HomeMy WebLinkAboutAPPROVED CALCS - 21-00667 - 277 Jill Dr - Solar PanelsAuthor Name Author Email Author Phone No.:
Larry Beesley Larry.Beesley@rexburg.org 208-372-2176
Description : 277 Jill Dr - Solar Panels
Address : 277 Jill Dr
Record Type : Solar Panels
Document Filename : Stamped PE Calcs_DANIEL MONCAYO.pdf
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 21-00667
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Stamp Larry Beesley : Building Open 1 Approved - Building Inspector
Solar Panels
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
Titan Services
Attn.: To Whom It May Concern
re job:DANIEL MONCAYO
277 JILL DR
REXBURG, ID 83440, USA
Design Criteria:
Code:2018 IBC
ASCE 7-16
Live Load:20 psf
Ult Wind Speed:105 mph
Exposure Cat:C
Ground Snow:50 psf Min Roof Snow:NA
Current Renewables Engineering Inc.
Professional Engineer
info@currentrenewableseng.com
11/12/2021
The following calculations are for the structural engineering design of the photovoltaic panels and are valid
only for the structural info referenced in the stamped plan set. The verification of such info is the
responsibility of others.
After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads.
All mounting equipment shall be designed and installed per manufacturer's approved installation
specifications.
N SE
EC
D
IL
1 9 8 4 6
M
E
A
T H
H U
O GDAER I M NA
EXP. 2/28/23
Date :11/12/2021
Job Code: DANIEL MONCAYO
2 of 6
Roof Properties:
Roof Type =
Roof Pitch (deg) =
Mean Roof Height (ft) =
Attachment Trib Width (ft) =
Attachment Spacing (ft) =
Framing Type =
Framing Size =
Framing OC Spacing (in.) =
Section Thickness, b (in.) =
Section Depth, d (in.) =
Section Modulus, Sx (in.^3) =
Moment of Inertia, Ix (in.^4) =
Framing Span (ft) =
Deflection Limit D+L (in.) =
Deflection Limit S or W (in.) =
Attachments Pattern =
Framing Upgrade =
Sister Size =
Wood Species =
Wood Fb (psi) =
Wood Fv (psi) =
Wood E (psi) =
CD (Wind) =
CD (Snow) =
CLS =
CM = Ct = CL = Ci =
CF =
Cfu =
Cr =
F'b_wind (psi) =
F'b_snow (psi) =
F'v_wind (psi) =
F'v_snow (psi) =
M_allowable_wind (lb-ft) =
M_allowable_snow (lb-ft) =
V_allowable_wind (lbs) =
V_allowable_snow (lbs) =1501
1564
2088
207
2176
1428
288
1.15
1987
1.2
1.00
1.00
1.0
1.6
1.15
180
1600000
DF #2
900
Adequate
NA
1.47
Fully Staggered
11
2.2
13.1
47.6
1.5
7.25
2x8
24
4
Truss
13
2.75
Shingle
29
Roof 1
Date :11/12/2021
Job Code: DANIEL MONCAYO
3 of 6
E' (psi) =
Load Calculation:
Panels Dead Load (psf) =
Roofing Weight (psf) =
Decking Weight (psf) =
Framing Weight (psf) =
Misc. Additional Weight (psf) =
Existing Dead Load (psf) =
Total Dead Load (psf) =
Ground Snow Load, pg (psf) =
Min Flat Snow, pf_min (psf) =
Min Sloped Snow, ps_min (psf) =
Snow Importance Factor, Ic =
Exposure Factor, Ce =
Thermal Factor, Ct =
Flat Roof Snow, pf (psf) =
Slope Factore, Cs =
Sloped Roof Snow, ps (psf) =
Ultimate Wind Speed (mph) =
Directionality Factor, kd =
Topographic Factor, kzt =
Velocity Press Exp Factor, kz =
Ground Elevation Factor, ke =
Velocity Pressure, qz (psf) =
Array Edge Factor, γE =
Solar Equalization Factor, γa =
External Pressure Up, GCp_1 =
External Pressure Up, GCp_2 =
External Pressure Up, GCp_3 =
External Pressure Down, GCp =
Design Pressure Up, p_1 (psf) =
0.8
-26.7
-1.8
-2.2
1.25
0.70
-1.5
0.85
1.00
20.4
105
0.85
1.0
Roof 1
38
Wind Load Calculations:
37.8
1.00
Roof 1
1.2
Snow Load Calculations:
50
NA
NA
1.0
0.9
7.2
10.2
1.2
1.0
3.0
2.0
Dead Load Calculations:
3.0
Roof 1
1600000
Date :11/12/2021
Job Code: DANIEL MONCAYO
4 of 6
Design Pressure Up, p_2 (psf) =
Design Pressure Up, p_3 (psf) =
Design Pressure Down, p (psf) =
Hardware Checks:
Ref. Widthrawal Value, W (lb/in) =
(CM = Ct = Ceg = 1.0) CD =
Adjusted Widthrawal Value, W' (lb/in) =
Lag Penetration, p (in.) =
Allowable Widthrawal Force, W'p (lbs) =
Applied Uplift Force (lbs) =
Uplift DCR =
Ref. Lateral Value, Z (lbs) =
(CM = Ct = CΔ = Ceg = 1.0) CD =
Adjusted Lateral Value, Z' (lbs) =
Applied Laeral Force (lbs) =
Angle of Resultant Force, α (deg) =
Adjusted Interaction Lateral Value, Z'α (lbs) =
Lateral DCR =
Roof Framing Checks:
LC1: D+S
Applied Moment (lb-ft) =
Applied Shear (lbs) =
Allowable Moment (lb-ft) =
Allowable Shear (lbs) =
Moment DCR =
Shear DCR =
LC2: D+0.6W
Applied Moment (lb-ft) =
Applied Shear (lbs) =
Allowable Moment (lb-ft) =
Allowable Shear (lbs) =
Moment DCR =
Shear DCR =
0.18
0.10
2176
2088
400
218
0.62
0.35
1564
1501
529
Force Checks:
Roof 1
969
504
0.43
218
47
1.15
311
0.22
270
1064
-237
426
2.5
266
1.6
Lag Screw Checks:
Roof 1
16.0
-32.1
-39.2
Date :11/12/2021
Job Code: DANIEL MONCAYO
5 of 6
LC3: D+0.75(S+0.6W)
Applied Moment (lb-ft) =
Applied Shear (lbs) =
Allowable Moment (lb-ft) =
Allowable Shear (lbs) =
Moment DCR =
Shear DCR =
LC4: 0.6D+0.6W
Applied Moment (lb-ft) =
Applied Shear (lbs) =
Allowable Moment (lb-ft) =
Allowable Shear (lbs) =
Moment DCR =
Shear DCR =
LC1: D+L
Deflection (in.) =
Deflection Limit (in.) =
Deflection DCR =
LC2: S
Deflection (in.) =
Deflection Limit (in.) =
Deflection DCR =
LC3: W (Down)
Deflection (in.) =
Deflection Limit (in.) =
Deflection DCR =
LC4: W (Up)
Deflection (in.) =
Deflection Limit (in.) =
Deflection DCR =
Seismic Check:
Wall Weight (psf) =
Tributary Wall Area (ft2) =
Total Wall Weight (lbs) =
Roof Weight (psf) =
1200
20400
7
0.01
Existing Weight:
17
-0.02
1.47
1.47
0.01
0.04
0.01
0.07
1.47
2.2
0.01
Deflection Checks (Service Level):
Roof 1
0.03
0.09
0.05
2176
2088
199
109
0.42
0.24
2176
2088
924
504
Date :11/12/2021
Job Code: DANIEL MONCAYO
6 of 6
Roof Area (ft2) =
Total Roof Weight (lbs) =
Total Existing Weight (lbs) =
PV Panel Weight (lbs) =
Number of Panels =
Total Additional PV Weight (lbs) =
(Existing W + Additional W)/(Existing W) =102%
The increase in weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
Limits of Scope of Work and Liability:
Existing structure is assumed to have been designed and constructed following appropriate codes at
time of erection, and assumed to have appropriate permits. The calculations produced are only for the
roof framing supporting the proposed PV installation referenced in the stamped planset and were
completed according to generally recognized structural analysis standards and procedures, professional
engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or
were not observable during time of inspection are not included in this scope of work. All PV modules,
racking, and mounting equipment shall be designed and installed per manufacturer's approved
installation specifications. The Engineer of Record and the engineering consulting firm assume no
responsibility for misuse or improper installation. This analysis is not stamped for water leakage.
Framing was determined based on information in provided plans and/or photos, along with engineering
judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and
spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the
Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that
there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter
(where applicable) and notify the Engineer of Record of any concerns prior to starting construction.
Additional PV Weight:
54
19
1035
Weight Increase:
3500
25361
45761