HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date:
06/07/2021
File Name:
20075DFR06072021DFA
Inspector's Signature:Inspector's Name:
D. Aust
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/09/2021
e875ea11521d0ef1-1623108247101 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Teton River Flats
Start Time:
02:30 PM
Client:
Headwater's Construction
Contractor:
Alpha Concrete
End Time:
05:00 PM
Inspection Type(s):
Concrete Placement
Concrete Reinforcement
Location(s):
Northeast building.
Observations/ Remarks:
I arrived when the concrete driver had approximately 5yds left of concrete. The contractor did not
schedule testing before the pour, which caused a lapse in observation of the pour. I tested the
concrete and found the results to be within tolerance. I observed the contractor wet setting the anchor
bolts and leaving large gaps between the concrete and bolts. I informed the foreman that that practice
was not acceptable, and that he needed to fill in the gaps to maintain structural integrity. I observed
the contractor rectify the issue. I observed the contractor utilizing a mechanical vibrator to consolidate
the concrete.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
06/07/2021
File Name:
20075DFR06072021DFA
Inspector's Signature:Inspector's Name:
D. Aust
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/09/2021
e875ea11521d0ef1-1623108247101 2
Inspection Date:
06/07/2021
File Name:
20075DFR06072021DFA
Inspector's Signature:Inspector's Name:
D. Aust
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/09/2021
e875ea11521d0ef1-1623108247101 3