HomeMy WebLinkAboutNARRATIVE OF CHANGES 2 - 20-00940 - Walmart - RemodelWAL-MART STORES, INC. STORE NO. 01878 03/25/21 PROJECT: Rexburg, ID CCD#2 PROJECT NO. 20296 Page 1 of 2 NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before beginning the Work defined in this CCD #2. If applicable, adjustment to the Contract Sum may be based only on the method described in 7.3.3.1 of the Contract. SCOPE: The scope of this CCD #2 is to revise the originally issued contract documents of Rexburg, ID dated 12/04/2020 and all subsequent contract modifications, to reflect the following: SUMMARY: • CI 30373 DISCIPLINE ARCHITECTURAL SHEET C1 – COVER SHEET SHEET INDEX 1. Added sheet A2.3 and CS8. SHEET A2.3 – EXTERIOR ELEVATION REMEDIATION 1. Added sheet in its entirety. MECHANICAL SHEET M1.1 – ENLARGED MECHANICAL PLANS DETAIL 3 – EXPANSION MECHANICAL PLAN 1. Added unit heater SOW. ROOFTOP UNIT SCHEDULE (LENNOX) 1. Revised schedule ELECTRIC UNIT HEATER SCHEDULE 1. Added schedule to sheet. SHEET BAS3 – BUILDING AUTOMATION SYSTEM DETAIL 1 – BUILDING AUTOMATION SYSTEM PLANS 1. Relocated RTU-34 temperature sensor. ELETRICAL SHEET E2.4 – ENLARGED POWER PLANS DETAIL 2 – STOCKROOM POWER PLAN 1. Added circuit for UH. SHEET E4.1 – PANELBOARD SCHEDULES PANEL SCHEDULE 1. PANEL H4B – Revised circuits 38,40&42. CIVIL SHEET CS1 – DEMOLITION & SITE PLAN 1. Proposed siphonic manhole location has shifted, ref. CS4 Utility Plan changes. SHEET CS3 – GRADING PLAN 1. Elevation at siphonic manhole has been provided to plan. SHEET CS4 – UTILITY PLAN 1. Plan has been updated to include invert information on new siphonic manhole. 2. Existing and proposed storm pipe has been included on plan. WAL-MART STORES, INC. STORE NO. 01878 03/25/21 PROJECT: Rexburg, ID CCD#2 PROJECT NO. 20296 Page 2 of 2 3. Proposed grease trap, cleanouts and siphonic manhole locations have been adjusted per city comment. SHEET CS8 – SITE DETAILS 3 1. Added sheet in its entirety. END CCD #2