HomeMy WebLinkAboutPLAN NOTES - 20-00940 - Walmart - RemodelWAL-MART STORES, INC. STORE NO. 01878 02/24/21 PROJECT: Rexburg, ID CCD#1 PROJECT NO. 20296 Page 1 of 5 NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before beginning the Work defined in this CCD #1. If applicable, adjustment to the Contract Sum may be based only on the method described in 7.3.3.1 of the Contract. SCOPE: The scope of this CCD #1 is to revise the originally issued contract documents of Rexburg, ID dated 12/04/2020 and all subsequent contract modifications, to reflect the following: SUMMARY: • CI 30314 • CI 30371 • CI 30373 • CI 30347 • CI 30399 • CI 30440 • CI 30255 • CI 30421 • CI 30434 • Order Copy & Merch/Power Plan DISCIPLINE ARCHITECTURAL C1 – COVER SHEET 1. Added sheet AC1 to set. SA1 – BID ALLOWANCE SCHEDULE 1. Removed Modular Pharmacy Dust Wall section. SP1 – SITE PLAN 1. Added future automated propane exchange units to plan. D1 – DEMOLITION PLAN DETAIL 1 – DEMOTLITION PLAN 1. Removed existing tire balancer. A1 – FLOOR PLAN DETAIL 1 – FLOOR PLAN 1. Added digital signage at electronics desk 2. Added enlarged Autocenter plan 3. Revised Autocenter elevation callouts 4. Removed Autocenter SOW box A3 – SECTIONS AND DETAILS DETAIL 9 – RETURNS SECTION 1. Updated detail per new digital boards. DETAIL 12 – MONITOR SUPPORT BRACKET (OWNER FURNISHED) 1. Added detail in its entirety. A5 – ENLARGED PLANS, ELEVATIONS, AND DETAILS DETAIL 2 – COURTESY DESK FLOOR PLAN 1. Revised digital display boards from two horizontal boards to three vertical boards. DETAIL 6 – INTERIOR ELEVATION 1. Removed portal elevation callouts and ledge section callouts. 2. Added new ledge notes. WAL-MART STORES, INC. STORE NO. 01878 02/24/21 PROJECT: Rexburg, ID CCD#1 PROJECT NO. 20296 Page 2 of 5 A6.2 – INTERIOR WALL, SECTIONS, ELEVATIONS, AND DETAILS 1. Removed details 1, 2, 11, & 12. DETAIL 5 – VESTIBULE SLAT WALL ELEVATION 1. Revised slat wall notes. DETAIL 13 – AUTO CENTER ENTRY ELEVATION 1. Moved detail to new AC1 sheet. DETAIL 15 – LEDGE DETAIL 1. Revised detail to show new ledge. KEYNOTES LEGEND 1. Added missing keynote. AC1 – AUTOCENTER PLAN AND DETAILS 1. Added sheet in its entirety. DETAIL 2 – AUTO CENTER ENTRY ELEVATION 1. Revised new ledge notes. A8 – DOOR AND ROOM FINISH SCHEDULE FINISH KEY 1. Added PS11 to finishes BR1 – BREAKROOM PLAN AND DETAILS DETAIL 2 – ENLARGED BREAKROOM FLOOR PLAN 1. Added slat wall. 2. Revised bulletin board locations. 3. Added back wall elevation. DETAIL 3 – ENLARGED BREAKROOM FINISH PLAN 1. Revised finishes. DETAIL 5 – TACK BULLETIN BOARD 1. Revised paint callout. DETAIL 8 – BREAKROOM ELEVATION 1. Added detail in its entirety. RXPFC – PAINT, FIX, CLEAN (PFC) PLANS AND DETAILS DETAIL 2 – PHARMACY EXTERIOR ELEVATION 1. Added digital display above pharmacy door. VC1 – VISION CENTER ADJUSTMENTS SOW BOX 1. Revised flooring SOW. DETAIL 1 – VISION CENTER DEMOLITION PLAN 1. Revised demo region to include Adjustments room. VC2 – SECTIONS AND DETAILS DETAIL 1 – MILLWORK SECTION (OWNER FURNISHED, GC INSTALLED) 1. Revised millwork depth from 1’-0” to 1’-0 ¾”. DETAIL 3 – MILLWORK SECTION (OWNER FURNISHED, GC INSTALLED) 1. Revised millwork depth from 1’-0” to 1’-0 ¾”. VC3 – EQUIPMENT (FOR REFERENCE ONLY) DETAIL 1 – VISION CENTER EQUIPMENT PLAN 1. Replaced equipment VC0016 with VC0012. 2. Corrected elevation tags. DETAIL 3 – EQUIPMENT – LOW TABLE 1. Added equipment tags. WAL-MART STORES, INC. STORE NO. 01878 02/24/21 PROJECT: Rexburg, ID CCD#1 PROJECT NO. 20296 Page 3 of 5 DETAIL 6 – EQUIPMENT – ADJUSTMENTS 1. Replaced equipment VC0016 with VC0012. EQUIPMENT SCHEDULE 1. Replaced equipment VC0016 with VC0012. FS1 – FUEL STATION FINISH PLAN 1. Updated sheet in its entirety. GA1 – FRONT GROCERY PLAN DETAIL 1 – FLOOR PLAN 1. Added digital display boards at Service Deli and Bakery. STRUCTURAL SHEET S0 – GENERAL STRUCTURAL INFORMATION DETAIL – GENERAL NOTES 1. Modified note 8.7 SHEET S5 – PLANS AND DETAILS DETAIL 5 – BACK-UP FRAMING AT PHARMACY CANOPY 1. Elevation – added base plate and anchors 2. Section a – revised base plate dimensions 3. Section b – added 1/2’’ space between hss and cmu 4. Section c – added 1/2’’ space between hss and cmu 5. Section d – added 1/2’’ space between hss and cmu DETAIL 7 – DRIVE-THRU CANOPY FRAMING SECTION 1. Revised detail reference 2. Revised adhesive anchor notes 3. Revised hss frame clip angles and attachments MECHANICAL SHEET M1.1 – ENLARGED MECHANICAL PLANS ROOFTOP UNIT SCHEDULE (LENNOX) 1. Added Schedule to sheet. AIR DEVICE SCHEDULE 1. Revised model number. ELETRICAL SHEET E1.1 – ENLARGED LIGHTING PLANS DETAIL 2 – VISION CENTER LIGHTING PLAN 1. Added three (3) ceiling occupancy sensors and two (2) relays for optical sales lighting. 2. Removed circuit LVC-23. 3. Connected new lighting to existing circuit serving optical sales area. 4. Added text note for ceiling mounted occupancy sensors. 5. Added callout to wiring diagram for occupancy sensors. SHEET E1.2 – LIGHTING DETAILS & SCHEDULES DETAIL 4 – OCCUPANCY SENSOR/RELAY WIRING DIAGRAM AND SETTINGS 1. Added detail to sheet. LIGHT FIXTURE SCHEDULE 1. Updated type 87 fixture to reflect current voltage conditions. WAL-MART STORES, INC. STORE NO. 01878 02/24/21 PROJECT: Rexburg, ID CCD#1 PROJECT NO. 20296 Page 4 of 5 SHEET E2 – OVERALL POWER PLAN KEYNOTES 1. Added keynote 16.507. DETAIL 1 – OVERALL POWER PLAN 1. Adjusted the Overall view scale to show fuel station. 2. Added digital signage SOW for the Auto center, Courtesy Desk, & Electronics. 3. Added SOW for future propane power to front of the store & fuel station. SHEET E2.2 – ENLARGED POWER PLANS KEYNOTES 1. Added keynote 16.493A. DETAIL 1 – COURTESY DESK POWER PLAN 1. Removed detail from sheet. DETAIL 6 – PHARMACY POWER PLAN 1. Added SOW for pharmacy digital signage. DETAIL 8 – BREAKROOM POWER PLAN 1. Added slat wall SOW for breakroom. SHEET E2.3 – ENLARGED POWER PLANS DETAIL 4 – VISION CENTER POWER PLAN 1. Added four (4) duplex outlets for optical sales power. 2. Added note “TYP” to callout for vision center power poles. 3. Removed one (1) duplex and one (1) data outlet from optical sales display board. SHEET E2.4 – ENLARGED POWER PLANS DETAIL 3 – TLE POWER PLAN 1. Added SOW for new tire balancer. DETAIL 2 – STOCKROOM POWER PLAN 1. Added circuit for RTU. SHEET E4.1 – PANELBOARD SCHEDULES PANEL SCHEDULE 1. PANEL L1D2 – Revised circuit 31. 2. PANEL L2D2 – Revised circuit 23. 3. PANEL L4D1 – Revised circuit 79. 4. PANEL LRX – Revised circuit 21. 5. PANEL LVC – revised circuit 20, removed circuit 23. 6. PANEL H4B – Revised circuits 32,34,36. SHEET GE2 – GROCERY POWER PLANS KEYNOTES 1. Added keynote 16.507. DETAIL 2 – GROCERY POWER PLAN 1. Added SOW for deli digital signage. REFRIGERATION SHEET R5 – REFRIGERATION SUBMITTALS 1. Revise OEM legends. WAL-MART STORES, INC. STORE NO. 01878 02/24/21 PROJECT: Rexburg, ID CCD#1 PROJECT NO. 20296 Page 5 of 5 SPECIFICATIONS APPENDIX A SECTION 06400 – ARCHITECTURAL WOODWORK - SECTION 2.2 - B 1. Revised Owner’s Supplier of Breakroom Casework. END CCD #1