Loading...
HomeMy WebLinkAboutDENSITY SOIL TEST - 3-4-2022File Name: 22–204BD03042022LC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5127D946-2C9F-4F90-AB44-08AE63057F80 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-204B Contractor: Edstrom Construction Project Name: Evo Automation Instrument ID 18025 Daily Standardization: Client: Edstrom Construction Date: 03/04/2022 MS: 526 DS: 1680 Time Start: 11:00 AM Time End: 01:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southeast corner of site Top of sub base 12 139.1 133.7 4.1 132.6 Material Type Native Material 101 2 Southwest corner of site Top of sub base 12 139.1 133.8 4.0 132.6 Material Type Native Material 101 3 100 feet north of Southwest corner Top of sub base 12 138.0 133.2 3.6 132.6 Material Type Native Material 100 4 North West corner of site Top of sub base 12 132.1 126.8 4.2 132.6 Material Type Native Material 96 5 Northeast corner of site Top of subbase 12 137.5 132.2 4.0 132.6 Material Type Native Material 100 File Name: 22–204BD03042022LC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5127D946-2C9F-4F90-AB44-08AE63057F80 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 6 100 feet south of north east corner Top of Subbase 12 134.1 129.0 4.0 132.6 Material Type Native Material 97 Observations/Remarks: Arrived on site around 11:45 AM to test compaction on the last lift of native fill material for the building pad. Met with Roberto from Edstrom Construction for Compaction testing. Density was tested every 100 linear feet, totaling in six tests for the building pad. All tests yielded passing results which were immediately reported to Roberto from Edstrom construction. Left site around 12:45 PM. Tested By: L. Clifford Signature: Reviewed By: E. Vail Signature: Date: 03/08/2022 Inspection Images: File Name: 22–204BD03042022LC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5127D946-2C9F-4F90-AB44-08AE63057F80 3