HomeMy WebLinkAboutCONCRETE TEST - 21-00191 - Summerfield Phase 9 - W 690 S - Plat.pdf (4)Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi) Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Location: Unit Weight (PCF):Set: o Civil Engineering o Surveying o Materials Testing o Special Inspection 350 N 2nd E Rexburg, ID 83440 208.356.9201 350 N 2nd E Rexburg, ID 83440 208-356-9201 Cylinders Picked Up By:Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength 5220 Summerfield Div.9 Depatco 142 01-21-0922-001-0004 07245 120/200 cu yds NP HAB 04/25/2022 2:30:00 PM 0.75 4.3 74 58 1 5 5 8 A E C B D 4" 4" 4" 4" 4" 05/02/22 05/23/22 05/23/22 05/23/22 52,020 64,560 66,850 65,550 4,0004,138 5,136 5,318 5,215 0 Digitally signed by: Eric Gunnarson DN: CN = Eric Gunnarson email = egunnarson@forsgren.com C = US O = Forsgren Associates OU = Laboratory Manager Date: 2022.05.23 16:53:55 -06'00' Eric Gunnarson Walter's Ready Mix South side curb line on 640 South Street STA 6+00 The previous truck which identified as ticket number 07242 with load 110/200 was tested and had an air of 4.6. air was added, but it was not able to pour for 45 minutes while waiting for the crew to be ready. air tested at 4.6 a second time. Air on this truck was added before test, but was out of spec anyway. Contractor was informed of results. 141.4 HAB 4/26/2022 2 PM