Loading...
HomeMy WebLinkAboutFINAL INSPECTION/TESTING REPORT - 21-00216 - Valley Agronomics - Maintenance Shop1774 Precision East Drive  Idaho Falls, ID 83402  (208) 529-8242  Fax (208) 529-6911 oneatlas.com Brian Christensen Phone: (208) 529-3577 Steel Design Fax: PO Box 50308 Other: E-REPORTS ONLY Idaho Falls, ID 83405 Project: Valley AG, 2223 S Yellowstone Hwy Rexburg ID Permit #: Project Manager: Derrick Fontes File #: E212922c INSPECTION/TESTING REPORT Our representative(s) performed work on the above referenced project. Attached you will find the corresponding inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and inspection services. If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242. Respectfully submitted, Atlas Technical Consultants, LLC cc: Josh Scott; Attachments: 7/8/2022 Page 1 of 2 rpt005swe www.oneatlas.com HIGH STRENGTH BOLTING REPORT Rev. Sept 29, 2020 Date:__________________ File #:_________________________ Project Name:_____________________________________ Contractor:_______________________________________________ Permit #:__________________________________________ Inspector:________________________________________________ Weather:_________________________________________ Project Specifications  Snug Tight only  Full Tension/Slip Critical  Turn-of-the-Nut method  Calibrated Wrench method  Direct Tension Indicators  Load-Indicating Washers  Twist-O-Bolts (”Lejune” bolts) Bolt Type  ASTM A-325  ASTM A-490  Other (specify): __________________________ Bolt Size Diameter: ____________Length: ______________ Diameter: ____________Length: ______________ Diameter: ____________Length: ______________ Washer Specifications  Hardened washers  Plate washers  None required General Conditions   Faying surfaces free from paint, oil, etc.  Visually monitored turn-of-the-nut method  Skidmore-Wilhelm tension measuring device  Applied Inspection torque of _____________ft/lbs to ______________ diameter bolts _____________ft/lbs to ______________ diameter bolts  Visually inspected twist-o bolts  Washers at slotted holes under turned element  Inspected load-indicating washers with feeler gauge to:  0.015”  0.005”  Other: ___________  or 10% of all bolts  Location(s): Reference Drawing Sheet and Detail, and Approved RFI: ____________________________________________________________ Work Inspected was:  in compliance  except as noted  reinspection/retesting required Remarks: NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.  This Report is Preliminary. observation was performed. Observations and/or conclusions and/or shall take precedence over those indicated in a preliminary report.  This Report is Final. conclusions drawn from this report should be discussed with and evaluated by the professional involved. Inspector: _________________________________________ Date: ________________ Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. Reviewed by: ______________________________________Date: ________________ Contractor Initials: ____________ 7/6/2022 E212922c Valley AG Steel Design LLC 21-00216 Aren Larsen Sunny 4 4 1" 3/4" 1/2" 4 4 4 Grid lines 1-6 and A-C C1-C3 Notes 1-2 4 Arrived at 11:30 reporting to Josh Scott. No notable exceptions were found. 7/6/2022 4 7/8/2022