Loading...
HomeMy WebLinkAboutPLAN REVIEW RESPONSE - 17-00667-682 - Providence Squarer`. GLE ROCK NG_M___._ERJNG CIVIL PLANNING -6 SURVEYING IDAHO FALLS (203) 542-26b5" REXBURG (208) 359-2655 December 18, 2017 Provi'dence Square Apartments Response letter to City of Rexburg review: P&Z - Response from Eagle dock Engineering I . Storage Units have been removed from plans. 2. Parking notes have been updated. There are now 284 units x 2 = _568 parking stalls required and we have 570 total. 3. Parking on east side of clubhouse is two-way direction, 24' in width, 4. Handicap ramp details and grades have been revised to meet min, slope. 5. Sidewalk to access public. right of way to canal bridge has been added. b. Sidewalk has been added to connzct apartments and clubhouse (ADA ramps shown). 7. 7` landscape strip between curb and sidewalk along 5TH West has been added. Public Works - Response from ]Eagle Rock. Engineering I _ Bollards have been mored to front wail of trash enclosure. ?. Elevations on bridge and on nlanholes ars now matching. 3. Bridge sheets have been revised to +67' and Bride plans wfll now be separate project_ 4_ 7' Landscape strip has been added along 5 TH West and connects to 4_f" Wby bridge- 5. Existing driveway curb has already been tom. out. 6. No access shown to S' W. 7. SS manhole in 5TI W. is now shown as existing. 8. Valve on C-4 has been removed. 9. Storm line has been moved to not go Through infiltTators. 10. Electric has it in their pians.