HomeMy WebLinkAboutFS PLAN REVIEW - 22-00210 - BYUI Manwaring - Welcome Center Remodel Brigham Young University-Idaho Welcome Center Remodel TI – Rexburg 1 of 1
STATE FIRE MARSHAL
IDAHO DEPARTMENT OF INSURANCE
700 W. State Street, 3rd Floor
P.O. Box 83720
Boise, ID 83720-0043
(208) 334-4370 | www.doi.idaho.gov/sfm
PLAN REVIEW FOR FIRE SPRINKLER SYSTEMS
PLANS RECEIVED: July 1, 2022 APPROVED: July 11, 2022
REVIEWED BY: Joe Schimanski, ISFM Fire Plan Reviewer
PROJECT: Brigham Young University-Idaho Welcome Center Remodel TI
STREET ADDRESS: BYUI Manwaring Center 525 S Center St CITY: Rexburg
AHJ: Madison Fire Department
SPRINKLER CONTRACTOR: 3-D Fire Protection
6312 S. Burgraff Way
Idaho Falls, ID 83401
IDAHO LICENSE: FPSC-008
CONTACT NAME: Austin Niederer
austin.niederer@3dfire.us
PHONE NO: (208) 525-8377
SYSTEM DESIGNED BY: Jason Blatter
jason.blatter@3dfire.us
PHONE NO: (208) 881-5439
TYPE OF SYSTEM: NFPA 13 HEAD COUNT: 37
TOTAL SYSTEMS: 1 OCCUPANCY CLASSIFICATION: B Single Story
CONSTRUCTION TYPE: II/B AREA SQUARE FOOTAGE: 4,000
SCOPE OF WORK: Accommodate New Ceiling in a 4000 square feet Welcome Center. After
removing 30 heads from existing whips will be added near the riser on the
second floor. All Branch lines and Mains are to to remain. All arm overs
and drops will be demolished to the branch lines.
PLAN REVIEW COMMENTS: Approved
Approval of shop drawings is not intended to imply waiver or modification of any requirements of the Idaho State Statutes or
Rules, International Fire Code, NFPA Standards or any other applicable criteria.
It is acknowledged that backflow preventer is installed per the demand of the local water purveyor. The State Fire Marshal’s
Office and its personnel does not take any responsibility for the back flow device.