HomeMy WebLinkAboutRexburg ID Rec Center Feasibility Study - September 7 Concept Plan Council Presentation - Final v2 (2)City of Rexburg, Idaho Recreation Center Feasibility Study 1 Agenda Community Need Prioritization Review Preferred Concept Plan Community Need Met by Concept Plan Next Steps 2 Priority Investment Rating 3 4 5 6 7 Core Program Areas 8 Priority Program Spaces 9 Concept Program & Plan 10 Concept Program & Plan ATHLETIC SPACES ACTIVE RECREATION COMMUNITY USES AMENITY FUNCTIONS AQUATIC SPACES 11 Concept Program & Plan Recreation Center Program - Approx. 78,000 SF Recreation & Athletic Spaces Gymnasium – 2 Primary Basketball Courts 1 High School Size Basketball Cross Court 2 Volleyball Courts 4-6 Pickleball Courts Elevated Walk / Jog Track Open Fitness Area – Cardio / Circuit / Weights Group Fitness Studios Aquatic Spaces Indoor Recreation Activity Pool Water Slide and Play Structure Spa 8-Lane x 25 Yard Competition Pool w/ Spectator Area General Support Spaces Lobby, Social Gathering, and Support Spaces Welcome / Control Desk Facility Administration Locker Rooms – Men’s, Women’s, and Family Community Spaces Large Event Hall / Multi-Purpose Rooms Party Rooms / Classrooms / Dry Crafts Catering / Teaching Kitchen Games Room Child Watch Indoor Playground 12 Concept Plan – Project Site 13 Concept Plan – Project Site SOUTH OPTION EAST OPTION NORTH OPTION W 2nd N E 3rd S RIVERSIDE PARK TETON RIVER TRAIL 14 Concept Plan – Project Site Options Review July ‘22 Initial Site Options Evaluation: The North Option was eliminated as the space available was inadequate compared to the size of the proposed recreation center South & East Options were deemed to be more viable in terms of impact to the existing park, indoor/outdoor potential, access, and visibility 15 South Option East Option Concept Plan – Project Site Options Refinement On August 23, 2022 the refined site options were reviewed with the Core Team Outcome: The South Option is the preferred option for the location of the new Recreation Center 16 Concept Plan – Project Site South Option KEY SITE CONSIDERATIONS: Location in Coordination with Rexburg Rapids Indoor | Outdoor Connection Reduced Impact to Existing Park – West Sports Field Vehicular & Pedestrian Connectivity Coordination of public access to the Rec Center, Rexburg Rapids, Fields, Teton Trail, and Park Service & maintenance access Emergency access Solar Orientation - Sustainability Prime Visibility from West 2nd North EVENT LAWN SERVICE AREA PRIMARY PARKING SECONDARY & RELOCATED PARKING PRIMARY ENTRY & DROP OFF TETON TRAIL WEST 2ND NORTH Riverside park Rexburg rapids 17 Concept Plan – Building Layout Review July ‘22 Initial Bldg. Layout Evaluation: The North Option was eliminated due to the site constraints, but some of the layout and adjacency concepts were utilized in other plan refinement South & East Options were preferred for advancement and were adapted based on programming feedback from the Core Team 18 Concept Plan – Options Refinement East Option South Option KEY LAYOUT CONSIDERATIONS: Location of the spaces before/behind the main lobby control desk Adjacency and openness between spaces Physical / visual connectivity Ease of patron use, access, and flow Appropriate staffing / monitoring Potential for spaces to be closed to allow for other events and/or setup to occur without shutting down other program areas Good access to support spaces and storage to optimize staffing level and reduce expenses A GREAT USER EXPERIENCE! 19 Concept Plan MAIN LEVEL UPPER LEVEL TRACK OPEN FITNESS GROUP FITNESS GROUP FITNESS COMPETITION POOL RECREATION ACTIVITY POOL GYM LOCKERS MAIN ENTRY MULTI-USE ROOMS INDOOR PLAY 20 Concept Plan MAIN LEVEL UPPER LEVEL COMPETITION POOL RECREATION ACTIVITY POOL LOCKER ROOMS POOL STORAGE POOL EQUIPMENT CLASSROOM/PARTY GAMES INDOOR PLAY RESTROOMS / SUPPORT GYMNASIUM ADMIN CONTROL DESK CHILD WATCH MAIN LOBBY OPEN FITNESS GROUP FITNESS TRACK EVENT HALL / MULTI-USE ROOMS CATERING KITCHEN STORAGE STAIR 21 22 23 Concept Plan 24 25 Concept Plan 26 Concept Plan 27 28 29 Concept Plan 30 Concept Plan 31 32 Concept Plan 33 34 Concept – Overall Building Form & Massing 35 Concept – Perspective from W 2nd N 36 Concept – Perspective from Drop-Off 37 Concept – Perspective from Parking 38 Concept Program – Creating Balance 39 Community Needs Met by Concept Plan 40 Core Program Areas 41 Next Steps Operational Assumptions/Pro Forma Funding Strategy Community Survey #2 42 43