HomeMy WebLinkAboutFIELD REPORTS - 21-00586 - Just4Kids Pediatric Urgent CareFile Name:
21056D10182021GKS
11a5fe16b57ffdca-1634584532200 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
21056
Contractor:
Bateman Hall
Project Name:
Just For Kids
Instrument ID
29484
Daily Standardization:
Client:
Bateman Hall
Date:
10/18/2021
MS:
655
DS:
2052
Time Start:
12:30 PM
Time End:
03:00 PM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 Front side south end 2 6 134.9 130.1 3.7 130.0
Material
Type
Pit Run
100
2 Front side middle 0 6 136.1 130.7 4.1 130.0
Material
Type
Pit Run
101
3 Front side north end 0 6 134.1 129.3 3.7 130.0
Material
Type
Pit Run
99
Remarks:
Tested By:
Gabe Stastny
Signature:
Date:
10/18/2021
Reviewed By:
E. Vail
Signature:
Date:
10/21/2021
Inspection Date:
10/18/2021
File Name:
21056DFR10182021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
10/21/2021
11a5fe16b57ffdca-1634584649410 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
12:30 PM
Client:
Bateman Hall
Contractor:
Bateman Hall
End Time:
03:00 PM
Inspection Type(s):
Earthwork Inspection
Location(s):
Areas around the inside and outside of the front
wall.
Observations/ Remarks:
Arrived and started doing compaction tests, needed to get material for a proctor on the native silt.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Date:
10/29/2021
File Name:
21056DFR10292021BB
Inspector's Signature:Inspector's Name:
Ben E. Ball
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
11/01/2021
b8bc23e67404a7c5-1635525864334 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
08:00 AM
Client:
Bateman-Hall
Contractor:
Hill & Son Excavation
End Time:
01:00 PM
Inspection Type(s):
Earthwork Inspection
Location(s):
Over plumbing
Observations/ Remarks:
Soil changes dramatically from the east side to the west side of structure.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
10/29/2021
File Name:
21056DFR10292021BB
Inspector's Signature:Inspector's Name:
Ben E. Ball
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
11/01/2021
b8bc23e67404a7c5-1635525864334 2
Inspection Date:
11/04/2021
File Name:
21056DFR11042021BB
Inspector's Signature:Inspector's Name:
Ben E. Ball
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
11/08/2021
b8bc23e67404a7c5-1636038599175 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
08:00 AM
Client:
Bateman Hall
Contractor:
Hill & Son
End Time:
04:00 PM
Inspection Type(s):
Concrete Reinforcement
Earthwork Inspection
Location(s):
Interior footings rebar and dumpster pad footing
rebar.
Interior floor slab.
Observations/ Remarks:
Rebar for interior footings and dumpster pad were in place.
Checked density on sub base on floor slab.
Concrete was poured at 2:00 pm. Ambient temperature was 48 degrees.
Picked up -3/4" base proctor sample.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
11/05/2021
File Name:
21056DFR11052021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
11/08/2021
11a5fe16b57ffdca-1636126855735 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
08:30 AM
Client:
Bateman Hall
Contractor:
Bateman Hall
End Time:
09:30 AM
Inspection Type(s):
Earthwork Inspection
Location(s):
Slab on Grade, 1-5, A-D
Observations/ Remarks:
I arrived on site and talked let the contractor know where I was testing, then I set up my equipment
and started testing. All tests were within project specifications. I let the contractor know about the
results and left the site.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
11/08/2021
File Name:
21056DFR11082021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
11/08/2021
11a5fe16b57ffdca-1636386715062 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
07:00 AM
Client:
Bateman Hall
Contractor:
Bateman Hall
End Time:
10:30 AM
Inspection Type(s):
Concrete Placement
Location(s):
Main Pad, 1-5, A-D
Observations/ Remarks:
I arrived on site and set up my equipment. I took a sample on the first truck, the sample test results
were within project specifications. After cleaning my equipment and letting the truck driver know the
results I observed them pouring the concrete until the 5th truck arrived. I took a sample from the
truck and the sample test results were within project specifications. After letting the truck driver know
the results I cleaned my equipment and left the site.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
11/09/2021
File Name:
21056DFR11092021EV
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
ABE495FC-F583-403B-9057-49D0C3BF0C16 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
12:30 PM
Client:
Bateman Hall
Contractor:
JM Concrete
End Time:
03:00 PM
Inspection Type(s):
Concrete Placement
Concrete Reinforcement
Location(s):
Foundation wall beneath trash pad.
Observations/ Remarks:
I arrived on location around 1:00 pm and was able to check out the rebar and forms prior to the pour.
Both looked to be in accordance with project documents.
The truck rolled in around 1:30 pm and after letting at least a yard leave the truck I grabbed my
sample for testing. Both air content and slump were within spec (see Concrete Report) and I reported
that to JM Concrete.
After completing my tests and cylinders, I observed the rest of the pour. I left around 2:30 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
11/09/2021
File Name:
21056DFR11092021EV
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
ABE495FC-F583-403B-9057-49D0C3BF0C16 2
Inspection Date:
11/09/2021
File Name:
21056DFR11092021EV
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
ABE495FC-F583-403B-9057-49D0C3BF0C16 3
Inspection Date:
11/10/2021
File Name:
21056DFR11102021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
11a5fe16b57ffdca-1636575173571 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
01:00 PM
Client:
Bateman Hall
Contractor:
Bateman Hall
End Time:
02:00 PM
Inspection Type(s):
Other
Location(s):
Trench around main building: (C-D, 1-5), (D-A,
5.0-5.5), (A, 1-5), (A-D, 0.5-1.0)
Observations/ Remarks:
I arrived on site and observed the Trench around the building, the depth of the material was within
project specifications. I took pictures, notified the contractor and left the site.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
11/10/2021
File Name:
21056DFR11102021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
11a5fe16b57ffdca-1636575173571 2
Inspection Date:
11/10/2021
File Name:
21056DFR11102021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
11a5fe16b57ffdca-1636575173571 3
Inspection Date:
11/10/2021
File Name:
21056DFR11102021GKS
Inspector's Signature:Inspector's Name:
Gabe Stastny
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
11a5fe16b57ffdca-1636575173571 4
Inspection Date:
11/11/2021
File Name:
21061DFR11112021BB
Inspector's Signature:Inspector's Name:
Ben E. Ball
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
11/18/2021
b8bc23e67404a7c5-1636653439167 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Texas Siding
Start Time:
08:30 AM
Client:
Jerome Bowen Construction
Contractor:
Jerome Bowen Construction
End Time:
10:30 AM
Inspection Type(s):
Earthwork Inspection
Location(s):
Texas Siding east from 3300 East approximately
750'
Observations/ Remarks:
Top lift of pit run on roadway. Was receiving heavy truck traffic and was well compacted for the first
750' I tested.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Date:
12/07/2021
File Name:
21056DFR12072021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
CB3DD705-A7DE-436C-9807-5D736593AB07 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
12:45 PM
Client:
Bateman Hall
Contractor:
Bateman Hall
End Time:
03:00 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Masonry wall, 2nd lift.
Observations/ Remarks:
I arrived on site with enough time to inspect the rebar and CMU wall prior to the grout showing up.
Rebar appeared to be in accordance with project documents. I also observed that the top row of CMU’s
were notched in the middle for the horizontal rebar to lay in. The corner CMU’s had rebar laying in it
that spanned the corner.
The grout showed up around 1:30 pm and began pumping. I observed that each cell was individually
filled with grout and that vibration was used to consolidate said grout.
With a few cells to go, grout ran out. They estimated about a yard and a half short. The pour will
continue tomorrow. I left location around 2:45 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
12/07/2021
File Name:
21056DFR12072021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
CB3DD705-A7DE-436C-9807-5D736593AB07 2
Inspection Date:
12/07/2021
File Name:
21056DFR12072021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
CB3DD705-A7DE-436C-9807-5D736593AB07 3
Inspection Date:
12/07/2021
File Name:
21056DFR12072021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
CB3DD705-A7DE-436C-9807-5D736593AB07 4
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
12/07/2021
Inspection Date:
12/13/2021
File Name:
21056DFR12132021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
A5331896-BC78-4A34-9CB8-286D644C3C5A 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
11:00 AM
Client:
Bateman Hall
Contractor:
Bateman-Hall
End Time:
12:45 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
CMU west, north, and east walls, third lift.
Observations/ Remarks:
I arrived on site around 11:15 am and was early enough to check out the rebar and existing CMU walls
prior to the pour. I o served that the rebar was placed in accordance with project documents and
specifications.
The grout showed up around 11:30 am and the pour began. As the pour continued I asked one of the
workers if they ever used mechanical vibration as a means of consolidating the grout, and he told me
that it was self-consolidating grout. That being said, they used their own methods of helping the grout
to consolidate.
The pour ended at 12:30 pm and I made this report.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
12/13/2021
File Name:
21056DFR12132021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
A5331896-BC78-4A34-9CB8-286D644C3C5A 2
Inspector's Signature:Inspector's Name:Reviewer's Signature:Reviewer's Name:Reviewed Date:
Inspection Date:
12/13/2021
File Name:
21056DFR12132021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
A5331896-BC78-4A34-9CB8-286D644C3C5A 3
E. Vail E. Vail 12/14/2021
Inspection Date:
12/14/2021
File Name:
21056DFR12142021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
98B86986-08E5-452F-9812-B944E89D0616 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
01:30 PM
Client:
Bateman Hall
Contractor:
Daniels Masonry
End Time:
03:45 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Masonry wall. West, north, and east walls. 4th lift.
Observations/ Remarks:
I arrived at 1:50 pm and was able to look at the rebar and existing CMU walls. Everything looked good
and we waited for the grout to show up.
Around 2:30 pm the grout showed up and they began to pour it. I observed that each cell was filled
with grout and once filled, it was troweled over and smoothed out.
I left location around 3:15 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
12/14/2021
File Name:
21056DFR12142021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
98B86986-08E5-452F-9812-B944E89D0616 2
Inspection Date:
12/14/2021
File Name:
21056DFR12142021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
98B86986-08E5-452F-9812-B944E89D0616 3
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
12/15/2021
Inspection Date:
12/22/2021
File Name:
21056DFR12222021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
0D4B51CB-178C-4047-B657-19C01D104064 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
08:30 AM
Client:
Bateman-Hall
Contractor:
Daniels Masonry
End Time:
10:30 AM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Just For Kids masonry wall. East, south, and west
walls. First lift.
Observations/ Remarks:
I arrived on site around 8:45 am with enough time to check out the rebar and CMU’s. Everything
looked to be in accordance with project documents and specs.
The grout rolled in around 9:10 am and the pour began. I observed that every cell was filled with grout
and manual vibration took place.
Rebar ran horizontally along the top of the blocks and each one was notched to allow for said rebar. I
also observed that there were several pieces of rebar that were bent to accommodate the corners.
I observed the remainder of the pour and then left location at 10:00 am.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
12/22/2021
File Name:
21056DFR12222021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
0D4B51CB-178C-4047-B657-19C01D104064 2
Inspection Date:
12/22/2021
File Name:
21056DFR12222021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
0D4B51CB-178C-4047-B657-19C01D104064 3
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
12/22/2021
Inspection Date:
12/29/2021
File Name:
21056DFR12292021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
14DCF7D7-5AF2-42CC-A50C-1E48486DA05F 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
07:45 AM
Client:
Bateman Hall
Contractor:
Daniels Masonry
End Time:
10:15 AM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
NW entryway walls first lift, dumpster pad walls.
Observations/ Remarks:
Upon arrival at 8:15 am I noticed that the grout truck had not yet arrived, which gave me time to
check out the rebar and walls prior to the pour.
The rebar was in place and looked to be in accordance with project documents. See photos.
The grout arrived at 8:45 am and the pour began. The first column appeared to blow out so they
shored it up and moved on to the next walls. Besides that first wall, everything went smoothly. Each
cell was filled and I witnessed manual vibration take place.
I left location at 10:00 am.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
12/29/2021
File Name:
21056DFR12292021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
14DCF7D7-5AF2-42CC-A50C-1E48486DA05F 2
Inspection Date:
12/29/2021
File Name:
21056DFR12292021EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
14DCF7D7-5AF2-42CC-A50C-1E48486DA05F 3
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
12/30/2021
Inspection Date:
01/04/2022
File Name:
21056DFR01042022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
84507DC5-5197-46E8-9D04-CC8E2321ABD9 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
02:30 PM
Client:
Bateman Hall
Contractor:
Daniels Masonry
End Time:
04:00 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
West, south, and east CMU walls. Second lift. Also
the entrance on the NW corner of building,
second left.
Observations/ Remarks:
I was told that the pour would be at 3:00 pm so I left at 2:30 pm to get there in time. It turns out that
the grout showed up early so they started around 2:00 pm.
I was able to inspect the walls that hadn’t been poured yet and the rebar and walls looked great.
I observed the remainder of the pour, which was the entrance portion of the building. The pour went
smoothly and the rebar looked great.
I left location around 3:30 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
01/04/2022
File Name:
21056DFR01042022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
84507DC5-5197-46E8-9D04-CC8E2321ABD9 2
Inspection Date:
01/04/2022
File Name:
21056DFR01042022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
84507DC5-5197-46E8-9D04-CC8E2321ABD9 3
Inspector's Signature:Inspector's Name:Reviewer's Signature:Reviewer's Name:Reviewed Date:
Inspection Date:
01/04/2022
File Name:
21056DFR01042022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
84507DC5-5197-46E8-9D04-CC8E2321ABD9 4
E. Vail E. Vail 01/10/2022
Inspection Date:
01/05/2022
File Name:
21056DFR01052022KD
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
C1B95E21-86A8-41E9-AC37-7924E6688755 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
11:15 AM
Client:
Bateman-Hall
Contractor:
Hawk Ridge
End Time:
02:45 PM
Inspection Type(s):
Epoxy Embeds/ Anchors
Location(s):
Along the east wall from A1-A1.5 and along the
west wall from C1-C1.75 as shown on the
structural plans page S3.
Observations/ Remarks:
I left the lab at 11:28 AM and arrived at 11:48 AM. I performed a visual inspection of the few bolts
that had already been placed and then spoke with Sam from Batemam-Hall. He said the framers went
to get a new drill bit and would likely be back soon. After the framing workers returned I observed
them drilling, cleaning, and installing the epoxy and bolts as outlined in the plans. While they were
drilling along the west wall the second hole drilled was hollow. I asked Jacob and he advised that they
would need to get it properly filled prior to installing the bolt. I informed the contractor and he said he
was going to get it filled and let it set over night then re-drill the hole again tomorrow. After they
installed the previously mentioned bolts they said they were going to be done for the day and they
would let us know when they were ready to have us come back out. I returned to the truck and filled
out the paperwork and headed back to the lab.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
01/05/2022
File Name:
21056DFR01052022KD
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
C1B95E21-86A8-41E9-AC37-7924E6688755 2
Inspection Date:
01/05/2022
File Name:
21056DFR01052022KD
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
C1B95E21-86A8-41E9-AC37-7924E6688755 3
Inspector's Signature:Inspector's Name:
K. Drake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
01/10/2022
Inspection Date:
01/06/2022
File Name:
21056DFR01062022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
906DE3B8-15AF-4529-A64F-77638797CD52 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
01:30 PM
Client:
Bateman Hall
Contractor:
Daniels Masonry
End Time:
04:00 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
West, south, east walls. Third lift.
Observations/ Remarks:
I left the shop at 1:30 pm and headed to Just For Kids and got there in plenty of time to check out the
rebar prior to the bar. It looked to be in conformance with project documents and the crew was ready
for the pour.
The grout showed up around 2:30 pm and the pour began. I observed each cell being filled and things
were going smoothly until the grout truck spit out some dry chunks which clogged the grate and
stalled things for a few minutes. They added a little water and mixed it up real good, then continued.
The rest of the pour went really well.
I left location at 3:30 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
01/06/2022
File Name:
21056DFR01062022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
906DE3B8-15AF-4529-A64F-77638797CD52 2
Inspection Date:
01/06/2022
File Name:
21056DFR01062022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
906DE3B8-15AF-4529-A64F-77638797CD52 3
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
01/10/2022
Inspection Date:
01/07/2022
File Name:
21056DFR01072022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
538FEE59-8476-49E6-8237-764211A7D681 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Just For Kids
Start Time:
12:45 PM
Client:
Bateman-Hall
Contractor:
Daniels Masonry
End Time:
02:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
West, south, and east walls. Top lift.
Observations/ Remarks:
I was notified at 12:00 pm that the pour was going to be bumped up from 2:30 pm to about 1:00 pm.
So I showed up around 12:45 pm just before the grout showed up.
I looked over the rebar and CMU’s prior to the pour. The top row of CMU’s had been notched to allow
for the horizontal rebar and the rebar on the corners had been bent to allow that angle. The rebar was
in accordance with project documents.
The pour went smoothly and I observed the masons finish the grout so that it was even with the tops
of the CMU’s.
I left location around 2:15 pm.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
01/07/2022
File Name:
21056DFR01072022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
538FEE59-8476-49E6-8237-764211A7D681 2
Inspection Date:
01/07/2022
File Name:
21056DFR01072022EV
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
538FEE59-8476-49E6-8237-764211A7D681 3
Inspector's Signature:Inspector's Name:
E. Vail
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
01/10/2022