . 7 0 . 7 0 . 7 1 . 0 1 . 0 1 . 1 0 . 7 0 . 7 1 . 6 1 . 6 0 . 8 0 . 9 0 . 8 0 . 8 0 . 8 1 . 0 1 . 0 1 . 1 0 . 8 0 . 8 1 . 8 1 . 8 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 1 1 . 2 1 . 2 1 . 0 1 . 0 2 . 0 2 . 0 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 4 1 . 4 1 . 3 1 . 3 1 . 9 2 . 0 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 4 1 . 4 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 1 2 . 0 2 . 0 2 . 0 1 . 2 1 . 1 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 1 2 . 0 2 . 0 2 . 0 0 . 9 0 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 9 1 . 8 1 . 9 1 . 8 0 . 7 0 . 7 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 5 1 . 6 1 . 6 0 . 6 0 . 6 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 3 1 . 3 0 . 6 0 . 5 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 0 . 6 0 . 5 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 6 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 0 0 . 9 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 1 . 3 1 . 3 1 . 2 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 1 . 6 1 . 6 1 . 6 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 0 1 . 0 2 . 0 2 . 0 1 . 9 1 . 1 1 . 2 1 . 1 1 . 1 1 . 1 1 . 3 1 . 3 1 . 3 1 . 2 1 . 3 2 . 2 2 . 3 2 . 2 1 . 4 1 . 5 1 . 4 1 . 4 1 . 4 1 . 6 1 . 6 1 . 7 1 . 5 1 . 6 2 . 3 2 . 4 2 . 4 2 . 3 2 . 1 1 . 8 1 . 6 1 . 7 1 . 9 1 . 7 1 . 7 1 . 7 1 . 9 2 . 0 2 . 1 1 . 9 2 . 0 2 . 2 2 . 3 2 . 4 2 . 3 2 . 2 2 . 1 1 . 9 2 . 1 2 . 3 2 . 0 2 . 0 2 . 0 2 . 2 2 . 4 2 . 4 2 . 3 2 . 4 2 . 0 2 . 1 2 . 2 2 . 3 2 . 3 2 . 2 2 . 1 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 7 2 . 5 2 . 3 2 . 0 1 . 9 1 . 9 2 . 0 2 . 2 2 . 2 2 . 2 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 4 2 . 4 2 . 3 2 . 1 2 . 1 2 . 1 2 . 2 2 . 4 2 . 6 2 . 7 2 . 7 2 . 8 2 . 8 2 . 7 2 . 6 2 . 4 2 . 2 2 . 1 2 . 2 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 8 2 . 7 2 . 5 2 . 2 2 . 0 1 . 8 1 . 7 1 . 7 1 . 8 1 . 9 2 . 0 2 . 2 2 . 3 2 . 3 2 . 2 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 6 2 . 3 2 . 1 1 . 9 1 . 9 2 . 0 2 . 1 2 . 2 2 . 2 2 . 1 2 . 0 2 . 0 2 . 1 2 . 3 2 . 4 2 . 4 2 . 3 2 . 2 2 . 1 2 . 1 2 . 2 2 . 4 2 . 6 2 . 7 2 . 8 2 . 8 2 . 8 2 . 6 2 . 4 2 . 3 2 . 2 2 . 3 2 . 4 2 . 6 2 . 8 2 . 8 2 . 6 2 . 2 1 . 9 1 . 7 1 . 5 1 . 5 1 . 5 1 . 6 1 . 8 2 . 0 2 . 1 2 . 2 2 . 1 2 . 1 2 . 3 2 . 5 2 . 6 2 . 7 2 . 6 2 . 5 2 . 2 2 . 0 1 . 9 1 . 8 1 . 9 2 . 0 2 . 0 2 . 0 1 . 9 1 . 9 1 . 9 2 . 0 2 . 2 2 . 3 2 . 3 2 . 2 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 4 2 . 5 2 . 6 2 . 7 2 . 7 2 . 7 2 . 5 2 . 3 2 . 2 2 . 1 2 . 2 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 8 2 . 7 2 . 4 2 . 1 1 . 8 1 . 5 1 . 4 1 . 3 1 . 3 1 . 4 1 . 5 1 . 7 1 . 8 1 . 9 1 . 8 1 . 8 2 . 0 1 . 7 1 . 7 1 . 7 1 . 9 2 . 1 2 . 2 2 . 2 2 . 4 2 . 4 2 . 5 2 . 5 2 . 4 2 . 2 1 . 9 1 . 6 1 . 4 1 . 2 1 . 1 1 . 1 1 . 1 1 . 2 1 . 4 1 . 5 1 . 5 1 . 5 1 . 4 1 . 6 1 . 4 1 . 4 1 . 4 1 . 6 1 . 7 1 . 8 1 . 9 2 . 0 2 . 0 2 . 1 2 . 1 2 . 0 1 . 8 1 . 6 1 . 4 1 . 2 1 . 0 1 . 0 0 . 9 0 . 9 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 2 1 . 1 1 . 1 1 . 1 1 . 3 1 . 4 1 . 5 1 . 5 1 . 6 1 . 6 1 . 7 1 . 6 1 . 6 1 . 5 1 . 3 1 . 2 1 . 0 0 . 9 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 1 . 0 0 . 9 0 . 9 0 . 9 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 3 1 . 3 1 . 2 1 . 1 1 . 0 0 . 9 0 . 8 0 . 7 0 . 7 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 8 0 . 9 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 8 0 . 8 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 2 1 . 2 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 5 1 . 5 1 . 5 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 9 1 . 8 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 1 . 9 2 . 0 2 . 0 2 . 0 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 1 . 9 2 . 0 2 . 0 2 . 0 1 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 9 1 . 8 1 . 8 1 . 8 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 5 1 . 5 1 . 5 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 3 1 . 2 1 . 2 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 8 0 . 8 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 9 0 . 9 0 . 9 0 . 8 0 . 8 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 1 . 0 1 . 0 1 . 0 0 . 9 0 . 9 0 . 9 1 . 0 0 . 9 0 . 9 1 . 0 1 . 1 1 . 2 1 . 3 1 . 1 1 . 1 1 . 1 1 . 3 1 . 1 1 . 1 1 . 2 1 . 4 1 . 4 1 . 6 1 . 3 1 . 4 1 . 4 1 . 6 1 . 4 1 . 4 1 . 4 1 . 7 1 . 8 1 . 9 1 . 7 1 . 8 1 . 8 2 . 0 1 . 7 1 . 7 1 . 7 2 . 0 2 . 2 2 . 3 2 . 0 2 . 1 2 . 1 2 . 3 2 . 5 2 . 7 2 . 7 2 . 7 2 . 5 2 . 2 2 . 0 1 . 9 1 . 8 1 . 9 2 . 0 2 . 0 2 . 0 1 . 9 1 . 9 1 . 9 2 . 1 2 . 3 2 . 4 2 . 4 2 . 3 2 . 1 2 . 0 2 . 0 2 . 1 2 . 3 2 . 5 2 . 6 2 . 8 2 . 8 2 . 8 2 . 7 2 . 4 2 . 2 2 . 0 1 . 9 2 . 0 2 . 1 2 . 3 2 . 5 2 . 6 2 . 6 2 . 6 2 . 5 2 . 2 1 . 8 1 . 4 1 . 0 0 . 8 0 . 5 0 . 4 0 . 3 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 7 2 . 6 2 . 3 2 . 1 1 . 9 1 . 9 2 . 0 2 . 1 2 . 2 2 . 2 2 . 1 2 . 0 2 . 0 2 . 1 2 . 3 2 . 4 2 . 4 2 . 3 2 . 2 2 . 1 2 . 1 2 . 3 2 . 5 2 . 7 2 . 8 2 . 7 2 . 5 2 . 2 2 . 1 2 . 0 2 . 1 2 . 3 2 . 5 2 . 6 2 . 7 2 . 8 2 . 7 2 . 5 2 . 2 1 . 8 1 . 4 1 . 1 0 . 8 0 . 6 0 . 4 0 . 3 0 . 3 2 . 2 2 . 5 2 . 1 2 . 2 2 . 2 2 . 5 2 . 6 2 . 8 2 . 5 2 . 6 0 . 4 0 . 3 0 . 3 2 . 0 2 . 2 2 . 0 2 . 0 2 . 0 2 . 2 2 . 4 2 . 5 2 . 3 2 . 4 0 . 4 0 . 3 0 . 3 1 . 7 1 . 9 1 . 7 1 . 7 1 . 7 1 . 9 2 . 0 2 . 1 1 . 9 2 . 0 0 . 4 0 . 3 0 . 3 1 . 3 1 . 5 1 . 4 1 . 4 1 . 4 1 . 6 1 . 6 1 . 7 1 . 5 1 . 6 0 . 4 0 . 4 0 . 3 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 2 1 . 3 1 . 3 1 . 2 1 . 2 0 . 4 0 . 4 0 . 3 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 0 1 . 0 0 . 5 0 . 4 0 . 4 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 8 0 . 8 0 . 5 0 . 5 0 . 5 0 . 6 0 . 6 0 . 7 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 7 0 . 7 0 . 6 0 . 6 0 . 6 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 1 . 1 1 . 1 1 . 0 0 . 7 0 . 7 0 . 8 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 1 . 3 1 . 4 1 . 3 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 6 1 . 7 1 . 6 1 . 1 1 . 1 1 . 2 1 . 2 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 8 1 . 8 1 . 7 1 . 4 1 . 4 1 . 4 1 . 5 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 8 1 . 8 1 . 7 1 . 6 1 . 7 1 . 7 1 . 8 1 . 7 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 6 1 . 6 1 . 6 1 . 8 1 . 8 1 . 9 1 . 9 1 . 8 1 . 9 2 . 0 1 . 9 1 . 9 1 . 9 1 . 3 1 . 4 1 . 3 1 . 8 1 . 8 1 . 9 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 0 1 . 0 1 . 0 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 7 1 . 7 1 . 7 0 . 8 0 . 8 0 . 7 1 . 3 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 5 1 . 4 1 . 5 1 . 4 0 . 6 0 . 6 0 . 6 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 0 . 5 0 . 4 0 . 4 0 . 8 0 . 8 0 . 9 0 . 9 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 4 0 . 3 0 . 3 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 3 0 . 3 0 . 3 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 3 0 . 3 0 . 3 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 3 0 . 3 0 . 3 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 3 0 . 3 0 . 3 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 4 0 . 3 0 . 3 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 5 0 . 4 0 . 4 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 6 0 . 6 0 . 6 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 0 . 8 0 . 8 0 . 7 1 . 3 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 5 1 . 4 1 . 5 1 . 5 1 . 1 1 . 0 1 . 0 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 4 1 . 4 1 . 3 1 . 8 1 . 9 1 . 9 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 6 1 . 7 1 . 6 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 0 1 . 8 1 . 9 1 . 8 1 . 7 1 . 7 1 . 7 1 . 8 1 . 7 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 1 . 8 1 . 4 1 . 4 1 . 4 1 . 5 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 7 1 . 7 1 . 6 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 5 1 . 5 1 . 4 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 2 1 . 2 1 . 2 0 . 8 0 . 8 0 . 7 0 . 7 0 . 8 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 1 1 . 0 1 . 0 0 . 7 0 . 8 0 . 6 0 . 6 0 . 7 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 1 . 0 0 . 9 0 . 9 0 . 7 0 . 8 0 . 5 0 . 6 0 . 6 0 . 5 0 . 5 0 . 6 0 . 7 0 . 6 1 . 1 1 . 0 0 . 9 0 . 8 0 . 9 0 . 5 0 . 5 0 . 6 0 . 5 0 . 5 0 . 5 0 . 7 0 . 6 1 . 2 1 . 1 0 . 9 0 . 8 1 . 1 0 . 5 0 . 5 0 . 6 0 . 5 0 . 5 0 . 5 0 . 7 0 . 6 1 . 4 1 . 2 1 . 0 0 . 9 1 . 2 0 . 4 0 . 5 0 . 6 0 . 4 0 . 4 0 . 5 0 . 8 0 . 6 1 . 6 1 . 3 1 . 1 0 . 9 1 . 3 1 . 6 1 . 7 1 . 7 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 4 0 . 4 0 . 4 0 . 4 0 . 6 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 5 0 . 4 0 . 4 0 . 5 0 . 6 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 5 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 7 1 . 8 1 . 7 1 . 4 1 . 1 0 . 9 1 . 2 1 . 5 1 . 7 1 . 7 1 . 6 1 . 3 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 4 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 7 1 . 7 1 . 6 1 . 3 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 4 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 5 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 4 1 . 1 0 . 2 2 . 9 2 . 9 2 . 9 2 . 9 2 . 9 2 . 9 2 . 9 2 . 9 StatisticsDescription S y m b o l A v g M a x M i n M a x / M i n A v g / M i n FLOOR 1 CORRIDORS 1 . 3 f c 2 . 9 f c 0 . 2 f c 1 4 . 5 : 1 6 . 5 : 1 FLOOR 2 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 FLOOR 3 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E E M L I G H T I N G P H O T O M E T R I C F I R S T F L O O R E 4 . 4 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E E M L I G H T I N G P H O T O M E T R I C - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S 1.0 1.4 1.7 1.9 1.9 1.8 1.5 1.2 0.9 0.7 0.6 0.5 0.5 0.6 0.6 0.8 1.0 1.3 1.6 1.8 1.9 1.7 1.5 1.2 0.9 0.7 0.5 0.4 0.41.1 1.5 1.8 2.0 2.0 1.8 1.6 1.2 1.0 0.8 0.7 0.6 0.6 0.7 0.7 0.9 1.1 1.4 1.7 1.9 1.9 1.8 1.5 1.2 0.9 0.7 0.6 0.5 0.4 0.4 0.4 0.41.2 1.5 0.8 0.8 0.5 0.51.3 1.6 1.0 1.0 0.7 0.71.5 1.7 1.2 1.3 1.0 1.01.7 1.8 1.5 1.6 1.3 1.31.9 2.0 1.8 1.8 1.6 1.62.0 2.0 2.0 2.0 1.8 1.82.0 2.0 1.9 2.0 1.8 1.81.8 1.8 1.8 1.8 1.7 1.61.5 1.5 1.5 1.5 1.4 1.41.1 1.2 1.2 1.2 1.1 1.10.9 0.9 0.9 0.9 0.9 0.90.6 0.7 0.7 0.7 0.8 0.70.5 0.5 0.6 0.6 0.7 0.60.5 0.5 0.5 0.5 0.7 0.60.4 0.5 0.5 0.5 0.8 0.70.5 0.5 0.6 0.5 0.9 0.80.6 0.6 0.7 0.6 1.1 0.90.8 0.8 0.8 0.8 1.2 1.01.0 1.0 1.1 1.1 1.3 1.6 1.8 1.8 1.6 1.3 1.01.3 1.3 1.4 1.4 1.3 1.6 1.8 1.8 1.6 1.3 1.01.6 1.6 1.7 1.7 1.2 1.51.8 1.8 1.8 1.9 1.1 1.31.8 1.8 1.8 1.9 0.9 1.11.7 1.7 1.7 1.7 0.8 0.91.4 1.4 1.4 1.4 0.7 0.71.1 1.1 1.1 1.1 0.6 0.60.8 0.9 0.9 0.9 0.6 0.60.7 0.7 0.7 0.7 0.6 0.60.6 0.6 0.6 0.6 0.7 0.70.5 0.6 0.6 0.6 0.9 0.90.6 0.6 0.7 0.6 1.1 1.10.6 0.7 0.7 0.7 1.4 1.40.8 0.8 0.9 0.9 1.7 1.71.0 1.0 1.1 1.1 1.9 1.91 . 3 1 . 4 1 . 4 1 . 4 2 . 0 1 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 7 2 . 1 2 . 1 2 . 1 2 . 2 1 . 5 1 . 5 2 . 3 2 . 4 2 . 4 2 . 5 1 . 2 1 . 2 2 . 4 2 . 5 2 . 4 2 . 5 1 . 0 0 . 9 2 . 3 2 . 5 2 . 3 2 . 4 0 . 8 0 . 7 0 . 7 1 . 0 1 . 3 1 . 6 1 . 7 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 5 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 1 1 . 5 1 . 8 2 . 0 2 . 0 1 . 9 1 . 8 1 . 7 1 . 7 1 . 8 1 . 9 2 . 1 2 . 2 2 . 4 2 . 6 2 . 6 2 . 5 2 . 4 2 . 1 1 . 9 1 . 8 1 . 8 1 . 9 2 . 0 2 . 2 2 . 4 2 . 5 2 . 6 2 . 5 2 . 4 2 . 1 1 . 7 1 . 4 1 . 1 0 . 9 0 . 8 0 . 7 0 . 6 0 . 7 1 . 0 1 . 4 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 5 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 8 2 . 0 2 . 1 1 . 9 1 . 7 1 . 6 1 . 5 1 . 5 1 . 6 1 . 7 2 . 0 2 . 2 2 . 4 2 . 5 2 . 5 2 . 3 2 . 1 1 . 8 1 . 7 1 . 6 1 . 6 1 . 7 1 . 9 2 . 1 2 . 3 2 . 5 2 . 5 2 . 3 2 . 1 1 . 7 1 . 3 1 . 1 0 . 9 0 . 7 0 . 6 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 7 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 8 1 . 9 2 . 0 1 . 8 1 . 6 1 . 5 1 . 4 1 . 3 1 . 4 1 . 5 1 . 7 1 . 9 2 . 2 2 . 3 2 . 3 2 . 2 2 . 0 1 . 7 1 . 5 1 . 4 1 . 4 1 . 5 1 . 6 1 . 8 2 . 1 2 . 2 2 . 3 2 . 2 1 . 9 1 . 6 1 . 3 1 . 1 0 . 9 0 . 7 0 . 6 0 . 5 0 . 7 0 . 9 0 . 5 0 . 6 1 . 3 1 . 5 1 . 3 1 . 4 1 . 6 0 . 6 0 . 6 0 . 7 0 . 9 0 . 5 0 . 6 1 . 1 1 . 3 1 . 1 1 . 2 1 . 4 0 . 7 0 . 7 0 . 6 0 . 8 0 . 5 0 . 6 1 . 0 1 . 1 1 . 0 1 . 1 1 . 2 0 . 9 0 . 9 0 . 6 0 . 7 0 . 6 0 . 6 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 2 1 . 1 0 . 6 0 . 7 0 . 6 0 . 7 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 5 1 . 4 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 7 1 . 7 0 . 9 0 . 9 0 . 9 0 . 9 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 9 1 . 8 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 3 1 . 4 1 . 3 1 . 9 1 . 8 1 . 4 1 . 5 1 . 5 1 . 5 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 8 1 . 4 1 . 4 1 . 8 1 . 9 2 . 0 1 . 9 2 . 0 2 . 0 2 . 0 2 . 1 2 . 0 1 . 1 1 . 1 1 . 8 1 . 9 2 . 0 2 . 0 2 . 1 2 . 0 2 . 0 2 . 1 2 . 0 0 . 9 0 . 8 1 . 7 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 8 0 . 7 0 . 7 1 . 4 1 . 4 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 5 0 . 6 0 . 5 1 . 1 1 . 1 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 0 . 5 0 . 5 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 0 0 . 5 0 . 5 0 . 7 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 6 0 . 5 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 1 1 . 1 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 4 1 . 4 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 8 1 . 7 1 . 1 1 . 3 1 . 2 1 . 2 1 . 4 1 . 5 1 . 4 1 . 5 1 . 6 2 . 0 1 . 9 1 . 5 1 . 6 1 . 5 1 . 5 1 . 7 1 . 8 1 . 8 1 . 9 2 . 0 2 . 0 1 . 9 1 . 8 2 . 0 1 . 8 1 . 8 2 . 1 2 . 2 2 . 1 2 . 3 2 . 4 1 . 8 1 . 7 2 . 1 2 . 3 2 . 5 2 . 7 2 . 7 2 . 7 2 . 5 2 . 3 2 . 1 1 . 9 1 . 9 1 . 9 2 . 0 2 . 1 2 . 1 2 . 1 2 . 1 2 . 2 2 . 3 2 . 4 2 . 4 2 . 2 2 . 0 1 . 9 1 . 8 1 . 8 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 8 2 . 8 2 . 7 2 . 5 2 . 2 2 . 0 2 . 0 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 8 2 . 8 2 . 7 2 . 5 2 . 2 1 . 9 1 . 7 1 . 6 1 . 6 1 . 6 1 . 5 1 . 4 2 . 2 2 . 5 2 . 7 2 . 8 2 . 9 2 . 8 2 . 6 2 . 4 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 3 2 . 3 2 . 2 2 . 2 2 . 3 2 . 4 2 . 5 2 . 5 2 . 3 2 . 1 1 . 9 1 . 9 1 . 9 2 . 1 2 . 3 2 . 6 2 . 7 2 . 9 2 . 9 2 . 9 2 . 8 2 . 6 2 . 3 2 . 1 2 . 0 2 . 1 2 . 3 2 . 5 2 . 7 2 . 9 2 . 8 2 . 6 2 . 2 1 . 9 1 . 6 1 . 4 1 . 3 1 . 3 1 . 2 1 . 1 2 . 2 2 . 5 2 . 6 2 . 7 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 3 2 . 3 2 . 2 2 . 2 2 . 2 2 . 3 2 . 4 2 . 4 2 . 2 2 . 1 1 . 9 1 . 9 1 . 9 2 . 1 2 . 4 2 . 6 2 . 7 2 . 8 2 . 9 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 1 2 . 3 2 . 5 2 . 7 2 . 8 2 . 9 2 . 9 2 . 7 2 . 5 2 . 1 1 . 8 1 . 5 1 . 3 1 . 1 1 . 0 1 . 0 0 . 9 2 . 0 2 . 2 2 . 1 2 . 1 2 . 4 2 . 5 2 . 3 2 . 5 0 . 8 0 . 7 1 . 6 1 . 8 1 . 8 1 . 8 2 . 0 2 . 1 2 . 0 2 . 1 0 . 7 0 . 6 1 . 3 1 . 4 1 . 4 1 . 5 1 . 6 1 . 7 1 . 6 1 . 7 0 . 6 0 . 5 1 . 0 1 . 1 1 . 1 1 . 2 1 . 3 1 . 3 1 . 3 1 . 3 0 . 6 0 . 5 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 1 1 . 0 1 . 1 0 . 6 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 7 1 . 1 1 . 1 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 4 1 . 4 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 1 . 7 1 . 7 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 9 1 . 8 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 9 1 . 8 1 . 4 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 7 1 . 6 1 . 7 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 1 . 4 1 . 4 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 0 2 . 0 2 . 0 1 . 1 1 . 1 1 . 8 1 . 9 2 . 0 2 . 0 2 . 1 2 . 0 2 . 0 2 . 1 0 . 9 0 . 8 1 . 7 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 0 . 7 0 . 6 1 . 4 1 . 4 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 0 . 6 0 . 5 1 . 1 1 . 1 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 0 . 5 0 . 5 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 0 . 5 0 . 5 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 0 . 9 0 . 9 0 . 6 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 1 . 0 0 . 9 1 . 0 1 . 2 1 . 1 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 1 1 . 1 1 . 1 1 . 5 1 . 4 0 . 9 1 . 1 1 . 0 1 . 0 1 . 2 1 . 3 1 . 2 1 . 3 1 . 8 1 . 7 1 . 1 1 . 3 1 . 2 1 . 2 1 . 4 1 . 6 1 . 5 1 . 6 2 . 0 1 . 9 1 . 4 1 . 6 1 . 4 1 . 5 1 . 7 1 . 9 1 . 8 1 . 9 2 . 0 1 . 9 1 . 7 2 . 0 2 . 2 2 . 4 2 . 6 2 . 6 2 . 5 2 . 3 2 . 0 1 . 8 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 8 1 . 9 2 . 0 2 . 2 2 . 3 2 . 4 2 . 3 2 . 1 1 . 9 1 . 7 1 . 7 1 . 7 1 . 9 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 6 2 . 5 2 . 2 2 . 0 1 . 9 1 . 8 1 . 9 2 . 1 2 . 2 2 . 4 2 . 6 2 . 7 2 . 7 2 . 6 2 . 3 2 . 1 1 . 9 1 . 8 1 . 8 1 . 8 1 . 8 1 . 7 2 . 0 2 . 3 2 . 5 2 . 6 2 . 7 2 . 7 2 . 6 2 . 4 2 . 1 2 . 0 1 . 9 1 . 9 2 . 0 2 . 0 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 4 2 . 4 2 . 3 2 . 1 1 . 9 1 . 8 1 . 8 2 . 0 2 . 1 2 . 3 2 . 5 2 . 6 2 . 7 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 0 2 . 1 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 8 2 . 6 2 . 3 2 . 0 1 . 8 1 . 6 1 . 6 1 . 6 1 . 5 1 . 4 2 . 2 2 . 4 2 . 3 2 . 2 2 . 5 2 . 6 2 . 5 2 . 7 1 . 2 1 . 1 2 . 1 2 . 3 2 . 3 2 . 2 2 . 5 2 . 6 2 . 5 2 . 6 1 . 0 0 . 9 1 . 9 2 . 1 2 . 1 2 . 1 2 . 3 2 . 3 2 . 2 2 . 3 0 . 8 0 . 7 1 . 6 1 . 7 1 . 8 1 . 7 1 . 9 2 . 0 1 . 9 1 . 9 0 . 6 0 . 6 1 . 2 1 . 3 1 . 4 1 . 4 1 . 5 1 . 6 1 . 5 1 . 5 0 . 6 0 . 5 0 . 9 1 . 0 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 0 . 6 0 . 5 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 0 . 6 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 5 0 . 5 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 9 0 . 9 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 1 . 1 1 . 1 0 . 5 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 1 . 4 1 . 4 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 7 1 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 9 1 . 9 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 2 1 . 2 2 . 0 1 . 9 1 . 3 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 5 1 . 5 1 . 8 1 . 8 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 6 1 . 5 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 3 1 . 3 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 1 1 . 1 1 . 6 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 7 1 . 8 1 . 0 1 . 1 1 . 3 1 . 4 1 . 5 1 . 4 1 . 5 1 . 5 1 . 4 1 . 5 1 . 0 1 . 1 1 . 0 1 . 0 1 . 2 1 . 1 1 . 2 1 . 2 1 . 1 1 . 1 1 . 1 1 . 2 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 1 . 2 1 . 4 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 1 . 3 1 . 6 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 1 . 4 1 . 7 1 . 9 1 . 9 1 . 7 1 . 5 1 . 1 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 1 . 4 1 . 7 1 . 9 1 . 9 1 . 8 1 . 5 1 . 2 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 1 . 4 1 . 1 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 1 . 3 1 . 1 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 1 . 3 1 . 1 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 1 . 3 1 . 2 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 4 1 . 3 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 6 1 . 6 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 1 . 8 1 . 9 2 . 0 1 . 9 2 . 0 1 . 9 1 . 9 2 . 0 1 . 9 1 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 7 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 4 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 2 1 . 1 1 . 1 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 0 . 9 0 . 8 0 . 8 0 . 9 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 7 0 . 7 0 . 7 0 . 8 0 . 7 0 . 7 0 . 6 0 . 7 0 . 9 0 . 8 0 . 6 0 . 5 0 . 7 0 . 9 0 . 6 0 . 6 0 . 6 0 . 6 0 . 9 0 . 7 0 . 5 0 . 5 0 . 7 0 . 9 0 . 5 0 . 6 0 . 5 0 . 5 0 . 9 0 . 7 0 . 5 0 . 4 0 . 7 1 . 0 0 . 5 0 . 6 0 . 4 0 . 5 0 . 9 0 . 7 0 . 5 0 . 4 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 5 0 . 4 0 . 5 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 7 1 . 8 1 . 7 1 . 5 1 . 1 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 8 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 6 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 7 1 . 8 1 . 7 1 . 4 1 . 1 0 . 8 0 . 6 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 6 0 . 4 0.3 0.3 0.3 0 . 3 0 . 3 3 . 0 3 . 0 StatisticsDescription S y m b o l A v g M a x M i n M a x / M i n A v g / M i n FLOOR 1 CORRIDORS 1 . 3 f c 2 . 9 f c 0 . 2 f c 1 4 . 5 : 1 6 . 5 : 1 FLOOR 2 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 FLOOR 3 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E E M L I G H T I N G P H O T O M E T R I C S E C O N D F L O O R E 4 . 5 XXXXX 0 9 / 1 5 / 2 0 2 2 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E E M L I G H T I N G P H O T O M E T R I C - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S 1.1 1.4 1.7 1.9 1.9 1.8 1.5 1.2 0.9 0.7 0.6 0.5 0.5 0.6 0.7 0.8 1.0 1.3 1.6 1.8 1.9 1.7 1.5 1.2 0.9 0.7 0.5 0.4 0.41.1 1.5 1.8 2.0 2.0 1.8 1.5 1.2 1.0 0.8 0.7 0.6 0.6 0.7 0.8 0.9 1.1 1.4 1.7 1.9 1.9 1.8 1.5 1.2 0.9 0.7 0.6 0.5 0.4 0.4 0.4 0.41.2 1.5 0.8 0.8 0.5 0.51.3 1.6 1.0 1.0 0.7 0.71.5 1.7 1.2 1.3 1.0 1.01.7 1.8 1.5 1.6 1.3 1.31.9 2.0 1.8 1.8 1.6 1.62.0 2.0 2.0 2.0 1.8 1.82.0 2.0 1.9 2.0 1.8 1.81.8 1.8 1.8 1.8 1.7 1.61.5 1.5 1.5 1.5 1.4 1.41.1 1.1 1.1 1.1 1.1 1.10.8 0.9 0.9 0.9 0.9 0.90.6 0.7 0.7 0.7 0.7 0.70.5 0.5 0.6 0.6 0.7 0.60.5 0.5 0.5 0.5 0.7 0.60.4 0.5 0.5 0.5 0.8 0.70.5 0.5 0.6 0.5 0.9 0.80.6 0.6 0.7 0.7 1.1 0.90.8 0.8 0.8 0.8 1.2 1.01.0 1.1 1.1 1.1 1.3 1.6 1.8 1.8 1.6 1.3 1.01.3 1.3 1.4 1.4 1.3 1.6 1.8 1.8 1.6 1.3 1.01.6 1.6 1.7 1.7 1.2 1.51.8 1.8 1.8 1.9 1.1 1.31.8 1.8 1.8 1.9 0.9 1.11.7 1.7 1.7 1.7 0.8 0.91.4 1.4 1.4 1.4 0.7 0.71.1 1.1 1.1 1.1 0.6 0.60.8 0.9 0.9 0.9 0.6 0.60.7 0.7 0.7 0.7 0.6 0.60.6 0.6 0.6 0.6 0.7 0.70.5 0.6 0.6 0.6 0.9 0.90.6 0.6 0.7 0.6 1.1 1.10.6 0.7 0.7 0.7 1.4 1.40.8 0.8 0.9 0.9 1.7 1.71.0 1.1 1.1 1.1 1.9 1.91 . 3 1 . 4 1 . 4 1 . 5 2 . 0 1 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 7 2 . 1 2 . 1 2 . 1 2 . 2 1 . 5 1 . 4 2 . 3 2 . 4 2 . 4 2 . 5 1 . 2 1 . 1 2 . 4 2 . 5 2 . 4 2 . 5 1 . 0 0 . 9 2 . 3 2 . 5 2 . 3 2 . 4 0 . 8 0 . 7 0 . 7 1 . 0 1 . 3 1 . 6 1 . 7 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 5 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 8 2 . 0 2 . 0 1 . 9 1 . 8 1 . 7 1 . 7 1 . 7 1 . 9 2 . 1 2 . 2 2 . 4 2 . 6 2 . 6 2 . 5 2 . 4 2 . 1 1 . 9 1 . 8 1 . 8 1 . 9 2 . 0 2 . 2 2 . 3 2 . 5 2 . 6 2 . 5 2 . 3 2 . 0 1 . 7 1 . 4 1 . 1 0 . 9 0 . 8 0 . 7 0 . 6 0 . 7 1 . 0 1 . 4 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 5 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 8 2 . 0 2 . 1 1 . 9 1 . 7 1 . 6 1 . 5 1 . 5 1 . 6 1 . 7 2 . 0 2 . 2 2 . 4 2 . 5 2 . 5 2 . 3 2 . 1 1 . 8 1 . 6 1 . 6 1 . 6 1 . 7 1 . 9 2 . 1 2 . 3 2 . 5 2 . 5 2 . 3 2 . 0 1 . 7 1 . 3 1 . 1 0 . 9 0 . 7 0 . 6 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 7 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 6 0 . 5 0 . 5 0 . 5 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 8 1 . 9 2 . 0 1 . 8 1 . 6 1 . 5 1 . 3 1 . 3 1 . 4 1 . 5 1 . 7 1 . 9 2 . 2 2 . 3 2 . 3 2 . 2 1 . 9 1 . 7 1 . 5 1 . 4 1 . 4 1 . 5 1 . 6 1 . 8 2 . 1 2 . 2 2 . 3 2 . 2 1 . 9 1 . 6 1 . 3 1 . 0 0 . 9 0 . 7 0 . 6 0 . 5 0 . 7 1 . 0 0 . 5 0 . 6 1 . 3 1 . 5 1 . 3 1 . 4 1 . 6 0 . 6 0 . 6 0 . 7 0 . 9 0 . 5 0 . 6 1 . 1 1 . 3 1 . 1 1 . 2 1 . 4 0 . 7 0 . 7 0 . 6 0 . 8 0 . 5 0 . 6 1 . 0 1 . 1 1 . 0 1 . 1 1 . 2 0 . 9 0 . 9 0 . 6 0 . 7 0 . 6 0 . 6 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 2 1 . 1 0 . 6 0 . 7 0 . 6 0 . 7 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 5 1 . 4 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 7 1 . 7 0 . 9 0 . 9 0 . 9 0 . 9 1 . 1 1 . 1 1 . 1 1 . 1 1 . 2 1 . 9 1 . 8 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 3 1 . 4 1 . 3 1 . 9 1 . 8 1 . 4 1 . 5 1 . 5 1 . 5 1 . 6 1 . 6 1 . 6 1 . 6 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 8 1 . 4 1 . 4 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 0 2 . 0 2 . 1 2 . 0 1 . 1 1 . 1 1 . 8 1 . 9 2 . 0 2 . 0 2 . 1 2 . 0 2 . 0 2 . 1 2 . 0 0 . 9 0 . 8 1 . 7 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 8 0 . 7 0 . 7 1 . 4 1 . 4 1 . 6 1 . 5 1 . 6 1 . 6 1 . 6 1 . 6 1 . 5 0 . 6 0 . 5 1 . 1 1 . 1 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 0 . 5 0 . 5 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 1 . 0 0 . 5 0 . 5 0 . 7 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 6 0 . 5 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 1 1 . 1 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 4 1 . 4 0 . 9 1 . 0 1 . 0 1 . 0 1 . 1 1 . 2 1 . 2 1 . 2 1 . 3 1 . 8 1 . 7 1 . 2 1 . 3 1 . 2 1 . 2 1 . 4 1 . 5 1 . 4 1 . 5 1 . 6 2 . 0 1 . 9 1 . 5 1 . 6 1 . 5 1 . 5 1 . 7 1 . 9 1 . 8 1 . 9 2 . 0 2 . 0 1 . 9 1 . 8 2 . 0 1 . 8 1 . 8 2 . 1 2 . 3 2 . 1 2 . 3 2 . 4 1 . 8 1 . 7 2 . 1 2 . 4 2 . 5 2 . 7 2 . 7 2 . 7 2 . 5 2 . 3 2 . 0 1 . 9 1 . 9 2 . 0 2 . 0 2 . 1 2 . 1 2 . 1 2 . 1 2 . 2 2 . 3 2 . 4 2 . 4 2 . 2 2 . 0 1 . 9 1 . 8 1 . 9 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 8 2 . 8 2 . 7 2 . 5 2 . 2 2 . 0 2 . 0 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 8 2 . 8 2 . 7 2 . 5 2 . 2 1 . 9 1 . 7 1 . 6 1 . 6 1 . 6 1 . 5 1 . 4 2 . 2 2 . 5 2 . 7 2 . 8 2 . 9 2 . 8 2 . 6 2 . 4 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 3 2 . 3 2 . 2 2 . 2 2 . 3 2 . 4 2 . 5 2 . 5 2 . 3 2 . 1 1 . 9 1 . 9 1 . 9 2 . 1 2 . 4 2 . 6 2 . 8 2 . 9 2 . 9 2 . 9 2 . 8 2 . 6 2 . 3 2 . 1 2 . 0 2 . 1 2 . 3 2 . 5 2 . 8 2 . 9 2 . 8 2 . 6 2 . 2 1 . 9 1 . 6 1 . 4 1 . 3 1 . 3 1 . 2 1 . 1 2 . 2 2 . 5 2 . 6 2 . 7 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 3 2 . 3 2 . 2 2 . 2 2 . 2 2 . 3 2 . 4 2 . 4 2 . 2 2 . 1 1 . 9 1 . 9 1 . 9 2 . 1 2 . 4 2 . 6 2 . 7 2 . 8 2 . 9 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 1 2 . 3 2 . 5 2 . 7 2 . 8 2 . 9 2 . 9 2 . 7 2 . 5 2 . 1 1 . 8 1 . 5 1 . 3 1 . 1 1 . 0 0 . 9 0 . 9 2 . 0 2 . 2 2 . 1 2 . 1 2 . 4 2 . 5 2 . 3 2 . 4 0 . 8 0 . 7 1 . 6 1 . 8 1 . 8 1 . 8 2 . 0 2 . 1 2 . 0 2 . 1 0 . 6 0 . 6 1 . 3 1 . 4 1 . 4 1 . 4 1 . 6 1 . 7 1 . 6 1 . 7 0 . 6 0 . 5 1 . 0 1 . 1 1 . 1 1 . 2 1 . 3 1 . 3 1 . 3 1 . 3 0 . 6 0 . 5 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 1 1 . 0 1 . 0 0 . 6 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 7 1 . 1 1 . 1 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 4 1 . 4 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 1 . 7 1 . 7 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 9 1 . 8 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 3 1 . 3 1 . 9 1 . 8 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 6 1 . 6 1 . 7 1 . 6 1 . 7 1 . 7 1 . 8 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 1 . 4 1 . 4 1 . 9 1 . 9 2 . 0 1 . 9 2 . 0 2 . 0 2 . 0 2 . 0 1 . 1 1 . 1 1 . 8 1 . 9 2 . 0 1 . 9 2 . 1 2 . 0 2 . 0 2 . 0 0 . 8 0 . 8 1 . 7 1 . 7 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 0 . 7 0 . 6 1 . 4 1 . 4 1 . 6 1 . 5 1 . 6 1 . 6 1 . 6 1 . 6 0 . 6 0 . 5 1 . 1 1 . 1 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 1 . 3 0 . 5 0 . 5 0 . 9 0 . 9 1 . 0 1 . 0 1 . 1 1 . 1 1 . 1 1 . 1 0 . 5 0 . 5 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 0 . 9 0 . 9 0 . 6 0 . 6 0 . 6 0 . 7 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 7 0 . 7 0 . 8 0 . 8 0 . 9 1 . 0 0 . 9 1 . 0 1 . 2 1 . 1 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 1 1 . 1 1 . 1 1 . 5 1 . 4 0 . 9 1 . 1 1 . 0 1 . 0 1 . 2 1 . 3 1 . 2 1 . 3 1 . 8 1 . 7 1 . 2 1 . 3 1 . 2 1 . 2 1 . 4 1 . 6 1 . 5 1 . 6 2 . 0 1 . 9 1 . 4 1 . 7 1 . 5 1 . 5 1 . 7 1 . 9 1 . 8 1 . 9 2 . 0 1 . 9 1 . 8 2 . 0 2 . 2 2 . 4 2 . 6 2 . 6 2 . 5 2 . 3 2 . 0 1 . 8 1 . 7 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 2 . 0 2 . 2 2 . 3 2 . 4 2 . 3 2 . 1 1 . 9 1 . 7 1 . 7 1 . 7 1 . 9 2 . 0 2 . 2 2 . 4 2 . 6 2 . 7 2 . 6 2 . 5 2 . 2 2 . 0 1 . 9 1 . 8 1 . 9 2 . 1 2 . 2 2 . 4 2 . 6 2 . 7 2 . 7 2 . 6 2 . 3 2 . 0 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 7 2 . 0 2 . 3 2 . 5 2 . 6 2 . 7 2 . 7 2 . 6 2 . 4 2 . 1 1 . 9 1 . 9 1 . 9 2 . 0 2 . 1 2 . 1 2 . 0 2 . 0 2 . 1 2 . 2 2 . 4 2 . 4 2 . 3 2 . 1 1 . 9 1 . 8 1 . 8 2 . 0 2 . 1 2 . 3 2 . 5 2 . 6 2 . 7 2 . 8 2 . 7 2 . 5 2 . 3 2 . 1 2 . 0 2 . 0 2 . 2 2 . 3 2 . 5 2 . 7 2 . 8 2 . 8 2 . 8 2 . 6 2 . 3 2 . 0 1 . 8 1 . 6 1 . 6 1 . 6 1 . 5 1 . 4 2 . 2 2 . 4 2 . 3 2 . 2 2 . 5 2 . 7 2 . 5 2 . 7 1 . 2 1 . 1 2 . 1 2 . 3 2 . 3 2 . 2 2 . 5 2 . 6 2 . 5 2 . 6 0 . 9 0 . 9 1 . 9 2 . 1 2 . 1 2 . 0 2 . 3 2 . 3 2 . 2 2 . 3 0 . 8 0 . 7 1 . 6 1 . 7 1 . 7 1 . 7 1 . 9 1 . 9 1 . 9 1 . 9 0 . 6 0 . 6 1 . 2 1 . 3 1 . 4 1 . 4 1 . 5 1 . 6 1 . 5 1 . 5 0 . 6 0 . 5 0 . 9 1 . 0 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 0 . 6 0 . 5 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 0 0 . 6 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 0 . 8 0 . 7 0 . 7 0 . 5 0 . 5 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 9 0 . 9 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 1 . 1 1 . 1 0 . 5 0 . 6 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 1 . 5 1 . 4 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 8 0 . 8 0 . 8 1 . 8 1 . 7 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 1 . 0 1 . 0 1 . 9 1 . 9 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 2 1 . 2 1 . 2 2 . 0 1 . 9 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 5 1 . 5 1 . 8 1 . 8 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 6 1 . 5 1 . 8 1 . 8 1 . 9 1 . 8 1 . 9 1 . 9 1 . 9 2 . 0 1 . 3 1 . 3 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 1 1 . 1 1 . 6 1 . 6 1 . 8 1 . 7 1 . 8 1 . 7 1 . 7 1 . 8 1 . 0 1 . 1 1 . 3 1 . 3 1 . 5 1 . 4 1 . 5 1 . 5 1 . 4 1 . 5 1 . 0 1 . 1 1 . 0 1 . 0 1 . 2 1 . 1 1 . 2 1 . 2 1 . 1 1 . 1 1 . 1 1 . 2 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 0 . 9 1 . 2 1 . 4 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 1 . 3 1 . 6 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 1 . 4 1 . 7 1 . 9 1 . 9 1 . 7 1 . 4 1 . 1 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 1 . 4 1 . 7 1 . 9 1 . 9 1 . 7 1 . 5 1 . 1 0 . 4 0 . 4 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 0 . 5 1 . 4 1 . 1 0 . 5 0 . 5 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 0 . 6 1 . 3 1 . 1 0 . 6 0 . 6 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 0 . 7 1 . 3 1 . 1 0 . 8 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 9 0 . 9 1 . 3 1 . 2 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 1 1 . 4 1 . 3 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 4 1 . 6 1 . 6 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 1 . 9 2 . 0 1 . 9 1 . 8 1 . 9 2 . 0 1 . 9 2 . 0 1 . 9 1 . 9 2 . 0 1 . 9 1 . 9 1 . 7 1 . 7 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 8 1 . 7 1 . 7 1 . 4 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 5 1 . 4 1 . 4 1 . 1 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 2 1 . 1 1 . 1 0 . 9 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 1 . 0 0 . 9 0 . 8 0 . 8 0 . 9 0 . 8 0 . 8 0 . 8 0 . 8 0 . 9 0 . 8 0 . 7 0 . 6 0 . 7 0 . 8 0 . 7 0 . 7 0 . 6 0 . 7 0 . 8 0 . 7 0 . 6 0 . 5 0 . 7 0 . 9 0 . 6 0 . 6 0 . 5 0 . 6 0 . 9 0 . 7 0 . 5 0 . 5 0 . 7 1 . 0 0 . 5 0 . 6 0 . 5 0 . 5 0 . 9 0 . 7 0 . 5 0 . 4 0 . 8 1 . 0 0 . 5 0 . 6 0 . 4 0 . 5 0 . 9 0 . 7 0 . 5 0 . 4 0 . 7 1 . 0 1 . 4 1 . 6 1 . 8 1 . 8 1 . 6 1 . 3 1 . 0 0 . 7 0 . 6 0 . 5 0 . 4 0 . 5 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 7 1 . 8 1 . 7 1 . 4 1 . 1 0 . 9 0 . 6 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 8 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 6 0 . 5 0 . 7 1 . 0 1 . 3 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 7 0 . 9 1 . 2 1 . 5 1 . 7 1 . 8 1 . 7 1 . 4 1 . 1 0 . 8 0 . 6 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 7 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 1 . 1 1 . 4 1 . 6 1 . 8 1 . 7 1 . 5 1 . 2 0 . 9 0 . 6 0 . 4 0.3 0.3 0.3 0 . 3 0 . 3 3 . 0 3 . 0 StatisticsDescription S y m b o l A v g M a x M i n M a x / M i n A v g / M i n FLOOR 1 CORRIDORS 1 . 3 f c 2 . 9 f c 0 . 2 f c 1 4 . 5 : 1 6 . 5 : 1 FLOOR 2 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 FLOOR 3 CORRIDORS 1 . 4 f c 3 . 0 f c 0 . 3 f c 1 0 . 0 : 1 4 . 7 : 1 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 L M E L M E E M L I G H T I N G P H O T O M E T R I C T H I R D F L O O R E 4 . 6 XXXXX 0 9 / 1 5 / 2 0 2 2 ···· P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 E 5 . 1 O N E - L I N E D I A G R A M XXXXX 0 9 / 1 5 / 2 0 2 2 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 E 5 . 2 P A N E L S C H E D U L E S XXXXX 0 9 / 1 5 / 2 0 2 2 P r o j e c t N o . 2 2 A P 1 1 I d a h o P E # : P - 1 7 1 7 2 S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMIITAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 3 E 6 . 1 E N E R G Y C O D E C O M P L I A N C E XXXXX 0 9 / 1 5 / 2 0 2 2 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G C O V E R S H E E T 7 1 8 0 8 1 _ P 0 . 1 P 0 . 1 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G S C H E D U L E S & C A L C U L A T I O N S 7 1 8 0 8 1 _ P 0 . 2 P 0 . 2 “ ” “ ” A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G S P E C I F I C A T I O N S 7 1 8 0 8 1 _ P 0 . 3 P 0 . 3 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S counter placement and orientation per retail groupED T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P L U M B I N G P L A N - F I R S T F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S SHOWROOM100OFFICE101BREAKROOM102 R&D A R E A 1 0 4 S T A I R 1 1 2 0 R E S T R O O M 1 0 6 R E F U S E 1 0 5 S T O R A G E 1 1 1 S T A I R 2 1 2 1 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 S E L F - S T O R A G E 1 1 2 R M F I R E R I S E R 1 0 7 E L E V A T O R RESTROOM103 R E - U S E A R E A A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G P L A N - F I R S T F L O O R 7 1 8 0 8 1 _ P 1 . 1 P 1 . 1 ABC 12345678 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D 9 T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P L U M B I N G P L A N - S E C O N D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S C O M M M O P / 2 0 8 E L E V A T O R A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G P L A N - S E C O N D F L O O R 7 1 8 0 8 1 _ P 1 . 2 P 1 . 2 ABC 12345678 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 S E D T R U E N O R T H P R O J E C T N O R T H 1 / 1 6 " = 1 ' - 0 " S C A L E P L U M B I N G P L A N - T H I R D F L O O R 1 N N G E N E R A L N O T E S K E Y N O T E S G E N E R A L N O T E S K E Y N O T E S C O M M M O P / 3 0 8 E L E V A T O R R E S T R O O M 3 0 6 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G P L A N - T H I R D F L O O R 7 1 8 0 8 1 _ P 1 . 3 P 1 . 3 OFFICE101 BREAKROOM102 R & D A R E A 1 0 4 RESTROOM103 SHOWROOM100 R E S T R O O M 1 0 6 L O B B Y 1 1 0 E Q U I P M E N T E L E V A T O R 1 0 9 C O M M M O P / 1 0 8 R M F I R E R I S E R 1 0 7 E L E V A T O R S C O M M M O P / 2 0 8 S C O M M M O P / 3 0 8 R E S T R O O M 3 0 6 879 1 0 AB A B G E N E R A L N O T E S K E Y N O T E S 1 5 1 4 A 1 4 1 5 1 5 1 4 B A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G E N L A R G E D P L A N S 7 1 8 0 8 1 _ P 2 . 1 P 2 . 1 1 A p e x P r o j e c t N o . 2 8 2 2 0 7 A S B T R B S I T E A D D R E S S : E N G I N E E R L O G O : P R O F E S S I O N A L S E A L : NOTES 3 DATENO. 2 INITIALS 4 5 6 7 1 R E V I S I O N S : S H E E T N O T E S : D R A W N : C H E C K E D : D A T E : S H E E T C O N T E N T S : AMERCO REAL ESTATE COMPANY 8 3 2 8 N 2 N D E R E X B U R G , I D 8 3 4 4 0 7 1 8 0 8 1 0 8 / 1 6 / 2 0 2 2 07.18.22 BG BID SET 08.02.22 BG ADDENDUM 1 08.16.22 BG ARCHITECTURAL UPDATES / CITY SUBMITTAL 09.15.22 BG UHI COMMENTS / CITY RESUBMITTAL -- -- -- -- U - H A U L M O V I N G A N D S T O R A G E 1 2 0 9 / 1 5 / 2 2 3 P L U M B I N G D E T A I L S 7 1 8 0 8 1 _ P 2 . 2 P 2 . 2 LEVEL 1 PLAN - BLDG A FIRE SPRINKLER FP101 NORTH 4" 6 " 6 " 4 " 4"4" 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2"1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1" 1" 1" 1" 1" 1" 1" 1"1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4"1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2"2"2"2"2" 2" 2"2" 2"2" 2"2"2" 2"2"2"2"2"1 " 2"2"2"2"2" 2"2" 2"2"2"2" 2"2" 2"2"2"2" 2"2"2" 2"1-1/2"1-1/2" 1-1/2" 1-1/2"1-1/2" 1-1/2" 4 " 4 " 4"4"4" UP SWS. S 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 319 SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: N O T E S 3 D A T E N O . 2 I N I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z A M E R C O R E A L E S T A T E C O M P A N Y 8 PH: (602) 263-6502 PHOENIX, ARIZONA 85004 2727 NORTH CENTRAL AVENUE CONSTRUCTION DEPARTMENT 328 N 2ND E REXBURG, ID 83440 718081 10/13/2022 - - - - - - - - - - U-HAUL MOVING AND STORAGE XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG GTJ GTJ 10/13/2022 0 9 . 1 4 . 2 0 2 2 G T J C I T Y S U B M I T T A L 1 0 . 0 5 . 2 0 2 2 G T J C I T Y R E S U B M I T T A L 1 0 . 1 3 . 2 0 2 2 G T J C I T Y R E S U B M I T T A L 2 3 6 5 11 1 15 15 " 32 3 1’-0" FIRE SPRINKLER PLAN - BUILDING A LEVEL 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 4 C B 2 14 3 3 3 4 4 15 LEVEL 2 PLAN - BLDG A FIRE SPRINKLER FP102 NORTH 4 " 4"4" 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 "1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1-1/2" 1-1/2" 1-1/2" 1" 1" 1" 1 " 1 " 1 " 1 " 1 " 1" 1" 1" 1" 1" 1"1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4"1-1/2" 1-1/2"1-1/2" 1 - 1 / 2 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2"2"2"2" 2"2"2"2"2"2"2"2"2" 2"2"2"2"2"2"2"2" 1 " 1 " 1 " 1 " 2" 2"2"2" 2"2"2"2"2"2"2" 2"2"2"2"2"2"2" 2" 2"2" 2"2"2" 1 " 1 " 1 " 1 " 2"2"2"2"2"2"2" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 UP S W S . C . S . S SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: N O T E S 3 D A T E N O . 2 I N I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z A M E R C O R E A L E S T A T E C O M P A N Y 8 PH: (602) 263-6502 PHOENIX, ARIZONA 85004 2727 NORTH CENTRAL AVENUE CONSTRUCTION DEPARTMENT 328 N 2ND E REXBURG, ID 83440 718081 09/15/2022 - - - - - - - - - - - - - - U-HAUL MOVING AND STORAGE XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG GTJ GTJ 09/15/2022 9 . 1 5 . 2 2 G T J U H I C O M M E N T S / C I T Y R E S U B M I T T A L 6 7 " 32 3 1’-0" FIRE SPRINKLER PLAN - BUILDING A LEVEL 2 9 9 9 9 9 9 9 9 9 9 9 9 9 9 LEVEL 3 PLAN - BLDG A FIRE SPRINKLER FP103 NORTH 4 " 4"4" 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 4 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1"1-1/4"1-1/2" 1-1/2" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1 "1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 "1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 3 " 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1 " 1 " 1 " 1 " 1 " 1" 1" 1" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4" 1-1/4"1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1 - 1 / 2 " 2" 2" 2"2" 2" 2"2"2"2"2"2" 2"2"2" 2"2"2"2"2"2"2" 2"2"2"2"2"2"2" 2"2"2" 2"2"2"2"2"2"2"2"2" 2"2"2"2"2"2"2"2"2" 2"2"2" 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 " 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 UP S W S . C . S . S SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: N O T E S 3 D A T E N O . 2 I N I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z A M E R C O R E A L E S T A T E C O M P A N Y 8 PH: (602) 263-6502 PHOENIX, ARIZONA 85004 2727 NORTH CENTRAL AVENUE CONSTRUCTION DEPARTMENT 328 N 2ND E REXBURG, ID 83440 718081 09/15/2022 - - - - - - - - - - - - - - U-HAUL MOVING AND STORAGE XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG GTJ GTJ 09/15/2022 9 . 1 5 . 2 2 G T J U H I C O M M E N T S / C I T Y R E S U B M I T T A L 6 8 12 13 " 32 3 1’-0" FIRE SPRINKLER PLAN - BUILDING A LEVEL 3 9 9 9 9 9 9 9 9 9 9 9 9 9 9 101102103104 105106107108109110111112 120 119 118 117 116 115 114 113 121122123124 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 4 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 1 2 3 4 5 6 7 1 2 3 45 6 78 8 9 8 OF EXIT STAIR VERTICAL STANDPIPE INSTALLED IN CORNER 9 ADJACENT TO STANDPIPE. MAIN RISER VIA 1-1/4" EXPRESS DRAIN INSTALLED EXTEND DISCHARGE FROM TEST/DRAIN VALVE TO FLOOR LEVEL OF BUILDING SUPPLY TO FIRE SPRINKLER SYSTEM ON EACH CAULKING. AREAS. SEAL ALL PENETRATIONS WITH FIRE 2-HOUR WALL SEPARATING STAIR FROM ADJACENT BUTTERFLY PATTERN CONTROL VALVE GLOBE UMC (OR EQUAL) RISER ASSEMBLY WITH CHECK VAVLE GLOBE UMC (OR EQUAL) WITH INTEGRATED (INTEGRATED INTO GLOBE UMC) VANE TYPE WATER FLOW SWITCH GLOBE UMC) PRESSURE GAUGE (INTEGRATED INTO INTO GLOBE UMC) RELIEF VALVE AND SIGHT GLASS (INTEGRATED COMBINATION TEST/DRAIN VALVE WITH PRESSURE EXCEEEDS 175 PSI (ALL SYSTEMS SERVING LEVEL P2) AT 170 PSI) WHERE MAXIMUM SYSTEM PRESSURE NOTE: PROVIDE PRESSURE REDUCING VALVE (SET NOTES & DETAILS FIRE SPRINKLER FP500 6 7 8 9 10 11 12 14 16 17 5 6 7 16 17 9 8 12 3 2 1 4 8 1415 1 2 3 4 5 13 15 19 18 19 18 90 M.J. BEND NFPA #13 CONCRETE THRUST BLOCK, SIZED PER CORROSION PROTECTION ANCHOR RODS, PER NFPA #13 - PROVIDE UNDERGROUND SUPPLY TO INTERIOR PIPING SPIGOT PIECE - TRANSITION FROM CEMENT LINED DUCTILE IRON FLANGE X MASTIC SPACE AROUND PIPE - FILL SPACE WITH SLEEVE AT FLOOR SPACE WITH 2" CLEAR NOT USED OF SPRINKLERS PER NFPA 13 6.2.9.7.1. SPARE SPRINKLER CABINET, PER NFPA 13. PROVIDE LIST VANE TYPE WATER FLOW SWITCH GENERAL INFORMATION SIGN PER NFPA 13 25.6. PRESSURE GAUGE ASSEMBLY (OR EQUAL) 4" AMES COLT SERIES C200BFG DOUBLE CHECK BUILDING EXTERIOR. VALVE WITH 1/2" ORIFICE. EXTEND DISCHARGE TO 2" COMBINATION DRAIN AND INSPECTOR’S TEST HYDRAULIC DESIGN INFORMAITON SIGN 10 11 4" CHECK VALVE CONNECTION. PROVIDE 1/2" AUTO BALL DRIP 4" TO 2-WAY, WALL MOUNT FIRE DEPARTMENT (BEYOND) 6" UNDERGROUND SUPPLY PIPING 6" X 4" FLEXIBLE COUPLING/FITTING ATTACHED LOCKING CHAIN BUILT-IN TAMPER SWITCH AND 4" BUTTERFLY CONTROL VALVE WITH FIRE SPRINKLERS (ONE PER LEVEL IN EXIT STAIR) 4" SUPPLY TO FLOOR CONTROL VALVE ASSEMBLIES FOR 6 7 8 9 10 11 12 14 16 17 5 6 7 16 17 9 8 12 3 2 1 4 8 1415 1 2 3 4 5 13 15 19 18 19 18 90 M.J. BEND NFPA #13 CONCRETE THRUST BLOCK, SIZED PER CORROSION PROTECTION ANCHOR RODS, PER NFPA #13 - PROVIDE UNDERGROUND SUPPLY TO INTERIOR PIPING SPIGOT PIECE - TRANSITION FROM CEMENT LINED DUCTILE IRON FLANGE X MASTIC SPACE AROUND PIPE - FILL SPACE WITH SLEEVE AT FLOOR SPACE WITH 2" CLEAR NOT USED OF SPRINKLERS PER NFPA 13 6.2.9.7.1. SPARE SPRINKLER CABINET, PER NFPA 13. PROVIDE LIST VANE TYPE WATER FLOW SWITCH GENERAL INFORMATION SIGN PER NFPA 13 25.6. PRESSURE GAUGE BUILDING EXTERIOR. VALVE WITH 1/2" ORIFICE. EXTEND DISCHARGE TO 2" COMBINATION DRAIN AND INSPECTOR’S TEST HYDRAULIC DESIGN INFORMAITON SIGN 10 11 4" CHECK VALVE CONNECTION. PROVIDE 1/2" AUTO BALL DRIP 4" TO 2-WAY, WALL MOUNT FIRE DEPARTMENT (BEYOND) 8" UNDERGROUND SUPPLY PIPING 8" X 6" FLEXIBLE COUPLING/FITTING ATTACHED LOCKING CHAIN BUILT-IN TAMPER SWITCH AND 6" BUTTERFLY CONTROL VALVE WITH ASSEMBLY (OR EQUAL) 6" AMES COLT SERIES C200BFG DOUBLE CHECK 6" SUPPLY TO ESFR FIRE SPRINKLER SYSTEM SITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: N O T E S 3 D A T E N O . 2 I N I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: z A M E R C O R E A L E S T A T E C O M P A N Y 8 PH: (602) 263-6502 PHOENIX, ARIZONA 85004 2727 NORTH CENTRAL AVENUE CONSTRUCTION DEPARTMENT 328 N 2ND E REXBURG, ID 83440 718081 09/15/2022 - - - - - - - - - - - - - - U-HAUL MOVING AND STORAGE XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG XX A1 NAME.DWG GTJ GTJ 09/15/2022 9 . 1 5 . 2 2 G T J U H I C O M M E N T S / C I T Y R E S U B M I T T A L 1 2 3 4 5 6 7 8 9 10 Fire Sprinkler Keynote Legend APPLICABLE PROVISIONS OF NFPA 13 AND 24. SITE PLANS FOR CONTINUATION. INSTALL, FLUSH AND PRESSURE TEST PER ALL 6" UNDERGROUND WATER SUPPLY TO FIRE SPRINKLER SYSTEM IN BUILDING A. SEE APPLICABLE PROVISIONS OF NFPA 13 AND 24. SITE PLANS FOR CONTINUATION. INSTALL, FLUSH AND PRESSURE TEST PER ALL 8" UNDERGROUND WATER SUPPLY TO FIRE SPRINKLER SYSTEM IN BUILDING B. SEE BACKFLOW PREVENTER. SEE DETAIL 1 ON SHEET FP500. 6" FIRE SPRINKLER RISER FOR BUILDING A. INCLUDE DOUBLE CHECK ASSEMBLY CHECK ASSEMBLY BACKFLOW PREVENTER. SEE DETAIL 2 ON SHEET FP500. 8" FIRE SPRINKLER RISER FOR BUILDING B (HIGH PILED STORAGE). INCLUDE DOUBLE LEVEL OF BUILDING. SHEET FP500. PROVIDE A SEPARATE ZONE OF FIRE SPRINKLERS FOR EACH FLOOR FLOOR CONTROL VALVE ASSEMBLY FOR BUILDING A LEVEL 1. SEE DETAIL 1 ON TEST VALVES. PARALLEL TO FEED MAIN FOR DISCHARGE FROM FLOOR CONTROL VALVE ASSEMBLY MINIMIZE OBSTRUCTION TO BUILDING EGRESS. PROVIDE A 1-1/4" EXPRESS DRAIN EXIT STAIR. PIPING MAY BE INSTALLED EXPOSED BUT SHALL BE LOCATED TO VALVE ASSEMBLIES FOR LEVELS 2 AND 3. ROUTE VERTICAL FEED MAIN THROUGH 4" FIRE PROTECTION WATER SUPPLY FROM MAIN RISER UP TO FLOOR CONTROL LEVEL OF BUILDING. SHEET FP500. PROVIDE A SEPARATE ZONE OF FIRE SPRINKLERS FOR EACH FLOOR FLOOR CONTROL VALVE ASSEMBLY FOR BUILDING A LEVEL 2. SEE DETAIL 3 ON LEVEL OF BUILDING. SHEET FP500. PROVIDE A SEPARATE ZONE OF FIRE SPRINKLERS FOR EACH FLOOR FLOOR CONTROL VALVE ASSEMBLY FOR BUILDING A LEVEL 3. SEE DETAIL 3 ON OF 12 FEET). HAZARD GROUP 2 (STORAGE OF MODERATE COMBUSTIBLE TO A MAXIMUM HEIGHT HYDRAULICALLY DESIGNED TO PROTECT A HAZARD CLASSIFICATION OF ORDINARY APPLICABLE PROVISIONS OF NFPA 13. FIRE SPRINKLER SYSTEMS SHALL BE DESIGN, INSTALL AND TEST FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH ALL INSTALL FIRE SPRINKLERS TO PROVIDE PROTECTION THROUGHOUT BUILDING A. MOST REMOTE SPRINKLER. FLOWING WITH A MINIMUM RESIDUAL PRESSURE OF 20 PSI AT THE HYDRAULICALLY ESFR FIRE SPRINKLERS. HYDRAULIC DESIGN AREA SHALL INCLUDE 12 SPRINKLERS HEIGHT OF 300 FEET IN A 35 FOOT TALL BUILDING. PROTECT BUILDING WITH K-25.2 I-IV COMMODITIES AND CARTONED UNEXP0ANDED PLASTICS TO A MAXIMUM HYDRAULICALLY DESIGNED TO PROTECT PALLETIZED OR RACK STORAGE OF CLASS APPLICABLE PROVISIONS OF NFPA 13. FIRE SPRINKLER SYSTEMS SHALL BE DESIGN, INSTALL AND TEST FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH ALL INSTALL FIRE SPRINKLERS TO PROVIDE PROTECTION THROUGHOUT BUILDING B. DOWNSTREAM OF BACKFLOW PREVENTER. ABOVE FINISHED EXTERIOR GRADE. CONNECT TO FIRE SPRINKLER RISER 2-WAY, WALL MOUNTED FIRE DEPARTMENT CONNECTION. WALL MOUNT AT 36" 11 12 SYSTEM SUPPLIES 68.9 PSI AT 763.9 GPM. FLOWING AT POINT OF CONNECTION TO PUBLIC WATER SYSTEM. PUBLIC WATER WITH 250 GPM HOSE ALLOWANCE. SYSTEM REQUIRES 64.2 PSI WITH 763.9 GPM HAZARD (0.10 GPM/SQ FT) IN CORRIDORS. TOTAL DESIGN AREA OF 1,500 SQ FT ORDINARY HAZARD GROUP 2 (0.20 GPM/SQ FT ) IN STORAGE LOCKERS WITH LIGHT HYDRAULIC DESIGN AREA #1 - BUILDING A, LEVEL 3 TREE: MIXED DENSITY - 13 SYSTEM SUPPLIES 70.0 PSI AT 687.2 GPM. FLOWING AT POINT OF CONNECTION TO PUBLIC WATER SYSTEM. PUBLIC WATER WITH 250 GPM HOSE ALLOWANCE. SYSTEM REQUIRES 60.1 PSI WITH 687.2 GPM HAZARD (0.10 GPM/SQ FT) IN CORRIDORS. TOTAL DESIGN AREA OF 1,500 SQ FT ORDINARY HAZARD GROUP 2 (0.20 GPM/SQ FT ) IN STORAGE LOCKERS WITH LIGHT HYDRAULIC DESIGN AREA #2 - BUILDING A, LEVEL 3 GRID: MIXED DENSITY - 14 GPM. TO PUBLIC WATER SYSTEM. PUBLIC WATER SYSTEM SUPPLIES XX.X PSI AT XXX.X SYSTEM REQUIRES XX.X PSI WITH XXX.X GPM FLOWING AT POINT OF CONNECTION SPRINKLER WITH 12 SPRINKLERS FLOWING AND 250 GPM HOSE ALLOWANCE. 16.3.3.1 AND 17.3.3.1 - MINIMUM 20 PSI AT HYDRAULICALLY MOST REMOTE BUILDING. PROTECTED WITH K-25.2 ESFR FIRE SPRINKLERS PER NFPA 13 TABLES COMMODITIES AND CARTONED, UNEXPANDED PLASTICS IN A 35 FOOT TALL HYDRAULIC DESIGN AREA #3 - BUILDING B: 30 FEET HIGH STORAGE OF CLASS I-IV 15 THE FLOOR. FIRE SPRINKLERS) SHALL BE INSTALLED AT A MINIMUM ELEVATION OF 10’-6" ABOVE BELOW DOOR. ALL PIPING WITHIN ROOM (EXCEPT DROPS TO SINGLE SIDEWALL SIDEWALL FIRE SPRINKLERS INSTALLED BELOW EDGE OF DOOR TO PROTECT PIPING SHALL BE RUN AROUND PERIMETER OF FOOTPRINT OF OPEN DOOR WITH PER NFPA 13 8.7.5.3.2. DUE TO LACK OF SPACE ABOVE OVERHEAD DOOR, ALL INSTALL ADDITIONAL FIRE SPRINKLERS TO PROTECT BELOW OVERHEAD DOORS 1 2 3 GENERAL NOTES - FIRE PROTECTION 4 5 6 7 8 9 10 11 12 13 14 COMPONENTS. MAINS. PROVIDE CALCULATIONS PER NFPA 13 TO JUSTIFY SWAY BRACING SCHEDULE 40 PIPE. RIGID COUPLINGS SHALL BE USED ON FEED MAINS AND CROSS SEISMIC BRACING: PROVIDE SWAY BRACING FOR ALL PIPING PER NFPA 13 USING 15 18 16 EXPOSED COMBUSTIBLE MATERIALS (NOT SHOWN ON PLANS). WHOLLY OR PARTLY BY EXPOSED COMBUSTIBLE CONSTRUCTION OR THAT CONTAIN PROVIDE FIRE SPRINKLER PROTECTION FOR ALL CONCEALED SPACES ENCLOSED 17 PENETRATIONS OF FIRE RATED WALLS/PARTITIONS. INSTALL FIRE RATED CUALIKING AROUND FIRE SPRINKLER PIPING TO SEAL ALL C. NFPA 13 INSTALLATION OF FIRE SPRINKLER SYSTEMS 2016 EDITION B. INTERNATIONAL FIRE CODE (IFC) - 2018 EDITION A. INTERNATIONAL BUILDING CODE (IBC) - 2018 EDITION APPLICABLE PROVISIONS OF THE FOLLOWING CODES AND STANDARDS: THE FIRE SPRINKLER SYSTEMS SHALL BE DESIGNED TO COMPLY WITH THE SPECIFICATIONS. IN NOTE 1 ABOVE AND SHALL BE IN ACCORDANCE WITH THE DRAWINGS AND SYSTEM DESIGN SHALL MEET THE REQUIREMENTS OF CODES AND STANDARDS LISTED SYSTEMS TO PROVIDE FIRE PROTECTION OF ALL AREAS OF BUILDINGS A AND B. THE OPERATIONS TO DESIGN, CONSTRUCT AND MAKE FUNCTIONAL FIRE SPRINKLER FURNISH ALL MATERIALS, EQUIPMENT AND SUPPLIES AND PERFORM ALL WORK AND SPRINKLER/STANDPIPE SYSTEMS INCLUDING HYDRAULIC CALCULATIONS CONTRACTOR IS RESPONSIBLE TO COMPLETE DETAILED DESIGN OF THE FIRE ADJUSTED WHERE REQUIRED TO MATCH ACTUAL BUILDING CONDITIONS. INSTALLING AND OTHER FIRE PROTECTION EQUIPMENT ARE APPROXIMATE AND MUST BE DEVELOPMENT DRAWINGS. THE LOCATIONS SHOWN ON THESE DRAWINGS FOR PIPING CONCEPTUAL IN NATURE AND IS BASED ON INFORMATION PROVIDED IN THE DESIGN THE DESIGN OF THE FIRE SPRINKLER SYSTEMS CONTAINED ON THESE DRAWINGS IS SYSTEMS. SYSTEMS SHALL BE U.L. LISTED OR FM APPROVED FOR USE IN FIRE PROTECTION ALL DEVICES AND MATERIALS USED FOR THE INSTALLATION OF THE FIRE SPRINKLER BY FIRE ALARM CONTRACTOR. SWITCHES AS WELL AS PROVISION OF LOCAL WATER FLOW ALARM DEVICE PROVIDED OFF-PREMISE SUPERVISION OF FIRE SPRINKLER SYSTEM CONTROL VALVES AND FLOW LOCAL FIRE DEPARTMENT REQUIREMENTS. SHOP DRAWINGS SHALL MEET ALL APPLICABLE REQUIREMENTS OF NFPA 13 AND THE OWNER PRIOR TO ORDERING, FABRICATING OR INSTALLING ANY EQUIPMENT. APPROVAL TO THE REXBURG FIRE DEPARTMENT, PROJECT ARCHITECT, ENGINEER AND HYDRAULIC CALCULATIONS IN ACCORDANCE WITH NFPA 13 FOR REVIEW AND CONTRACTOR SHALL PREPARE AND SUBMIT COMPLETE SHOP DRAWINGS AND GPM HOSE ALLOWANCE LIGHT HAZARD, 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1,500 SQ. FT. INCLUDING 100 C. CORRIDORS, LOBBIES, OFFICES, STAIRS, COMMON AREAS AND SIMILAR SPACES: SPRINKLERS. PROVIDE 250 GPM HOSE ALLOWANCE. 12 SPRINKLERS FLOWING WITH A MINIMUM OF 20 PSI AT HYDRAULICALY MOST REMOTE STORED ON PALLETS OR RACKS IN 35 FOOT BUILDING. DESIGN AREA SHALL INLCUDE STORAGE OF CLASSI-IV COMMODITIES AND CARTONED, UNEXPANDED PLASTICS B. STORAGE AREAS IN BUILDING B - K-25.2 ESFR SPRINKLERS TO PROTECT 30 FOOT OVER THE MOST REMOTE 1,500 SQ. FT. INCLUDING 250 GPM HOSE ALLOWANCE. A. STORAGE SPACES IN BUILDING A: ORDINARY HAZARD GROUP 2, 0.20 GPM/SQ. FT. FIRE SPRINKLER DESIGN DENSITIES: C. ESFR SPRINKLERS: 100 SQ FT (10’ X 10’’) B. LIGHT HAZARD: 225 SQ FT A. ORDINARY HAZARD: 130 SQ FT MAXIMUM COVERAGE AREA PER SPRINKLER: ESFR FIRE SPRINKLERS FROM NFPA 13. NO MORE THAN 18" BELOW ROOF DECK. COMPLY WITH OBSTRUCTION RULES FOR BUILDING B STORAGE AREAS: K-25.2, ESFR, PENDENT WITH DEFLECTORS INSTALLED CONCEALED ABOVE CEILING. ORDINARY TEMPERATURE SPRINKLER WITH WHITE FINISH. INSTALL PIPING AREAS WITH CEILINGS: QUICK RESPONSE, RECESSED PENDENT TYPE, K-5.6, WITHIN 12" OF THE CEILING/DECK ABOVE INTERMEDIATE TEMPERATURE. INSTALL SPRINKLERS ON EXPOSED BRANCH LINES AREAS WITHOUT CEILINGS: QUICK RESPONSE, BRASS, UPRIGHT, K-5.6, ORDINARY OR FIRE SPRINKLERS: THREADED TEES. C. SPRINKLERS ON BRANCH LINES SHALL BE INSTALLED USING 1/2", 3/4" OR 1" OUTLET COUPLINGS. ROLL GROOVED JOINTS USING RUBBER GASKETED VICTAULIC STYLE FITTINGS AND B. STEEL PIPING 2-1/2" AND LARGER IN NOMINAL DIAMETER SHALL BE JOINED WITH THREADED JOINTS USING CAST IRON FITTINGS AND COUPLINGS. A. STEEL PIPING 2" AND SMALLER IN NOMINAL DIAMETER SHALL BE JOINED WITH FITTINGS: BETWEEN HANGERS. 1-1/2" AND LARGER: MINIMUM ONE HANGER PER LENGTH OF PIPE AND MAXIMUM 15’-0" 12’-0" BETWEEN HANGERS. 1-1/4" AND SMALLER PIPE: MINIMUM ONE HANGER PER LENGTH OF PIPE AND MAXIMUM HANGERS SHALL MEET REQUIREMENTS OF NFPA 13: PORTIONS OF FIRE SPRINKLER PIPING. DRIPS ON DRY-SYSTEM) PER NFPA 13 TO FACILITATE DRAINAGE OF TRAPPED INSTALL ALL PIPING PITCHED TO DRAIN. PROVIDE AUXILIARY DRAINS (WITH DRUM WITNESSED AND APPROVED BY OWNER AND REXBURG FIRE DEPARTMENT. 13 AND RECOMMENDED BY EQUIPMENT MANUFACTURERS. ALL TESTING SHALL BE CONTRACTOR SHALL PERFORM ALL TESTING AND COMMISSIONING REQUIRED BY NFPA DATA FROM: REXBURG FIRE DEPARTMENT FLOW: 1,000 GPM RESIDUAL PRESSURE: 65 PSI STATIC PRESSURE: 75 PSI PURPOSES: ENGINEER. THE FOLLOWING WATER SUPPLY MAY BE USED FOR ESTIMATING PERSONNEL. SUBMIT A COPY OF THE FLOW TEST REPORT TO THE PROJECT SCHEDULE ALL FLOW TESTS WITH APPROPRIATE FIRE AND/OR WATER DEPARTMENT APPROPRIATE REDUCTION FACTORS TO ACCOUNT FOR SEASONAL VARIATIONS. BEGINNING DESIGN OF THE FIRE SPRINKLER/STANDPIPE SYSTEM. APPLY TEST IN ACCORDANCE WITH NFPA 291 AFTER AWARD OF THE CONTRACT BUT BEFORE THE FIRE PROTECTION SUBCONTRACTOR SHALL PERFORM A FIRE HYDRANT FLOW 2" AND SMALLER - SCHEDULE 30 2-1/2" AND LARGER - SCHEDULE 10 ASTM A135 OR A795 ALL FIRE SPRINKLER PIPING SHALL BE STEEL PIPE CONFORMING TO ANSI/ASTM A53, 2 NTS NTS RISER DETAIL - BUILDING B NTS NTS RISER DETAIL - BUILDING A 1 NTS NTS 3 FIRE SPRINKLER FLOOR CONTROL VALVE ASSEMBLY 3