Loading...
HomeMy WebLinkAboutDENSITY SOIL TEST - 2-14-2022File Name: 22-204BD02142022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1644868596827 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-204B Contractor: Edstrom Construction Project Name: Evo Automation Instrument ID 76561 Daily Standardization: Client: Edstrom Construction Date: 02/14/2022 MS: 769 DS: 2784 Time Start: 12:30 PM Time End: 03:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southeast corner of building pad Approximately 4' above water table 4 134.0 129.2 3.7 132.6 Material Type Native Material 97 2 Southwest corner of building pad Approximately 4' above water table 6 134.5 127.8 5.2 132.6 Material Type Native Material 96 3 West center of building pad Approximately 4' above water table 6 131.5 126.1 4.3 132.6 Material Type Native Material 95 4 East center of building pad Approximately 4' above water table 8 130.7 126.1 3.6 132.6 Material Type Native Material 95 5 Northwest corner of building pad Approximately 4' above water table 6 130.0 125.4 3.8 132.6 Material Type Native Material 95 File Name: 22-204BD02142022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1644868596827 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 6 Northeast corner of building pad Approximately 4' above water table 8 130.3 126.1 3.3 132.6 Material Type Native Material 95 Observations/Remarks: Contractor continues to build up building pad with material imported approximately 100 yards from nearby bank. Tested By: Ben E. Ball Signature: Reviewed By: E. Vail Signature: Date: 02/15/2022 Inspection Images: File Name: 22-204BD02142022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1644868596827 3