Loading...
HomeMy WebLinkAboutSOIL DENSITY TESTS - 20-00273 - Madison High School Field HouseIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ MHS Field House 20027 Madison School District Thompson Excavation and Asphalt 10/06/2020 L. Steiner 8:30 AM 10:30 AM 29613 616 1812 62nd Lift 5.9 142 99% 60ft West and 100ft North of Most South West Corner of Building 2nd Lift Pit Run 97% 142 3.7 138 143.1 95% 142 4.6 134.6 140.8 Pit Run 2nd Lift 20ft West and 100ft North of Most South West Corner of Building 96% 142 4.1 136 141.6 Pit Run 2nd Lift 20ft West and 20ft North of Most South West Corner of Building Digitally signed by Jacob P Christensen Date: 2020.10.08 09:14:25 -06'00' 4 4 4 1 141 149.160ft West and 20ft North of Most South West Corner of Building Pit Run 2 3 4 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ MHS Field House 20027 Madison School District Headwaters Nov 5, 2020 T FALLS 10:00 AM 11:00 AM 3491 2802 718 BS3/4 BASE 3.8 135.1 98% BY NORTH WEST BAY DOOR 3/4 BASE 3/4 BASE 98% 135.1 3.2 132.5 136.7 100% 135.1 4.1 134.7 140.2 3/4 BASE 3/4 BASE 100 FTR FROM END OF PAVEMENT ON WEST SIDE 101% 135.1 3.4 136.4 141 3/4 BASE 3/4 BASE 50 FT FROM SUB STATION ADJACENT TO PARKING AREA 101% 135.1 3.5 136.1 140.2 3/4 BASE 3/4 BASE BY SOUTH WEST BAY DOOR Digitally signed by Jacob P Christensen Date: 2020.11.11 11:51:17 -07'00' BS BS BS BS 1 132 136.5BY NORTH WEST BAY DOOR 3/4 BASE 5 2 3 4 File Name: 20027D04192021AS 88e4e71eb0d121c0-1618865481023 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20027 Contractor: Thompson paving Project Name: Madison Fieldhouse Instrument ID 78652 Daily Standardization: Client: Madison School District Date: 04/19/2021 MS: 699 DS: 2581 Time Start: 02:15 PM Time End: 03:30 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 30 ft south of North east side Top of grade 4 136.2 132.2 3.0 135.1 Material Type 3/4" Base 97.85 2 130 Ft from north east corner Top grade 2 133.0 130.5 1.9 135.1 Material Type 3/4" Base 96.60 3 125 ft north of south east corner Top of grade 2 133.8 130.4 2.7 135.1 Material Type 3/4" Base 96.52 4 45 ft north of south east corner Top of grade 2 133.2 130.0 2.5 135.1 Material Type 3/4" Base 96.23 Remarks: We showed up at approximately 2:45, shot 4 shots, all four passed informed the super and left at approximately 3:15. Tested By: Alan Schiess Signature: Date: 04/19/2021 Reviewed By: E. Vail Signature: Date: 04/19/2021 File Name: 20027D05052021MS A01ACBA6-A47A-4EDB-BA2F-84C41B543D6D 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20027 Contractor: Thompson Paving and Excavation Project Name: Madison Fieldhouse Instrument ID 10483 Daily Standardization: Client: Madison School District Date: 05/05/2021 MS: 649 DS: 2220 Time Start: 08:15 AM Time End: 08:45 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 South end of building 20 feet east of doors. 0 BS 136.2 132.7 2.7 135.1 Material Type 3/4" Base 98.22 2 South end of building 50 feet east of doors. 0 BS 144.6 137.0 5.5 135.1 Material Type 3/4" Base 101.41 Remarks: Tested By: Mitch Singleton Signature: Date: 05/05/2021 Reviewed By: E. Vail Signature: Date: 05/05/2021 File Name: 20027D05062021LC D29B83CD-C67F-4B37-8575-6F8E4CBFFCC4 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20027 Contractor: Thompson Project Name: Madison Fieldhouse Instrument ID 23916 Daily Standardization: Client: Madison School District Date: 05/06/2021 MS: 629 DS: 1765 Time Start: 09:30 AM Time End: 10:30 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 20 feet south, 20 feet east of south east corner of building Top of subgrade BS 135.8 132.2 2.7 135.1 Material Type 3/4" Base 97.85 2 20 feet south, 150 feet East of south east corner of building Top of subgrade BS 131.3 128.4 2.2 135.1 Material Type 3/4" Base 95.04 Remarks: Testing subgrade for sidewalk south east of main building, all tests passed. Spoke with Josh to inform of passing tests. Tested By: Loren Clifford Signature: Date: 05/06/2021 Reviewed By: E. Vail Signature: Date: 05/06/2021