Loading...
HomeMy WebLinkAboutREDLINED PLANS - 21-00191 - Summerfield Phase 9 - W 690 S - Plat A d a m M a c k e l p r a n g TESTING REPORT Project Name: Utility Jurisdiction: City: Job Number:County: SEWER Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date Flush & CCTV Mandrel Air Test MH Clean & Grouted MH Lids Marked "Sewer" MH Hydro/Vac Test Service Marker Boards Installed w/Wire & Painted MH & Clean-Out Collars WATER Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date Pressure Test Locate Wire Test Bacteria Test Valve Cans Clean with "Water" Marked Lids Meter Cans & Setters Per Jurisdictional Tolerance FH Painted FH Correct Storz Nozzle (if req) Service Marker Boards Blow-Off Stand Pipe Hydrant Reflectors Valve Collars STORM DRAIN Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date Mains Air Tested Mandrel Manholes and Inlets Grouted Manholes and Inlets Clean Lids Marked "Storm Drain" Fabric Needed End Sections Secured to Pipe Trash Rack Secured to End Section Sand/Rock Section in Ponds Swale Swales Graded and Raked MH Collars PRESSURE IRRIGATION Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date Pressure Test Locate Wire Test Valve Cans Clean with "Irrigation" Marked Lids Service Marker Boards Service "T" Post (if req) Drains Clean & Operational Air Vents Clean & Operational All Casting to Grade Valves in RW Collared GRAVITY IRRIGATION Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date Pipes Tested (if req) Air/Hydro Manholes / Boxes Grouted Proper Lids/Grates Installed Lids Marked "Irrigation" MH's Boxes Structures Clean In-Take Screens Installed Head Gates Pressure Line to Screen MISC ITEMS Description Completed? Y/ N Date Inspected By Test Result Pass / Fail Re-Test Scheduled Date AC Patching Concrete Patching Sod / Landscape Repair Gravel / Shoulder Repair Striping Fence Repair Signage Sweep Roads / Walks Remove Erosion Control Items Trash to Dump Spare Parts back to Supplier Scraps to Yard A d a m M a c k e l p r a n g A d a m M a c k e l p r a n g A d a m M a c k e l p r a n g 2” Gas line shown in Green will require a 4” plastic sleeve wherever it crosses the road, installed a minimum of 36” deep and with 12” of separation from all other utility’s sleeves must not contain any angled fittings. 3/4” Stubs shown in orange will require a 2” plastic sleeve each time the stub crosses the road, installed a minimum of 36” deep and with 12” of separation from all other utility’s sleeves must not contain any angled fittings. 3/4” Short side stubs shown in orange will require a 6’ long trench dug out of the common trench 42” deep opposite side of the lot line from the power cabinets. Please see attached trench profile.