Loading...
HomeMy WebLinkAboutAPPROVED PLANS - 22-00220 - Express Labs - RemodelAuthor Name Author Email Author Phone No.: Alex Owens Alex.Owens@rexburg.org 208-372-2330 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Don Allen Don.Allen@rexburg.org 208-372-2174 Description : Express Labs - Remodel Address : 859 S Yellowstone Hwy Record Type : Commercial - Remodel Document Filename : doc00118020220406105337.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 22-00220 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 2 Free text Cody Jones : Building Open 2 Egress door and exit ramp and stairs will need to be in compliance with IBC 2018. Pg 2 Free text Cody Jones : Building Open 2 Exit lighting and exit signs need to comply with sections 1008 and 1013. Pg 2 Free text Cody Jones : Building Open 2 Met with Tiffany on site, occupants have access to restrooms not shown on plans. Seating at tables, counters and work areas need to comply with IBC section 1109.11 Pg 2 Free text Cody Jones : Building Open 2 All construction and materials will need to be in compliance with IBC 2018. Pg 2 Stamp Cody Jones : Building Open 2 Approved - Building Inspector Pg 1 Free text Alex Owens : Electrical Open 1 All electrical work must meet 2017 NEC standards. Pg 1 Stamp Alex Owens : Electrical Open 1 Approved - Electrical Inspector Pg 1 Stamp Don Allen : Mechanical Open 1 Approved - Plumbing Inspector Commercial - Remodel Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) All electrical work must meet 2017 NEC standards. Egress door and exit ramp and s t a i r s will need to be in compliance wit h I B C 2018. Exit lighting and exit signs need to comply with sections 1008 an d 1013. Met with Tiffany on site, occupa n t s h a v e a c c e s s t o restrooms not shown on plans. Seating at tables, counters and w o r k a r e a s n e e d t o comply with IBC section 1109.11 All construction and materials wi l l need to be in compliance with IB C 2018.