HomeMy WebLinkAboutINFRASTRUCTURE & LANDSCAPE PLAN 2.22.22 - 22-00007 - 253 W 2nd S - Sundance Bldg C6/1
I
CL SEW MH DWN 11.25 S 11.330 E 11.30
I
15TIN6 IMANHOLE
RIM EL=4863.a
E INVERT = 4852.60
N INVERT = 4852.55
5 INVERT ;= 4852.60
X
�L
tiCb
14111)1
bw FW 4P/E0
k� ti
3
WM
BC cc
Tl CC
SE
CC
cc
�o
I
I
W
L%l
w
WEST 2ND SOUTH
6„TAT 6//W 6`/W W'W 6„W
HOT TAP EXIST. 12"
INSTALL VALVE
12" EXI5TIH5 CITY WATER V , / / w � / / w / / w 6//w xiW
63.8
63.60
ATGH
ATGH
INSTALL FH
OCT 2021
8 VALVE
W
F_
U
0
~
V)
V
ATGH
(.'CNS1JLTANTS.
63.91
-st �tr_-turc
Enqmeerng
1U10 L oln Mood
kho ally, 3 C3s01
Tel (203' 227-34Cz
Fax 78' ,/7-3,4(1`,
MECHANICAL ENGINEERING
64.75
0�
m
o ete 3c -o 83_
z
Q
Fax:(1C8;
ELECTRICAL ENGINEERING
Po,/ -e E -ginesrinV
MATG
Poet I rc 8`0
AT
=nx. '2',',S' -32-14.35
64.91
64.9-Q
dJ
U
0
CD C)Q
64.05
6 .O?
z
zj
5 FRONT YARD SETBACK () 0)
J
65.33 65.33
8'-o"
��• 64.33 64.33
«fYYY
o0
i
INSIDE BLDG p
iETER
~
3" DOMESTICHATER WATER v
j�///%i•
z
-
A
Y 65.33 -
6" FIRE LINE NEW 6" 62.ba�
0
v
o Q 65.33 F.L. Gg00
o
AREA #1
J
w 5,212 FT 2 SURF G
445 FT' 5TORACGE NEEDED
I
6 GHAME3ER5 REQUIRED A 74A FT'
�I6' -O" 24'-O" I6' -O" I6' -O"
W
Z s aJ 6 B4P.18
O
,z 64.3W 0 64.33 64.33
C/)
z m
U�
%
0
1z
® t_
AREA #2
�
FT2 SURFACE AFZE
-4 FT
/ I01& FT' STORAGE NEEMII
14 GHAMBER5 REQU I REIN 74A FT
Q
Fq8"
55 ® Lc
MI
z m
4865.35 m
p 8" INVERT = 486018 =' O Lu
v
W
V)
�
Q ® 1 2.Og
2.8G Z
Q
O WLu
V 1zLL
_
10
10 m 's
a -
I
❑ p o
i
1U
Z
- cv X
Q
D
O 11.1
I
REVISION:
64.18
BP LIP
0
6'
Q
1z I S' -O" 24'-0" 16'-0" 16'-0" 24'-0" 16'-0" 16'-0"
1j"
Iq3
CHECKED BY:
°
1j"
FEB 2022
PLOT DATE: 2-22-22
10 10
FILE: SUNDANCE BUILDING C SITE
XREF (002)
i
DUMPSTER
OF a
12
6 62.89
ZAREA
10
64.62 µ3
AREA #42
10,8 2 FT2 SURFACE AREA
p 4,024 FT 5URFAGE AREA 3
344 FT' STORAGE NEEDED a31 FT STORAGE NEEDED
N 5 GHAMBER5 REQUIRED AT 74A FT3 13 GHAMBERS REQUIRED AT 74A F2T3 24.33
N LIP1 LIP
m
19
I
O T 64.24 64.24
LIP LIP 411
(�
' 6434 L4P34 b14
LIP
EXISTING FENCE
LIP -LIP
LIP � 11
A A #5
10
,n
q,l a FT RFA E ARE
LIP 91 - 7 FT3 TORA E NEE W
11 HAMS R5 RE UIRED FT3
Nq
6 17 51TE PLAN - LAYOUT
O SCALE: I" = 20'-0" NORTH
62.89 Z
N
O
p r
X
!u
�5
64.15
LIP
A BW
�9
i
lb
0l"
�7 FNCN "
d)_
4.17 64.1 64.11 e'��
IP LIP L1P 230.00 EXISTING FENCE
6k
-
.L4LIF;
H❑tj
\ie_
P
w
4.17
64.1-7
LIP
64.
�
�
�
�6p,•
L I
6�
0O
G
25
4.15
O r
�Y
O
r
64.1-7
m
LP
AREA #1 AREA #2
I 115,01 E SURFACE ARES 14,082 FT 2 SUR GE AREA
1,342 F 3 STORAGE NE ED 1,204 FT3 STORA NEEDED
ZONI N6 INFORMATION
ZONE: H I GH DEN51 TY RF -51 DENT 1 AL (HDR2)
FF -DF -57R I AN EMPHA515 D 15TR I OT2
1.354 AORE5 = 60125-' 5.F.
DEN51 TY ALLOAED : 42 UN I T5/AORE
BU I LD I NG HE I GHT ALLOAED : 55 FEET
LOT COVERAGE ALLOkNED: 50%
LOT AREA = 60125-7 5.F. X 20% =12,05-1 5.F.
LAND50APE AREA=-7,0cf0 5.F. = 55.2%
75% PARK I NCG PROVIDED
5' FRONT YARD REaU I RED
-- 52 UN I T5 PROVIDED -�
1 Iz12 TOTAL BED5
4 5TOR I F-5
MAIN LEVEL 5-F. 111650
TOTAL 5.F ./BUILDING = 46,-7205.F .
TYPE V-A 0ON5TRUOT I ON
15R FIRE 5U PRF -55I ON
144 PARKING 5FACE5 REaU I RED
4-7 FULL 51 ZE 5FAOE5 REaU I RED lel I TH
"
DEVELOPER OPTION
146 5PAOF-5 PROVIDED
50 FULL 51 ZE 5FACE5 PROVIDED
5 DUMF5TER
5TREET TREE5 20 FEET ON CENTER
5' PF_DF_5TR I AN NALK
PEDE5TR1 AN AREA5 WITH B NOS 5
N075
10 ALL WORK 15 TO BE DONE IN ACCORDANCE TO 017'r
OF REXBURG STANDARDS
20 ALL WATER LINE 15 TO BE OLASS 50 DUOT I LE IRON,
AVViA 0-151 IN PUBL I O ROW. 12 GAUGE INSULATED
OOPPER WIRE TO BE INSTALLED ,ABOVE MAIN LINES
AND SERV I GES UP TO THE METER.
0 ALL SEWER LINE PIPING SHALL BE A57M D-3034
SDR 35
WW MINIMUM COVER OVER WATER LINES SHALL BE 6 FEET.
0 WATER LINE MUST HAVE A MINIMUM SEPARATION OF 10
FEET FROM ANY SANITARY SEWER OR STORM SEWER
AS PER I SPWC, STANDARD DRAW I N6 SD -40-7. CROSS
AT RIGHT ANGLES WITH FULL PIPE SECTIONS AND A
MINIMUM OF 1.5 VERTICAL SEPARATION.
00 THRUST BLOCKS SHALL BE PLACED AT ALL
D I REOT I ON CHANGES IN THE PRESSURE PIPE.
-01 ALL EX 1ST I NG WATER AND SEWER SERVICES ARE TO
BE TERMINATED AS PER O 1 TY STANDARDS.
,NC COR W S
Cwmw
OCT 2021
W
F_
U
0
V)
V
(.'CNS1JLTANTS.
STRUCTURAL ENGINEERING
-st �tr_-turc
Enqmeerng
1U10 L oln Mood
kho ally, 3 C3s01
Tel (203' 227-34Cz
Fax 78' ,/7-3,4(1`,
MECHANICAL ENGINEERING
0�
o ete 3c -o 83_
Tel '228) '3-b ,
Fax:(1C8;
ELECTRICAL ENGINEERING
Po,/ -e E -ginesrinV
1832 Ecs entc S-eet
Poet I rc 8`0
Te (2 �8) 4439
=nx. '2',',S' -32-14.35
U
0
CD C)Q
z
zj
J
o0
i
~
z
W
Q
o
J
I
o
W
W 0
C/)
U�
zQ
0
�
Q I
Q
z m
W
V)
�
Q
_
J
a -
I
1U
Z
O
d
Q
D
REVISION:
DRAWN BY:
JOB NO:
1j"
Iq3
CHECKED BY:
DATE:
1j"
FEB 2022
PLOT DATE: 2-22-22
DRAWING NO.
FILE: SUNDANCE BUILDING C SITE
XREF (002)
OF a