HomeMy WebLinkAboutSPECIAL INSPECTION FINAL REPORT - 21-00353 - Teton River Flats Community Housing - 4Plex - B7
4103 E 605 N Suite 1 • Rigby, ID 83442 • 208.881.0081
March 10, 2022
Eric Albaugh
Headwaters Construction
RE: FINAL REPORT OF REQUIRED SPECIAL INSPECTIONS Building 11 aka B7
Project: Teton River Flats, Rexburg, ID
In accordance with Section 1704 of the International Building Code (IBC) and the project documents
special inspection has been provided for the following items:
1. Soils – Bottom of excavation, footing backfill and structural backfill against foundation walls.
2. Concrete – Concrete testing and inspection of the reinforcement for the footings, foundations, and
slabs on grade.
3. Post Installed Anchors – Size, depth and cleanliness of drilled holes and epoxy type used.
Based upon inspections performed and our substantiating reports, it is our professional judgment that, to
the best of our knowledge, the inspected work was performed in general accordance with the approved
plans, specifications, and applicable workmanship provisions of the IBC.
Jacob Christensen
Laboratory Manager
208.881.0081
Jchristensen@connectengr.com