Loading...
HomeMy WebLinkAboutEXCAVATION PERMIT - 22-00780 - NORTH 3RD WEST AND MAIN STREET - PLACE INNERDUCTExcavation Permit Public Works 35 North la East johnm@rexburgorg Phone: 208359.3020x2313 Rexburg. ID 83440 wwwxexburg.org Fox: 208.3593022 Use Expiorer toEma Time Received: Date Issued Starting Date & Time: Area of Street Repair_ `Sae, iS C € T � a FF �,�'" RMURG AUTHORIZATION ISHEREBY Giv:NT0_(mService Company ContractoPhone No. (2081521-2980 r._Km MMic company LLC Phone No. _p0B) 52j -2980 To=nalceanexcavahonmthe public right ofwayat Nnrth 3rd��A/� { g M2in St purpose of Directional Bore & glace 1 -1 1/4" innerduct for 1200' for the excavation: _ asphalt street alleyLocation of Refund to: m lawn behind sidewalk _ tudeveloped Amount Refunded: CONDITIONS OF PERMIT: 1. No excavation shall be made in anycity street or rigbt ofway witbout first obtaining an excavation permit and paying the required ices. 2. This permit is good for 30 calendar days afterissuance. 3. Contractor is to tarry a mroimum of$500,000 in general liability insurance to Myer possible damages that may be caused by the excavation or any accident caused by the work. 4. The permit fee within the public right ofway is $1000 for any excavation that will disturb less than 30 square yards of asphalt surfacing. A The ofS100 will be retained from the permit fee to cover city inspection costs. 5. For excavations that will disturb more than 30 square yards ofesphalt sudacioC the permit fee will be determined by the city on an individual basis, 6. The contractor is to node city prior to Placing backfill material and final asphalt placement If these conditions are acceptable to the city enginm, $900 ofthePermit fee will be m5mded within 30 calendar days of completion. 7. If stated conditions are not met, the city may hold the permit fee for one year from R asphalt placement In the event repairs are needed, the connector will be responsible for the repairs, If contractor falls to make the mpairs, the city may do 8. to repairs and rsretain thto ey ermit feeIkg� and permit at l-80 0-3 421 5 85 ais respsttwole for my Mstovernw, 9. The contractor shall furnish and main �) business days in advance afar excavation. Traffic Control Devices ( AMM)_ tam all barricades signs, and flagmen as required by the Manual on Uniform 10, Existing asphalt pavement shall be saw cuttoprovide avertical surface. 11. Excavation and backfill work shall be completed in mcordaneewith the requirements of Sections 300 and 8Dm of the ISPWC (Idaho Standards for Public Works Construction). See stmmaryattacbed 12. All excavated material shall be stockpiled forte use or immediately removed from the site if it is unacceptable for m- use as backfill. XCEP excavatedmaterial safely away from the beach and farm the traveled roadway. 13. Excavations made in all streets shall be backfilled with 3 feet of flowable fill, 4 inches of 314 inch crushed aggregate toad base, and 2 14 inch aunimty„ tlxiokaesa ofpi m luta pavement surface or equal whichever is greater. to the existing material thickness, 14. Existing asphalt pavement shall be "tacked" prior to new asphakplacement 15. Final repair of asphalt surfaces is to be completed within 10 calendar days of the initial excavation. In the winter, a temporary cold mix Paving must be placed and maintained by the mntrador until final Paving is completed as soon as weather permits in the spri In making applicationfor this permit, I hereby agree to the above conditions of the Permit and applicable City Ordnance,. Address: 1418 IA[est Cnlnrado Idaho Falls ID 83402 By: Approved this day of. 201_; Office ofd city Clerk Lshedl„ i �/ CIA(�r�j� Office Use Only: Receipt Codes: 1 1$900 --SPEP t 1$100=5MISC Revised 9/24/2055 m» ' CD y/^CD 4 ° O ic ,I OiN�