HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTIONS - 20-00273 - Madison High School Field HouseProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 09/18/2020
Clear
12:30 AM
44
7:30 AM
I arrived on site and observed the concrete placement for the Tennis Courts, area C. I observed the
contractor pump the concrete into place and use a laser screed to level the concrete. I observed the
concrete consistency for the duration of the pour and that the contractor was placing chairs ahead of the
concrete placement. I notified the contractor of the concrete test results and my observations prior to
leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.20 14:56:33 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 9/17/2020
Clear
11:00 AM
75
1:00 PM
I arrived on site and began my observations of the post tension cables and reinforcement for pour C. I
observed that the contractor had placed the cables and edge reinforcement in general conformance with
the project documents. I observed that there were a couple of cables that had exposed cables at the
connection point. I notified the contractor of this and they placed tape around the exposed cables. I notified
the contractor of my observations prior to leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.17 08:27:12 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 9/15/20
Clear
2:30 AM
45
10:00 AM
I arrived on site and observed the concrete placement for area B. I observed the contractor pump the
concrete into place. The contractor had placed plywood into the area being poured for the pump truck and
concrete trucks to drive on. I observed the contractor placing chairs ahead of concrete being placed. Once
the pump truck moved outside of the area to be poured, I observed that there were not any tears in the
cables or vapor barrier. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.17 09:02:22 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 9/14/2020
Clear
9:00 AM
75
12:00 PM
I arrived on site and began my observations of the post tension cables and reinforcement for pour B. I
observed that the contractor had placed the cables and edge reinforcement in general conformance with
the project documents. I observed that there were a couple of cables that had exposed cables at the
connection point. I notified the contractor of this and they placed tape around the exposed cables. I notified
the contractor of my observations prior to leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.17 08:25:47 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 9/11/20
Clear
2:30 AM
45
10:00 AM
I arrived on site and observed the concrete placement. I observed the contractor pump the concrete into
place. The contractor had placed plywood into the area being poured for the pump truck and concrete
trucks to drive on. I observed the contractor placing chairs ahead of concrete being placed. Once the pump
truck moved outside of the area to be poured, I observed that there were not any tears in the cables or
vapor barrier. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.17 08:56:23 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Hellas Construction 9/9/2020
Clear
10:00 AM
75
1:00 PM
I arrived on site and began my observations of the post tension cables and reinforcement. I observed that
the contractor had placed the cables and edge reinforcement in general conformance with the project
documents. I observed that the contractor had not placed the chairs under the cables yet. I asked the
contractor and they notified me that because of the laser screed they would be placing the chairs as they
went. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P
Christensen
Date: 2020.09.17 08:21:51 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
D3 Construction 09/25/2020
Cool, Windy
1:15 PM
68
3:15 PM
I arrived at the site at about 1:45 and began my inspections. I checked the Epoxy to make sure it was up to
spec, and I also checked the holes and the bolts, to make sure they were also up to spec and that there
was not any dust. I observed the contractor place the epoxy and bolts, and confirmed that he was within
general conformance for the entire special inspection.
Digitally signed by Jacob P
Christensen
Date: 2020.09.25 21:40:10 -06'00'
●
Epoxy Epoxy Placement Bolt Placement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
K&C concrete 10/12/2020
Partly Cloudy. Wind
3:15 PM
60
6:15 PM
I arrived on site and began my observation of the Concrete Reinforcement and Concrete Placement for
interior Footings at the north and South Ends of the building. At gridlines 1/A-G at the base of the columns.
And at grid lines 13/A-G at the base of the columns. each about 4.5 yards.
I observed that the concrete reinforcement was in general conformance to project documents.
I performed ACI tests and observed that the concrete was in general conformance to project documents. I
Informed the contractor and supplier of the results. I observed the contractor place by means the shoot,
and consolidate the concrete by means of a mechanical vibrator.
I observed for the duration of the pour.
Digitally signed by Jacob P
Christensen
Date: 2020.10.14 20:21:39 -06'00'8129697
●
Reinforcment Placement. South end Placement and consolidation. North
End.
E Jenkins
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Inspection Date
05/05/2021
File Name
20027DFR05052021MAS
Inspector's Signature Inspector's Name
Mitch Singleton
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
05/05/2021
B9B5BC88-AB3C-49D6-8224-A2060F59A7A8 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
Madison Fieldhouse
Time Start
07:30 AM
Client
Madison School District
Contractor
Thompson Excavation and Asphalt
Time End
10:30 AM
Inspection Type(s)
Concrete Placement
Earthwork Inspection
Location(s)
Sidewalk on Southside of building at the Madison
Field House.
Observations/ Remarks
7:30-8:30 Densities
When we first arrived at the job site we observed that the area to have densities taken had been
worked more with more water. We took densities in two places and observed that the compaction spec
was met.
8:30-10:30
Concrete Placement
We observed that the area to be poured was a sidewalk. We waited until the concrete truck had poured
approximately 10% of the load of the concrete truck. We then grabbed our sample and ran our
concrete tests and observed that the air content of the concrete was within spec, but the slump was
out of spec as it was higher than allowed. We informed the contractor of the results and they chose to
continue the pour. We then made our cylinders and left them where they would not be disturbed. We
left the site at approximately 10:15 AM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
05/05/2021
File Name
20027DFR05052021MAS
Inspector's Signature Inspector's Name
Mitch Singleton
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
05/05/2021
B9B5BC88-AB3C-49D6-8224-A2060F59A7A8 2
Inspection Date
05/06/2021
File Name
20027DFR05062021LGS
Inspector's Signature Inspector's Name
Leland Steiner
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
05/07/2021
C1BBEEC6-633F-4D35-8839-371075A627B2 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
Madison Fieldhouse
Time Start
11:15 AM
Client
Madison School District
Contractor
Thompson Excavation
Time End
12:15 PM
Inspection Type(s)
Concrete Placement
Concrete Reinforcement
Other
Location(s)
Madison Field House
Observations/ Remarks
Loren and I arrived at about 9:40 and began our observations. We first shot densities which passed
with ease and everything there looked good. We then waited for the concrete truck to show up and it
arrived at about 11:05 AM and began pouring by 11:10 AM. We then tested the concrete and it was all
within spec. Finished testing at about 11:40 and headed out from the site at about 12:05 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.