Loading...
HomeMy WebLinkAboutDENSITY SOIL TEST - 2-17-2022File Name: 22204BD02172022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1645134048736 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-204B Contractor: Edstrom Project Name: Evo Automation Instrument ID 76561 Daily Standardization: Client: Edstrom Construction Date: 02/17/2022 MS: 780 DS: 2797 Time Start: 02:15 PM Time End: 04:30 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southeast corner of building pad 6th lift 8 139.2 131.8 5.6 132.6 Material Type Native Material 99 2 Southeast corner of building pad 6th lift 8 138.6 131.1 5.7 132.6 Material Type Native Material 99 3 Southwest corner of building pad 6th lift 6 138.3 130.4 6.1 132.6 Material Type Native Material 98 4 West center of building pad 6th lift 8 138.7 130.7 6.1 132.6 Material Type Native Material 99 5 East center of building pad 6th lift 8 139.8 133.7 4.5 132.6 Material Type Native Material 101 File Name: 22204BD02172022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1645134048736 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 6 Northwest corner of building pad 6th lift 8 137.4 130.4 5.4 132.6 Material Type Native Material 98 7 Northeast corner of building pad 6th lift 6 137.6 128.2 7.4 132.6 Material Type Native Material 97 Observations/Remarks: Contractor continues to import materials from nearby bank. Lifts seem to be closer to 18" lifts. I mentioned this to the loader operator Tested By: Ben E. Ball Signature: Reviewed By: Steve Anderson Signature: Date: 02/18/2022 Inspection Images: File Name: 22204BD02172022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1645134048736 3 File Name: 22204BD02172022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1645134048736 4