Loading...
HomeMy WebLinkAboutEARTHWORK INSPECTION 5 - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date: 06/28/2021 File Name: 20075DFR06282021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 F9469782-3B3F-408F-92D5-30950323DCE0 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:45 PM Client: Headwater's Construction Contractor: Thompson End Time: 04:30 PM Inspection Type(s): Earthwork Inspection Location(s): Buildings B7 and D1 foundation pads Observations/ Remarks: Arrived just after 3pm, talked to Don and one of his tractor operators. I tested the 1st lift of pit run on the building D1 foundation pad, then tested the 3/4” base on the top of B7 footing elevation of foundation pad. Informed Don, Manny and the tractor operator of the passing results. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/28/2021 File Name: 20075DFR06282021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 F9469782-3B3F-408F-92D5-30950323DCE0 2