Loading...
HomeMy WebLinkAboutFS PLAN REVIEW - 22-00210 - BYUI Manwaring - Welcome Center Remodel Brigham Young University-Idaho Welcome Center Remodel TI – Rexburg 1 of 1 STATE FIRE MARSHAL IDAHO DEPARTMENT OF INSURANCE 700 W. State Street, 3rd Floor P.O. Box 83720 Boise, ID 83720-0043 (208) 334-4370 | www.doi.idaho.gov/sfm PLAN REVIEW FOR FIRE SPRINKLER SYSTEMS PLANS RECEIVED: July 1, 2022 APPROVED: July 11, 2022 REVIEWED BY: Joe Schimanski, ISFM Fire Plan Reviewer PROJECT: Brigham Young University-Idaho Welcome Center Remodel TI STREET ADDRESS: BYUI Manwaring Center 525 S Center St CITY: Rexburg AHJ: Madison Fire Department SPRINKLER CONTRACTOR: 3-D Fire Protection 6312 S. Burgraff Way Idaho Falls, ID 83401 IDAHO LICENSE: FPSC-008 CONTACT NAME: Austin Niederer austin.niederer@3dfire.us PHONE NO: (208) 525-8377 SYSTEM DESIGNED BY: Jason Blatter jason.blatter@3dfire.us PHONE NO: (208) 881-5439 TYPE OF SYSTEM: NFPA 13 HEAD COUNT: 37 TOTAL SYSTEMS: 1 OCCUPANCY CLASSIFICATION: B Single Story CONSTRUCTION TYPE: II/B AREA SQUARE FOOTAGE: 4,000 SCOPE OF WORK: Accommodate New Ceiling in a 4000 square feet Welcome Center. After removing 30 heads from existing whips will be added near the riser on the second floor. All Branch lines and Mains are to to remain. All arm overs and drops will be demolished to the branch lines. PLAN REVIEW COMMENTS: Approved Approval of shop drawings is not intended to imply waiver or modification of any requirements of the Idaho State Statutes or Rules, International Fire Code, NFPA Standards or any other applicable criteria. It is acknowledged that backflow preventer is installed per the demand of the local water purveyor. The State Fire Marshal’s Office and its personnel does not take any responsibility for the back flow device.