HomeMy WebLinkAboutREDLINED REVIEWED PLAN - 22-00211 - 887 Jet Stream Dr Suite 101 & 102 - Justin Packard Gym.pdf (3)Author Name Author Email Author Phone No.:
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Cody Jones Cody.Jones@rexburg.org 208-372-2173
Description : RPRAIRCP020050 - Justin Packard Shop
Address : RPRAIRCP020050 - AIRPORT COMM Blk2 Lot 5
Application Type :
Document Filename : Drawings 3-3-22.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 3 Free text Cody Jones : Building Open 3 As per table 508.4 an A separation from an S1 requires a 2
hour separation. Will need listed assembly for rated wall.
Pg 3 Free text Cody Jones : Building Open 3 As per table 1106.1 at least two parking spots will be needed.
At least one of those will need to be van accessible.
Pg 3 Free text Cody Jones : Building Open 3 Restrooms to meet all ADA requirements.
Need an Envelope COMM check or a signed prescriptive
method of insulation form signed.
Emergency lighting and exit sign need to comply with
section1008 and 1013.
Special Inspector needs to be identified.
Doors need to meet requirements of Section 1010, and Exits
with Sections 1006 and 1022.
Pg 3 Free text Cody Jones : Building Open 3 As per section 1109.5 two drinking fountains will be required
for A3 side.
Pg 3 Callout Kyle Baldwin : P&Z Open 3 Highway 20 corridor buffering requirements must be met.
25' setback from Hwy 20 ROW, and landscape buffering; see
Development Code 3.02.100,G
# 22-00211
New Commercial Building
Report Date: 04.01.2022
Approval of plans does not constitute approval of variance from code
Page 1 of 2
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 3 Callout Kyle Baldwin : P&Z Open 3 10' Landscape buffer from ROW line required in front yard
3.04.060,5,C
Pg 3 Free text Kyle Baldwin : P&Z Open 3 Snow storage area and locations must be indicated on Site
Plan
Parking spaces must meet requirements in section 3.04.040
Pg 3 Callout Kyle Baldwin : P&Z Open 3 Sidewalk must be 6' wide or parking bumpers must be
installed
Pg 3 Callout Kyle Baldwin : P&Z Open 3 Sight triangle requirements apply here
Report Date: 04.01.2022
Approval of plans does not constitute approval of variance from code
Page 2 of 2
Powered by TCPDF (www.tcpdf.org)
Re
v
.
3/
3
0
/
2
0
2
2
9:
1
7
:
3
5
A
M
CO
V
E
R
Au
t
h
o
r
Ju
s
t
i
n
P
a
c
k
a
r
d
Pr
o
j
e
c
t
N
a
m
e
A1
0
1
Justin Packard
80' x 125' x 18'
A1041
A105
A104
A105
1
2
2
54321
25' - 0"25' - 0"25' - 0"25' - 0"
6
X-BRACE
FU
L
L
H
E
I
G
H
T
PA
R
T
I
T
I
O
N
W
A
L
L
14'x14' OHD 14'x14' OHD
80
'
-
0
"
25' - 0"
Office
125' - 0"20' - 0"
15
'
-
0
"
51' - 0"
20' - 0"
10' - 5"
26
'
-
0
"
15
'
-
7
"
15
'
-
8
"
25
'
-
1
0
"
Office EntryPortal Frame
Re
v
.
3/
3
0
/
2
0
2
2
9:
1
7
:
3
6
A
M
FL
O
O
R
P
L
A
N
Au
t
h
o
r
Ju
s
t
i
n
P
a
c
k
a
r
d
Pr
o
j
e
c
t
N
a
m
e
A1
0
2
3/64" = 1'-0"1 100
A1041
A105
A104
A105
1
2
2
X-BRACE
FU
L
L
H
E
I
G
H
T
PA
R
T
I
T
I
O
N
W
A
L
L
14'x14' OHD 14'x14' OHD
80
'
-
0
"
15
'
-
0
"
20' - 0"
10' - 5"
26
'
-
0
"
15
'
-
7
"
15
'
-
8
"
25
'
-
1
0
"
Office EntryPortal Frame
Gymn Space
A-3 Occupancy 303.4 Gymnasium
120 person Occupancy 1004.5
9,500 S.F. allowed area Table 506.2 (NS, Tybe II B)
No fire Sprinklers required under 12,000 s.f. and under 300 ocupants 903.2.1.3
Storage Space
S-1 Occupancy 311.2 Storage
14 person Occupancy 4,000/300=14 Table 1004.5
17,500 S.F. allowed area Table 506.2 (NS, Tybe II B)
No fire Sprinklers required under 12,000 s.f. 903.2.9
4" building Sewer Line
1" building Water Line
50' - 0"75' - 0"
Property Line
Je
t
S
t
r
e
a
m
D
r
i
v
e
HW
Y
2
0
No
r
t
h
Re
v
.
3/
3
0
/
2
0
2
2
9:
1
7
:
3
6
A
M
Si
t
e
Au
t
h
o
r
Ju
s
t
i
n
P
a
c
k
a
r
d
Pr
o
j
e
c
t
N
a
m
e
A1
0
3
As per table 508.4 an A separation
from an S1 requires a 2 hour
separation. Will need listed
assembly for rated wall.
As per table 1106.1 at least two parking
spots will be needed. At least one of those
will need to be van accessible.
Restrooms to meet all ADA requirements.
Need an Envelope COMM check or a signed prescriptive method of insulation form signed.
Emergency lighting and exit sign need to comply with section1008 and 1013.
Special Inspector needs to be identified.
Doors need to meet requirements of Section 1010, and Exits with Sections 1006 and 1022.
As per section 1109.5 two drinking fountains will be
required for A3 side.
23.2 ft
2
0
.
0
f
t
7
.
5
f
t
Highway 20 corridor buffering
requirements must be met.
25' setback from Hwy 20 ROW, and
landscape buffering; see
Development Code 3.02.100,G
10' Landscape buffer
from ROW line
required in front yard
3.04.060,5,C
1
8
.
0
f
t
18
.
1
f
t
Snow storage area and
locations must be
indicated on Site Plan
Parking spaces must meet
requirements in section
3.04.040
5.1 ft
Sidewalk must be 6' wide or
parking bumpers must be installed
Sight triangle
requirements
apply here
100
0' -0"
118
18' -0"
102
1' -0"
123
23' -0"
100
0' -0"
118
18' -0"
102
1' -0"
123
23' -0"
Re
v
.
3/
3
0
/
2
0
2
2
9:
1
7
:
3
6
A
M
EL
E
V
A
T
I
O
N
Au
t
h
o
r
Ju
s
t
i
n
P
a
c
k
a
r
d
Pr
o
j
e
c
t
N
a
m
e
A1
0
4
1/8" = 1'-0"2 West
1/8" = 1'-0"1 East
100
0' -0"
118
18' -0"
102
1' -0"
5 4 3 2 16
123
23' -0"
125' - 0"
100
0' -0"
118
18' -0"
102
1' -0"
54321 6
123
23' -0"
Re
v
.
3/
3
0
/
2
0
2
2
9:
1
7
:
3
7
A
M
EL
E
V
A
T
I
O
N
Au
t
h
o
r
Ju
s
t
i
n
P
a
c
k
a
r
d
Pr
o
j
e
c
t
N
a
m
e
A1
0
5
3/32" = 1'-0"1 North
3/32" = 1'-0"2 South