Loading...
HomeMy WebLinkAboutSOIL DENSITY TESTS - 21-00586 - Just4Kids Pediatric Urgent CareFile Name: 21056D10292021BB b8bc23e67404a7c5-1635519737507 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21056 Contractor: Hill and Sons Project Name: Just For Kids Instrument ID 00443 Daily Standardization: Client: Bateman-Hall Date: 10/29/2021 MS: 966 DS: 1553 Time Start: 08:00 AM Time End: 01:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southeast corner of building over plumbing Approximately 12" below finish floor 6 136.9 132.0 3.6 130.0 Material Type Pit Run 102 2 Southeast corner of building over plumbing Approximately 12" below finish floor 6 138.2 133.8 3.2 130.0 Material Type Pit Run 103 3 Southeast corner of building over plumbing Approximately 12" below finish floor 6 137.0 132.5 3.4 130.0 Material Type Pit Run 102 4 Southwest corner of building over plumbing Approximately 12" below finish floor 6 123.7 120.0 3.1 123.8 Material Type Native Silt 97 5 Southwest corner of building over plumbing Approximately 12" below finish floor 6 129.3 121.2 6.7 123.8 Material Type Native Silt 98 6 Southwest corner of building over plumbing Approximately 12" below finish floor 6 130.5 122.9 6.2 123.8 Material Type Native Silt 99 7 West center of building over plumbing Approximately 24" below finish floor 6 126.9 118.0 7.5 123.8 Material Type Native Silt 95 8 West center of building over plumbing Approximately 24" below finish floor 6 129.0 123.8 4.2 123.8 Material Type Native Silt 100 File Name: 21056D10292021BB b8bc23e67404a7c5-1635519737507 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 9 West center of building over plumbing Approximately 12" below finish floor 6 131.0 122.7 6.8 123.8 Material Type Native Silt 99 10 West center of building over plumbing Approximately 12" below finish floor 6 130.6 121.9 7.1 123.8 Material Type Native Silt 98 11 West center of building over plumbing Approximately 12" below finish floor 6 129.6 122.5 5.8 123.8 Material Type Native Silt 99 Remarks: Tested By: Ben E. Ball Signature: Date: 10/29/2021 Reviewed By: E. Vail Signature: Date: 11/01/2021 File Name: 21056D11042021BB b8bc23e67404a7c5-1636036895167 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21056 Contractor: Hill & Son Project Name: Just For Kids Instrument ID 00443 Daily Standardization: Client: Bateman Hall Date: 11/04/2021 MS: 969 DS: 1551 Time Start: 08:00 AM Time End: 04:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Tests on sub base for floor slab Top of sub base BS 126.8 121.0 4.8 123.8 Material Type Native Silt 98 2 Tests on sub base for floor slab Top of sub base BS 131.1 121.8 7.6 123.8 Material Type Native Silt 98 3 Tests on sub base for floor slab Top of sub base BS 125.2 120.0 4.3 123.8 Material Type Native Silt 97 4 Tests on sub base for floor slab Top of sub base BS 126.3 119.7 5.5 123.8 Material Type Native Silt 97 5 Tests on sub base for floor slab Top of sub base BS 126.3 120.8 4.6 123.8 Material Type Native Silt 98 6 Tests on sub base for floor slab Top of sub base BS 2124.3 120.2 3.4 123.8 Material Type Native Silt 97 7 Tests on sub base for floor slab Top of sub base BS 128.8 124.0 3.9 123.8 Material Type Native Silt 100 8 Tests on sub base for floor slab Top of sub base BS 130.1 125.4 3.7 123.8 Material Type Native Silt 101 File Name: 21056D11042021BB b8bc23e67404a7c5-1636036895167 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 9 Tests on sub base for floor slab Top of sub base BS 125.0 120.1 4.0 123.8 Material Type Native Silt 97 10 Tests on sub base for floor slab Top of sub base BS 123.4 118.6 4.0 123.8 Material Type Native Silt 96 11 Tests on sub base for floor slab Top of sub base BS 124.2 120.1 3.4 123.8 Material Type Native Silt 97 12 Tests on sub base for floor slab Top of sub base BS 131.1 126.0 4.1 123.8 Material Type Native Silt 102 Remarks: Tested By: Ben E. Ball Signature: Date: 11/04/2021 Reviewed By: E. Vail Signature: Date: 11/05/2021 File Name: 21056D11052021GKS 11a5fe16b57ffdca-1636124321498 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21056 Contractor: Hill and Son Project Name: Just For Kids Instrument ID 78652 Daily Standardization: Client: Bateman Hall Date: 11/05/2021 MS: 671 DS: 2439 Time Start: 08:30 AM Time End: 09:30 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 4.1, A.6 0'BFG 6 131.1 124.8 5.0 131.0 Material Type 3/4" Base 95 2 1.7, A.8 0'BFG 6 131.2 124.8 5.1 131.0 Material Type 3/4" Base 95 3 2.3, B.2 0'BFG 6 131.5 126.1 4.3 131.0 Material Type 3/4" Base 96 Remarks: Tested By: Gabe Stastny Signature: Date: 11/05/2021 Reviewed By: E. Vail Signature: Date: 11/05/2021 File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21056 Contractor: Bateman Hall Project Name: Just For Kids Instrument ID 76560 Daily Standardization: Client: Bateman Hall Date: 05/03/2022 MS: 621 DS: 2502 Time Start: 11:30 AM Time End: 02:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 8’ N from S edge of building’s entrance pad 6’ W from building doors Sidewalk Top of base 6 129.5 123.9 4.5 126.4 Material Type 3/4" Base #2 98 2 48’ S of the S side of building entrance (window) 4’ W of the building’s E wall Sidewalk Top of base 6 126.2 121.7 3.7 126.4 Material Type 3/4" Base #2 96 3 4’ W of the building’s SW corner Sidewalk Top of base 6 125.4 121.3 3.7 126.4 Material Type 3/4" Base #2 96 4 18’ E from building’s SW corner 5’ S from building’s S wall Sidewalk Top of base 6 128.0 123.4 3.8 126.4 Material Type 3/4" Base #2 98 5 16’ E of SW corner Top of base 6 132.5 123.1 3.8 126.4 97 File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1’ N of the project’s S edge Curb Material Type 3/4" Base #2 6 7’ E of dumpster enclosure 1’ S from the N edge of the dumpster enclosure Curb Top of base 6 138.3 131.5 5.2 131.0 Material Type 3/4" Base 100 7 48’ N of parking lot entrance 20’ E of Bond Ave. Curb Top of base 6 136.4 129.5 5.3 131.0 Material Type 3/4" Base 99 8 2’ E of Bond Ave 36’ N of parking lot entrance Sidewalk Top of Base 6 128.9 121.6 6.0 126.4 Material Type 3/4" Base #2 96 9 15’ S of existing side wall on N side of project 4’ E of Bond Ave Sidewalk Top of base 6 132.8 125.1 6.2 126.4 Material Type 3/4" Base #2 99 Observations/Remarks: At 11:30 AM, Eric asked me to take density shots of the 3/4 base at the Just for Kids project in Rexburg. I loaded the truck, standardized the gauge, and left the lab at 11:45 AM. I arrived on the project, met Sam (Project Manager with Bateman Hall), and starting taking density shots at 12:15 PM. As reported, I took 9 passing shots; all met the specifications of the 3/4 Base values. I then packed up the equipment and left the site at 1:00 PM. I came back to the lab, unloaded the equipment, and completed the associated paperwork at 2:00 PM. Tested By:Reviewed By: File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 3 AWalburger Signature: E. Vail Signature: Date: 05/04/2022 Inspection Images: File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 4 File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 5 File Name: 21056D05032022AW PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DFE1D4E9-1468-492A-BC47-1BDE7B071A65 6 File Name: 21056D05102022HR PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8F4C84C2-93BC-4799-A05F-51B153CCAC06 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21056 Contractor: Bateman Hall Construction Project Name: Just For Kids Instrument ID 78653 Daily Standardization: Client: Bateman Hall Date: 05/10/2022 MS: 635 DS: 2608 Time Start: 08:00 AM Time End: 10:30 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 South west property corner on Bond Ave 30 feet east 10 feet north Top of 3/4 base 6 129.7 125.5 3.4 131.0 Material Type 3/4" Base 96 2 South West corner of property line 50 feet east 5 feet north Top of 3/4 base 6 134.8 129.1 3.4 131.0 Material Type 3/4" Base 99 3 South West corner of the building. 10 feet south 8 feet east Top of 3/4 base 6 128.6 124.4 4.2 131.0 Material Type 3/4" Base 95 4 South west corner of building. 30 feet north 12 feet west Top of 3/4 base 6 132.7 127.3 4.2 131.0 Material Type 3/4" Base 97 5 South west corner of building. 45 feet north and 42 feet west Top of 3/4 base 6 134.1 127.8 4.9 131.0 Material Type 3/4" Base 98 6 South west corner of building. 45 feet north 60 feet west Top of 3/4 base 6 131.5 125.5 4.8 131.0 Material Type 3/4" Base 96 7 South west corner of Top of 3/4 6 133.2 126.7 5.1 131.0 97 File Name: 21056D05102022HR PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8F4C84C2-93BC-4799-A05F-51B153CCAC06 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail building. 75 feet north and 50 feet west base Material Type 3/4" Base 8 South west corner of building. 65 feet north 15 feet west Top of 3/4 base 6 133.6 126.8 4.6 131.0 Material Type 3/4" Base 97 9 From north west corner of building. 15 feet south 15 feet west. Top of 3/4 base 6 129.6 126.2 3.7 131.0 Material Type 3/4" Base 96 10 North west corner of building. 20 feet south 30 feet west Top of 3/4 base 6 133.7 128.3 4.7 131.0 Material Type 3/4" Base 98 11 North west corner of building. 10 feet north and 45 feet west Top of 3/4 base 6 132.1 126.0 4.8 131.0 Material Type 3/4" Base 96 Observations/Remarks: The base was prepared and rolled before I arrived on site. The contractor stated the ground had been rolled significantly. The densities were easily passing. Tested By: Hunter Redd Signature: Reviewed By: E. Vail Signature: Date: 05/10/2022 Inspection Images: File Name: 21056D05102022HR PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8F4C84C2-93BC-4799-A05F-51B153CCAC06 3 Date: 05/11/2022 File Name: 21056DA051132022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1652282225407 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Number: 21056 Contractor: HK Contractors Project Name: Just For Kids Instrument ID 00443 Daily Standardization: Client: Bateman Hall Date: 05/11/2022 MS: 988 DS: 1589 Time Start: 08:00 AM Time End: 03:00 PM Details Test #: Location:Lift: Material:Wet:Marshall #: % Marshall: Pass Fail 1 Just For Kids first pull 1 Asphalt Marshall 141.9 151.8 93 2 Just For Kids second pull 1 Asphalt Marshall 140.0 151.8 92 3 Just For Kids third pull 1 Asphalt Marshall 143.3 151.8 94 4 Just For Kids south end of first three pulls 1 Asphalt Marshall 141.0 151.8 93 5 Just For Kids forth pull 1 Asphalt Marshall 140.1 151.8 92 6 Just For Kids fifth pull 1 Asphalt Marshall 139.8 151.8 92 7 Just For Kids sixth pull 1 Asphalt Marshall 140.6 151.8 93 8 Just For Kids south end exit pull 1 Asphalt Marshall 140.5 151.8 93 9 Just For Kids south end exit pull 1 Asphalt Marshall 140.8 151.8 93 Observations/Remarks: Arrived on site at approximately 8:30 am. Ambient temperature was 39 degrees and sunny skies. Asphalt arrived approximately 9:20 am. Ambient temperature was 42 degrees asphalt temperature was 233 degrees. Tested By: Ben E. Ball Signature: Reviewed By: E. Vail Signature: Date: 05/11/2022 File Name: 21056DA051132022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1652282225407 2 Date: 05/11/2022 Inspection Images: Date: 05/11/2022 File Name: 21056DA051132022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1652282225407 3