Loading...
HomeMy WebLinkAboutEARTHWORK INSPECTION 3 - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date: 06/11/2021 File Name: 20075DFR06112021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:30 AM Client: Headwater's Construction Contractor: Headwaters End Time: 10:00 AM Inspection Type(s): Earthwork Inspection Location(s): Building B7, interior foundation pad Observations/ Remarks: Arrived at 9am, tested the pit run lift and they passed quickly. Don said I can return in 1-2 hours to test another lift on the same foundation. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/11/2021 File Name: 20075DFR06112021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 2