Loading...
HomeMy WebLinkAboutEARTHWORK INSPECTION 2 - 21-00353 - Teton River Flats Community Housing - 4Plex - B7Inspection Date: 06/10/2021 File Name: 20075DFR06102021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 1E4C23D7-B129-4A43-8482-342B6F07984D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 01:45 PM Client: Headwater's Construction Contractor: Headwaters End Time: 03:30 PM Inspection Type(s): Earthwork Inspection Location(s): Building B7 interior foundation pad. Observations/ Remarks: Arrived at 2pm, tested the 1st lift of pit run. Lots of water was added before compaction, so the lift passed fairly quickly. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: