HomeMy WebLinkAboutEARTHWORK INSPECTION 3 - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date:
06/11/2021
File Name:
20075DFR06112021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/11/2021
8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Teton River Flats
Start Time:
08:30 AM
Client:
Headwater's Construction
Contractor:
Headwaters
End Time:
10:00 AM
Inspection Type(s):
Earthwork Inspection
Location(s):
Building B7, interior foundation pad
Observations/ Remarks:
Arrived at 9am, tested the pit run lift and they passed quickly. Don said I can return in 1-2 hours to
test another lift on the same foundation.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
06/11/2021
File Name:
20075DFR06112021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/11/2021
8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 2