HomeMy WebLinkAboutSTRAPPING LOCATION CLARIFICATION - 22-00282 - Teton River Lofts - 24 Units - Bldg 1 REQUEST FOR INFORMATION (RFI) RFI #: 012 SUBMITTED TO: GPC ARCHITECTS DATE: 10-21-22 NEEDED BY: 10-22-22 SUBMITTED BY: VENTURE BUILDERS PROJECT: TETON RIVER LOFTS – PHASE I PROJECT #:2022-201 RFI DESCRIPTION During our city inspection, the inspector stated that we still need to add strapping on the 3rd floor to the top of the roof. Can you clarify the necessary locations for all 3rd floor strapping needed? ATTACHMENTS: I’ve attached shop plan drawings with the 3rd floor and roof framing with the strapping areas in question. SUBMITTED BY: Scott Page, VENTURE BUILDERS RESPONSE TO RFI RESPONSE BY: DATE: The holdown straps that are indicated on sheet S2.2 are to attached the top of the second floor wall to the bottom of the third floor wall. The straps are indicated with the following symbol, . Detail T12 on sheet S1.2 gives further direction for how they are to be installed. D MIRRORED SET 7-18-22 MIRRORED PLAN MIRRORED SET 7-18-22 MIRRORED PLAN