Loading...
HomeMy WebLinkAboutSOIL DENISTY TEST - 21-00191 - Summerfield Phase 9 - W 690 S - Plat.pdf (3)In Place Density of Soils ASTM D6938 / AASHTO T310 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number 1 Test Location: Depth:Elevation: Material Type: Dry: Wet: % M: Proctor: MC: DC: % of Proctor: Test Number 2 Test Number 3 Test Number 4 Test Number 5 Test Number 6 Test Number 7 Test Location: Elevation: Material Type: % of Proctor:Proctor: % M: DC:Dry: MC:Wet: MC: DC: % of Proctor:Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: MC: DC: % of Proctor:Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: MC: DC: % of Proctor:Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: MC: DC: % of Proctor:Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: MC: DC: % of Proctor:Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: o Civil Engineering o Surveying o Materials Testing o Special Inspection 350 N 2nd E Rexburg, ID 83440 208.356.9201 Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Summerfield Div 9 01-21-0922-001-0004 Depatco Depatco May 5,2022 HAB 2034 Calibration 04/28/20 502 2848 STA 0+75 1' S of CL 690 South St Final lift Coltman Pit 3/4 Base 136.5 141.9 3.9 137 58 867 100% STA 1+00 10' E of CL 2275 West st Final lift Coltman Pit 3/4 Base 99%137 4.5 872135.4 64141.4 62 901 97%137 4.4 133.2 139 Coltman Pit 3/4 Base Final lift STA 4+50 15' E of CL 2275 West st 54 889 99%137 3.6 135.2 140 Coltman Pit 3/4 Base Final lift STA 1+00 10' S of CL 640 South St 44 933 97%137 2.8 132.8 136.5 Coltman Pit 3/4 Base Final lift STA 3+25 12.5' N of CL 640 South St 62 915 96%137 4.4 132 137.8 Coltman Pit 3/4 Base Final lift STA 6+00 7.5' E of CL 2100 West St 50 913 97%137 4.1 132.6 138 Coltman Pit 3/4 Base Final lift STA 1+00 10' S of CL 640 South St Digitally signed by: Eric Gunnarson DN: CN = Eric Gunnarson email = egunnarson@forsgren.com C = US O = Forsgren Associates OU = Laboratory Manager Date: 2022.05.11 10:50:30 -06'00' Eric Gunnarson Gauge #2034 calibrated on 9-9-21