Southfork Design Group LLC, 1066 N. Yellowstone Hwy., Rexburg, ID 83440, 208-852-6236
Memorandum
DATE: 12/01/20
TO: Andrew Ashmore
FROM: Ray McDougal, P.E.
SUBJECT: Renovation, Upper Floor, 49 E. Main St.,
Rexburg, Idaho
MEMO:
At your request, we have performed a site inspection of the project at the
above-referenced address regarding issues raised by the city building
inspection. Issues were identified at two locations where header support
trimmers bear on floor decking between joists. See Figure 2.
Figure 1. Area of Concern Photo.
Southfork Design Group LLC, 1066 N. Yellowstone Hwy., Rexburg, ID 83440, 208-852-6236
Bracing between joists is difficult due to plumbing through the joists. We
recommend bridging between the joists with steel because of the limited space
available due to the plumbing. See the detail below in Figure 2.
Figure 2. Bracing Detail.
If you have any questions or concerns, please let us know.