Loading...
HomeMy WebLinkAboutPLANS REVIEWED - 21-00725 - Iron Horse RV - Interior FinishAuthor Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Don Allen Don.Allen@rexburg.org 208-372-2174 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : Iron Horse RV - Interior Finish Address : 1076 S 12th W Application Type : Document Filename : 03 Iron Horse Architectural 090921.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments G0.1 Free text Cody Jones : Building Open 1 as per city ordinance , buildings connot be partially sprinkled even if only some areas require sprinklers and others do not. G0.1 Free text Cody Jones : Building Open 1 seating at tables, counters and work areas comply with section 1109.11 G0.1 Free text Cody Jones : Building Open 1 Special inspector needs to be identified. G0.1 Free text Cody Jones : Building Open 1 Need Envelope COMM check. G0.1 Free text Cody Jones : Building Open 1 Restrooms, rooms, occupant load and other directional signage to be installed. A1.1 Free text Cody Jones : Building Open 2 Exit lighting and exit signs to comply with sections 1008 and 1013. A4.1 Free text Cody Jones : Building Open 8 Grade to slope away from building 6" in first 10'. A4.1 Free text Cody Jones : Building Open 8 36" min # 21-00725 Commercial - Remodel Panic Hardware shall be installed as per IBC Section 1010.1.10 Report Date: 10.14.2021 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A5.1 Comment Cody Jones : Building Open 9 Handrails and Guards meet the requirements of IBC Sections 1014 and 1015 A5.1 Free text Cody Jones : Building Open 9 Minimum of one restroom to be ADA accessible.(with 60" turning radius.) A6.1 Comment Cody Jones : Building Open 11 Panic Hardware shall be installed as per IBC Section 1010.1.10 A6.1 Free text Cody Jones : Building Open 11 Glass and glazing to meet requirements of Chapter 24. A6.2 Free text Cody Jones : Building Open 12 Suspended ceiling to be installed to manufacturer specifications. G0.1 Free text Stan Crittenden : Fire Open 1 The building will need to have fire sprinklers through out. G0.1 Free text Stan Crittenden : Fire Open 1 Will need to install a Knox Box for keys at or near the front of building. This is usually 1-2 months to order. G0.1 Free text Stan Crittenden : Fire Open 1 Will need to verify that the existing fire hydrant on 12th West or the new hydrant on the north end of the developement is close enough. G0.1 Free text Don Allen : Mechanical Open 1 Need water meter size Report Date: 10.14.2021 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) a s p e r c i t y o r d i n a n c e , b u i l d i n g s c o n n o t b e p a r t i a l l y s p r i n k l e d e v e n i f o n l y s o m e a r e a s r e q u i r e s p r i n k l e r s a n d o t h e r s d o n o t . s e a t i n g a t t a b l e s , c o u n t e r s a n d w o r k a r e a s c o m p l y w i t h s e c t i o n 1 1 0 9 . 1 1 S p e c i a l i n s p e c t o r n e e d s t o b e i d e n t i f i e d . N e e d E n v e l o p e C O M M c h e c k . R e s t r o o m s , r o o m s , o c c u p a n t l o a d a n d o t h e r d i r e c t i o n a l s i g n a g e t o b e i n s t a l l e d . T h e b u i l d i n g w i l l n e e d t o h a v e f i r e s p r i n k l e r s t h r o u g h o u t . W i l l n e e d t o i n s t a l l a K n o x B o x f o r k e y s a t o r n e a r t h e f r o n t o f b u i l d i n g . T h i s i s u s u a l l y 1 - 2 m o n t h s t o o r d e r . W i l l n e e d t o v e r i f y t h a t t h e e x i s t i n g f i r e h y d r a n t o n 1 2 t h W e s t o r t h e n e w h y d r a n t o n t h e n o r t h e n d o f t h e d e v e l o p e m e n t i s c l o s e e n o u g h . Need water m e t e r s i z e E x i t l i g h t i n g a n d e x i t s i g n s t o c o m p l y w i t h s e c t i o n s 1 0 0 8 a n d 1 0 1 3 . G r a d e t o s l o p e a w a y f r o m b u i l d i n g 6 " i n f i r s t 1 0 ' . 3 6 " m i n Minimum of one restroom to be ADA accessible.(with 60" turning radius.) Glass and glazing to meet requirements of Chapter 24. Suspended ceiling to be installed to manufacturer specifications.