Loading...
HomeMy WebLinkAboutAPPROVED CERTIFICATION LETTER - 22-00472 - 152 N Center St - Solar PanelsAuthor Name Author Email Author Phone No.: Larry Beesley Larry.Beesley@rexburg.org 208-372-2176 Description : 152 N Center St - Solar Panels Address : 152 N Center St Record Type : Solar Panels Document Filename : Zollinger GL2.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 22-00472 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Stamp Larry Beesley : Building Open 1 Approved - Building Inspector Solar Panels Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) RE:CERTIFICATION LETTER Project Address: JACK ZOLLINGER RESIDENCE 152 N CENTER REXBURG, ID 83440 Design Criteria: - Applicable Codes = 2018 IEBC/IBC, 2018 IRC, ASCE 7-16 and 2018 NDS - Risk Category = II - Wind Speed = 115 mph, Exposure Category B, Partially/Fully Enclosed Method - Ground Snow Load = 50 psf - Roof 1: 2 x 6 @ 24" OC, Roof DL = 7 psf, Roof LL/SL = 39 psf (Non-PV), Roof LL/SL = 33.4 psf (PV) To Whom It May Concern, Sincerely, August 11, 2022 Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, the PV module assembly including attachment hardware has been reviewed to be in accordance with the manufacturer’s specifications and to meet and/or exceed the requirements set forth by the referenced codes. A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Existing roof structural framing has been reviewed for additional loading due to installation of PV Solar System on the roof. The structural review applies to the sections of roof that is directly supporting the solar PV system. Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 1/4 By Yuri at 12:21:09 AM, 8/12/2022 Yurianto Yurianto Digitally signed by Yurianto Yurianto DN: cn=Yurianto Yurianto c=US o=Unaffiliated ou=A01410D00000176B0 7CBF250000A7A2 Reason: I am the author of this document Location: Date: 2022-08-12 00:21-05:00 Roof 1 18°OK IEBC IMPACT CHECK MOUNTING PLANE Limits of Scope of Work and Liability: The existing structure has been reviewed based on the assumption that it has been originally designed and constructed per appropriate codes.The structural analysis of the subject property is based on the provided site survey data.The calculations produced for this structure's assessment are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were made according to generally recognized structural analysis standards and procedures.All PV modules, racking and attachment components shall be designed and installed per manufacturer’s approved guidelines and specifications. These plans are not stamped for water leakage or existing damage to the structural component that was not accessed during the site survey.Prior to commencement of work,the PV system installer should verify that the existing roof and connections are in suitable condition and inspect framing noted on the certification letter and inform the Engineer of Record of any discrepancies prior to installation.The installer should also check for any damages such as water damage,cracked framing,etc.and inform the Engineer of Record of existing deficiencies which are unknown and/or were not observable during the time of survey and have not been included in this scope of work.Any change in the scope of the work shall not be accepted unless such change,addition, or deletion is approved in advance and in writing by the Engineer of Record. STANDOFF HARDWARE EVALUATION FOR WIND UPLIFT UPLIFT DCR RESULTS SUMMARYBARUN CORP JACK ZOLLINGER RESIDENCE, 152 N CENTER, REXBURG, ID 83440 RESULTMOUNTING PLANE ROOF PITCH (deg.)GOVERNING ANALYSIS MOUNTING PLANE STRUCTURAL EVALUATION Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 2/4 PV Module Weight =2.50 psf Hardware Assembly Weight =0.50 psf PV-DL =3.00 psf Existing Roofing Material Weight 1 Layer(s)=2.50 psf Underlayment Weight =0.50 psf Plywood/OSB Sheathing Weight =1.50 psf Framing Weight =1.15 psf No Vaulted Ceiling =0.00 psf Miscellaneous =1.50 psf Total Roof Dead Load R-DL =7.10 psf Roof Live Load Lo =20.00 psf Member Tributary Area At < 200 ft2 Roof 1 Pitch 18° or 4/12 Tributary Area Reduction Factor R1 =1.00 Roof Slope Reduction Factor R2 =1.00 Reduced Roof Live Load, Lr = Lo (R1) (R2)Lr =20.00 psf Ground Snow Load pg =50.00 psf Effective Roof Slope 18° Snow Importance Factor Is =1.00 Snow Exposure Factor Ce =1.00 Snow Thermal Factor Ct =1.10 Minimum Flat Roof Snow Load pf-min =20.00 psf Flat Roof Snow Load pf =38.50 psf Roof Slope Factor Cs-roof =1.00 Sloped Roof Snow Load on Roof ps-roof =38.50 psf Roof Slope Factor Cs-pv =0.87 Sloped Roof Snow Load on PV Panel ps-pv =33.40 psf Total PV System Dead Load 2 x 6 @ 24 in. O.C. Composite Shingle Roof BARUN CORP Roof 1 LOAD CALCULATION JACK ZOLLINGER RESIDENCE, 152 N CENTER, REXBURG, ID 83440 PV SYSTEM DEAD LOAD (PV-DL) ROOF DEAD LOAD (R-DL) SLOPED ROOF SNOW LOAD ON PV PANEL (Unobstructed Slippery Surfaces) REDUCED ROOF LIVE LOAD (Lr) SNOW LOAD SLOPED ROOF SNOW LOAD ON ROOF (Non-Slippery Surfaces) Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 3/4 EXISTING 7.10 psf 20.00 psf 38.50 psf EXISTING 21.68 psf 39.65 psf 39.65 psf -4.61%OK 2018 Roof Snow Load (SL) =33.40 (DL + SL)/Cd =37.83 Maximum Gravity Load =37.83 BARUN CORP IEBC IMPACT CHECK Roof 1 JACK ZOLLINGER RESIDENCE, 152 N CENTER, REXBURG, ID 83440 Roof Live Load (Lr) =0.00 WITH PV PANEL WITH PV PANEL Roof Dead Load (DL) =10.10 The requirements of section 806.2 of 2018 IEBC are met and the structure is permitted to remain unaltered. IEBC Provision : Load Increase (%) = (DL + Lr)/Cd =11.22 Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 4/4