Loading...
HomeMy WebLinkAboutREDLINED REVIEWED PLAN - 22-00211 - 887 Jet Stream Dr Suite 101 & 102 - Justin Packard Gym.pdf (3)Author Name Author Email Author Phone No.: Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : RPRAIRCP020050 - Justin Packard Shop Address : RPRAIRCP020050 - AIRPORT COMM Blk2 Lot 5 Application Type : Document Filename : Drawings 3-3-22.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 3 Free text Cody Jones : Building Open 3 As per table 508.4 an A separation from an S1 requires a 2 hour separation. Will need listed assembly for rated wall. Pg 3 Free text Cody Jones : Building Open 3 As per table 1106.1 at least two parking spots will be needed. At least one of those will need to be van accessible. Pg 3 Free text Cody Jones : Building Open 3 Restrooms to meet all ADA requirements. Need an Envelope COMM check or a signed prescriptive method of insulation form signed. Emergency lighting and exit sign need to comply with section1008 and 1013. Special Inspector needs to be identified. Doors need to meet requirements of Section 1010, and Exits with Sections 1006 and 1022. Pg 3 Free text Cody Jones : Building Open 3 As per section 1109.5 two drinking fountains will be required for A3 side. Pg 3 Callout Kyle Baldwin : P&Z Open 3 Highway 20 corridor buffering requirements must be met. 25' setback from Hwy 20 ROW, and landscape buffering; see Development Code 3.02.100,G # 22-00211 New Commercial Building Report Date: 04.01.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 3 Callout Kyle Baldwin : P&Z Open 3 10' Landscape buffer from ROW line required in front yard 3.04.060,5,C Pg 3 Free text Kyle Baldwin : P&Z Open 3 Snow storage area and locations must be indicated on Site Plan Parking spaces must meet requirements in section 3.04.040 Pg 3 Callout Kyle Baldwin : P&Z Open 3 Sidewalk must be 6' wide or parking bumpers must be installed Pg 3 Callout Kyle Baldwin : P&Z Open 3 Sight triangle requirements apply here Report Date: 04.01.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) Re v . 3/ 3 0 / 2 0 2 2 9: 1 7 : 3 5 A M CO V E R Au t h o r Ju s t i n P a c k a r d Pr o j e c t N a m e A1 0 1 Justin Packard 80' x 125' x 18' A1041 A105 A104 A105 1 2 2 54321 25' - 0"25' - 0"25' - 0"25' - 0" 6 X-BRACE FU L L H E I G H T PA R T I T I O N W A L L 14'x14' OHD 14'x14' OHD 80 ' - 0 " 25' - 0" Office 125' - 0"20' - 0" 15 ' - 0 " 51' - 0" 20' - 0" 10' - 5" 26 ' - 0 " 15 ' - 7 " 15 ' - 8 " 25 ' - 1 0 " Office EntryPortal Frame Re v . 3/ 3 0 / 2 0 2 2 9: 1 7 : 3 6 A M FL O O R P L A N Au t h o r Ju s t i n P a c k a r d Pr o j e c t N a m e A1 0 2 3/64" = 1'-0"1 100 A1041 A105 A104 A105 1 2 2 X-BRACE FU L L H E I G H T PA R T I T I O N W A L L 14'x14' OHD 14'x14' OHD 80 ' - 0 " 15 ' - 0 " 20' - 0" 10' - 5" 26 ' - 0 " 15 ' - 7 " 15 ' - 8 " 25 ' - 1 0 " Office EntryPortal Frame Gymn Space A-3 Occupancy 303.4 Gymnasium 120 person Occupancy 1004.5 9,500 S.F. allowed area Table 506.2 (NS, Tybe II B) No fire Sprinklers required under 12,000 s.f. and under 300 ocupants 903.2.1.3 Storage Space S-1 Occupancy 311.2 Storage 14 person Occupancy 4,000/300=14 Table 1004.5 17,500 S.F. allowed area Table 506.2 (NS, Tybe II B) No fire Sprinklers required under 12,000 s.f. 903.2.9 4" building Sewer Line 1" building Water Line 50' - 0"75' - 0" Property Line Je t S t r e a m D r i v e HW Y 2 0 No r t h Re v . 3/ 3 0 / 2 0 2 2 9: 1 7 : 3 6 A M Si t e Au t h o r Ju s t i n P a c k a r d Pr o j e c t N a m e A1 0 3 As per table 508.4 an A separation from an S1 requires a 2 hour separation. Will need listed assembly for rated wall. As per table 1106.1 at least two parking spots will be needed. At least one of those will need to be van accessible. Restrooms to meet all ADA requirements. Need an Envelope COMM check or a signed prescriptive method of insulation form signed. Emergency lighting and exit sign need to comply with section1008 and 1013. Special Inspector needs to be identified. Doors need to meet requirements of Section 1010, and Exits with Sections 1006 and 1022. As per section 1109.5 two drinking fountains will be required for A3 side. 23.2 ft 2 0 . 0 f t 7 . 5 f t Highway 20 corridor buffering requirements must be met. 25' setback from Hwy 20 ROW, and landscape buffering; see Development Code 3.02.100,G 10' Landscape buffer from ROW line required in front yard 3.04.060,5,C 1 8 . 0 f t 18 . 1 f t Snow storage area and locations must be indicated on Site Plan Parking spaces must meet requirements in section 3.04.040 5.1 ft Sidewalk must be 6' wide or parking bumpers must be installed Sight triangle requirements apply here 100 0' -0" 118 18' -0" 102 1' -0" 123 23' -0" 100 0' -0" 118 18' -0" 102 1' -0" 123 23' -0" Re v . 3/ 3 0 / 2 0 2 2 9: 1 7 : 3 6 A M EL E V A T I O N Au t h o r Ju s t i n P a c k a r d Pr o j e c t N a m e A1 0 4 1/8" = 1'-0"2 West 1/8" = 1'-0"1 East 100 0' -0" 118 18' -0" 102 1' -0" 5 4 3 2 16 123 23' -0" 125' - 0" 100 0' -0" 118 18' -0" 102 1' -0" 54321 6 123 23' -0" Re v . 3/ 3 0 / 2 0 2 2 9: 1 7 : 3 7 A M EL E V A T I O N Au t h o r Ju s t i n P a c k a r d Pr o j e c t N a m e A1 0 5 3/32" = 1'-0"1 North 3/32" = 1'-0"2 South