HomeMy WebLinkAboutDENSITY SOIL TEST - 3-4-2022File Name:
22–204BD03042022LC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
5127D946-2C9F-4F90-AB44-08AE63057F80 1
4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
22-204B
Contractor:
Edstrom Construction
Project Name:
Evo Automation
Instrument ID
18025
Daily Standardization:
Client:
Edstrom Construction
Date:
03/04/2022
MS:
526
DS:
1680
Time Start:
11:00 AM
Time End:
01:00 PM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 Southeast corner of
site
Top of sub
base
12 139.1 133.7 4.1 132.6
Material
Type
Native
Material
101
2 Southwest corner of
site
Top of sub
base
12 139.1 133.8 4.0 132.6
Material
Type
Native
Material
101
3 100 feet north of
Southwest corner
Top of sub
base
12 138.0 133.2 3.6 132.6
Material
Type
Native
Material
100
4 North West corner of
site
Top of sub
base
12 132.1 126.8 4.2 132.6
Material
Type
Native
Material
96
5 Northeast corner of
site
Top of
subbase
12 137.5 132.2 4.0 132.6
Material
Type
Native
Material
100
File Name:
22–204BD03042022LC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
5127D946-2C9F-4F90-AB44-08AE63057F80 2
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
6 100 feet south of
north east corner
Top of
Subbase
12 134.1 129.0 4.0 132.6
Material
Type
Native
Material
97
Observations/Remarks:
Arrived on site around 11:45 AM to test compaction on the last lift of native fill material for the building pad. Met
with Roberto from Edstrom Construction for Compaction testing. Density was tested every 100 linear feet,
totaling in six tests for the building pad. All tests yielded passing results which were immediately reported to
Roberto from Edstrom construction. Left site around 12:45 PM.
Tested By:
L. Clifford
Signature:
Reviewed By:
E. Vail
Signature:
Date:
03/08/2022
Inspection Images:
File Name:
22–204BD03042022LC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
5127D946-2C9F-4F90-AB44-08AE63057F80 3