Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:30 PM Client: Headwater's Construction Contractor: Alpha Concrete End Time: 05:00 PM Inspection Type(s): Concrete Placement Concrete Reinforcement Location(s): Northeast building. Observations/ Remarks: I arrived when the concrete driver had approximately 5yds left of concrete. The contractor did not schedule testing before the pour, which caused a lapse in observation of the pour. I tested the concrete and found the results to be within tolerance. I observed the contractor wet setting the anchor bolts and leaving large gaps between the concrete and bolts. I informed the foreman that that practice was not acceptable, and that he needed to fill in the gaps to maintain structural integrity. I observed the contractor rectify the issue. I observed the contractor utilizing a mechanical vibrator to consolidate the concrete. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 2 Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 3