HomeMy WebLinkAboutBroadband details UPDATED-Layout1ScaleProject Name and AddressEXBURGRPlot ScaleDateDescriptionSheetFirm Name and AddressCITYOFAmerica's Family CommunityCITY
OF
REXBURG,IDAHOESTABLISHEDI
883CITY OF REXBURGBROADBAND DETAILSGENERAL NOTESNOTES3/29/20221 = 2AS NOTED11.Distribution fiber conduit shall be located within the Communication Trench as shown in the City of Rexburg's Engineering Standards.a.Unless otherwise determined, fiber conduit must be laid on both sides of the street.Distribution fiber conduit shall be direct bury 4-Way 18mm/14mm Traceable Dura-Line FuturePath (or equivalent).2.All distribution fiber conduit shall have a locate wire grounded at each handhole.3.Minimum depth of cover over conduit shall be 36”, unless otherwise approved by the City Engineer.4.Distribution Boxes and /or Handholes shall be placed:a.Single Family Residences: a 14” x 19” x 12” Carson HDPE (or equivalent) handholes shall be placed in between single-family residences onthe lot line with the intent to serve two single family homes from each pull box.b.Subdivisions: for multi-home developments, A 24” x 36” x x24” T22 Duralite (or equivalent) handholes shall be placed at the corner of thiseasement lot.c.Multifamily Residences:i.Duplexes & Fourplexes: 24” x 36” x 24” Duralite T22 (or equivalent) handholes shall be placed in between buildings with the intent to serveall the residences from the handhole. For fourplexes and apartments the builder is encouraged to plan out the path of the drop(s) andinclude a 2” PVC stub-out from the building to a point that is past sidewalks, patios, driveways, and other hard surfaces so the drop can beinstalled without boring or cutting concrete.ii.Town Homes & 4 or more Apartment Buildings: a 24” x 36” x x24” T22 Duralite (or equivalent) handholes shall be placed at the corner ofthe lot where practical. A 10'x 10' easement shall be granted to the City for additional fiber infrastructure adjacent to the handholes (thehandholes may be within this 10' x10' area).5.A 10'x 10' easement shall be granted to the City for additional fiber infrastructure if needed.6.Fiber conduit shall be stubbed-out to the edges of developing property to allow for future fiber optic service to adjacent property and to providepathways to the overall system.a.All empty conduits should be plugged as construction takes place.b.Individual house/business fiber service lines shall be labeled and stubbed-out to lots adjacent to new streets to eliminate the need forfuture excavation work in new streets.6.Developers shall be responsible for installation and purchase of conduit, distribution boxes and handholes for direct bury 4-Way DuraLine18mm/14mm Traceable FuturePath (or equivalent) for the proposed new development.7.Acceptance of the fiber conduit are based on the following criteria:a.Bedding and backfilling of trenches shall be constructed in accordance with current City standards or otherwise specified by the CityEngineer.b.Perform all testing in the presence of the City Engineer or his assigned agent.Placeholder for testing and inspection checklist itemsc.A signed “Letter of Acceptance” from the City will be required prior to final surface reconstruction (i.e.: paving, landscaping, etc.).8.The developer will construct, and the City will own, and the City's Third-Party Network Administer will operate and maintain the facilities withinthe easements or rights-of-way.GENERAL NOTES: