Recreation Center Feasibility Study
1
Agenda
Community Need Prioritization Review
Preferred Concept Plan
Community Need Met by Concept Plan
Next Steps
2
Priority Investment Rating
3
4
5
6
7
Core Program Areas
8
Priority Program Spaces
9
Concept Program & Plan
10
Concept Program & Plan
ATHLETIC
SPACES
ACTIVE
RECREATION
COMMUNITY
USES
AMENITY
FUNCTIONS
AQUATIC
SPACES
11
Concept Program & Plan
Recreation Center Program - Approx. 78,000 SF
Recreation & Athletic Spaces
Gymnasium – 2 Primary Basketball Courts
1 High School Size Basketball Cross Court
2 Volleyball Courts
4-6 Pickleball Courts
Elevated Walk / Jog Track
Open Fitness Area – Cardio / Circuit / Weights
Group Fitness Studios
Aquatic Spaces
Indoor Recreation Activity Pool
Water Slide and Play Structure
Spa
8-Lane x 25 Yard Competition Pool w/ Spectator Area
General Support Spaces
Lobby, Social Gathering, and Support Spaces
Welcome / Control Desk
Facility Administration
Locker Rooms – Men’s, Women’s, and Family
Community Spaces
Large Event Hall / Multi-Purpose Rooms
Party Rooms / Classrooms / Dry Crafts
Catering / Teaching Kitchen
Games Room
Child Watch
Indoor Playground
12
Concept Plan – Project Site
13
Concept Plan – Project Site
SOUTH OPTION
EAST OPTION
NORTH OPTION
W 2nd N
E 3rd S
RIVERSIDE PARK
TETON RIVER TRAIL
14
Concept Plan – Project Site Options Review July ‘22
Initial Site Options Evaluation:
The North Option was eliminated as the space available was inadequate compared to the size of the proposed recreation center
South & East Options were deemed to be more viable in terms of impact to the existing park, indoor/outdoor potential, access, and visibility
15
South Option
East Option
Concept Plan – Project Site Options Refinement
On August 23, 2022 the refined site options were reviewed with the Core Team
Outcome: The South Option is the preferred option for the location of the new Recreation Center
16
Concept Plan – Project Site
South Option
KEY SITE CONSIDERATIONS:
Location in Coordination with Rexburg Rapids
Indoor | Outdoor Connection
Reduced Impact to Existing Park – West Sports Field
Vehicular & Pedestrian Connectivity
Coordination of public access to the Rec Center, Rexburg Rapids, Fields, Teton Trail, and Park
Service & maintenance access
Emergency access
Solar Orientation - Sustainability
Prime Visibility from West 2nd North
EVENT LAWN
SERVICE AREA
PRIMARY PARKING
SECONDARY & RELOCATED PARKING
PRIMARY ENTRY & DROP OFF
TETON TRAIL
WEST 2ND NORTH
Riverside park
Rexburg rapids
17
Concept Plan – Building Layout Review July ‘22
Initial Bldg. Layout Evaluation:
The North Option was eliminated due to the site constraints, but some of the layout and adjacency concepts were utilized in other plan refinement
South & East Options were preferred for advancement and were adapted based on programming feedback from the Core Team
18
Concept Plan – Options Refinement
East Option
South Option
KEY LAYOUT CONSIDERATIONS:
Location of the spaces before/behind the main lobby control desk
Adjacency and openness between spaces
Physical / visual connectivity
Ease of patron use, access, and flow
Appropriate staffing / monitoring
Potential for spaces to be closed to allow for other events and/or setup to occur without shutting down other program areas
Good access to support spaces and storage to optimize staffing level and reduce expenses
A GREAT USER EXPERIENCE!
19
Concept Plan
MAIN LEVEL
UPPER LEVEL
TRACK
OPEN FITNESS
GROUP FITNESS
GROUP FITNESS
COMPETITION POOL
RECREATION ACTIVITY POOL
GYM
LOCKERS
MAIN ENTRY
MULTI-USE ROOMS
INDOOR PLAY
20
Concept Plan
MAIN LEVEL
UPPER LEVEL
COMPETITION POOL
RECREATION ACTIVITY POOL
LOCKER ROOMS
POOL STORAGE
POOL EQUIPMENT
CLASSROOM/PARTY
GAMES
INDOOR PLAY
RESTROOMS / SUPPORT
GYMNASIUM
ADMIN
CONTROL DESK
CHILD WATCH
MAIN LOBBY
OPEN FITNESS
GROUP FITNESS
TRACK
EVENT HALL / MULTI-USE ROOMS
CATERING KITCHEN
STORAGE
STAIR
21
22
23
Concept Plan
24
25
Concept Plan
26
Concept Plan
27
28
29
Concept Plan
30
Concept Plan
31
32
Concept Plan
33
34
Concept – Overall Building Form & Massing
35
Concept – Perspective from W 2nd N
36
Concept – Perspective from Drop-Off
37
Concept – Perspective from Parking
38
Concept Program – Creating Balance
39
Community Needs Met by Concept Plan
40
Core Program Areas
41
Next Steps
Operational Assumptions/Pro Forma
Funding Strategy
Community Survey #2
42
43