Loading...
HomeMy WebLinkAboutTITAN DESIGN - CEDARPOINT TRUCKING - REV IX 6-21-22 (2)156' - 0" 10 0 ' - 0 " 3' - 0"2' - 0"16' - 0"6' - 0"16' - 0"13' - 0"16' - 0"6' - 0"16' - 0"1' - 0"3' - 0" 3' - 0"2' - 0"16' - 0"6' - 0"16' - 0"13' - 0"16' - 0"6' - 0"16' - 0"2' - 2"3' - 0" 26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0" 0' - 6 " 24 ' - 6 " 25 ' - 0 " 25 ' - 0 " 24 ' - 6 " 0' - 6 " 1234 5 6 7 A B C D E 25 ' - 0 " 25 ' - 0 " 7' - 6 " www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1" 6'-0" 6/ 2 0 / 2 0 2 2 4 : 4 8 : 5 2 P M A01 FLOOR PLAN CEDARPOINT TRUCKING RKS AR 05/17/2022 Project Number No.Description Date 1" 6'-0"1FLOOR PLAN 12' X 14' SHOP OFFICE20' X 50' PARS AREA 50' X 50' LOUNGE AREA 30' X 50' TIRE STORAGE 1/2 LOAD MAIN FRAME T.O. WALL ELEV 102' - 0" T.O. WALL ELEV 102' - 0" T.O. PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" 1/2 LOAD MAIN FRAME T.O. WALL ELEV 102' - 0" ENDWALL COL @ ELEV 102' - 0" (TYP U.N.O.) FULL HGT LINER PANEL AT SHOP AREA - MATCH EXTERIOR COLORSBASE OF COLUMN @ ELEV 100' - 0" BASE OF COLUMN @ ELEV 100' - 0" OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' (WASH BAY) OVERHEAD DOOR 16' X 14' (WASH BAY) OVERHEAD DOOR 16' X 14' (CAR WASH) OVERHEAD DOOR 16' X 14' (CAR WASH) OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' "PBR" LINER PANEL FROM T.O. STEMWALL TO EAVE @ SHOP AREA - LINER COLORS TO MATCH EXTERIOR OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' 52' X 100' SHOP AREA FULL CEILING LINER @ WASH BAY AND EQUIP ROOM 52' X 100' WASH BAY 16 ' X 1 4 ' OP E N I N G S FO R S T R I P C U R T A I N T.O. STEMWALL ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" 3/4" T&G PLYWOOD FROM T.O. STEMWALL TO 10' - 0" AFF METAL PANEL ABOVE PLYWOOD ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) 50LF CONCRETE FLOOR DRAINS (TYP) ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) T.O. PIER ELEV 100' - 0" T.O.PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" FULL HGT WALL LINER "X" BRACE FULL HGT LINER PANEL OVERHEAD DOOR 8" X 10' 15' X 50' EQUIPMENT ROOM T.O.W. ELEV 102' - 0" FULL HGT WALL & CEILING LINER BASE OF COLUMN @ ELEV 100' - 0" FULL HGT LINER VI 05/26/2022 VII 05/27/2022 VIII 06/07/2022 10' X 7' 2" OPENING CENTER BETWEEN COLUMNS IX 06/20/2022 NOTES: - CONNECT 4 WET BAY DRAINS TO GREASE INTERCEPTOR THEN TO STORM RETENTION SWALE ALONG THE ROAD. - BOTH BAYS CLOSER TO THE OFFICES WILL BE "WET" MAINTENANCE. ALL DRAINS WILL CONNECT TO SAND OIL INTERCEPTOR AND THEN FLOW INTO STORM AWALE AT ROAD. SLOPE FLOOR TO OVERHEAD DOOR 29 ' - 0 " 26 ' - 8 " 55 ' - 8 " 1 2 3 4 5 6 78 9 10 11 1213 13' - 0"12' - 0" 20' - 0" 10 ' - 0 " 6' - 0" 6' - 0 " 14' - 0" 25' - 0" 5' - 0" 20' - 0" 8' - 0 " 8' - 0 " 25' - 0" 12' - 0"12' - 0" 6' - 0"6' - 0"6' - 0"6' - 0" 30313233 1 2 3 ABCDE 104' - 0" 4' - 0" 4' - 0 " 16 ' - 0 " 51 ' - 8 " 3' - 0 " 3' - 0 " 29' - 0" www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1" 3'-6" 6/ 2 0 / 2 0 2 2 4 : 4 9 : 0 0 P M A02 FIRST FLOOR CEDARPOINT TRUCKING Checker Author 05/17/2022 Project Number No.Description Date 1" 3'-6"1FIRST FLOOR LOUNGE AREA RECEPTION MAIN STAIRS TO SECOND FLOOR OFFICE OFFICE STORAGE ROOM LAUNDRY AREA WOMEN RESTROOM AND SHOWER AREA MEN RESTROOM AND SHOWER AREA DRIVER'S LOUNGE KI T C H E N W/DW/DREST R O O M SHOP RESTROOM PARTS STORAGE SHOP/ OFFICE TIRES/ WHEELS/ BREAKS STORAGE TV WALL OPENING / OVERHEAD DOOR SH O P S T A I R S TO S E C O N D F L O O R 05/26/2022VI VII 05/27/2022 DN DN 29 ' - 0 " 32' - 6 1/2" 10' - 10 5/32"10' - 10 3/16"10' - 10 3/16"12' - 0"10' - 0"10' - 0"10' - 0" 13 ' - 2 1 / 2 " 5' - 0 " 1516 1718 19 20 21222324 10' - 0"10' - 0"10' - 0"10' - 0" 100' - 0" 10' - 0" 25 26 27 28 29 35 1 2 3 ABCDE 91 92 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 29' - 0" www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1" 3'-6" 6/ 2 0 / 2 0 2 2 4 : 4 9 : 0 7 P M A03 SECOND FLOOR CEDARPOINT TRUCKING Checker AR 05/17/2022 Project Number No.Description Date 1" 3'-6"1SECOND FLOOR CONFERENCE ROOMOFFICEOFFICEOFFICE OFFICE OFFICE OFFICE OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE OFFICE WOMEN RESTROOM MEN RESTROOM MECH ROOM KITCHEN MAIN STAIRS TO FIRST FLOOR ST A I R S T O SH O P SU P P L Y RO O M SE R V E R 05/26/2022VI VII 05/27/2022 FIRST FLOOR2' - 0" EAVE HGT26' - 0" FLOOR PLAN0' - 0" SECOND FLOOR 13' - 0 5/8" TOW 12' - 0" EAVE LOW SIDE 18' - 10 1/2" Level 519' - 6" 1234 5 6 7OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' 17 ' - 2 " FIRST FLOOR2' - 0" EAVE HGT26' - 0" FLOOR PLAN0' - 0" SECOND FLOOR13' - 0 5/8" TOW12' - 0" EAVE LOW SIDE18' - 10 1/2" Level 519' - 6" 1234567 OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' 17 ' - 2 " www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1" 6'-0" 6/ 2 0 / 2 0 2 2 4 : 5 0 : 2 2 P M A04 ELEVATIONS CEDARPOINT TRUCKING Checker AR 05/17/2022 Project Number 1" 6'-0"1South 1" 6'-0"2North No.Description Date 05/26/2022VI VII 05/27/2022 VIII 06/07/2022 IX 06/20/2022 FIRST FLOOR 2' - 0" EAVE HGT 26' - 0" FLOOR PLAN 0' - 0" SECOND FLOOR 13' - 0 5/8" TOW 12' - 0" EAVE LOW SIDE18' - 10 1/2" Level 5 19' - 6" ABCDE OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' FIRST FLOOR2' - 0" EAVE HGT26' - 0" FLOOR PLAN0' - 0" SECOND FLOOR13' - 0 5/8" TOW 12' - 0" EAVE LOW SIDE18' - 10 1/2" Level 5 19' - 6" ABC D E OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1/4" 1'-0" 6/ 2 0 / 2 0 2 2 4 : 5 1 : 4 1 P M A05 ELEVATIONS CEDARPOINT TRUCKING Checker Author 05/17/2022 Project Number 1/4" 1'-0"1East 1/4" 1'-0"2West No.Description Date 05/26/2022VI VII 05/27/2022 VIII 06/07/2022 IX 06/20/2022 www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 6/ 2 0 / 2 0 2 2 4 : 5 2 : 3 5 P M A06 ISOMETRIC CEDARPOINT TRUCKING Checker AR 05/17/2022 Project Number No.Description Date 13D View 1 05/26/2022VI VII 05/27/2022 OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' VIII 06/07/2022 IX 06/20/2022 www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 6/ 2 0 / 2 0 2 2 4 : 5 3 : 2 7 P M A07 ISOMETRIC CEDARPOINT TRUCKING Checker Author 05/17/2022 Project Number No.Description Date 13D View 2 05/26/2022VI VII 05/27/2022 VIII 06/07/2022 IX 06/20/2022