HomeMy WebLinkAboutSOIL DENSITY TESTS - 20-00273 - Madison High School Field HouseIn Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
MHS Field House
20027
Madison School District
Thompson Excavation and Asphalt
10/06/2020 L. Steiner
8:30 AM 10:30 AM
29613
616 1812
62nd Lift 5.9
142
99%
60ft West and 100ft North of Most South West Corner of
Building
2nd Lift
Pit Run
97%
142
3.7
138
143.1
95%
142
4.6
134.6
140.8
Pit Run
2nd Lift
20ft West and 100ft North of Most South West Corner of
Building
96%
142
4.1
136
141.6
Pit Run
2nd Lift
20ft West and 20ft North of Most South West Corner of
Building
Digitally signed by Jacob P
Christensen
Date: 2020.10.08 09:14:25 -06'00'
4
4
4
1
141
149.160ft West and 20ft North of Most South West Corner of
Building
Pit Run
2
3
4
In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
MHS Field House
20027
Madison School District
Headwaters
Nov 5, 2020 T FALLS
10:00 AM 11:00 AM
3491
2802 718
BS3/4 BASE 3.8
135.1
98%
BY NORTH WEST BAY DOOR
3/4 BASE
3/4 BASE
98%
135.1
3.2
132.5
136.7
100%
135.1
4.1
134.7
140.2
3/4 BASE
3/4 BASE
100 FTR FROM END OF PAVEMENT ON WEST SIDE
101%
135.1
3.4
136.4
141
3/4 BASE
3/4 BASE
50 FT FROM SUB STATION ADJACENT TO PARKING AREA
101%
135.1
3.5
136.1
140.2
3/4 BASE
3/4 BASE
BY SOUTH WEST BAY DOOR
Digitally signed by Jacob P
Christensen
Date: 2020.11.11 11:51:17 -07'00'
BS
BS
BS
BS
1
132
136.5BY NORTH WEST BAY DOOR
3/4 BASE
5
2
3
4
File Name:
20027D04192021AS
88e4e71eb0d121c0-1618865481023 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
20027
Contractor:
Thompson paving
Project Name:
Madison Fieldhouse
Instrument ID
78652
Daily Standardization:
Client:
Madison School District
Date:
04/19/2021
MS:
699
DS:
2581
Time Start:
02:15 PM
Time End:
03:30 PM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 30 ft south of North
east side
Top of grade 4 136.2 132.2 3.0 135.1
Material
Type
3/4" Base
97.85
2 130 Ft from north
east corner
Top grade 2 133.0 130.5 1.9 135.1
Material
Type
3/4" Base
96.60
3 125 ft north of south
east corner
Top of grade 2 133.8 130.4 2.7 135.1
Material
Type
3/4" Base
96.52
4 45 ft north of south
east corner
Top of grade 2 133.2 130.0 2.5 135.1
Material
Type
3/4" Base
96.23
Remarks:
We showed up at approximately 2:45, shot 4 shots, all four passed informed the super and left at approximately
3:15.
Tested By:
Alan Schiess
Signature:
Date:
04/19/2021
Reviewed By:
E. Vail
Signature:
Date:
04/19/2021
File Name:
20027D05052021MS
A01ACBA6-A47A-4EDB-BA2F-84C41B543D6D 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
20027
Contractor:
Thompson Paving and Excavation
Project Name:
Madison Fieldhouse
Instrument ID
10483
Daily Standardization:
Client:
Madison School District
Date:
05/05/2021
MS:
649
DS:
2220
Time Start:
08:15 AM
Time End:
08:45 AM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 South end of
building 20 feet east
of doors.
0 BS 136.2 132.7 2.7 135.1
Material
Type
3/4" Base
98.22
2 South end of
building 50 feet east
of doors.
0 BS 144.6 137.0 5.5 135.1
Material
Type
3/4" Base
101.41
Remarks:
Tested By:
Mitch Singleton
Signature:
Date:
05/05/2021
Reviewed By:
E. Vail
Signature:
Date:
05/05/2021
File Name:
20027D05062021LC
D29B83CD-C67F-4B37-8575-6F8E4CBFFCC4 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
20027
Contractor:
Thompson
Project Name:
Madison Fieldhouse
Instrument ID
23916
Daily Standardization:
Client:
Madison School District
Date:
05/06/2021
MS:
629
DS:
1765
Time Start:
09:30 AM
Time End:
10:30 AM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 20 feet south, 20
feet east of south
east corner of
building
Top of
subgrade
BS 135.8 132.2 2.7 135.1
Material
Type
3/4" Base
97.85
2 20 feet south, 150
feet East of south
east corner of
building
Top of
subgrade
BS 131.3 128.4 2.2 135.1
Material
Type
3/4" Base
95.04
Remarks:
Testing subgrade for sidewalk south east of main building, all tests passed. Spoke with Josh to inform of passing
tests.
Tested By:
Loren Clifford
Signature:
Date:
05/06/2021
Reviewed By:
E. Vail
Signature:
Date:
05/06/2021