Loading...
HomeMy WebLinkAboutFOUNDATION PLAN - 22-00609 - 1158 Stone Dr - New SFR4 0 ' 2 7 ' 1 3 ' 2 3 '-5 1 /2 " 3 '-2 " 60' 37'23' 4 0 ' 3 0 ' 23'37' 3'-11"16'-2"3'-10"9'-2"3'-11" PONY WALLS W/ STUDS @16" O.C. OVER 16" X 8" CONC. FOOTING PROVIDE BREAKS IN PONY WALLS & FOOTINGS TO ALLOW FOR CRAWL SPACE ACCESS (TYP) INTERIOR BEARING WALL BLOCKING 2 X 4 PONY WALL CRAWL SPACE MOISTURE BARRIER TO EXTEND MIN. 6" UP STEM WALL AND OVER INTERIOR FTG. INTERIOR BEARING WALL FOOTING TYPICAL 2 X 6 EXTIOR WALL: STUCCO OR SIDING PER MANUF. SPECS MOISTURE BARRIER 1/2" SHEATHING 2 X 4 STUDS ALTERNATING @ 12" O.C. R21 BATT INSULATION 6 MIL POLY VAPOR BARRIER 1/2" GYPSUM BOARD 2 X 6 SILL PLATE ON GASKET FASTENED TO FOUNDATION WALL WITH 1/2" X 10" ANCHOR BOLT 6'-0" O.C. AND 4" MINIMUM / 12" MAXIMUM FROM ENDS OF EACH SILL PLATE 6" CONCRETE WALL WITH DAMP-PROOFING BACKFILL TYPICAL TJI FLOOR SYSTEM: 7/8" T&G PLYWOOD SUBFLOOR 9.5" TJI FLOOR JOISTS @ 24" O.C. R-30 BATT INSULATION CRAWL FOUNDATION DETAIL 9/16" 4" CONC. SLAB OVER 4" COMPACTED GRAVEL 6" CONCRETE WALL CRAWL SPACE TYPICAL 2 X 6 GARAGE/DWELLING WALL: 1/2" GYPSUM BOARD 2 X 6 STUDS @ 16" O.C. R21 BATT INSULATION 6 MIL POLY VAPOR BARRIER 5/8" GYPSUM BOARD (GARAGE SIDE) GARAGE/DWELLING FIRE SEPARATION DETAIL SHEET: SCALE: LO T 2 1 B L O C K 1 FO U N D E R S S Q U A R E S U B D I V I S I O N CO N T A C T : J A C O B L E W I S 2 0 8 - 3 5 3 - 5 4 1 3 DATE: FOUNDATION PLAN SCALE: 1/8" = 1'0" FOUNDATION NOTES: 1.CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION. ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. 2.ALL CONCRETE SLABS (PORCHES, PATIOS AND WALKWAYS) TO CONSIST OF 4" CONCRETE ON COMPACTED SAND/GRAVEL MIX (#4 REBAR OR WIRE MESH RECOMMENDED). 3.VERIFY DESIGN OF PORCHES, PATIOS AND WALKWAYS PRIOR TO CONSTRUCTION. 4.PROVIDE TJI BLOCKING BETWEEN JOISTS AT BEARING WALL LOC. SPAN PER MGR. RECOMMENDATION. 5.DESIGNER IS NOT A LICENSED ENGINEER AND WILL CLAIM NO RESPONSIBILITY FOR STRUCTURAL ITEMS -- ALL LOADING RELATED DESIGN SHOULD BE VERIFIED WITH A LICENSED ENGINEER PRIOR TO CONSTRUCTION. 6.COORDINATE ANY NEWLY ESTABLISHED POINT LOADS (NOT DESIGNED FOR) AS CREATED FROM THE FLOOR JOIST OR TRUSS PROVIDER WITH THE DESIGNER PRIOR TO POURING FOUNDATION. METHOD PFH INTERMITTENT PORTAL FRAME (Not to Scale) MIN. 12 X 12 FOOTING PORTAL FRAME PANEL WITH HOLD-DOWN CONSTRUCTION. SEE PORTAL FRAME DETAIL FOR ASSEMBLY. A2 A2 A2 8/16/2022 A2 1/4" = 1' 2